POLISCOPE

The public record

PINELLAS AUTHORITY TAMPA BAY WATER COUNTY · LOCALMinutes linked · not read herePartial coverage

Board of Directors

Monday, March 17, 2025 · Special district meeting record

The 30-second read

Record incomplete

Board of Directors

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are linked at the source, but their text is not held here.

The publisher links minutes or an action agenda for this meeting, but its text is not held here. Nothing on this page is presented as a decision; open the linked record for outcomes.

Transcript and record text

Closed captionsWhat was said at the meeting, transcribed Nov 29, 2026. Speech is not a decision.
  • No speaker turns were supplied with this transcript.
  • This transcript has no source timestamps.
  • No speaker identities were supplied with this transcript.

This source published text without speaker turns, so speakers and timestamps are not shown.

The opening of 89,528 stored characters

>> Good morning, everyone, and welcome to this Regular Meeting of Tampa Bay water for Monday, March 17, 2025. This meeting was noticed in the Florida Administrative Register and on the Tampa Bay Water website. The meeting is available for viewing through live streaming and a recording of the meeting will be posted on the agency's website. Commissioner Kathleen Peters and Commissioner Jack Mariano both had conflicts this morning and they wanted their absences excused. Absences noted for the record. And Vice Chair Hanewicz was unable to attend the meeting and informed us of her absence prior to today. So with that, Madam Clerk, can we please call the roll? >> [ CALLING ROLL] >> Mr. Chair, we have a quorum. >> Thank you very much. Commissioner Oakley, would you now please lead us in the pledge of Allegiance. >> I pledge allegiance to the Flag of the United States of America and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all. >> At this time we will open the meeting for public comment. We have three people signed up for public, public comment this morning. The first is Karen Hillary, followed by David Ballard Geddes Jr. and then Mark Clutho. So, Ms. Hillary, good morning. You have three minutes. Thank you. >> Thank you. Hi. Hello. My name is Karen Hillary and I live in Brandon. Prior to the meeting, I sent all of you an email that detailed and outlined the south county pipeline that was handled and the way it was handled in my neighborhood based on the number of Brandon residents I've spoken. Spoken to. I've lived in Brandon almost my entire life, so I know a lot of people in Brandon. Without a doubt, the project was handled just as poorly along the route as it was in my neighborhood. I'm not here to get explanations. At this point, your explanations seem to be an excuse that you feel to help you, make you feel better that this was done properly today. I'm strictly here to put into the public records that as an entire branding community, we, we were not informed of the pipeline properly until it was too late. We were not given input that was actually heard and used. We have been told there is nothing we can do and this pipeline is coming to us no matter what. At the very first community meeting we had, that's what we were told as a tax paying citizen in Hillsborough county for over 30 years. That's a very tough pill to swallow and I think all of you who sit on the board would not feel any differently. This pipeline is not being placed to benefit our community. At all. It's being placed to serve the poor planning and the lack of growth management that has happened in south Hillsborough county that's been allowed to happen. In the document I sent each of you, I detailed years of communication with Tampa Bay Water where I was given incorrect information, false information or no information at all due to errors on the part of the Tampa Bay Water and their staff. I have been told the route was diverted here at this board meeting to at a board meeting to go through the heart of Brandon due to cost. But your own people that you hire stated at that same meeting that it was more likely to have a higher cost in the route that you ended up voting on due to the right of ways and easements. I have also been told this route better serves the needs of Hillsborough county for easier connections to the west for future plans. I've lived in Hillsborough county almost my entire life, and to this day I find it very difficult to believe that Hillsborough county is going to adhere to some plan that they've made with just this pipeline alone. Changes to Hillsborough county plans have been made by running this pipeline through an EPC protected area of my neighborhood that we have been told numerous times is not allowed to be touched. But now it's going to be allowed to be dug up, dewatered and put the pipeline through not far from my neighborhood, about another mile south over the Alafaya. Previously, a bridge could not be built due to the environmental sensitivity of the area. Now the pipeline is going to be allowed to go underneath the Alafaya and that's going to be okay. Makes no sense whatsoever as a community we're supposed to trust. I have been told numerous times that any concern that we bring up will be addressed and handled competently. Based on all my experience through this whole process, which has been years, I find it really hard to believe. It is frustrating to know that none of you live in the pipeline route nor in the area of