POLISCOPE

The public record

KEYBISCAYNE (MIAMI-DADE COUNTY) · LOCALHeld · official record pendingPartial coverage

Virtual Special Council Meeting June 30, 2020

Tuesday, June 30, 2020 · Government meeting record

The 30-second read

Record incomplete

Virtual Special Council Meeting June 30, 2020

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Record text

No transcript is held for this meeting. Recording: Watch video

Showing the first 60,000 of 1,188,709 characters. The full document is at the source.

VILLAGE OF KEY BISCAYNE Vil/age Coancil Michael'W Davey,Malor Bfett Moss, Vice Mayr Luis Lauredo Edward London Allison McCormick Katie Petros Ignacio J. Segurola 6:00 P.M 1. CALL TO ORDER/ROLL CALL OF MEMBERS 2. PLEDGE OF ALLEGIANCE 3. BRIEF COMMENTS BY COUNCIL AGENDA: APPROVAL/DEFERRALS/ADDITIONS/DELETIONS SUB STITUTIONS/WITHDRAWAL PUBLIC COMMENTSz There is a (3) minute time limit for each speaker during public comment. Your cooperation is appreciated in observing the (3) minute rule. If you have a matter you would like to discuss during public comments, a request form is qvailable at the entrance of the Council Chambers, please fill-it in and return it to the Village Clerk prior to the start of the meeting. When your name is called, please come forward to the podium, STATE YOUR NAME, ADDRESS, IF YOU ARE A HIRED CONSULTANT OR VILLAGE EMPLOYEE AND/OR IF ENGAGED IN LOBBYING ACTIVITIES AND/OR REPRESENTING AN ORGANIZATION FORTHE RECORD. 6. SPECIAL PRESENTATIONS: A. PRESENTATION OF COMPREHENSIVE ANNUAL FINANCIAL REPORT (CAFR) BY MARCUM, LLP. CONSENT AGENDA z (Consent agenda items are those which are routine, do not require discussion or explanation prior to Village Council action, or have already been discussed and/or explained and do not require further discussion or explanation. Items can be removed from the consent agenda by the request on an individual Council member for independent consideration provided such request is made during the approval/deferrals/additions/deletions substitutions/withdrawals segment of the meeting, prior to the vote on the consent agenda.) A. A CAPITAL AUTHORIZING RESOLUTION OF TAB 1 THE VILLAGE COLINCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, SELECTING FLORIDA ENGINEERING AND 88'West Mclntyre Street . Suite 2oo . Key BiscaynpSprida33I4g . (305) 365-5506. Fax (305) 355-8914 MISSION S'lAl'|jMEN't':"'l'O PROVIDEA SAt E, QUALI|Y CUMMUNIf Y hNVll{UNMLN l. l(ALL ISLA|\LrhRS I HRULIGH l(851'UI\5lBLh GUV!,R[lNlBNl:" www.keybiscayme.fl . gov SPECIAL VIRTUAL COUNCIL MEETING TUESDAY, JLINE 3O,2O2O 4 5 l

VILLAGE OF KEY BISCAYNE B DEVELOPMENT CORP. FOR CONSTRUCTION OF THE SAFE ROUTES TO SCHOOL (SRTS) PROJECT rN Af[ AMOUNT NOT TO EXCEEn $485,300; PROVIDING FOR AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATE. (VILLAGE MANAGER) A RESOLUTION OF THE VILLAGE COUNCIL TAB 2 OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, APPROVING AN AGREEMENT WITH KCI TECHNOLOGIES,INC. FOR CONSTRUCTION, ENGINEERING, AND INSPECTION (CEI) SERVICES FOR THE SAFE ROUTES TO SCHOOL (SRTS) PROJECT rN AN AMOUNT NOT TO EXCEED $180,000; PROVIDING FOR AUTHORZATION; AND PROVIDING FOR AN EFFECTIVE DATE (VILLAGE MANAGER) C. D E. F. MAY I9,2O2O MINUTES (REGULAR COUNCIL MINUTES) NOVEMBER 8, 2017 MINUTES (zoNrNG coDE REVTEW WORKSHOP) FEBRUARY 6, 2OI8 MINUTES (MONUMENT SrGN WORKSHOP) MARCH 4,2019 MINUTES (BEACH NOURTSHMENT WORKSHOP) MARCH I9,2OI9 MINUTES (LOCAL PLANNING AGENCY) JUNE 26,2018 MINUTES (SPECIAL COLINCIL MEETING) NOVEMBER 5, 2019 MINUTES (SPECIAL COUNCIL MEETING) TAB 3 TAB 4 TAB 5 TAB 6 TAB 7 TAB 8 TAB 9 G H I. A. 8. APPROVAL OF MINUTES: JLTNE 9,2020 MINUTES (REGULAR COUNCIL MEETING) TAB 10 9 ORDINANCES: (NO LATER THAN 7:30 P.M.) A. FIRST READING: 1.) AN ORDTNANCE OF THE VTLLAGE OF KEY TAB 11 BISCAYNE, FLORIDA, AMENDING CHAPTER 5, (PROPERTY MAINTENANCE STANDARDS'' OF THE VILLAGE CODE OF ORDINANCES RELATING TO SOLID WASTE, RECYCLING, AND 2 qf 5 MISSION STATEMENT "TO PROVIDE A SAFE, QUALITY COMMUNITY EI.IVIRONMENT FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT.'

VILLAGE OF KEY BISCAYNE CIVI VIOLATIONS; PROVIDING FOR SEVERABILITY; PROVIDING FOR CODIFICATION; PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE. (VILLAGE MANAGER) 2.) AN ORDINANCE OF THE VILLAGE COLTNCTL TAB 12 OF KEY BISCAYNE, FLORIDA, PROVIDING FOR THE SUBMISSION TO THE VILLAGE ELECTORS FOR APPROVAL OR DTSAPPROVAL, rN ACCORDANCE WITH SECTTON 6.02(AXr) OF THE VILLAGE CHARTER, A PROPOSED AMENDMENT TO SECTION 4.10 OF THE VILLAGE CHARTER, ENTITLED (BORROWING' TO PROVIDE THAT GENERAL OBLIGATION BONDS APPROVED BY THE ET,ECTORATE BE EXCLUDED FROM THE VILLAGE CHARTER'S LIMIT ON DEBT; PROVIDING REQUISITE BALLOT LANGUAGE FOR SUBMISSION OF THE CHARTER AMENDMENT TO THE ELECTORATE; CALLING A SPECIAL ELECTION ON THE PROPOSED CHARTER AMENDMENT TO BE HELD ON TUESDAY, 3RD DAY OF NOVEMBER, 2020, IN CONJUNCTTON WrTH THE GENERAL ELECTION BEING HELD ON SAID DATE; PROVIDING FOR VOTING AT THE POLLS; PROVIDING FOR NOTICE OF ELECTION; PROVIDING FOR REQUISITE BALLOT LANGUAGE; PROVIDING FOR INCLUSION IN THE CHARTER; AND PROVIDING FOR AN EFFECTIVE DATE. (VILLAGE COUNCIL) 10. RESOLUTIONS: A. A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, SELECTING TAB 13 AS THE VILLAGE CLERI( PROVIDING FOR AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATE. (VILLAGE COUNCIL) B. A RESOLUTION OF THE VILLAGE COUNCIL OF THE TAB 14 VILLAGE OF KEY BISCAYNE, FLORIDA, CALLING FOR A BOND REFERENDUM ELECTION REGARDING THE ISSUANCE OF GENERAL OBLIGATION BONDS BY THE VILLAGE IN AN AMOUNT NOT TO EXCEED $-,OOO,OO() FOR THE PURPOSE OF FINANCING THE COSTS OF MITIGATING THE EFFECTS OF SEA LEVEL RISE AND FLOODING, PROTECTING THE VILLAGE'S BEACHES AND SHORELINE, AND HARDENING INFRASTRUCTURE TO THE EFFECTS OF HURRICANES; CALLING A SPECIAL ELECTION ON THE MATTER TO BE HELD ON NOVEMBER 3RD, 2O2O; PROVIDING REQUISITE BALLOT LANGUAGE FOR SUBMISSION TO THE ELECTORATE; PROVIDING NOTICE OF ELECTION; AND PROVIDING FOR AN EFFECTIVE DATE. (VILLAGE COLTNCIL) C. A RESOLUTION OF THE VILLAGE COI-INCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, SELECTING HILLTOP SECURITIES, INC. FOR FINANCIAL ADVISOR TAB 15 SERVICES; MrssroN STATEMENT "TO PROVIDE A SAFE, QUALTTY COMMUNTTY -Jol 5 pvufr.oNruerur FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT."

