MELBOURNEBEACH (BREVARD COUNTY) · LOCALDecisions publishedPartial coverage

261104-etcm

Wednesday, November 4, 2026 · Government meeting record

The 30-second read

Recorded outcome

Town lists shelter-in-place advisories and closed schools as emergency measures

The Melbourne Beach Town Commission is considering a 12-month pilot program that would allow the Town to use unused fill sand from permitted private construction sites to quickly fill sandbags for residents during flood emergencies. The proposal includes pre-signed builder agreements guaranteeing sand replacement or reimbursement within 72 hours, an 8,000 dollar budget for equipment and initial supplies, and procedures for staging and distributing bags.

Why it matters

Local homeowners facing flood risks would receive sandbags at their doorsteps within hours of an activation, while participating builders would have their removed sand replaced with fresh fill at no net cost.

What happens next

No later meeting or follow-up date is stated in the reviewed record.

An official outcome record - an action agenda or minutes - is published for this meeting.

Captured actions

19

Recorded outcomes

0

Source artifacts

1

Record text

No recording or transcript is held for this meeting.

20+″ of rain recorded in Melbourne Beach, Nov. 1–3, 2026 T O W N O F M E L B O U R N E B E A C H , F L O R I D A Historic Rainfall & Flooding Understanding the damage from the November 1-3, 2026 storm Briefing for Town Commission | November 2026

W H Y I T F L O O D E D More rain than the drainage system could move 1 Moisture feed An upper-level disturbance and a low- pressure system over the Gulf pushed persistent onshore flow across the peninsula. 2 A stalled storm Rounds of heavy rain began Sunday, and the system sat over Brevard County through Monday. 3 Drainage overwhelmed Officials said stormwater systems, however robust, cannot move that much water that quickly. 4 Water with nowhere to go Neighborhoods, roads and beachside canals filled and overflowed; saturated ground added to the damage. “One in a 1,000-year event.” The National Weather Service used this description for rainfall in southern Brevard County; other forecasters cited a 1-in-100-year flood in the hardest-hit areas.

D A M A G E A N D D I S R U P T I O N Flooding reached homes, roads and daily life Homes Neighborhoods were swamped; at least 30 residents reported water intrusion into their homes in Melbourne Beach. Roads and vehicles Many roads were impassable, and abandoned vehicles blocked roadways. Schools and business Brevard Public Schools closed Monday and Tuesday; businesses were disrupted. Water service The City of Melbourne remains under a boil-water advisory; no major plant failures were reported. Trees and power lines Saturated ground caused trees to fall, threatening power lines. Public services Trash pickup was paused and area hospitals canceled elective surgeries. Sources: Yahoo/ABC News (Nov. 3, 2026); WKMG ClickOrlando; WESH; City of Melbourne advisory (Nov. 2, 2026)

S T O R M D A M A G E A T A G L A N C E Riverside Drive 23.69″ Peak rainfall in Brevard County (Grant-Valkaria) 20+″ Rainfall recorded in Melbourne Beach 160+ People rescued in Brevard by FWC (60+) and sheriff’s deputies (100+) 2 Lives lost in the Palm Bay flooding

S T O R M D A M A G E A T A G L A N C E Cherry Drive, Elm Avenue and Avenue B

S T O R M D A M A G E A T A G L A N C E 6th Avenue Boat Ramp

T I M E L I N E Three days from first rain to damage assessment S U N , N O V . 1 Rain begins • Rounds of heavy rain start across Central Florida • Onshore flow keeps feeding the system M O N , N O V . 2 Peak flooding • Rescues by airboat, helicopter and high-water vehicles • Shelter-in-place advisories; schools closed • Rain moves out in the evening T U E , N O V . 3 Assessment begins • Floodwaters slowly recede • County starts damage assessments • Palm Bay confirms two deaths; state of emergency declared Sources: USA TODAY; WKMG ClickOrlando; ABC News; WESH; Fox Weather (Nov. 2–3, 2026)

W H A T W E D O N ’ T K N O W Y E T The full extent of damage is still being measured Months Brevard County Emergency Management says assessment and repairs “could go on for months and months.” Roadways beneath floodwater Officials warn pavement and subgrade may be damaged under flooded areas. Water treatment plants Being examined; no major plant failures reported so far. Power and tree damage Saturated ground continues to bring down trees and lines. Hardest-hit areas Assessments will map the worst damage and set repair priorities. Source: WESH, Nov. 3, 2026; WKMG ClickOrlando, Nov. 2, 2026