the pipeline. None of you will feel the inconvenience and the negative impact that a 12 to 15 foot deep trash. >> Thank you very much. >> And dewatered in your house and placed three to six feet underneath. >> Thank you. >> You voted without looking at schools, neighborhoods and their businesses that will be impacted. Since nothing can be done, I will end with saying, I just want you to take time. Think about how profoundly you negatively impacted a community with your vote. And before you ever vote again on something that's so costly that will so deeply impact a community, please ask yourself, would I want to stun where I live? >> Thank you, Mr. Geddes and then Mark Plutho. >> Hi, good morning. David Ballard, Geddes Jr. I live on Georgia Avenue in Palm Harbor. The Mosaic Phosphate Mining Company held a public meeting in Plant City last Tuesday on March 11th to inform us that they are intending on injecting the wastewater from their phosphate mining operations into the ground. The Mosaic Phosphate Company wants to take the same type of toxic sludge that. The Piney Point disaster spilled into Tampa Bay and pump their toxic caustic wastewater into the ground, infecting the groundwater with the caustic waste fluids of their phosphate mining operations. The Mosaic phosphate mining has unearthed nearly half of central Florida in search of nitrogen based fertilizer and raw material that is ultimately refined down into the making of plutonium, desecrating the Florida landscape. In its process, the phosphate mining has proven to be a horrible steward of the eco structure. When Mosaic tries to explain this logic of theirs injecting caustic, noxious, corrosive wastewater into a confined salty layer of the substrate in our aquifer, what could possibly. Go wrong with their logic? Trust me, I don't trust them or their chemistry in. Intermixing chemicals or components into a confined salty, saline or brine like substrate could very well cause a chemical reaction underground using the salty substrate as a catalyst, causing things to react, causing an expansion of such an eruption or even an explosion underground. Once the phosphorus wastewater is interjected underground. Such potential catalyst will remain in the substrate indefinitely. Interjecting toxins and possible carcinogens causing gases to build up underground could cause an explosion. This is a ticking time bomb just waiting to go off. I think we have a national security issue before us with the injecting of caustic phosphate mining wastewater in our ground. Thank you, . >> Thank you. And Mark Clutho. >> Mark Lutho, Largo look at this agenda here and it's just unbelievable. You know, you talk about environmental conditions and you know, water wise and I look at the plants that you're building here and what the water will do to make them grow. And then they have to be mutilated because they can't grow. They'll be over the parking lot, over the sidewalk. Doggone shame, isn't it a waste? Here we have the weakened Trump. Oh, here we go. Pledge to reverse the Biden administration focus on climate change. Well, you know what that's going to do, don't you? Science can't keep up with the warming planet. Yeah, Hurricane Milton is terrifying and it's just the start. More hurricanes are slamming the Gulf coast and this is the new normal. Yeah. And I remember that dumb fool that came here to say, this is the first public green building in Tampa Bay. Daily daylit. And you stupid fools still have those lights shining on the wall out there, like you have some pictures hanging there. Where's Doge? Doge needs to be here to illuminate the waste that you fools are doing. It's so pathetic. It's absolutely ridiculous. How many dollars are wasted just on the lighting in this room alone. It's like you planned on doing appendectomies in here. >> Thank you, Mr. Clutho. That is all of the people that we had signed up for public comment today. At this time, we are going to move on to the consent agenda. There were not items pulled for discussion. And so at this time, we will entertain a motion move for approval. >> Excuse me. >> Yes, Commissioner Akos. >> Just if we could have just brief conversation about A8 and A13, I would appreciate it. >> Yes, sir. >> A8 is an item, Kelly. I believe. >> The explanation on A8 is that gray Robinson is handling the South Hillsboro pipeline project eminent domain work for Tampa Bay Water. They have a partner who joined them who represents the Hillsborough County School Board. There's two parcels of the project of the Hillsboro South Hillsboro pipeline project that involve Hillsborough County School Board properties. And so we don't anticipate there being any issues between the two parties in negotiating the acquisition of those temporary construction easements. But if for some reason the negotiations fail, then each party will have to retain separate counsel. It is not Gray Robinson. So I was accepting of the request for a conflict waiver. >> And you're comfortable with this? >> Yes, I am. >> Okay. A13 is the procurement exceptions vendors list. Our purchasing policy allows me as the general manager to sign contracts our purchases up to 100,000. The interpretation from our previous legal general counsel was that it's an accumulative hundred thousand going back to the start of when Tampa Bay Water was formed in 1998. So as we approach over the 100,000, we bring this back to you. I believe about once a year is what our finance team has