VILLAGE OF KEY BISCAYNE PROVIDING FOR AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATED. (VILLAGE MANAGER) D. A RESOLUTION OF THE VILLAGE COUNCIL OF THE TAB 16 VILLAGE OF KEY BISCAYNE, FLORIDA, PROVIDING FOR A REFERENDUM ELECTION IN ACCORDANCE WITH SECTION 4.15 OF TIIE VILLAGE CHARTER, SO AS TO PRESENT TO THE QUALIFIED ELECTORS OF THE VILLAGE THE MATTER OF APPROVAL OF THE CREATION OF A NEW ZONING DISTRICT ENTITLED "SENIOR LIVING DISTRICT',, CALLING A SPECIAL ELECTION ON THE MATTER TO BE HELD ON THE 3RD DAY OF NOVEMBE& 2020; PROVIDING REQUISITE BALLOT LANGUAGE FOR SUBMISSION TO THE ELECTORATE; PROVIDING NOTICE OF ELECTION; AND PROVIDING FOR AN EFFECTTVE DATE. (COUNCTLMEMBER LONDON) 11. REPORTS AND RECOMMENDATIONS: A. MAYOR AND COLINCILMEMBERS 1.) SCHEDULING A WORKSHOP FOR DICUSSION OF PRIOzuTIES FOR THE NEW PARK ON HARBOR DRIVE. (COUNCILMEMBER PETROS) 2.) BEACHMAINTENANCE (COUNCILMEMBERMCCORMICK) VILLAGE ATTORNEY 1.) NONE VILLAGE CLERK D 1.) NONE VILLAGE MANAGER (NO LATER THAN 8:00 P.M.) 1.) ONGOTNG PROJECTS 2.) CHANNEL 77 UPDATE ON PROGRAMMTNG TAB 17 12. OTHERBUSINESS/GENERALDISCUSSION A. NONE 13. SCTIEDULE OF FUTI]RE MEETINGS/EVENTS: A CONTINUATION OF 2ND BUDGET WORKSHOP TUESDAY, ruLY 28,2020 VIRTUAL COUNCIL CHAMBER B C MISSION STATEMENT "TO PROVTDE A SAFE, QUALITY COMMUNTTY 4 of 5 ENvI[oNMENT FOR ALL ISI.ANDERS THROUGH RESPONSIBLE GOVERNMENT."

VILLAGE OF KEY BISCAYNE REGULAR COUNCIL MEETING TUESDAY, AUGUST 25,2020 COI-INCIL CHAMBER OUALIFICATION PERIOD FOR COUNCILMEMBER 12:00 NOON MONDAY, AUGUST 10,202A TO 12:00 NOON AUGUST 20, 2020 t4. ADJOURNMENT L ANY PERSON WISHING TO ADDRESS THE VILLAGE COUNCIL ON AN ITEM ON THIS AGENDA IS ASKED TO REGISTER WITH THE VILL.AGE CLERK PRIOR TO TIIAT ITEM BEING HEARD. PKIOR TO MAKING A STATEMENT, PLEASE STATE YOAR NAME, ADDRESS, IF YOA ARE A HIRED CONSULTANT OR VILLAGE EMPLOYEE/FORMER VILLAGE EMPLOYEE AND/OR IF ENGAGED IN LOBBYING ACTIVITIES AND/OR REPRESENTING AN ORGANIZATION FOR THE RECORD. II. IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1990, ALL PERSONS ItrHO ARE DISABLED AND WHO NEED SPECIAL ACCOMMODATIONS TO PARTICIPATE IN THIS PROCEEDING BECAASE OF THAT DISABILITY SHOULD CONTACT THE OFFICE OF THE VILLAGE CLERK,88 WEST MCINTYRE STREET, KEY BISCAYNE, FLORIDA 33149, TELEPHONE NaMBER (305) 365-5506, NOT LATER THAN TWO BASINESS DAYS PRIOR TO SUCH PROCEEDINGS, ilI IF A PERSON DECIDES TO APPEAL ANY DECISION MADE BY THE VILLAGE COANCIL WITH RESPECT TO ANY MATTER CONSIDERED AT A MEETING OR HEARING, THAT PERSON WILL NEED A RECORD OF THE PROCEEDINGS AND, FOR SUCH PURPOSE, MAY NEED TO ENSARE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH RECORD INCLUDES THE TESTIMONY AND EVTDENCE apON WHrCH THE AppEAL rS TO BE BASED (F.5.286.010s). IV. IN ACCORDANCE II/ITH VILL,4GE CODE SECTION 2-161, ADOPTING SECTION 2-11.1(s) OF THE MIAMI-DADE COaNTY CODE, ANY PERSON ENGAGING IN LOBBYING ACTIVITIES, AS DEFINED THEREIN, MUST REGISTER AT THE VILLAGE CLERK'S OFFICE BEFORE ADDRESSING THE COUNCIL ON THE ABOVE MATTERS OR ENGAGING IN LOBBYING ACTIVITIES. B. C. MrssroN STATEMENT "TO PROVTDE A SAFE, QUALTTY COMMUNTTY tol) ENVIRONMENT FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT."

VILLAGE OF KEY BISCAYNE A^-:1 ? tnln Village of Key Biscayne 2020 Village Council Meeting Schedule 6:00 P.M. 1.) ltm.uert9*;m 1 1.) Iuly 28,2020 2nd Budget Workshop Continuation 2.) eeUn*ary+bZg:g 12.) August 25,2020 3.) *+are++g;+0Zg 4.) 13.) September 8,2020x lst Budget Hearing 17.) November 17,2020 5.) lpr+X;m 14.) September 22,2020x 2nd Budget Hearing 6.) W 7.) l,an.eg;M 15.) October 13,2020 16.) October 27,2020 8.) lum.e+l# tsBudge++Mep @ions 18.) December 8,2020 9.) lu.se+Z;m 2dBufu*J#er{<shep 10.) +une+g;ZgZg Note: *September Budget Hearings are subject to change due to Miami-Dade County School Board and Miami-Dade County Commissioners Meeting Schedule. THE COUNCIL MEETINGS ARE HELD IN THE WLL,AGE COANCIL CHAMBER LOCATED AT 560 CRANDON BOULEVARD AND ARE SABJECT TO CHANGE. VISIT 'YWTW.KEYBISCAYNE.FL.GOV TO WEW THE CONFIRMED MEETING SCHEDALE DATES/TIMES AND/OR SABSCRIBE TO OAR MAILING LIST AND RECEIVE MEETING AGENDAS/UPDATES BY EMAIL. IF YOA HAVE ANY QUESTIONS REGARDING THE WLLAGE COANCIL MEETING SCHEDALE PLEASE CONTACT THE WLLAGE CLERK'S OFFICE AT 305.365.5506. MISSION STATEMENT "TO PROVIDE A SAFE, QUALITY COMMUNITY ET{VIRONMENT FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT."

