POLISCOPE

The public record

SCHAUMBURG (COOK COUNTY)Minutes linked · not read herePartial coverage

Engineering and Public Works Committee

Tuesday, December 30, 2025 · Government meeting record

The 30-second read

Record incomplete

Engineering and Public Works Committee

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are linked at the source, but their text is not held here.

The publisher links minutes or an action agenda for this meeting, but its text is not held here. Nothing on this page is presented as a decision; open the linked record for outcomes.

Record text

No recording or transcript is held for this meeting.

AGENDA Engineering and Public Works Committee Tuesday, December 30, 2025 7:00 PM Temporary Village Hall 1000 E. Woodfield Rd. Schaumburg, IL 60193 I. CALL TO ORDER II. APPROVAL OF MINUTES A. December 4, 2025 III. NEW BUSINESS A. Recommendation to Approve a Code Amendment to Title 15: Land Usage, Chapter 150 Flood Control B. Recommendation to Authorize Participation in the Sourcewell Cooperative Purchasing Program and Award the Purchase of Fitness Equipment to Life Fitness, LLC C. Recommendation to Approve Participation in the ISAWWA Water Ambassador Program and Authorize Staff to Pursue Water Ambassador Community Certification for the Village of Schaumburg, including Implementation of Outreach Initiatives and Promotion of the Water 1-2-3 Guide for Elected Officials D. Recommendation to Approve Completion of the Plans and Specifications for Bidding of the FY 26/27 Street Improvement Program E. Recommendation to Approve Ratification of Expenditures for the American Lane and Plaza Drive Improvements with Builders Paving IV. COMMENTS FROM THE PUBLIC V. ADJOURNMENT VI. NEXT VILLAGE BOARD MEETING A. January 13, 2026 A G E N D A In compliance with the Americans with Disabilities Act and other applicable Federal and State laws, the 1

In compliance with the Americans with Disabilities Act and other applicable Federal and State laws, the meeting will be accessible to individuals with disabilities. Persons requiring auxiliary aids and/or services should contact the Village Manager's Office at 847.923.4705, preferably no later than five days before the meeting. 2

Showing the first 24,000 of 449,797 characters. The full document is at the source.

AGENDA Engineering and Public Works Committee Tuesday, December 30, 2025 7:00 PM Temporary Village Hall 1000 E. Woodfield Rd. Schaumburg, IL 60193 I. CALL TO ORDER II. APPROVAL OF MINUTES A. December 4, 2025 III. NEW BUSINESS A. Recommendation to Approve a Code Amendment to Title 15: Land Usage, Chapter 150 Flood Control B. Recommendation to Authorize Participation in the Sourcewell Cooperative Purchasing Program and Award the Purchase of Fitness Equipment to Life Fitness, LLC C. Recommendation to Approve Participation in the ISAWWA Water Ambassador Program and Authorize Staff to Pursue Water Ambassador Community Certification for the Village of Schaumburg, including Implementation of Outreach Initiatives and Promotion of the Water 1-2-3 Guide for Elected Officials D. Recommendation to Approve Completion of the Plans and Specifications for Bidding of the FY 26/27 Street Improvement Program E. Recommendation to Approve Ratification of Expenditures for the American Lane and Plaza Drive Improvements with Builders Paving IV. COMMENTS FROM THE PUBLIC V. ADJOURNMENT VI. NEXT VILLAGE BOARD MEETING A. January 13, 2026 A G E N D A In compliance with the Americans with Disabilities Act and other applicable Federal and State laws, the 1

In compliance with the Americans with Disabilities Act and other applicable Federal and State laws, the meeting will be accessible to individuals with disabilities. Persons requiring auxiliary aids and/or services should contact the Village Manager's Office at 847.923.4705, preferably no later than five days before the meeting. 2

AGENDA ITEM SUMMARY Presenter: Lead Department: Engineering and Public Works December 4, 2025 12/30/25 Engineering and Public Works Committee Executive Summary: Recommended Action: ATTACHMENTS: • December 4, 2025 3

