The civic record
Read. Follow. Verify.Proposed New Home Construction at 220 S. Cliff Street
Record date · June 1, 2026
Track this bill to get notified when it advances a stage. One tap to stop, anytime.
What This Bill Does
The city is reviewing a request to build a new one-and-a-half-story house on a vacant lot in the Tenth Street Historic District. Planning staff recommend approval provided the applicant meets specific design requirements regarding windows, foundation height, and building materials.
The approval of this project determines the architectural standards for a new residential building in a protected historic district, impacting the property owner's construction plans and the neighborhood's aesthetic compliance.
Who It Affects
Groups the bill's text affects, as described in the record. Being affected is not a position for or against it.
Rafael Alfaro
The applicant must modify construction plans to meet city design requirements to receive approval.
Tenth Street Historic District residents
The new construction will alter the physical landscape of the neighborhood according to historic preservation standards.
Key Facts
- The applicant seeks a Certificate of Appropriateness to build a new one-and-a-half-story residential building on a vacant corner lot.
- Staff recommend approval contingent on specific design conditions including all-aluminum windows (1 over 1 configuration).
- The foundation must be at least 15 inches above grade and use either pier and beam or concrete posts and beam construction.
- Driveways, walkways, and steps must be constructed using brush-finished concrete.
Show all 10 facts
- Design requirements include increasing the size of the front dormer and aligning window and door headers on all sides.
- Mullions between paired windows must be four to six inches wide.
- The Task Force noted the foundation drawings currently incorrectly show a slab-on-grade foundation.
- The Task Force identified a potential issue with the back door height appearing too short.
- The application was filed on April 27, 2026.
- The project must comply with City Code Section 51A-4.501(g)(6)(C)(ii) and Secretary of the Interior’s Guidelines.
Frequently Asked Questions
What is a Certificate of Appropriateness?
What happens if the applicant does not follow the staff's conditions?
What else do you want to know?
News Coverage
Follow the record
Votes, people, money & the original sourceFull breakdown
Who this bill affects and the strongest case for and against it, written only from the bill’s own text.
Discoveries
Patterns POLISCOPE noticed across the record. These are observations to investigate, not conclusions.
Foundation Requirement Discrepancy
The applicant's current drawings show a slab-on-grade foundation, which conflicts with the staff's requirement for a pier and beam or concrete post and beam foundation.
Connected Entities
Sources
webapi.legistar.com
Analysis Score
0–100- Significance30How much this matters to a regular citizen
- Controversy10Intensity of disagreement among stakeholders
- Entertainment5Compellingness for a non-policy-wonk reader
- Buzz10Current news / social attention level
Publisher tools