TAB 1

VillageCouncil MichaelW.Davey,Mayor BrettMoss, ViceMayor LuisLauredo EdwardLondon AHisonMcCormick IGtiePetnos Ignaciof. Segurola VillageManager AndreaM.Agha VIt LLAG]E OJF' ]KJEY P,]ISCAY I\ IE DATE MEMORANDUM June 30, 2O2O Honorable Mayor and Council Members FROM: Andrea M. Agha, Village Manager RE Recommendation for Award of ITB No. 2020-47 - Safe Routes to School Key Biscayne K-8 Center Construction LAP Project TO MMENDATION It is recommended that the Village Council authorize the Manager to execute a contract with Florida Engineering and Development Corp. ("FEDC"), the lowest responsive and responsible bidder for the Safe Routes to School (SRTS) Key Biscayne K-8 Center Construction Project in an amount not to exceed $485,300. This amount includes FEDC's bid amount of $441,180.30 and a contingency amount of $44,120 (approximately 10o/o), for unforeseen circumstances. Construction is anticipated to be completed within 180 days after contract execution. Funding of $1,147,000, of which $180,000 is reserved for CEI services awarded in a companion item, is allocated from the FY20 Adopted Budget, Capital lmprovements, SRTS Construction line item. BACKGROUND ln 2015, the Educational Advisory Board ('EAB'), with administrative and technical support provided by Village staff and consultants, lead the charge for the successful award of a Safe Routes to School grant. The grant aligned with the 2020 Vision Plan (2006 WRT), the Village's "sounding board" for future planning and policy-making decisions, and its specific recommendations for new sidewalks and intersection improvements to encourage pedestrian activity. The grant also aligned with the 2014 Sustainability Report which encourages school transit options that reduce congestion and save energy, such as increased protection for children that walk or bike to school. The Village accepted the grant from the Florida Department of Transportation (FDOT) in the amount of $837,351 for Design, Construction, and Construction Engineering and lnspection (CEl) services for the Safe Routes to School project ("Project"). The Project includes the installation of sidewalks, crosswalks, and other pedestrian safety measures that terminate at the K-8 school. The objective of the Project is to provide safe, walkable sidewalks for students and other pedestrians while also creating alternative modalities of transportation, which should reduce traffic congestion. 88 West Mclntyre Street ' Key Biscayne, Fkrrida 33149. (305) 365-5511 . www.keybiscayne.fl.gov

VIILLAG]E C)IF lKiEY Pult:SCAYb{lE On June 25,2018, the Village Council authorized the negotiated agreement with Kimley-Horn and Associates, lnc. ("KHA") the top-ranked firm, for the design of the Project. KHA submitted the final design phase plans for FDOT to review on December 17,2019. On March 13,2020, FDOT issued a Notice to Proceed to Advertise for the Construction of the Safe Routes to School Project. The Village issued IB 2020-47 for the Construction of SRTS Key Biscayne K-8 Center Project on March 19, 2020. See attached staff report for details. As a result of the procurement process, FEDC is recommended for award of the construction contract in an amount not to exceed $485,300 contingent upon receiving FDOT's concurrence. Construction is anticipated to be completed within 180 days after contract execution. 88 West Mclntyre Street . Key Biscayne, F'lorida 33149. (305) 365-551[ . www.keybiscayne.fl.gov

VILLAG]E C)]F ]KJEY ]B][SCAV}\]E MEMORANDUM DATE: VillageCouncil MidraelW.Davey,Malnr BrcttMoss, ViceMayor Luisl^auredo EdwardLondon Allison McCormick IgtiePerm Ignacio f. Segurola VillageManager AndrcaM.Agha TO RE Iune25,2020 Andrea Agha, Village Manager Thomas Fossler, Chief of Staff Recommendation to Award for ITB No. 2020-47 - Safe Routes to School Key Biscayne K-8 Center Construction LAP Project FROM: RECOMMENDATION It is recommended that the Village Manager execute a contract with Florida Engineering & Development Corp. ("FEDC"), the lowest responsive and responsible bidder, for the SRTS Key Biscayne K-8 Center Construction Project in an amount not to exceed $485,300. This amount includes FEDC's bid amount of $441,180 and a contingency amount of $44,120 (approximately l0%;o), for unforeseen circumstances. Construction is anticipated to be completed within 180 days after contract execution. BACKGROLIND The Village requires a qualified and experienced contractor to provide construction services on the Safe Routes to School Key Biscayne K-8 Center Construction LAP Project ("Project"). The Project includes construction of additional sidewalks, sidewalk improvements, street crossing improvements, ADA ramps, high visibility striping, bike ramps, and pedestrian signals. The recommended routes for this Project were developed based on an examination of the school boundary, aerial photography, existing and future land uses, crash data, counted traffic volumes, posted speed limits and location of traffic control devices. The Construction Documents forthe Project were prepared by Kimley-Horn, as the Engineer of Record for the Project. The Village has received grant funding for this Project through an agreement with FDOT for its LAP. As such, the Village must abide by the guidelines and procedures found in the FDOT LAP Manual. The Village issued ITB 2020-47 for Safe Routes to School Key Biscayne K-8 Center Construction LAP Project on March 19,2020. The ITB was advertised in the Miami Daily Business Review, posted to DemandStar, Bonfire Procurement Portal, and the Village's website. To qualify for award, prospective Bidders were required to: l. Be FDOT pre-qualified prior to the time of Award of the Contract for the following work classes: Flexible Paving, Grading, Pavement Markings, Sidewalks and Traffic Signals 2. Provide a Bid Guaranty in the amount of 5Yo ofthe total Bid from a surety with an A-rating or beffer under Best's Guidelines 88 West Mclntyre Street . Key Bisceryne, Florida 33149 . (305) 365-551 I . www.keytriscayne.fl.gov

V ]t LLAGIE C)]F' ]K]EY ]BIISCA Y I\ IE 3. Contractor needs to be licensed and insured to perform the work On the date of the bid opening, April 20, 2020, we received four (4) bids from the following Bidders: l. Action Property Svces, Inc. ("Action") S374,805.00 2. Florida Engineering and Development, Corp. $441.180.30 3. AUM Construction, Inc. $767,767.00 4. F.H. Paschen, S.N. Nielsen & Associates, LLC $779,744.00 Procurement performed a due diligence review of the bids and found the apparent lowest bid, Action, was non-responsive due to an issue with its licensing, bid amount, and failure to submit a bid bond. The firm asserted license number CGC1528536 as its qualifring license, however, the license is listed on the Florida Department of Business & Professional Regulation website as qualiffing another business instead. Action's bid amount was approximately 20% under the engineer of record's opinion of probable cost ($460,495). Finally, the bid bond was missing from the physical submission of the bid and the file included with the virtual copy was corrupted and could not be accessed. The second lowest bidder was Florida Engineering and Development, Corp ("FEDC"). Procurement reviewed FEDC's bid for responsiveness and found the firm provided all material requirements of the ITB and possessed the required licensing and was pre-qualified for Sidewalk and Grading work types. FEDC also included a subcontractor (P & J Striping) that was pre- qualified for pavement markings. If selected, the firm would have an opportunity to obtain the remaining pre-qualifications prior to contract award. In light of the above, Procurement recommends executing a contract with FEDC, the lowest responsive and responsible bidder, contingent upon the concurrent of FDOT. V concur tr Reject "AM* Andrea Agha, Village Manager BB West Mclntyre Street . Key Biscayne, Fkrrida 33149 . (305) 365-551I . www.keybiscayne.fl.gov