done. So this is the current list that will go over the 100 grand, which is my delegated authority. >> So are we going to keep the cumulative thing or are we going to get rid of it? >> I would like to have an internal discussion to change it to be on an annual basis of 100,000. And rather than the going all the way back to 1998. >> And what do we have to do to get to that? >> We have to change our purchasing policies internally. >> Okay. And you'll bring that back here? >> Yes, sir. >> Okay. >> All right, thank you. >> Any other questions on the consent agenda? >> Move approval. >> Second. >> We have a motion from Commissioner Oakley. Seconded by Commissioner Wostal. Please record your vote. >> Mr. Chair the motion passed unanimously. >> Thank you very much. We're going to move on now to the regular agenda. Mr. Cardin, I will turn the meeting over to you at this time. >> Yes, sir. B1 will be the general management report. And so I wanted to start with our environmental conditions and report to you that we are in very good shape. We're doing very well. But I did want to show you some graphs and go through them. This is a new graph that updates on how we use our multiple sources. And so each bar of the month is an average water delivery from our regional system. Where you see the red in the bar? That's the reservoir usage. And blue represents the river water. And yellow represents the production from our desal facility. The green in each bar is our groundwater pumping from all of our well fields. So when we use water from the reservoir and the river water and the desal. So the red, blue and yellow, that has an impact on the green. So when we have those available to us, we can adjust how much we're pumping out of the ground groundwater. So this is what this is showing you. We set monthly targets every month and well, we actually set them at the beginning of the fiscal year. And this is going to show you how well we have been doing based upon our management of the system and some things that we cannot control. Mother Nature. In February, we projected demands to be about 195 million gallons a day. And our actuals were 192.2 million gallons a day. For our future months. This graph is showing you that we are expecting to deliver more water in March through May of this year than what we predicted back in October. On a yearly basis. Running average from October 2024 through February, we are averaging 195.1 million gallons a day. And our budget is for 209.7 million gallons a day. Next slide. You've seen this slide many times in Warren's presentation. It shows our consolidated permit monthly pumping rate and it shows it all the way back through October of 23. The 12 month running average is currently at 86.8 million gallons a day at the end of February. And we expect to remain below or at our permit limit for the rest of the year. We are having good river flow this year. We have a full reservoir and the desal plant is back online. The February pumping from the CWOP was 66.8 just for the month of February. And we targeted 82.7. So quite a bit lower than what our plans were. This graph is another way of looking at the production from our consolidated well field permit. The same graph I showed you, but just differently. On this one previously, where you see the red all by itself, that's where we pump more water from the well fields than we targeted. Where you see the blue all on its own, that is where we actually pumped less than we targeted. So the permit limit is 90 million gallons a day as it's shown in the red line. And the 12 month running average pumping rate is the blue going out further right. Those haven't happened yet, but you can see how we're tracking. This graph shows the same information from the consolidated well field permit, but only for the south central Hillsborough well field. By itself, the average through February, it drops slightly below the permit limit. It's at 24.78. The current permit is 24.95 million gallons a day. And as you can see the dotted line, that is action that the board took last month. We transferred some permits from I think Tampa Electric and Hillsborough county and we are modifying the permit with swift mud. It was presented to them I think on Friday. So the 26.92 million gallons a day would be the new permit limit if approved by the district later this year. And getting to my favorite graph, this is the graph of our reservoir. And as you can see, there's a lot of blue and blue is good. The orange line is what we targeted. And you can see during the various months right now, if we all go down to March, we are supposed to be a little bit over 10 million, 10 billion gallons a day, almost 11. But we are completely full still. We're at 15 million gallons. With yesterday's rain, I would expect that should stay that way for a little bit longer. So here we are in the dry season with a full reservoir. And that's the first that's ever occurred. A few outreach slides. We have a partnership with the Pasco County Schools and we sponsor the Tampa Bay Water Environmental Stewardship Award at the Pasco Science and Engineering Showcase. This award was presented to this student for her work that focused on environmental conservation and sustainability of our water resources. We also joined the Tampa Bay Times Community Conversation. Diving Deep and How can we Improve Tampa Bay's Water Quality? Warren Hogg represented the agency and he was joined by other leaders from the Tampa