M E L B O U R N E B E A C H A S S E S S M E N T Documenting the Town’s damage, area by area Area What is documented Lead Status Homes and structures Flooded properties, water depth, habitability Fire and Building Departments Figures pending Streets and drainage Road damage, blocked drains, canal overflow Public Works Figures pending Water and Sewer Service interruptions and system condition Town Manager/Public Works (liaison with utilities) Figures pending Town facilities Buildings, equipment and records Public Works Figures pending Costs and funding Response costs, repair estimates, aid eligibility Town Manager/Finance Figures pending Town-specific damage figures will be added here as each assessment is completed and verified. Framework for Town staff; leads are suggested and can be adjusted

N E X T S T E P S Recovery starts with staying safe Floodwaters can take several days to drain, even after the rain stops. Stay off flooded roads Avoid standing water, fast-moving water and downed power lines. FOR YOUR SAFETY, adhere to traffic cones and police tape. Document damage Take photos and notes before cleanup to support insurance and aid claims. Watch for advisories Follow Town and county notices on boil-water, road closures and services. Report damage to the Town Contact the Town Office so staff can include your property in assessments. Guidance reflects advice from Brevard County officials (Nov. 2–3, 2026); Town of Melbourne Beach, Florida

If resident’s homes have been damaged or flooded by the rain, please use the QR code (or link: https://crisistrack.juvare.com/public/brevardFL/request.html ) to help Brevard County Emergency Management assess community impacts and guide recovery efforts. This form is not an application for assistance.

The Emergency SandBank Residential Flood Mitigation Pilot Nov 4, 2026 · @Alison Executive summary The Emergency SandBank Residential Flood Mitigation Pilot lets the Town fill sandbags for residents within about three hours of a flood threat, using sand already sitting on permitted construction sites and the full-time Fire and Public Works crews the Town already pays. The Town keeps a registry of active sites with unused sand, builders pre- sign a one-page participation agreement, and every yard taken is replaced in kind within 24–72 hours or reimbursed at invoice price. Setup costs about $5,000–$8,000; each activation costs roughly $1,500–$3,000, almost all of it replacement sand. The October 31–November 2, 2026 storm is the case for it. Roughly 20 inches of rain fell, homes flooded, the Town had no sand, and several residential sites lost their fill piles into the Indian River Lagoon. Crews and trucks were on duty and could have bagged that sand for the homes a few blocks away; nothing but a list, an agreement, and a procedure was missing. The program is positive-sum. Builders lose nothing (sand that would have washed away comes back as fresh fill), residents get bags in hours instead of never, the lagoon is spared a pulse of sediment, and the Town gets a flood reserve already distributed across the neighborhoods that flood, with no stockpile yard, no storage cost, and no new staff. What is requested A 12-month pilot resolution covering the 2027 hurricane season. Approval of the form Builder Participation Agreement and pilot terms (see the Sample agreements tab). Up to $8,000 for bags, two hopper funnels, and a standing replacement-sand purchase order. A report back to the Commission in December 2027 with a recommendation on permanent adoption. The rest of this proposal gives the problem, the design, the operating procedure, the legal basis, roles, cost, timeline, risks, and the Commission action requested. Proposal Page 1 of 12

The problem the October 31–November 2, 2026 storm exposed About 20 inches of rain fell on Melbourne Beach over three days, and homes flooded while usable sand sat unused a few blocks away. Several residential construction sites held piles of fill sand that had not yet been placed; much of it washed off-site into the Indian River Lagoon, becoming a pollutant instead of a resource. At the same time the Town had no sand on hand, so residents who saw water rising toward their doors had nothing to bag. The Town did have what it needed in people and equipment. The Fire Department and Public Works are staffed full time, on site, with trucks and loaders, and they were available during the storm. What was missing was sand within reach and a plan that let crews go get it. The mismatch is the whole case for the pilot: Sand was present in Town, on private sites, loose and about to wash away. Labor and trucks were present and paid for, but idle on this task. Residents needed filled bags in a window of a few hours, not a few days. No one had authority, a list, or a procedure to connect the three. The idea in one page SandBank treats unused sand on construction sites as a borrowed emergency reserve, not Town inventory. Four pieces make it work: 1. Registry. The Building Department logs every active permit with a sand or fill pile on site, its approximate volume, access point, and the builder's after-hours contact. The list is refreshed at each inspection and reviewed monthly during hurricane season (June 1–November 30). 2. Pre-signed participation agreement. At permit issuance (or by letter to existing permits), the builder signs a one-page agreement allowing the Town to take sand during a declared flood emergency in exchange for guaranteed replacement or reimbursement. Participation is voluntary; the registry notes who has signed. 3. Activation and bagging. When the Town Manager (or designee) declares a SandBank activation under an existing weather warning, Public Works pulls sand from the nearest registered sites, and Fire and Public Works crews fill bags at a staging point or directly at the site. Residents collect bags, and crews deliver to residents who cannot. Proposal Page 2 of 12