RESOLUTION NO. 2020. A CAPITAL AUTHORIZING RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, SELECTING FLORIDA ENGINEERING AND DEVELOPMENT CORP. FOR CONSTRUCTION OF THE SAFE ROUTES TO SCHOOL (SRTS) PROJECT IN AN AMOUNT NOT TO EXCEED $485,300; PROVIDING FOR AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Village of Key Biscayne (the "Village") issued Invitation to Bid No. 2020- 47 (the "ITB") for construction ofthe Safe Routes to School Key Biscayne K-8 Center Project (the " Capital Proj ect") ; and WHEREAS, four sealed bids were received by the ITB deadline and Florida Engineering and Development Corp. (the "Contractor") was the lowest responsive and responsible bidder for the Capital Project, with a bid totaling $441,180.30; and WHEREAS, after review and evaluation of the bids submitted in response to the ITB, the Village Manager recommends that the Contractor be selected to perform the Capital Project as the lowest responsive and responsible bidder; and WHEREAS, pursuant to Section 3.07(b) of the Village Charter, the Village Council desires to authorize the expenditure of Village funds for the Capital Project, select the Contractor to perform the Capital Project, and execute an agreement with the Contractor, in an amount not to exceed $485,300, in substantially the form attached hereto as Exhibit ooA" (the "Construction Contract"); and WHEREAS' the Village Council finds that this Resolution is in the best interest and welfare of the residents of the Village. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, AS FOLLOWS: Page I of2

Section 1.. Recitals. That each of the above-stated recitals are hereby adopted, confirmed, and incorporated herein. Section 2. Selection. That the Village Council hereby selects the Contractor to perform the Capital Project pursuant to Section 3.07(b) of the Village Charter. Section 3. Authorization. That the Village Council hereby authorizes the Village Manager to execute the Construction Contract with the Contractor for the Capital Project, in an amount not to exceed $485,300, in substantially the form attached hereto as Exhibit "A," subject to the Village Attorney's approval as to form, content, and legal sufficiency. Section 4. Effective Date. That this Resolution shall be effective immediately upon adoption. PASSED and ADOPTED this day of ,2020 ATTEST: MICHAEL W. DAVEY, MAYOR PETER J. KULPA INTERIM VILLAGE CLERK APPROVED AS TO FORM AND LEGAL SUFFICIENCY WEISS SEROTA HELFMAN COLE & BIERMAN, P.L. VILLAGE ATTORNEY Page2 of2

VILLAGE OF KEY BISCAYNE PUBLIC WORKS DEPARTMENT INVITATION TO BID ITB #2020-47 VILLAGE OF KEY BISCAYNE SAFE ROUTES TO SCHOOL KEY BISCAYNE K.8 CENTER FDOT LAP PROJECT FM: 438162-I FAP: D619-061-B BID DUE DATE & TIME April 20,2020 at 1:00 PM NON.MANDATORY "PRE.BID'' MEETING DATE & TIME: March 27 ,2020 at 2:00 PM

VILLAGE OF KEY BISCAYNE INVITATION TO BID tTB#2020-47 TABLE OF CONTENTS VILLAGE OF KEY BISCAYNE ITB #2020-47 SAFE ROUTES TO SCHOOL KEY BISCA\'NE K-8 CENTER 1 Advertisement for Bids (Invitation to Bid) 2 Instruction to Bidders 3 Contract 4 Bidder's Representation and Proposal/Bid Form 5 Modified EJCDC Standard General Conditions of the Construction Contract (2018) 6 [not rised] 7 Addendum Acknowledgement 8 Anti-Kickback Affi davit 9 Non-Collusive Affi davit 10 Sworn Statement on Public Entity Crimes Qualification Statement11 t2 Performance Bond and Payment Bond Forms 13 [not used] l4 Notice of Intent to Award 15 Notice to Proceed t6 Drug Free Workplace Form t7 LAP Project Specifications , I. Excerpted Specifications from the Specifications II. LAP "BIG 4" Specifications Earthwork and Related Operations Superpave Asphalt for LAP Concrete for LAP Department's LAP Division I

Landscaping Installation for LAP 18 Local Agency Program (LAP) Project Attachments ATTA'IT]\/ T'NT DESCRIPTION A B C D E F G H J K L M N o Buy America - FDOT Standard Spec Section 6-5.2 Certifi cation of Current Capacity (525 -01 0 -46) DBE Bid Package Information (275-030-ll) E-Veriff - (from FDOT Specs on the Web) Appendices A and E (Title VI - Non- Discrimination) Equipment Rental Rates FHWA Form 1273 DBE Opportunity Form 375-040-62 Lobbying Certification (375-030-33 & #37 5-030-34) INOT USED] Non-Collusion Provision (575-060- I 3) Prevailing Minimum Wage (Davis-Bacon) Prohibition Against Convict Produced Materials Federal and State Requirements (l) - (s) P a Not used Suspension and Debarment (Forms #37 5 -030-32 and 37 5 -030-9 1 ) t9 Appendix A - Project Survey (part of Exhibit I to Contract) 20 Appendix B - Project Plans (part of Exhibit I to Contract) VILLAGE OF KEY BISCAYNE ITB #2020-4'1 SAFE ROUTES TO SCHOOL KEY BISCAYNE K-8 CENTER

VILLAGE OF KEY BISCAYNE SAFE ROUTES TO SCHOOL KEY BISCAYNE K-8 CENTER SECTION 1. ADVERTISEMENT FOR BIDS INVITATION TO BID tTB #2020-47 The Village of Key Biscayne is requesting bids from FDOT pre-qualified biddels to provide construction improvements for the Village of Key Biscayne. Interested bidders should visit the Village website at http://keybiscayne.fl.gov/index.php?src:gendocs&ref=RFPsBids&category:Govt or www.demandstar.com to obtain the Invitation to Bid package. Sealed submittals including one (1) original, three (3) bound paper copies of the submittal, and one (l) readable/reproducible flash drive completely duplicating the original proposal of the submittals must be received no later than l:00 PM on April 20, 2020 and be clearly marked on the outside, "ITB #2020-47 VILLAGE OF' KEY BISCAYNE SAFE ROUTES TO SCHOOL KEY BISCAYNE K-8 CENTER', by Conchita Alvarez, MMC, Village Clerk, Village of Key Biscayne, Village Hall, 88 West Mclntyre Street, Suite 220,Key Biscayne, FL 33149. Late submittals and electronic submittals will not be accepted. A NON-MANDATORY "Pre-Bid" Meeting will be held on March 21,2020 at 2:00 PM in the BZP Conference Room at 88 West Mclntyre Street, Key Biscayne, Florida 33149. Pursuant to Section 4-19 of the Village Code; Section 7.6 of the Village Charter, vendors of the Village are required to disclose any campaign contributions to the Village Clerk, and each vendor must do so prior to and as a condition of the award of any Village contract to the vendor. Please see the detailed specifications of this solicitation for further details. The Village of Key Biscayne reserves the right to reject all bids and cancel the solicitation. The Village reserves the right to reject any bid for any of the following reasons: any condition, limitation or provision is is included in the bid that is not officially invited in the ITB; failure by the bidder to meet Project qualifications; bidder has been suspended or debarred or is otherwise disqualified from submitting bids on federal and/or state contracts; bidder has failed to comply with applicable state and federal law as described herein, including when certain state and/or federal requirements pre-empt or are more restrictive than the Village's local procurement requirements; the low bid differs from the Engineer's estimate by an unreasonable amount; obvious unbalancing of unit prices has occurred in the bid; or where it has been determined that competition is considered to be inadequate relative to the size, fype and location of this Project. Andrea Agha Village Manager Publish: [March 19, 2020] Miami Daily Business Review wnrv,keybiscavne.fl ,gov \l'WW.DEMANDSTAR.COM 4 of304