4

5

6

7

8

AGENDA ITEM SUMMARY Presenter: Ryan Franklin, Assistant Director, Community Development Department Lead Department: Community Development Recommendation to Approve a Code Amendment to Title 15: Land Usage, Chapter 150 Flood Control 12/30/25 Engineering and Public Works Committee Executive Summary: Schaumburg participates in the National Flood Insurance Program (NFIP). Participation in the program offers financial protection for property owners by providing coverage for flood damage. Some federally backed mortgages for homes in high-risk areas require participation in NFIP. Communities must also participate in the NFIP for residents to be eligible for some federal disaster assistance and grants. The Village’s Floodplain Ordinance is being revised to adopt the Federal Emergency Management Agency (FEMA) approved revised floodplain maps for Cook County, effective January 23, 2026. The ordinance is being updated to reference the new adoption date of the Flood Insurance Rate Maps (FIRMs). Being in this program requires the village to adopt the most current maps. Currently, the Floodplain Ordinance contains references to Cook County FIRMs from 2008 and a couple of DuPage FIRM panels from 2019. With these new maps coming out, the Village Code will have to include references to: (1) Cook County FIRM panels from 2008, (2) the Cook County FIRM panels that will be updated effective 2026, and (3) the couple of DuPage FIRM panels from 2019. And to further clarify, only 3 of the Cook County FIRM panels within the Village are being updated; all others will keep their effective date of 2008. In conjunction with updating the Code to match the upcoming FIRM effective dates, Illinois Department of Natural Resources is also requesting updates to the floodplain regulations based on their newest model language. Our engineering consultant, Christopher Burke Engineering, has reviewed the IDNR model ordinance. They have redlined our existing ordinance to identify which areas will need to be amended. The redline and proposed ordinance are attached for review. The map update impacts three FIRM panels within the Village of Schaumburg limits. The floodplain boundary shown on the three panels largely remains unchanged. However, some buildings that were previously depicted outside the floodplain limits on the 2008 panels are now identified within the 100- year floodplain on the updated panels. This change is due to increases in the flood elevation based on updated stormwater studies. There are mechanisms in place from FEMA for the property owner to appeal / contest the need for flood insurance through the preparation of a certified survey and filing the appropriate paperwork. 9

Recommended Action: The Village Manager recommends the Engineering and Public Works Committee recommend the Village Board approve the amendment to the municipal code Title 15: Land Usage, Chapter 150 Flood Control. ATTACHMENTS: • Schaumburg - Ordinance re_ Floodplain Regulations - final draftrf.docx • CHAPTER_150____FLOOD_CONTROL_CBBEL121625 (3)rf1finalredlinepdf.pdf • 2008-2026 FIRM Comparison - Schaumburg-F (1)rf.pdf 10

PUBLICATION OF: ORDINANCE NO. 26-___ AN ORDINANCE AMENDING TITLE 15, CHAPTER 150 WITH REGARD TO FLOODPLAIN REGULATIONS ADOPTED: _________, 2026 PUBLISHED IN PAMPHLET FORM PURSUANT TO AUTHORIZATION AND DIRECTION OF THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF SCHAUMBURG ON _________, 2026 11