4. Replacement within 24–72 hours. The Town orders replacement sand from a pre- arranged vendor the moment sand is taken, delivers it to the site within 72 hours, and documents volume both ways. If the builder prefers, the Town pays the builder's invoice price instead. The builder loses nothing: sand that would have been lost to the river or sat idle during a storm comes back as fresh fill a day or two later. The Town gains a reserve that is already distributed across the neighborhoods that flood, with no yard, no stockpile, and no storage cost. Why this is positive-sum Every party is better off than under the status quo, and the gains come from the same event that would otherwise produce only losses. Less waste. Fill sand left loose on a site during a storm is partly or wholly lost: it washes off, compacts into mud, or has to be re-graded and topped up at the builder's cost. SandBank converts that about-to-be-lost sand into bags that protect homes, then returns clean fill after the storm. The Town also avoids buying and storing a stockpile that sits for years, hardens, grows weeds, and is itself at risk of washing out during the exact event it was bought for. Fast activation. The Town's barrier to sandbags today is not labor or trucks; it is that sand is miles away and no one is authorized to go get it. With sites registered and agreements pre-signed, the Manager can activate on a Flood Watch and crews can be filling bags within the hour, because the sand is already inside Town limits, often on the same streets that flood. Target: first bags in residents' hands within three hours of activation. Keeps sand out of the river and the stormwater system. Sand that washes off a site does not disappear. It enters swales, catch basins, and outfalls, reduces the capacity of the stormwater system the Town maintains, and ends up as sediment in the Indian River Lagoon, where it smothers seagrass and carries whatever was on the site with it. Moving that sand into bags before the peak of the storm, and replacing it after, removes a sediment source at the moment it is most likely to mobilize. It also aligns the pilot with the Town's stormwater utility purposes and the Lagoon basin management goals the Town is already expected to support. No loser in the transaction Proposal Page 3 of 12

How it works: operating procedure Before the season (standing) 1. Building Department adds a "sand on site" field to the permit record and updates it at each inspection; the registry is exported to Fire and Public Works monthly. 2. Town Clerk mails the participation agreement to every open permit holder; new permits sign at issuance. 3. Public Works keeps 2,000 empty sandbags, ties, two hopper funnels, and shovels on the PW truck or at the station. 4. Finance holds a purchase order with a sand vendor for up to 100 cubic yards, deliverable within 48 hours of a call. Trigger 5. A National Weather Service Flood Watch or Flash Flood Warning for south Brevard, or a Town or County emergency declaration, lets the Town Manager (or Fire Chief if the Manager is unreachable) declare a SandBank activation. The declaration names the Party Gives Gets Builder Temporary use of sand that was at risk of washing away Fresh fill within 72 hours or invoice-price reimbursement; a site that sheds less sediment; goodwill with neighbors Resident Nothing Filled bags within hours, at the doorstep if they cannot self- serve Town Bags, funnels, a replacement- sand reserve, a registry A distributed flood reserve with no yard or storage cost; fewer flooded homes; less sediment in Town stormwater infrastructure; a FEMA-reimbursable protective measure Lagoon and stormwater system Nothing Less sediment and debris during the highest-flow hours of the storm Proposal Page 4 of 12