VILLAGE OF KEY BISCAYNE SECTION 2.INSTRUCTION TO BIDDERS 2.01 SEALED BIDS Sealed bids for fumishing all goods and services necessary to complete the Work specified in these documents will be received at: Date: April20,2020 Time: l:00 PM Place: Village Hall 88 West Mclntyre Street, Suite 220 Key Biscayne, Florida 33149 2.02 SCHEDULE OF EVENTS *The Village reserves the right to change the scheduled dates and time. 2.03 DEFINITION OF TERMS Certain terms used in these documents are defined as follows: Bid\Proposal The bid documents submitted by the Bidder No. Event Date* Time* (Daylight Savings Time) I Advertisement/ Distribution of ITB March 19,2020 2 Mandatory Pre-Bid Meeting 560 Crandon Blvd., Council Chambers Kev Biscayne, Florida 33149 March 27,2020 2:00 PM 3 Deadline to Submit Questions April2,2020 Close of Business 4 Deadline for Village Responses to Questions April6,2020 5 Deadline to Submit Bid April20,2020 l:00 PM 6 7 Evaluation of Bids Intent to Award April 20-27,2020 April 28,2020 8 9 Anticipated Award Date 2nd Readins of Award Ordinance June 9,2020 Ausust 11,2020 5 of304

Bidder Village Contractor Days Responsible Bidder Responsive Bidder Work Village Engineer or Engineer Any person, firm or corporation submitting a proposal for the Work covered by these specifications or his duly authorized representative. The Village Council of the Village of Key Biscayne or the Village Manager, if applicable. The person, firm or corporation with whom the Village has executed a contract for the Work. Days shall mean calendar days. In order to be considered a "responsible" bidder, the Bidder must have adequate equipment and personnel to do the Work within the time limits that are established, has adequate financial status to meet the obligations to perform the Work and has not defaulted on a prior contract. Any person, firm or corporation submitting a Bid for the Work whose Bid form is complete and includes all required attachments and enclosures, free from exclusions or special conditions and has no alternative Bids for any items, unless alternatives are requested in the specifications. The services required by the Contract Documents, including labor and materials. The Village's general engineering consultant and project manager. FDOT/Department of Transportation/ Department The Florida Department of Transportation 2.04 DELIVERY OF BIDS All Bids, whether mailed or delivered in person, shall be submitted in a SEALED ENVELOPE (One (l) Original / Three (3) copies / One (l) readable/reproducible flash drive containing all documents) bearing on the outside the following project information as well as the name of the Bidder and their address clearly marked: VILLAGE OF KEY BISCAYNE SAFE ROUTES TO SCHOOL KEYBISCAYNE K-8 CENTER Addressed to: 6 of304

Village of Key Biscayne Attn: Conchita Alvarez, Village Clerk 88 West Mclntyre Street, Suite 220 All Bids must be received by the Village no later than April 20,2020 at I :00 PM. 2.05 BID GUARANTY A certified or cashier's check drawn on a national or state bank, or bid bond in the form attached to this ITB at Section 12, in the amount of five percent (5%) of the total Bid, shall accompany each Bid as a guarantee that the Bidder will, if award is made, execute the Contract to do the Work for the amount proposed and furnish any required certificates of insurance and bond documents. The bid bond shall be from a surety with an A-rating or better under Best's Guidelines, made payable to: The Village of Key Biscayne. 2.06 BID FORMS The Bidder shall submit an original Bid on the bid forms attached to this ITB at Section 4. The Bidder shall fill in all the blank spaces completely for each and every unit item for which a Bid is tendered. The Bidder shall state the price, typewritten or in ink, for which he proposes to do each item of Work. The Bid shall include: l) Base Agreement;2) Bid Forms;3) Certificate or Evidence of Insurance; 4) Bid Bond/Bid Guarantee; 5) Qualifications Statement; 6) Sworn Statement on Public Entity Crime Form; 7) Addenda Acknowledgement, if applicable; 8) Anti- Kickback Affidavit; 9) Non-Collusive Affidavit; l0) Drug Free Workplace form; and l1) a Corporate Resolution evidencing authorization to submit Bid, if applicable. 2.07 SIGNATURE ON BID The Bidder shall sign the Bid as follows: If the Bid is made by an individual, the Bidder's name and address shall be shown. If made by a firm or partnership, the name and address of each member of the firm or partnership shall be shown. If made by a corporation, the person signing the Bid shall show the name of the state under the laws of which the corporation is chartered, also the names and business addresses of its corporate officers. The Bid shall bear the seal of the corporation attested by the secretary. Anyone signing the Bid as agent shall include in the Bid legal evidence ofhisftrer authority to do so. 2.08 COST OF BIDS All expenses involved with the preparation and submission of Bids to the Village or any work performed in connection therewith, shall be bome by the Bidder(s). No payment shall be made for any responses received, nor for any other effort required of or made by the Bidder(s) prior to commencement of work as defined by the Contract duly approved by the Village Council. 2.09 QUALIFICATION OF BIDDERS Each Bidder shall submit a completed Qualification Statement utilizing the form attached 7 of304

2.IO RIGHT TO REJECT BIDS The Village reserves the right to reject all bids and cancel the solicitation. The Village also reserves the right to reject any bid for any of the following reasons: any condition, limitation or provision is is included in the bid that is not officially invited in the ITB; failure by the bidder to meet Project qualifications; bidder has been suspended or debarred or is otherwise disqualified from submitting bids on federal and/or state contracts; bidder has failed to comply with applicable state and federal law as described herein, including when certain state and/or federal requirements pre-empt or are more restrictive than the Village's local procurement requirements; the low bid differs from the Engineer's estimate by an unreasonable amount; obvious unbalancing of unit prices has occurred in the bid; or where it has been determined that competition is considered to be inadequate relative to the size, type and location ofthis Project. 2.II AWARD OF CONTRACT 2.11.1 The Award of the Contract will be to the lowest Responsive and Responsible Bidder who meets all the criteria of the ITB. The prime contractor or a combination of the prime contractor and subcontracts need to be FDOT pre-qualified prior to the time of Award of the Contract for the following work classes: Flexible Paving, Grading, Pavement Markings, Sidewalks and Traffic Signals. In the event of a tie, the Contract will be awarded to the Bidder with the most capital based on a financial statement. 2.11.2 If the Village accepts a Bid, the Village will provide a written notice of Award to the successful Bidder. 2.11.3 If the successful Bidder to whom the Contract is awarded forfeits the Award by failing to meet the conditions of Subsection 2.13.1, the Village may award the Contract to the next lowest Responsive and Responsible Bidder or reject all Bids or re-advertise the Work. 2.12 RETURN OF THE BID GUARANTY The Village will return Bid Guarantees of unsuccessful Bidders after the Contract is awarded and executed, ifrequested by such unsuccessful Bidders. 2.13 EXECUTION OF CONTRACT The successfulBidder(s) shall, within ten (10) days of receipt of a written notice of the Award of the Contract, deliver to the Village a fully executed Contract and all requested certificates of insurance and bonds. 8 of304