Bay Estuary Program. The Tampa Bay Watch, USF and Mosaic. They all participated in a presentation and round robin on the stage. Tampa Bay Water also sponsored and exhibited at the Tampa Bay Water Days at the Museum of Science and Industry in celebration of the World Water Day. I believe that's coming up on March 22nd. This occurred just this weekend, so it was Friday and Saturday. We did the participation and our sponsorship funded field Trips for Title 1 students for those two days. And just a few notes that I would like to give to you. Items F6 and F8 you've already approved through the consent, but F6 is our financial statement through February and we are not quite six months. We're almost what, five months through the fiscal year. And you can see the condition of the agency. We are I think running $19 million ahead of our expenditures at this time. So all on track under our financial conditions. And then the other is the true up for our member governments. We include that every month to give an idea to the different members. How are they tracking against our true up at the end of the year? At the end of the year we look at what they took and their percentage. Either give money back or you will get an invoice. So it's showing currently that Pinellas county and the cities of Newport, Richey and Tampa will be refunded some moneys if the fiscal year ended today. And then St. Petersburg, Pasco and Hillsborough county will have a balance due if it ended today. I did want to let you know that next month we're planning to bring a permit to the board for approval. It's for the Alafaya River. We've been operating the river under an emergency order by Swift Mud for more than a year now. It is currently set to expire at the end of March. But it allows us to take higher flow when we're in high flows than the permit. 19% in high flows versus 10% is the permit. We're also asking the board, the Swift Mud to allow the permit to take up to 75 million gallons a day instead of the 60 million gallons a day we've been going around talking to the various stakeholders and getting their feedback. I'm told that it's been all positive including the district. And so we will be presenting a permit to you next month for approval to be submitted to make this a permanent permit. Change the budget. We are getting real close to presenting with all of the members the proposed budget. The workshop is scheduled for next month's meeting and I have scheduled a one on one meeting with each of the board members prior to that. So I think over the next two weeks I'll be meeting one on one with each of the board members to give you a high level overview of what we are proposing in our budget. And then lastly, last week we conducted an internal strengths, weaknesses and opportunities threats analysis. And so we're putting together the notes from that and I'll be happy to share that with each of the board members when we have it available. But we did do a lot analysis and so it was very timely and I think it was very informative. And that, Mr. Chair, is my report under B1. >> Commissioner Eggers? >> Yeah. I think this past week you sent us a letter or a memo just briefly summarizing our approach over the last couple of years as it relates to the comments from Karen Hillary on the pipeline. So if you don't mind, I just, just that commentary just kind of sitting out there and I'd like to just, if you could talk about that just briefly about the methods that we did, if there's any shortfalls, the improvements that we need to make sure that we're going through in the future. >> Yes, sir. >> And actually I have Brandon Moore here to speak to that. >> Morning board members. Yeah. So I think to the, to the first question, Commissioner Eggers, we've had about nearly 100 communications between 2019 and today with various channels that we've used like mailings, emails, social media, community meetings, door hangers, website updates. So those are the types of things that we've used. Some of them. >> How many, how many did we do before the decision was made of the hundreds that we were talking about? >> Well, those were, those were mainly postcards and surveys. So we collected input before the decision was made on the criteria that the engineers were using to design the routes. So that was we. And we used an advertising campaign to reach as many residents as we could. I'm not sure the quantity of postcards that went out, but I could find that out for you. >> I'm just not. Again, maybe I'm not asking the question right. I'm not liking the answer. So I need a little bit more. What did we have from a public interaction standpoint before we made this decision on this route? That's what I'm asking. Did we have public engagement or was it just simply sending cards out to people and hoping they might respond to us? I mean, I'm just trying to make sure I'm clear on what we actually did to get input from our residents. >> Yes, the actual efforts were postcards, collected data input through a survey and then followed up with emails when as things. Changed on the board. So no public hearings. We did not have no public conversations, no public outreaches in the community at all. >> We had one virtual public meeting on the long term master water plan update and the pipeline project. >> So we had one virtual community meeting before the decision was made? >> Yes. >> Okay. >> Well, it again sounds like we maybe could have done a little bit more to engage our