sites to draw from and the staging point. During the event 6. Public Works notifies each builder by phone or text (no response required), photographs the pile, and takes sand by loader or by hand; the crew records the estimated yards taken. 7. Fire and PW crews fill bags at the staging point (Town Hall or the fire station) or at the site if it is closer to the homes at risk. 8. The Town posts pickup instructions on its website, social media, and the emergency text list; crews deliver to residents who are elderly, disabled, or already cut off, with a cap of 10–15 bags per home during the pilot. 9. Residents are reminded that bags are for door and garage thresholds and that sandbags do not stop rising groundwater or sewer backup. After the event (24–72 hours) 10. Public Works calls the replacement order the same day sand is taken and delivers it to each site within 72 hours; the builder signs a receipt or elects reimbursement. 11. The Town retrieves used bags from the right-of-way on request and disposes of them as flood debris (bags that touched sewer-mixed water are not reused). 12. The Fire Chief files a one-page after-action report: sites used, yards taken, bags filled, homes served, replacement completed, cost. Legal basis and the preferred voluntary-agreement route The pilot should run on consent, with Chapter 252 emergency powers held in reserve. A pre-signed participation agreement makes the sand a contracted resource, so taking it is performance of a contract rather than a taking of private property. That avoids any Article X, § 6 compensation claim, any argument over valuation, and any need to declare a local state of emergency just to fill bags. Citations below are from memory and should be confirmed by the Town Attorney before adoption. Statutory backstop (Fla. Stat. ch. 252, State Emergency Management Act) § 252.38(3)(a) gives municipalities emergency management powers, including the authority to declare a local state of emergency, to obtain and distribute materials and supplies for emergency purposes, and to use available resources of the political subdivision as reasonably necessary to cope with the emergency. Proposal Page 5 of 12

§ 252.43 provides compensation for property commandeered or used under the chapter, measured by fair value, which is why a builder who has not signed is still protected if the Town ever has to take sand without consent. § 252.38 also requires that municipal emergency plans be consistent with the County's; the Fire Chief should file the SandBank procedure with Brevard County Emergency Management as an annex to the Town's plan. Why the agreement does the real work Consent removes the takings question and the need for an emergency declaration before crews can act. It fixes the remedy in advance: replacement sand in kind within 72 hours, or payment at the builder's documented invoice price, builder's choice. It allocates risk: the Town's crews are covered by the Town's sovereign immunity and workers' compensation (§ 768.28), the builder is released from liability for Town personnel on site during the activation, and the Town indemnifies the builder for damage its crews cause to the site. It is short enough to sign at the permit counter: one page, plus a site sketch showing the pile and access. Procurement and budget Replacement sand is purchased under a standing purchase order within the Manager's existing spending authority; an activation does not require Commission action. Costs are tracked by activation so they can be claimed under a FEMA Public Assistance declaration (Category B, emergency protective measures) if one is later issued for the event. Adoption vehicle A Commission resolution adopting the pilot and the form agreement, directing the Manager to build the registry, and authorizing the standing purchase order. No ordinance is needed because the program creates no new regulation; it is an operational procedure under existing emergency and purchasing authority. Proposal Page 6 of 12

Roles and responsibilities Who Before the season During activation After Town Commission Adopts the pilot resolution and form agreement; funds bag inventory and sand reserve None required Receives after-action report; decides whether to make the program permanent Town Manager Owns the program; signs standing sand purchase order Declares activation; names sites and staging point Approves replacement orders and reimbursements Fire Chief Files the procedure with County Emergency Management; trains crews on bagging and distribution Runs the staging point; leads bagging and resident delivery Writes the one-page after-action report Public Works Director Stores bags, ties, funnels; keeps loader and truck ready Draws sand from registered sites; records yards taken; hauls to staging Orders and delivers replacement sand within 72 hours; retrieves used bags Building Official Maintains the sand- on-site registry; collects signed agreements at permit issuance Confirms site access and contacts Updates registry after replacement Town Clerk Mails agreements to existing permit holders; keeps signed originals Posts pickup notices Files receipts and reimbursements with Finance Finance Sets up the purchase order and a SandBank cost code Tracks activation costs Prepares FEMA reimbursement package if a declaration follows Proposal Page 7 of 12

Resources and estimated cost The pilot costs about $7,000 to stand up and roughly $1,500–$3,000 per activation, almost all of it replacement sand. Figures are planning estimates from memory and should be replaced with Public Works quotes. Per activation Sand taken: 20–40 cu yd fills roughly 800–1,600 bags (a cubic yard fills about 40 bags at 35–40 lb each). Replacement sand: 20–40 cu yd at $35–$50 per yard delivered = $700–$2,000. Who Before the season During activation After Participating builders Sign agreement; keep pile accessible and mapped Take the notification call; no action required Sign replacement receipt or submit invoice Item Quantity Est. cost (USD) Notes Empty polypropylene sandbags, 14 × 26 in. 2,000 700–1,000 Reorder point at 500 Bag ties or zip ties 2,500 150 Sandbag hopper funnels (2- person) 2 400–600 Doubles fill rate Shovels, gloves 10 sets 300 Mostly on hand Replacement-sand reserve (standing PO) 100 cu yd 3,500– 5,000 Delivered fill sand, south Brevard; drawn down only on activation Registry and agreement setup Staff time 0 Building and Clerk, existing staff Printing, signage, mailing — 200 Total to launch ~5,300– 7,300 Proposal Page 8 of 12