2.13.1 FORFEITURE OF BID GUARANTY FOR FAILURE TO EXECUTE CONTRACT The failure of the successful Bidder(s) to execute a Contract and submit required insurance certificates and bonds as specified in subsection 1.13 of the "Modified Standard General Conditions of the Construction Contract" will result in forfeit of the Award. Each Bidder agrees in advance that the Village will sustain certain damages too difficult to accurately ascertain. Accordingly, if the Award is forfeited under this Section, the amount of the Bid Guaranty of the forfeiting Bidder will be retained by the Village, not as forfeiture or a penalty, but as liquidated damages. 2.I4 TIME AND AWARD The Bidder agrees to abide by the overall and unit prices quoted in the Bid for up to ninety (90) days from the date of bid opening to allow for the Village review, award, and execute the Contract. 2.I5 INTERPRETATIONANDCLARIFICATION All questions about the meaning or intent of the Bid Documents and specifications shall be directed in writing to procurement@keybiscayne.fl.gov. All correspondences must be titled *VILLAGE OF KEY BISCAYNE SAFE ROUTES TO SCHOOL KEY BISCAYNE K.8 CENTER." Interpretation or Clarifications considered necessary by the Village in response to such questions will be issued by means of addenda issued on www.demandstar.com. It is each Bidder's sole responsibility to be informed of any changes to the ITB in the form of written addenda and the Village shall not be responsible for any Bidder's failure to receive same. The Village has the right to rely on all Bids received and the submittal of a Bid shall represent the Bidder's acknowledgement that he has read and understood the ITB and any addenda thereto. Written questions must be received by March 20, 2020 by close of business. Only questions answered by written addenda shall be binding. Oral and other interpretation or clarifications shall be without legal effect. 2.16 BID MODIFICATIONS No modifications shall be submitted by Bidder or accepted by the Village. 2.I7 WITHDRAWAL OF A BID A Bidder may withdraw his Bid at any date and time prior to the time the Bids are scheduled to be opened. Notice of withdrawal should be made in writing to the procurement@keybiscayne.fl . gov email. 2.18 OPENING OF BIDS Bids will be publicly opened and read aloud at the appointed time and place stated in the Invitation to Bid/Request for Proposals. Late Bids will not be considered. No responsibility will 9 of 304

be attached to any Village Staff for the premature opening of a Bid not properly addressed and identified. Bidders or their authorized agents are invited to be present at the bid opening. 2.19 PUBLIC ENTITY CRIMES ACT In accordance with the Public Entity Crimes Act, (Section 287.133, Florida Statutes) a person or affiliate who is a contractor, who had been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the Village, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases or real properfy to the Village, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with the Village in excess of the threshold amount provided in Section 287.91'1, Florida Statutes, for Category Two for a period of 36 months form the date of being placed on the convicted vendor list. Violation of this section by the Contractor shall result in rejection of the Bid, termination of the contract, and may cause Contractor debarment. 2.20 VILLAGE LICENSES. PERMITS AND FEES In accordance with the Public Bid Disclosure Act, 218.80, Florida Statutes, each license, permit, or fee a Contractor will have to pay the Village before or during the Work or the percentage method or unit method of all licenses, permits and fees required by the Village and payable to the Village by virtue of the Work as part of the Contract are as follows: 2.20.1 Contractor shall have and maintain during the term of the Contract all appropriate Village licenses, and fees for which shall be paid in full in accordance with the Village's Fee structure for such licenses. THERE WILL NOT BE ANY PERCENTAGE REDUCTION OR WAIVING OF VILLAGE LICENSE FEES. 2.20.2 During the performance of the Contract there may be times when the Contractor will be required to obtain a Village permit for the Work. It is the responsibility of the Contractor to ensure that he or she has the appropriate Village permits to perform such Work as may become necessary during the performance of the Contract. Any fees related to Village required permits in connection with the Contract will be the responsibility of the Contractor and will not be reimbursed by the Village. Licenses, permits, and fees that may be required by County, State or Federal entities are not included in the above list. 2.21 INSURANCE The Bidder shall be required to provide and maintain insurance coverage of such types and amounts as specified in Section 3 in the form of Construction Contract, Article 7-Bond and Insurance. The Bidder shall include with his or her Bid either Certificates of Insurance evidencing same or documentation from his or her insurer evidencing the insurability of the Bidder to meet the insurance requirements. l0 of304

2.22 BONDS A Performance Bond and a Payment Bond, in the forms attached in Section 72, for the full Base Bid Amount/Contract Price, shall be required in connection with this Contract. 2.23 FAMILIARITYWITH LAWS The Bidder is assumed to be familiar with all applicable Federal, State, and local laws, ordinances, rules, and regulations that may in any manner affect the Work. As per Florida Statute, Section 20.055(5) it is the duty of every state officer, employee, agenay, special district, board, commission, contractor, and subcontractor to cooperate with the inspector general in any investigation, audit, inspection, review, or hearing pursuant to this section. The Bidder understands and will comply with this Section. 2.24 EXAMINATION OF' 'S FACILITIES The Village, as part of its evaluation may perform an examination of the Bidder's facilities. The Village Manager or designee, as part of the evaluation, may perform this examination. The term facilities as used in this solicitation shall include, but shall not be limited to, all properties operated by the Bidder, all equipment used in the perforrnance of business by the Bidder, and/or any other evidence, tangible or intangible, that the Village may deem necessary to substantiate the technical and other qualifications, and the abilities ofthe Bidder to perform the Work. The examination shall include, but shall not be limited to, appearance and cleanliness of facilities, appearance and cleanliness of equipment, "road worthiness" of vehicles, appearance and visibility of all signage on vehicles, and possession and distribution of mandatory equipment. Vehicles shall be examined for compliance with State of Florida Statutes, as well as applicable County and Village Ordinances. Additionally, examination may include verihcation of some of the (physical) minimum requirements for Bidders. Additionally, the Village reserves the right to perform such examinations on the successful Bidder as often as it deems necessary, to ensure proper performance ofthe proposed Contract. 2.25 LOBBYIST REGISTRATION Proposers must comply with the Villages lobbyist registration requirements. Please contact the Village Clerk, Conchita Alvarez at 305-365-5506 for additional information. 2,26 PUBLIC RECORDS LAW a. Contractor agrees to keep and maintain public records in Contractor's possession or control in connection with Contractor's performance under this Contract. Contractor additionally agrees to comply specifically with the provisions of Section 119.0701, Florida Statutes. Contractor shall ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed I 1 of304