public, give them opportunities. I know that Hillsborough county has done some of that. So I just was trying to get an overall sense of how we reached out. And I'm not saying I'm not hearing maybe Hillsborough county did more. >> Thank you, Commissioner Wostal >> Thank you. I remember, as many of you might know, I'm kind of a political outsider and unknown when I ran, but one of the first meetings I was watching was the county was pushing a. A countywide sales tax. And it's illegal for a county to market something. It's against the state's laws. So what they did is they went through and they used this other third party to develop a playbook to do it. But essentially the county spent about a million dollars marketing and pushing. Not marketing, but marketing and pushing this tax through the county. They had all of these info graphs printed out. They did all of these community meetings all around Hillsborough county, which is about 1.6 million people, as many of you know. And Commissioner Cohen might not remember. But during the board meeting, he asked Woppert how many people did they eventually get to show up? And basically 7 tens of the county. So 0.0007% of the county population showed up after a million dollars of expenditures with all of this big push from the staff and these infographics. And my point is that even after that million dollars, it brought out such low participation. And it really opened my eyes to how difficult it is to get people to see what we' when we're notifying them and them to show up. I mean, it really opened my eyes and I just don't know how much money it would take to make a meaningful impact on Tampa Bay water or Hillsborough county to notify people that, hey, we're going to build this big pipeline. I don't really have a question. I just wanted to make that point in defense of whatever efforts we're doing. It's extremely difficult. So I appreciate. >> I would just. Thank you. That was. I recall what you're referring to. Many of us were here when we made the decision about the pipeline. And it's been a couple of years. It was 2022, I think, when it came in front of us. But what I remember was that there was a pretty robust discussion about it at the time. It wasn't like it went on for a series of meetings. It was definitely discussed at the Board of County Commissioners in Hillsboro. I do think it would be a good idea, though, to answer your questions, Commissioner Eggers, and perhaps we could get you some information on what Hillsborough did at the time that all this was going on here at Tampa Bay Water. But I remember there were people that were coming to public comment and speaking to us about it and weighing in on it from the community over the period of meetings that we had to discuss it. >> Okay, well, again, that makes me feel a little better that we were at least reaching out somewhere along the ways to have either virtual interactions. We seem to have them all over the place. Our staff does it all the time. Sometimes they actually go into the field and have it, and they have both. And so. And sometimes we don't get much interaction. To your point. But the point, that's not the issue. The issue is, are we providing that outlet for our residents to reach out to us, Tampa Bay Water, for one, but also to your, you know, Hillsborough county as well. So I'm not hearing that we did, in my mind, enough to get that for Tampa Bay Water. So just want you to think through that, Chuck. I want you guys to maybe look at what our policies are. Heck, we do it when we're talking about repaving a road or restructuring a road through a community that might involve a little roundabout. And we've had like three public hearings and two in the field, so you can't have enough out there for access. And if the residents choose not to come, that's. That's on them. But I just want to make sure that we're doing enough. And that's all I have to say. Thank you. >> Yeah. The only follow up from our comments, there was a survey sent out when we were. We had 10 routes. I don't know the number we sent out. I do know we had less than 700 returned. They did not ask the residents which route they asked for. What in a route, what would you be looking for? So we took that information, the routes got narrowed down to three, and we resurveyed a number of folks. And again, from their open comments, they were allowed to write comments to us. We gathered where they were, would like it and where they wouldn't, and we took that into consideration. So we brought it to the board. As commissioner, Chairman Cohen has said it Was in front of the board a few times. There was several folks that showed up. So we did reach out to a group of folks in the Brandon area, Broad broadcast for surveys. >> All right. >> Took feedback that way. >> I'd like to have some discussion on that in the future with how we're going to. These are huge capital projects that have implications for residents and I don't think it hurts for us to be out in the field and having a conversation with our residents and giving them that opportunity to touch base. So. And that doesn't take a lot of money. Okay, so. All right, thank you. >> All right, thank you very much. At this time, we are going to move on to item B2, which is the legislative and grant funding program update. >> Good morning, Chair members of the Board, My name is Brant Bartlett. I'm the Government Affairs Program Manager here at Tampa Bay Water. As you know, the 2025 