Labor: existing on-duty Fire and Public Works staff; overtime only if the event already triggers it. Each activation is logged under a SandBank cost code for possible FEMA Category B reimbursement. What the Town does not need No sand stockpile yard, no storage lease, no annual sand purchase that goes stale or washes away. No new positions or seasonal hires. Pilot scope, timeline and success measures The pilot runs 12 months from adoption, covering the 2027 hurricane season, and reports back to the Commission in December 2027. Scope Town limits only; all open residential and commercial building permits with fill or sand on site. Residents only during the pilot (no businesses), capped at 10–15 bags per home, priority to homes with a documented flooding history and to residents who cannot self-serve. Replacement in kind or reimbursement, builder's choice; no cash payments to residents. Timeline When Milestone December 2026 Commission adopts resolution and form agreement; Town Attorney review complete January 2027 Registry built; agreements mailed to existing permit holders; bags and funnels purchased February 2027 Standing sand purchase order in place; procedure filed with Brevard County Emergency Management March 2027 Crew training and one tabletop drill with Fire, Public Works, Building Proposal Page 9 of 12

Success measures At least 75% of open permits with sand on site have a signed agreement before June 1, 2027. First filled bags available to residents within 3 hours of an activation declaration. Replacement sand delivered to every drawn site within 72 hours, 100% of the time. Zero builder complaints unresolved after 30 days. Per-activation cost at or under $3,000. Resident survey after each activation: bags received in time, yes or no. Risks and mitigations When Milestone May 2027 Pre-season registry review; resident notice in Town newsletter and website June–November 2027 Live season; activate as triggered December 2027 After-action review and Commission decision on permanent adoption Risk Mitigation Builders refuse to sign or see it as a taking Voluntary program; replacement or invoice- price reimbursement, their choice; the sand would otherwise wash away. Chapter 252 remains the backstop only for a declared emergency. Sand is unsuitable (clay, debris, already wet) Registry notes material type; crews use judgment on site; any clean fill sand works for a threshold bag. Replacement sand not available within 72 hours after a regional event Standing purchase order with a named vendor and a backup vendor; agreement allows reimbursement in lieu when delivery slips. Proposal Page 10 of 12

Alternative names considered SandBank is recommended: it says the sand is on deposit and comes back, which is the point of the 72-hour replacement promise. Other options if the Commission prefers: Operation Sand Loan — plain and accurate; reads well in a press release. Borrowed Beach — memorable, but implies beach sand, which the Town is not taking. Pile to Porch — describes the path from site to doorstep. SandShare — friendly, but sounds like an app. Dune Reserve — evocative, but again suggests beach sand. S.A.N.D. (Site Aggregate for Neighborhood Defense) — works as an acronym if a formal program title is wanted. Risk Mitigation Crew injury on a private site Town workers' compensation and sovereign immunity apply; agreement releases the builder; crews use their own equipment and PPE. Damage to the construction site (ruts, silt fence, stakes) Photograph before and after; Town repairs or pays; access route agreed in advance on the site sketch. Fire and Public Works are consumed by rescue or road work Fire Chief sets priority; bagging is a between-calls task; resident self-serve pickup needs only one person at the staging point. Residents expect bags to stop all water Written notice with every pickup: thresholds and garage doors only; no protection from groundwater or sewer backup. Used bags left in rights-of-way Town retrieves on request and disposes as flood debris; no reuse of bags exposed to contaminated water. Registry goes stale between inspections Monthly in-season refresh by Building; builders asked to notify when a pile is placed or removed. Proposal Page 11 of 12