except as authorized by law, for the duration of the Contract, and following completion of the Contract until the records are transferred to the Village. b. Upon request from the Village's custodian of public records, Contractor shall provide the Village with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided by Chapter I 19, Florida Statutes, or as otherwise provided by law. c. Unless otherwise provided by law, any and all records, including but not limited to reports, surveys, and other data and documents provided or created in connection with this Contract are and shall remain the property of the Village. d. Upon completion of this Contract or in the event of termination by either party, any and all public records relating to the Contract in the possession of the CONTRACTOR shall be delivered by the CONTRACTOR to the VILLAGE MANAGER, at no cost to the VILLAGE, within seven (7) days. All such records stored electronically by CONTRACTOR shall be delivered to the VILLAGE in a format that is compatible with the VILLAGE's information technology systems. Once the public records have been delivered upon completion or termination of this Contract, the CONTRACTOR shall destroy any and all duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. e. Any compensation due to CONTRACTOR shall be withheld until all records are received as provided herein. f. CONTRACTOR's failure or refusal to comply with the provisions of this section shall result in the immediate termination of this Contract by the VILLAGE. Section 119.0701(2Xa). Florida Statutes IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORTDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS. Custodian of Records: Mailing address: Telephone number: Email: Conchita Alvarez, MMC, Village Clerk 88 West Mclntyre Street Suite 220 Key Biscayne, FL 33149 (30s) 36s-ss06 calvarez@keybiscayne.fl . gov VILLAGE OF KEY BISCAYNE tTB#2020-47 SAFE ROUTES TO SCHOOL KEY BISCAYNE K-8 CENTER 12 of304

SECTION 3 CONTRACT FOR CONSTRUCTION BETWEEN VILLAGE OF KEY BISCAYNE AND FLORIDA ENGINEERING AND DEVELOPMENT CORP. THIS IS A CONTRACT FOR CONSTRUCTION ("Contract"), dated ("Effective Date") by and between the VILLAGE OF KEY BISCAYNE, FLORIDA, a Florida municipal corporation, whose mailing address is 88 West Mclntyre Street, Key Biscayne, Florida 33149 (hereinafter referred to as "Village"), and FLORIDA ENGINEERING AND DEVELOPMENT CORP., a profit corporation, with its principal place of business aI 12076 NW 98th Avenue, Hialeah Gardens, Florida 33018 (hereinafter referred to as "Contractor"). WITNESSETH WHEREAS, the Village solicited bids for the construction of SAFE ROUTES TO SCHOOL KEY BISCAYNE K-8 CENTER ("Project") through Invitation to Bid No. 2020-47; and WHEREAS, the Contractor responded to the Village's solicitation by submitting its bid ("Bid"), attached and incorporated into this Contract as Exhibit A; and WHEREAS, after review and consideration of all submitted bids, the Village Manager recommended the Contractor to perform all necessary tasks, including furnishing all labor, materials, equipment, services and incidentals described in the Contract Documents (the "Work") for the Project; and WHEREAS, on pursuant to Resolution No. 20- , attached and incorporated hereto as Exhibit B, the Village Council approved the Contractor to perform the Work and authorized the Village to contract with the Contractor to perform the Work for the Project; and NOW, THEREFORE, in consideration of the mutual covenants and conditions contained herein, the Contractor and the Village agree as follows: ARTICLE I SCOPE OF WORK 1.1 Contractor shall perform the Work as set forth in the Contract Documents. 1.2 Contractor shall perform all necessary tasks in order to complete the Work. 1.3 All Work under this Contract shall be completed for an amount not to exceed $441,180.30 ("Contract Price/Base Bid Amount"). The Contract Price shall be paid in progress payments no more often than monthly based upon the Engineer's certification of the value of the Work performed based on the unit prices listed on Contractor's Bid Form. Contractor bears the risk and responsibility that compensation may not be amended due to delay or extensions of time. l3 of304

ARTICLE 2 TERM 2.1 The Village Manager will issue a Notice to Proceed for the Contractor to commence the Work to be substantially completed within 180 consecutive calendar days after the Commencement Date set forth in the Notice to Proceed (the "Contract Time"). 2.2 The parties intend for the Work to commence within thirty (30) days of the Effective Date of this Contract. The Work shall be completed in accordance with all Contract Documents, including, but not limited to, the Modified EJCDC Standard General Conditions of the Construction Contract, attached hereto and incorporated herein as Exhibit C ("General Conditions"). The Village may allow extended daily working hours and work on weekends if requested by Contractor with advance notice and approved by the Village in writing. ARTICLE 3 BENCHMARKS AND REMEDIES FORBREACH 3.1 Contractor acknowledges and agrees that the Village shall have no obligation to issue a Notice to Proceed for the Work or any portion thereof. A Notice to Proceed will not be issued until Contractor's submission to Village of all required documents under this Contract and execution of this Contract. 3.2 The Contractor shall prosecute all Work with faithfulness and diligence. J.J Liquidated Damages. Owner and Contractor recognize that time is of the essence of this Contract and that Owner will suffer financial loss and other damages if the Work is not substantially complete within the Contract Time, plus any extensions thereof allowed in accordance with Article 11 of the General Conditions. The parties also recognize the expense and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not substantially complete within the Contract Time. Contractor acknowledges and agrees that the actual delay damages which Owner will suffer in the event of delay in achieving Substantial Completion of the Work are difficult, if not impossible, to determine and that the liquidated damages described herein are a fair and reasonable estimate of the delay damages which the Owner is expected to suffer in the event of such delay. Accordingly, instead of requiring any such prool Owner and Contractor agree, that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner, in accordance with the FDOT Specifications Table attached to and incorporated into this Contract as part of Exhibit I, the liquidated damages amount, for each day after the Contract Time expires up until the date the Contractor achieves actual Substantial Completion of the Work set forth in the applicable Work Order. Liquidated damages shall be deducted from the Contractor's Applications for Payment. However, if at the time of the Contractor's Final Application for Payment, Contractor is owed insufficient amounts to fully cover the deduction for liquidated damages, then Contractor shall pay any amount due within ten (10) days of written demand by Owner. 14 of 304

3.4 3.5 4.1 4.2 4.3 4.4 Amount of Liquidated Damages: Applicable liquidated damages are the amounts established in the Department's schedule at Section 8-10.2 of the LAP Division I Specifications (Rev. 4-2-19) ( I -20) that are attache d to this Contract as part of Exhibit I. Recognizing the impossibility of ascertaining the precise amount of damages that will be sustained by the Village as a consequence of such delay, Liquidated Damages are hereby fixed and agreed upon between the parties. The parties have agreed upon Liquidated Damages to obviate any question or dispute regarding the amount of damages and costs and effect of Contractor's failure to complete the Work within the Contract Time. The Contractor hereby agrees that the Village is authorized to deduct the Liquidated Damages from monies due to Contractor for the Work pursuant to this Contract. In the event that the amount of Liquidated Damages due to the Village by Contractor exceeds the payment or monies due to the Contractor pursuant to this Contract, the Contractor shall be liable and shall immediately, upon demand by Village, make payment to the Village in the amount of said excess. ARTICLE 4 CONTRACT PRICE The Village shall pay to the Contractor for the performance of the Work, or any portion thereof, that has been completed for the prior month, a portion of the Contract Price based on the Unit Pricing as set forth in Exhibit A, subject to the conditions, limitations, and restrictions of Section 4.4 herein and in accordance with the General Conditions, up to the total amount of the Contract Price. The Pay Item Unit Prices shall be full compensation for all costs, including overhead and profit, associated with completion of the Work, or any portion and in full conformity witti the Contract Documents, including all requirements as stated or shown, or both, in the Drawings and Specifications, as defined in the General Conditions. The Contract Price shall not be modified except by a Change Order issued by the Village or as otherwise specified herein. The Contract Price may be adjusted by the Village pursuant to Section 11.07 of the General Conditions. The Village has no obligation to adjust the Contract Price as Contractor bears the risk that the sum of the Unit Prices for all the Work under this Contract does not exceed the Contract Price. Village and Contractor agree that this Contract, and any Work authorized pursuant to this Contract, shall be subject to the conditions precedent that Village funds are available, appropriated, and budgeted for the accomplishment of the Work, or any portion thereof, for this Project, and that the Village secures and obtains any necessary loans, grants, or proceeds necessary for the accomplishment of this Project pursuant to a duly authorized Village borrowing enabling ordinance and any loan implementing resolution, or acceptance resolution, adopted by the Village Council as described in the Village Council resolution which awards and authorizes the execution of this Contract. l5 of304