Florida legislative session kicked off a few weeks ago on March 4th. As a result, we have with us our legislative consultants. Joining us via Zoom to provide the Board with an update. First, we'll be hearing from Mr. Peter Dunbar with Jones Walker, who serves as our General legislative council. Following Mr. Dunbar will be Mr. Matthew Blair, Corcoran Partners, who serves as both. Our legislative and grant funding consultant and our federal consultant. So at this time, I'll go ahead and turn it over to Pete and Matthew to provide an update on our efforts as well as any insights they may have for the board. Pete, floor is yours, sir. >> Thank you. Brant, can you hear me? Mr. Chairman? >> Yes, we can. Good morning. >> Excellent. I'll try to do a brief overview as we begin the third week of the regular legislative session. We were a bit delayed in the start because there were two special sessions and we had our snow week here in Tallahassee which delayed things a bit. But the first two weeks of the session, they have picked up the pace. We now see the leadership incentives that begin to emerge in the House. We're dealing again with the condo and construction related issues in the Senate Affordable Housing and Rural Communities Initiative. And in both Houses, we've seen some water related issues emerge. There are first two studies that deal with water quality in our surface waters. They are separate. One to be done by the Department of Environmental Protection, the other to be done by the legislation Legislative OPPAGA Office of Planning and Budget. Those two do not appear to be a significant priority in the House, but there are two that I'd like to focus on. One is found in a committee bill from the Senate which gives it a priority in that body. It Also has a companion bill. Its focus is primarily on the water management districts, particularly on South Florida Water Management District. But in it there are new incentives or restrictions that are created for lobbying activities when advocating before the board and new conflict of interest standards for the board members. There are restrictions contained in it on the use of funds received from the state to the water management districts, using them for local match. And also a provision that provides for new ad valorem tax incentives for capital improvement projects and that includes those for water supply. The other significant initiative also I think a leadership priority is the annual Department of Agriculture bill. In that one, while it's a hundred plus page bill, there are two significant sections that probably are very relevant both to Tampa Bay water and to the individual member governments. In one of the sections we now have appearing a new definition of what a water quality additive is and a new restriction that does not permit water quality additives that do not meet the new defined standard. While not mentioned specifically, I think the speculation is much of this deals with whether or not an additive might be fluoride and whether or not fluoride would be permitted. So those are the water related items. I will say that there are as there are each year operational initiatives relating to the State Retirement Program, how we can display flags on our properties. There are new pending restrictions on the use of drones, modifications to the Administrative Procedures act, and an effort to raise the limit on sovereign immunity. All of those we have bimonthly updates with senior staff to keep them abreast of where we are. And so that's a quick overview. I would also point out that we do provide a weekly memo that I believe is distributed to each of you that will help keep track of the progress as these things move through the process. And with that, Matthew, I'm going to turn it over to you and we can come back and I'm happy to answer any questions if there are some, but Matthew, Take it away, bud. >> Good morning, Mr. Chairman and Board. Can you hear me okay? >> Yes, we can. Good morning. >> Good morning. Well, again, thank you for allowing Pete and I to speak to you. And just to remind you that Pete stands with a team of seven or eight lobbyists here representing you, and we do as well. And so while you get to see our faces, you have a significant team here working for you during the legislative session. On the funding front, you have two funding requests that have been advanced. You're familiar with both of those. As Pete said, sessions started off a bit slower than we're used to because of the two special sessions that preceded it and the lack of really committee work that went in in preparation for the session. As a result of those two special sessions that that jumped ahead. The budget today is starting to be worked. They expect originally expected to have budgets out late this week. We're being told by sub chairs that the budgets are likely going to surface early next. That would put them just a few days behind what's typical with an expectation to pass a House and a Senate individual budget late week five or week six. Now, more likely, we stay on a normal budget time frame. There was discussion at the beginning of session as to whether the legislature would try to fast track its budget and get its budget wrapped up a week or two earlier than normal. We've seen no evidence of that. There's been no advancing of time frame as it relates to budget. We do hear from members, whether they're members of the subcommittees that are appropriations