ORDINANCE NO. 26-___ AN ORDINANCE AMENDING TITLE 15, CHAPTER 150 WITH REGARD TO FLOODPLAIN REGULATIONS Page 2 of 44 2075786_1 WHEREAS, the Village of Schaumburg, as a home rule unit of local government as provided by Article VII, Section 6 of the Illinois Constitution of 1970, has the authority to exercise any power and perform any function pertaining to its government and affairs except as limited by Article VII, Section 6 of the Illinois Constitution of 1970; and WHEREAS, the Village pursuant to the police powers granted to by the Illinois Municipal Code (65 ILCS 5/1-2-1, 5/11-12-12, 5/11-30-2, 5/11-30-8 and 5/11-31-2), wishes to establish eligibility in the National Flood Insurance Program and in order to do so must meet the requirements of Title 44 of the Code of Federal Regulations (CFR) Sections 59 to 79 of the National Flood Insurance Program Regulations, necessary for such participation; and WHEREAS, the President and Board of Trustees of the Village of Schaumburg find it to be in the best interest of the Village to establish rules and regulations for floodplain management throughout the Village and superseding any less restrictive municipal rules and regulations therein. NOW THEREFORE, BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF SCHAUMBURG: SECTION ONE: The recitals above shall be and are hereby incorporated in this Section 1 as if restated herein. SECTION TWO: Title 15, Chapter 150 of the Schaumburg Village Code is hereby amended to read in its entirety as follows: § 150.01 PURPOSE. This floodplain ordinance is enacted pursuant to the police powers granted to the village by 65 Illinois Compiled Statutes 5/2-21, 5/11-30-8, 5/11-31-2 and its home rule powers. The purpose of this chapter is to maintain this village's eligibility in the national flood insurance program; to minimize potential losses due to periodic flooding including loss of life, loss of property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare; and to preserve and enhance the quality of surface waters, conserve economic and natural values and provide for the wise utilization of water and related land resources. The ordinance codified herein is adopted in order to accomplish the following specific purposes: (A) To meet the requirements of 615 Illinois Compiled Statutes 5/4.9 of the Rivers, Lakes and Streams Act of the State of Illinois, approved September 6, 1990, as amended; (B) To assure that new development does not increase the flood or drainage hazards to others, or create unstable conditions susceptible to erosion; (C) To protect new buildings and major improvements to buildings from flood damage; 12

ORDINANCE NO. 26-___ AN ORDINANCE AMENDING TITLE 15, CHAPTER 150 WITH REGARD TO FLOODPLAIN REGULATIONS Page 3 of 44 2075786_1 (D) To protect human life and health from the hazards of flooding; (E) To lessen the burden on the taxpayer for flood control projects, repairs to flood damaged public facilities and utilities, and flood rescue and relief operations; (F) To make federally subsidized flood insurance available for property in the village by fulfilling the requirements of the national flood insurance program; (G) To comply with the rules and regulations of the national flood insurance program codified as 44 CFR 59-79, as amended; (H) To protect, conserve, and promote the orderly development of land and water resources; (I) To preserve the natural hydrologic and hydraulic functions of watercourses and floodplains and to protect water quality and aquatic habitats; (J) To preserve the natural characteristics of stream corridors in order to moderate flood and stormwater impacts, improve water quality, reduce soil erosion, protect aquatic and riparian habitat, provide recreational opportunities, provide aesthetic benefits and enhance community and economic development. § 150.02 DEFINITIONS. For the purposes of this chapter, the following definitions are adopted: ACT: The Rivers, Lakes and Streams Act, 615 ILCS 5/4.9, September 6, 1990. APPLICANT: Any person, firm, corporation or agency which submits an application. APPROPRIATE USE: Only uses of the designated floodway that are permissible and will be considered for permit issuance. The only uses that will be allowed are as specified in subsection 150.07(B)(1) of this chapter. BASE FLOOD: The flood having a one percent (1%) probability of being equaled or exceeded in any given year. The base flood is also known as the 100-year frequency flood event. Application of the base flood elevation at any location is as defined in section 150.05 of this chapter. BASE FLOOD ELEVATION (BFE): The height in relation to the North American Vertical Datum (NAVD) of 1988 (or other datum, where specified) of the crest of the base flood. BUILDING: A structure that is principally aboveground and is enclosed by walls and a roof. The term includes a gas or liquid storage tank, a manufactured home, mobile home or a prefabricated building. This term also includes recreational vehicles and travel trailers to be installed on a site for more than one hundred eighty (180) days. CHANNEL: Any river, stream, creek, brook, branch, natural or artificial depression, ponded area, flowage, slough, ditch, conduit, culvert, gully, ravine, wash, or natural or manmade drainageway, which has a definite bed and banks or shoreline, in or into which surface or groundwater flows, either perennially or intermittently. 13