Requested Commission action and next steps Staff requests that the Commission adopt a resolution establishing the SandBank pilot for 12 months, approving the form participation agreement, and authorizing up to $8,000 from the General Fund (or the stormwater fund, at Finance's recommendation) for bags, equipment, and a replacement-sand reserve. Attachments to prepare: (A) draft resolution, (B) one-page participation agreement with site sketch, (C) registry template, (D) resident pickup notice. Draft forms A–C are in Sample agreements . Town Attorney reviews the form agreement and the Chapter 252 citations Public Works obtains sand and bag quotes to replace the estimates above Building Official pulls the current list of open permits with sand on site Fire Chief confirms the activation trigger with Brevard County Emergency Management Clerk places the resolution on the December 2026 agenda Proposal Page 12 of 12

Sample agreements and pilot terms The Emergency SandBank Residential Flood Mitigation Pilot — Town of Melbourne Beach Draft for Town Attorney review · November 4, 2026 Three short forms carry the pilot: a builder participation agreement signed at the permit counter, pilot terms the Commission adopts by resolution, and a resident acknowledgment handed out with each pickup. All three are drafts for Town Attorney review; bracketed items are fill-ins. Form A — Builder Site Participation Agreement Town of Melbourne Beach — Emergency SandBank Residential Flood Mitigation Pilot Permit No. [________] Site address: [________________________] Owner/Contractor: [________________________] After-hours contact (name, mobile): [________________________] Estimated sand/fill on site: [______] cubic yards Material: [fill sand / other: ________] Access point and pile location: [see attached sketch] 1. Purpose. The undersigned (“Participant”) allows the Town of Melbourne Beach (“Town”) to remove sand or fill from the site above during a SandBank activation to fill sandbags for Town residents. 2. Activation. An activation is declared by the Town Manager or designee under a National Weather Service flood watch or warning, or a Town or County emergency declaration. The Town will attempt to notify Participant by phone or text before entry; no response is required and entry is not conditioned on reaching Participant. 3. Entry and removal. Town employees and equipment may enter the site by the access route shown on the sketch, photograph the pile before and after, and remove sand by loader or by hand. The Town will record the estimated volume removed. 4. Replacement. Within 72 hours after the activation ends, the Town will deliver clean fill sand of at least the volume removed to the site, at Participant’s choice of location on the site, OR, at Participant’s written election, pay Participant the documented delivered invoice price of the volume removed within 30 days. Participant selects: [ ] replacement in kind [ ] reimbursement. 5. Site damage. The Town will repair, or pay the reasonable cost to repair, damage to erosion controls, grading, stakes, or improvements caused by Town personnel during an activation, as shown by the before-and-after photographs. 6. Liability. Town personnel act as Town employees under § 768.28, Florida Statutes, and are covered by the Town’s workers’ compensation and sovereign immunity. Participant is released from liability for injury to Town personnel arising from an activation except to the extent caused by Participant’s gross negligence or willful misconduct. The Town will indemnify Participant for third-party claims arising from the Town’s activities on site, to the limits of § 768.28. 7. Permit status. Participation does not alter any permit condition, inspection schedule, or erosion- control obligation. Temporary removal of sand during an activation will not be cited as a permit or erosion-control violation. 8. Changes and withdrawal. Participant will notify the Building Department when sand is placed, used, or removed from the site. Participant may withdraw on 7 days’ written notice, except during an active activation. 9. Term. This agreement runs for the life of the permit or the pilot period, whichever ends first, and renews with any permit extension unless withdrawn. 10. No compensation for consent. Participation is voluntary and uncompensated except as provided in paragraphs 4 and 5. Participant signature: ______________________________ Date: ____________