related, whether it's from the sub chairs, whether it's from the big chairs, or whether it's just from a member that's not on an appropriations committee, that the funding levels this year for appropriations requests will be reduced. As we had reported, that was expected to be around a billion dollars. Sub chairs were telling us last week that that could be more in the range of $750 million. And so again, just continued focus on reduction from the legislature as it relates to member requests and the budget. That doesn't put us in a better or worse condition than we ever are. It just means that the members are individually very, very thoughtful about what they put forward as a number of requests and the priorities that they're identifying to their chairs that they really want to take home to their community. I'm going to shift just quickly to federal and give you a quick snapshot that, as you all are aware, the House and the Senate passed continuing resolution late last week at the federal level, which averted a government shutdown. I think early in the week there was an expectation that that might not be the case. But by Friday morning, there had been agreement reached to keep government funded at the current levels, raise the debt ceiling. And you'll note that the government didn't shut down on Saturday morning as had been expected. We are expecting that the next two months will hold the discussion related to budget and spend spending, making permanent the tax package that the Trump administration had passed during its first term in office and Congress and the discussions that we've had with members suggest that that will be their focus heavily for the next two months. Trying to wrap that up sometime by the early summer you remember that there are usually community project requests that are requested or allowed during this time of the year by members of the House and Senate in Congress. There's been no clarity on that this year. This is normally the time of year when the Ways and Means Committee is starting to announce those things and there has been no information provided yet. Some members are requesting from local governments and others projects that may be of interest for federal funding, but there is no formal process for that yet. And in the conversations we're waiting to see what shakes out and whether that will be colored by the next two months discussion on budget and the tax package, your staff and we continue to stay focused on things related to PFAs, some tax matters related to bonding that could pop up into the tax, the overall tax agreement once that comes closer to fruition. And of course we're monitoring the grants that are normally available through government that there's been some funds freezes and then releases on. And so as this new administration starts to get its feet under it and things begin to get into a more normalized pattern, once appointments are completed by the Senate and again not just cabinet level appointments confirmed, but most of those leadership teams also have to be confirmed by the Senate. We expect all of that work to be wrapped up ideally by the end of April, early May, and we start to see more of a normal cadence as it relates to, you know, federal administration and federal agency activity, which is the typical time frame when there's a transition between administrations. So with that, I'll wrap up the federal side and like Pete, again, appreciate the opportunity to represent the board and staff at Tampa Bay Water and are available for any questions. >> Okay, Commissioner Wostal? >> Thank you, Mr. Chair. I don't know that this is something that the board wants to take a position on, but maybe that we just need to have our lobbyists be informed about and watching. We've talked a lot about growth management here. When we're growing, do we communicate with Tampa Bay Water on what that might mean for permitting of new water? And there's two bills the gentleman mentioned that they're talking about affordable housing. There's one in there by Senator Gates. The number is slipping my mind right now. But specifically it's to put statewide exemptions for accessory dwelling units, which is a challenge that Commissioner Cohen and I have both personally dealt with. It's not that I think either of us hate someone being able to create an accessory dwelling unit for their parent, which is what the intent of it is, or a family member. It's that it goes far beyond that. And then at the local level, we've been met with challenges of enforcement, code enforcement, the sheriffs being able to go in there and say whether or not they're actually doing what is permitted or allowed. And why that's important is because if we're really talking about strategic growth management, we're planning on, let's call it residential four. And then we're going to have these major preemptions that we have no ability from our experience, to go in and actually enforce and make sure what's happening is happening, how often it's happening because it's a private property rights issue. And unless you're given access to the backyard where they might bring in a shed, run in and tie into the water, they've thus increased the amount of burden on the local utility system that we planned for and permitted for. I think that that's something that the state might not have optics on because they don't deal with that at the local level. So that one's from Senator Gates. The other one is SB 1118 that