ORDINANCE NO. 26-___ AN ORDINANCE AMENDING TITLE 15, CHAPTER 150 WITH REGARD TO FLOODPLAIN REGULATIONS Created: 2025-12-04 15:03:43 [EST] (Supp. No. 54, Update 1) Page 4 of 44 CHANNEL MODIFICATION: Alteration of a channel by changing the physical dimensions or materials of its bed or banks. Channel modification includes: damming, riprapping (or other armoring), widening, deepening, straightening, relocating, lining and significant removal of bottom or woody vegetation. Channel modification does not include the clearing of dead or dying vegetation, debris, or trash from the channel. Channelization is a severe form of channel modification involving a significant change in the channel cross section and typically involving relocation of the existing channel (e.g., straightening). COMPENSATORY STORAGE: An artificially excavated, hydraulically equivalent volume of storage within the SFHA used to balance the loss of natural flood storage capacity when artificial fill or structures are placed within the floodplain. The uncompensated loss of natural floodplain storage can increase off-site floodwater elevations and flows. CONDITIONAL APPROVAL OF A DESIGNATED FLOODWAY MAP CHANGE: Preconstruction approval by IDNR/OWR and the Federal Emergency Management Agency of a proposed change to the floodway map. This preconstruction approval, pursuant to this title, gives assurances to the property owner that once an appropriate use is constructed according to permitted plans, the floodway map can be changed, as previously agreed, upon review and acceptance of as built plans. CONDITIONAL LETTER OF MAP REVISION (CLOMR): A letter which indicates that the Federal Emergency Management Agency will revise base flood elevations, flood insurance rate zones, flood boundaries or floodway as shown on an effective flood hazard boundary map or Flood Insurance Rate Map, once the as built plans are submitted and approved. CONTROL STRUCTURE: A structure designed to control the rate of flow that passes through the structure, given a specific upstream and downstream water surface elevation. DAM: All obstructions, wall embankments or barriers, together with their abutments and appurtenant works, if any, constructed for the purpose of storing or diverting water or creating a pool. Undergroundwater storage tanks are not included. DESIGNATED FLOODWAY: Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. In no case shall the designated height be more than 0.1 foot at any point within the community. The floodway for the floodplains shall be as delineated on the FIRM prepared by FEMA. For other areas, the entire floodplain shall be considered to be the floodway unless an analysis is approved by the IDNR/OWR demonstrating that a project site is outside of the floodway. If an floodway analysis is not required by IDNR/OWR under 17 ILL. ADM. Code 3700, the floodways shall be according to the best data available from the Federal, State, or other sources. (A) The floodways are designated on panel numbers 17031C0179J, 17031C0183J, 17031C0184J, 17031C0187J, 17031C0188J, 17031C0189J, 17031C0191J, 17031C0192J, 14