4.5 4.6 4.7 4.8 Village shall make progress payments on the basis of Work completed and approval of Contractor's Application for Payment(s), as defined by section l.0l(3) of the General Conditions, on or before thirty (30) days after receipt of the Application for Payment so long as it also complies with Article 13 of the General Conditions. Rejection of an Application for Payment by the Village shall be within twenty (20) days after receipt of the Application for Payment. Any rejection shall speci$ the applicable deficiency and necessary corrective action. Any undisputed portion shall be paid as specified above. All such payments will be made in accordance with the Schedule of Values established in Article 13, Section 13.01 of the General Conditions, or, inthe eventthere is no Schedule of Values, then payments will be made for Work completed as provided in this Article 4. 4.5.1 In the event the Contract Documents do not provide a Schedule of Values or other payment schedule, Applications for Payment shall be submitted monthly by Contractor on or before the l0th of each month for the prior month's Work. Progress payments shall be made in an amount equal to the percentage of Work completed, but, in each case, less the aggregate of payments previously made and less such amounts as Village shall determine, or, Village may withhold taking into account the aggregate of payments made and the percentage of Project completion in accordance with the Contract Documents and Schedule of Values, if any. 4.5.2 The Contractor agrees that ten percent (10%) of the amount due for each progress payment, or Application for Payment, shall be retained by the Village (the "Retainage") until Final Completion and acceptance of the Work by the Village. In the event there is a dispute between the Contractor and the Village concerning an Application for Payment, dispute resolution procedures shall be conducted by the Village commencing within forty-five (45) days of receipt of the disputed Application for Payment. The Village shall reach a conclusion within fifteen (15) days thereafter and promptly notify Contractor of the outcome, including payment, if applicable. Each Application for Payment shall include an affidavit, or partial release, or waiver of lien by Contractor indicating that parlial payments received from Village for the Work have been applied by Contractor to discharge in full all of Contractor's obligations, including payments to subcontractors and material suppliers. The payment of any Application for Payment by Village, including the final request for payment, does not constitute approval or acceptance by Village of any item of the Work reflected in such Application for Payment, nor shall it be construed as a waiver of any of the Village's rights hereunder or ai law or in equity. Prior to the issuance of final payment, the Village and the Engineer shall conduct a performance evaluation with the Contractor in accordance with procedures determined by the Village and approved by FDOT. 16 of304

5.1 ARTICLE 5. CONTRACT DOCUMENTS Each of the following listed exhibits are hereby made a part of this Contract for the Proj ect (col lectively "Contract Documents"): Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F 12 of ITB) Exhibit G Exhibit H Exhibit I Bid or Proposal Submitted by Contractor (from Section 4 of ITB) Village Authorization: Resolution No. **-rr*(Village to provide) General Conditions (from Section 5 of ITB) Advertisement for Bids (from Section 1 of ITB) Contractor's Executed Bid Forms (from Sections 7-11 of ITB) Executed Performance Bond and Payment Bond (Forms from Section Insurance and License Certificates (Contractor to provide) Drug-Free Work Place Form (from Section l6 of ITB) Project Specifications, LAP Attachments & Drawings (from Sections 17-20 of ITB) 5.2 Priority of Interpretation. The Code and any Village resolutions take precedence'over this Contract. This document without exhibits is referred to as the "Base Agreement." In the event of any conflict or inconsistency in the definition or interpretation of any word, responsibility, schedule, or the contents or description ofany task, deliverable, service, or other work, or otherwise, between the Base Agreement and the exhibits, or between exhibits, such conflict or inconsistency shall be resolved by giving precedence first to the body of this Base Agreement, and then to the exhibits according to the following priority: Village Resolution Approving Contractor, Exhibit B Village Invitation to Bid (ITB) Drawings and Specifications and all other Exhibit I documents Contractor's Response to ITB, Exhibit A Insurance Certifltcates, Exhibit G Notice to Proceed (NTP) Performance Bond, and Payment Bond, in the forms included as Exhibit F 5.3 Any mandatory clauses which are required by such federal, state, or other govemmental regulations shall be deemed to be automatically incorporated herein. In the event of any conflict among the foregoing Contract Documents, the documents shall govem in the order listed and/or as determined by the Village Engineer, provided, however, there are certain state and/or federal requirements that pre-empt or are more restrictive than the Village's local procurement requirements, and they shall govern over any local requirements. 5.4 The Contract Documents shall remain the property of the Village. The Contractor shall have the right to keep one record set of the Contract Documents upon completion of the Project; provided; however, that in no event shall the Contractor use, or permit to be used, any or all of such Contract Documents on other Projects without the Village's prior written authorization. a. b. c. d. e. f. 0b' 17 of304

ARTICLE 6 INDEMNIFICATION 6.1 To the extent provided by law, Contractor shall defend, indemni$ and hold harmless the Village and the State of Florida, Department of Transportation, including their officers, agents, and employees against any actions, claims, or damages arising out of, relating to, or resulting from negligent or wrongful act(s) of the Contractor or any of its officers, agents, or employees, acting within the scope of their office or employment, in connection with the rights granted to or exercised by Contractor hereunder, to the extent and within the limitations of Section 768.28, Florida Statutes. 6.2 The foregoing indemnification shall not constitute a waiver of sovereign immunity beyond the limits set forth in Florida Statutes, Section 768.28. Nor shall the same be construed to constitute agreement by Contractor to indemnifu Village for the negligent acts or omissions of Village, its officers, agents or employees or third parties. Nor shall the same be construed to constitute agreement by Contractor to indemniff the State of Florida, Deparlment of Transportation for the negligent acts or omissions of the Department, its officers, agents or employees or third parties. This indemnification shall survive the termination of this Contract. 6.3 In any and all claims against the Village, the State of Florida, Department of Transportation, or any of their consultants, agents, officers or employees by any employee of Contractor, any Subcontractor, any person or organization directly or indirectly employed by any of them to perform or furnish any of the work or anyone for whose acts any of them may be liable, the indemnification obligation under the above paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for Contractor or any such Subcontractor or other person or organization under workers or workman's compensation acts, disability benefit acts or other employee benefit acts. 6.4 It is the specific intent of the parties hereto that the foregoing indemnification complies with Florida Statute 725.06 (Chapter '125). h is further the specific intent and agreement of the parties that all of the Contract Documents on this project are hereby amended to include the foregoing indemnification. 6.5 The official title of the Village is "Village of Key Biscayne". This offi

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Recording and media

Coverage and corrections

Records considered

  • Virtual Special Council Meeting June 30, 2020

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: fc0b882504d05a3b4a4769277ee857b3. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record