Town of Melbourne Beach, by: ______________________________ Title: ____________ Date: ____________ Attachment: site sketch showing pile location and access route. Form B — Pilot Program Terms (adopted by resolution) 1. Name and duration. The Emergency SandBank Residential Flood Mitigation Pilot runs 12 months from adoption and ends unless renewed by the Commission. 2. Eligible sand. Sand or fill on any site in Town limits with an open building permit and a signed Form A. Sand not covered by a Form A may be used only under a declared local state of emergency with compensation under Chapter 252, Florida Statutes. 3. Activation authority. The Town Manager, or the Fire Chief if the Manager is unreachable, declares and ends an activation and names the sites to draw from and the staging point. 4. Eligible recipients. Owners and occupants of residential property in Town limits, up to [15] bags per household per activation, with priority to homes with documented prior flooding and to residents who cannot self-serve. Bags are not for businesses or for properties outside Town limits during the pilot. 5. Delivery. Residents collect bags at the staging point. Town crews deliver to residents who are elderly, disabled, or cut off by water, as crew availability allows after life-safety calls. 6. Replacement guarantee. The Town replaces sand taken under Form A within 72 hours or reimburses at invoice price within 30 days, funded from the SandBank reserve within the Manager’s purchasing authority. 7. Registry. The Building Official keeps the sand-on-site registry, updates it at each inspection, and reviews it monthly from June 1 to November 30. 8. Records. Each activation is recorded: sites drawn, yards taken, bags filled, homes served, replacement completed, cost, under a SandBank cost code for possible FEMA Public Assistance reimbursement. 9. Used bags. The Town retrieves used bags from the right-of-way on request and disposes of them as flood debris. Bags exposed to sewer-mixed water are not reused. 10. Limits. Sandbags reduce water entry at doors and garage thresholds. They do not stop rising groundwater, sewer backup, or sustained flooding, and the Town makes no warranty that bags will prevent damage. 11. Reporting. The Fire Chief reports to the Commission after each activation and at the end of the pilot with a recommendation on permanent adoption. Form C — Resident Sandbag Acknowledgment (one half-sheet, handed out at pickup) Emergency SandBank — Town of Melbourne Beach Name: [________________] Address: [________________________] Bags received: [______] Date: [__________] These bags are provided free during a declared SandBank activation for use at a residence in Town limits. Place bags at door sills and garage thresholds. Sandbags do not stop groundwater, sewer backup, or deep or sustained flooding. The Town makes no guarantee that sandbags will prevent water damage. Use is at your own risk. After the event, bags may be left curbside for Town pickup; call Public Works at [__________]. Do not open bags that touched floodwater. The sand in these bags was borrowed from a nearby construction site and will be replaced by the

Town. Signature: ______________________________

All meeting actions

Source coverage incomplete

19 meeting items captured. The published sources do not prove this is the complete docket.

Showing 12 of 19

Browse by category19 actions
  • Meeting recordOther meeting itemsNo recorded outcome

    • Rounds of heavy rain start

  • Meeting recordOther meeting itemsNo recorded outcome

    • Onshore flow keeps feeding

    Topics: flood mitigation

  • Meeting recordOther meeting itemsNo recorded outcome

    Town addresses potential rescues by airboat, helicopter and high-water vehicles

    Topics: utilities

  • Meeting recordOther meeting itemsNo recorded outcome

    Town lists shelter-in-place advisories and closed schools as emergency measures

    Topics: education

  • Meeting recordOther meeting itemsNo recorded outcome

    • Rain moves out in the

  • Meeting recordOther meeting itemsNo recorded outcome

    Palm Bay confirms two deaths and a state of emergency has been declared.

    Palm Bay confirms two deaths and state of emergency declared

    Topics: utilities, stormwater, flood mitigation, coastal resilience, roads, traffic safety, fire ems, public-safety, procurement

  • Agenda item 1Other meeting itemsNo recorded outcome

    Registry. The Building Department logs every active permit with a sand or fill pile on

  • Agenda item 2ContractsNo recorded outcome

    Pre-signed participation agreement.

    Topics: flood mitigation, procurement

  • Agenda item 3Other meeting itemsNo recorded outcome

    Activation and bagging.

  • Agenda item 4Other meeting itemsNo recorded outcome

    The town outlines replacement within 24 to 72 hours using a pre-arranged vendor or invoice price.

    Town details replacement of sand within 24 to 72 hours

    Topics: utilities, stormwater, flood mitigation, procurement

  • Agenda item 5Other meeting itemsNo recorded outcome

    A National Weather Service Flood Watch or Flash Flood Warning lets the Town Manager declare a SandBank activation.

    Topics: stormwater, flood mitigation

  • Agenda item 6Other meeting itemsNo recorded outcome

    Public Works notifies each builder by phone or text (no response required),

Official record

ArtifactSourceState
AgendaNot published in the sources we holdunavailable
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Official pages

Coverage and corrections

Records considered

  • 261104-etcm-packet-additions

Not claimed by this page

  • A source-grounded next meeting date
  • Official outcomes have not been published.
  • A transcript is not available.
  • No audio or video recording is linked.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.
  • Low-grade, ungraded, procedural, or superseded items remain in the complete agenda inventory rather than the meeting digest.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: f62ded3ee8524862890a7dc57b9cd592. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record