ORDINANCE NO. 26-___ AN ORDINANCE AMENDING TITLE 15, CHAPTER 150 WITH REGARD TO FLOODPLAIN REGULATIONS Created: 2025-12-04 15:03:43 [EST] (Supp. No. 54, Update 1) Page 5 of 44 17031C0193J, 17031C0194J, 17031C0307J, and 17031C0330J, dated August 19, 2008, of the countywide Flood Insurance Rate Maps for Cook County, Illinois and panel numbers 17031C0167K, 17031C0169K, and 17031C0186K, dated January 23, 2026, of the countywide Flood Insurance Rate Maps for Cook County, Illinois, and panel numbers 17043C0051J and 17043C0052J, dated August 1, 2019, of the countywide Flood Insurance Rate Maps for DuPage County, prepared by FEMA. When two (2) floodway maps exist for a waterway, the more restrictive floodway limit shall prevail. (B) The floodways for those parts of unincorporated Cook County that are within the one and one-half (1½) mile extraterritorial jurisdiction of the village and may be annexed into the village are shown on panel numbers 17031C0156K and 17031C0178K, dated January 23, 2026, of the countywide Flood Insurance Rate Maps for Cook County prepared by FEMA, and panel numbers 17043C0051J and 17043C0052J, dated August 1, 2019, of the countywide Flood Insurance Rate Maps for DuPage County prepared by FEMA. (C) To locate the designated floodway boundary on any site, the designated floodway boundary should be scaled off the designated floodway map and located on a site plan, using reference marks common to both maps. Where interpretation is needed to determine the exact location of the designated floodway boundary, IDNR/OWR should be contacted for the interpretation. DEVELOPMENT: Any manmade change to real estate, including: (A) Construction, reconstruction, repair, or placement of a building or any addition to a building; (B) Drilling, mining, installing utilities, construction of roads, bridges, or similar projects; (C) Demolition of a structure or redevelopment of a site; (D) Clearing of land as an adjunct of construction; (E) Construction or erection of levees, walls, fences, dams, or culverts; channel modification; filling, dredging, grading, excavating, paving, or other nonagricultural alterations of the ground surface; storage of materials; (F) Any other activity of man that might change the direction, height, or velocity of flood or surface water, including extensive vegetation removal. DIRECTOR OF ENGINEERING AND PUBLIC WORKS: The duly appointed head of the department of engineering and public works or his or her designee. ELEVATION CERTIFICATES: A form published by the federal emergency management agency that is used to certify the elevation to which a building has been elevated. EROSION: The general process whereby soils are moved by flowing water or wave action. 15

ORDINANCE NO. 26-___ AN ORDINANCE AMENDING TITLE 15, CHAPTER 150 WITH REGARD TO FLOODPLAIN REGULATIONS Created: 2025-12-04 15:03:43 [EST] (Supp. No. 54, Update 1) Page 6 of 44 EXEMPT ORGANIZATIONS: Organizations which are exempt from this chapter per the Illinois Compiled Statutes including state, federal or local units of government. EXISTING MANUFACTURED HOME PARK OR SUBDIVISION: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed or buildings to be constructed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community. EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION: The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads). FEMA: Federal Emergency Management Agency and its regulations at 44 CFR 59-79, as amended. FLOOD: A general and temporary condition of partial or complete inundation of normally dry land areas from overflow of inland or tidal waves, or the unusual and rapid accumulation or runoff of surface waters from any source. FLOOD FREQUENCY: A period of years, based on a statistical analysis, during which a flood of a stated magnitude may be expected to be equaled or exceeded. FLOOD FRINGE: That portion of the floodplain outside of the designated floodway. FLOOD INSURANCE RATE MAPS (FIRM): A map prepared by the Federal Emergency Management Agency that depicts the special flood hazard area (SFHA) within a community. This map includes insurance rate zones and floodplains and may or may not depict floodways. FLOOD INSURANCE STUDY (FIS): An examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations. FLOOD PROTECTION ELEVATION (FPE): The elevation of the base flood or 100-year frequency flood plus two feet (2') of freeboard at any given location in the SFHA. FLOODPLAIN AND SPECIAL FLOOD HAZARD AREA (SFHA) : These two terms are synonymous. SFHA is the land in the floodplain within a community subject to a 1 percent or greater chance of flooding in any given year. Those lands within the jurisdiction of the community and the extraterritorial jurisdiction of the community, or that may be annexed into the community, that are subject to inundation by the base flood. The floodplains of the community are identified as such on panel number(s) of the countywide FIRM prepared by the FEMA. The area may be designated as Zone A on the FHBM. After detailed ratemaking has 16

ORDINANCE NO. 26-___ AN ORDINANCE AMENDING TITLE 15, CHAPTER 150 WITH REGARD TO FLOODPLAIN REGULATIONS Created: 2025-12-04 15:03:43 [EST] (Supp. No. 54, Update 1) Page 7 of 44 been completed in preparation for publication of the Flood Insurance Rate Map, Zone A usually is refined into Zones A, AO, AH, A1-30, AE, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, VO, or V1-30, VE, or V. SFHA may also refer to areas identified by the community that are flood prone and designated from other federal state or local sources of data including but not limited to historical flood information reflecting high water marks, previous flood inundation areas, and flood prone soils associated with a watercourse. (A) The floodplains are those lands within the jurisdiction of the village that are subject to inundation by the base flood or 100-year frequency flood. The BFEs for the floodplains shall be as delineated on the base flood profiles in the countywide Flood Insurance Study (FIS) of Cook County prepared by FEMA and dated January 23, 2026. Flood Insurance Rate Map (FIRM) panel numbers 17031C0167K, 17031C0169K, and 17031C0186K, dated January 23, 2026 and Flood Insurance Rate Map (FIRM) panel numbers 17031C0179J, 17031C0183J, 17031C0184J, 17031C0187J, 17031C0188J, 17031C0189J, 17031C0191J, 17031C0192J, 17031C0193J, 17031C0194J, 17031C0307J, and 17031C0330J, dated August 19, 2008. The BFEs for the floodplains shall be as delineated on the base flood profiles in the countywide Flood Insurance Study (FIS) of DuPage County prepared by FEMA and dated August 1, 2019. Flood Insurance Rate Map (FIRM) panel numbers 17043C0051J and 17043C0052J, dated August 1, 2019. (B) The SFHAs of those parts of unincorporated Cook County that are within the one and one- half (1½) mile extraterritorial jurisdiction of the village and may be annexed into the village are shown on panel numbers 17031C0156K and 17031C0178K, dated January 23, 2026, of the countywide Flood Insurance Rate Maps for Cook County prepared by FEMA, and panel numbers 17043C0051J and 17043C0052J, dated August 1, 2019, of the countywide Flood Insurance Rate Maps for DuPage County prepared by FEMA. (C) USGS-NIPC hydrologic investigation atlases (floods of record) if included as best available data in the Illinois State Water Survey Floodplain Information Repository. FLOODPROOFING: Any combination of structural and nonstructural additions, changes or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. FLOODPROOFING CERTIFICATE: A form published by the Federal Emergency Management Agency that is used to certify that a building has been designed and constructed to be structurally dry floodproofed to the flood protection elevation. FLOODWAY: See definition of Designated Floodway. FREEBOARD: An increment of elevation added to the base flood elevation to provide a factor of safety for uncertainties in calculations, unknown localized conditions, wave actions and unpredictable effects such as those caused by ice or debris jams. HISTORIC STRUCTURE: Any structure that is: 17

ORDINANCE NO. 26-___ AN ORDINANCE AMENDING TITLE 15, CHAPTER 150 WITH REGARD TO FLOODPLAIN REGULATIONS Created: 2025-12-04 15:03:43 [EST] (Supp. No. 54, Update 1) Page 8 of 44 (A) Listed individually in the National Register of Historic Places or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register. (B) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district. (C) Individually listed on the state inventory of historic places by the Illinois Historic Preservation Agency. (D) Individually listed on a local inventory of historic places that has been certified by the Illinois Historic Preservation Agency. HYDROLOGIC AND HYDRAULIC CALCULATIONS: Engineering analyses which determine expected flood flows and flood elevations based on land characteristics and rainfall events. IDNR/OWR: Illinois Departmen

Official record

ArtifactSourceState
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Engineering and Public Works Committee — Minutes
  • Engineering and Public Works Committee
  • Engineering and Public Works Committee — Packet

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • No audio or video recording is linked.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: fa8d71b12c0fc2da131471ad56374c71. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record