is being ran by Senator McClain. And I appreciate the bill. I think that it's right. It's superseding local government's rule over agricultural land. We just had a pretty tumultuous meeting where for the first time in Hillsborough County's history, we actually planned for growth and expanded our urban service area line. And I think that that was good and smart. We're planning for it. But SB 1118, as I read it, is very similar to Live Local, where it completely preempts the local government's comprehensive plans, land development codes, and local policies that may or may not restrict that farmer's private property rights in terms of growth and give them entitlements of any of the up to a certain percentage of the surrounding property. And why I think that that's important from our perspective is that we truly are, and from what I've seen in our conversations, trying to plan for this growth, stop being surprised, try and target the growth into areas that we believe would make sense, but this would just be another unknown exemption or superseding of our growth management strategies. Because it's just the way I read it, and maybe the lobbyists will have a different opinion, was that it completely preempts our ability to hold them over our current policies and comprehensive plans. So that's SB 1118 from Senator McClain, and then the other one was from Senator Gates, and that was about accessory dwelling units. So that's more of an informational. I don't know that we need to take action on it, but maybe they can keep an eye on that and have conversations with those elected officials and bring some of those points to mind as they're making those decisions. So thank you. >> Thank you, Commissioner Wostal. Anyone else? >> I thought you were talking about short term rentals. Crying out loud. We've been dealing with that problem and all of the issues that super. You know, you know, state government is, you know, overriding our own growth plans. And so I certainly understand and appreciate your comments. Thank you. >> And I would just say, Commissioner, I learned about accessory dwelling units from Councilman Miranda. All right, thank you very much. Is there, is there anything else on this item? All right, we are going to go now to our action Items. We have two. I'd like to go to number C2 first. That is the surface water treatment plant expansion. And Maribel Medina will take us through that discussion. And we do have a vote. >> Yes, just before Maribel goes up there, I did want to talk to you a little bit about. You had an email that was sent over the weekend with some changes on pages five and six. Our general counsel, our assistant general counsel, David Jackson, sent that out. We received those very late on Friday afternoon into the evening. And normally, ordinarily I would not be entertaining such late changes, but there is a financial implication. The cost guaranteed max pricing has subs locking in their prices that would expire if I brought it to you in April. And so I'm going to lock these prices in. Our general counsel has reviewed the changes they've asked for and he is recommending approval of those changes. So Maribel will go through some slides and then she's going to turn it over to David and walk us through those two changes that we brought to you. >> Good morning. >> Good morning, Mr. Chairman and members of the board. Agenda item C2 is an action item and at the end of this presentation, I will be asking for your approval for a contract amendment for construction phase services for the surface water treatment plant expansion project. Before that, I would like to acknowledge the project team, including our project manager, Karim Molina Oyola, our legal counsel, David Jackson, and our integrated program management team, Black and Veatch, for supporting getting through this step in the process. The surface water treatment expansion project was selected as the next water supply project for the region and needs to be completed no later than the end of 2028. The main goal of this project is to increase the annual average water supply capacity available for the region up to 12 and a half million gallons per day. This project is being delivered through the Progressive Design Build delivery method with guaranteed maximum pricing or GMP and amending the existing Veolia Design Build Operate contract to implement the design and construction of this project. This slide shows the completed and upcoming milestones for this project. To date we have reached the 60% design. We have issued and received your approval for two early equipment packages and the purchase of equipment, completed value Engineering and negotiated the guarantee maximum price package being presented today for construction activities. As part of upcoming activities, we will be completing the design by August, start construction on September, and reach substantial and final completion by January and April of 2028 respectively. The key message in here is that we are on schedule to complete this project before the end of 2028. This slide shows that to date we have contract amounts of up to $36 million, which includes the items listed in the slide. In addition to that, the contract amendment being presented today of $145.1 million includes the engineering services during the construction phase, the actual construction, additional equipment and material purchases, and owners allowances and contingencies. Now I'm going to transition to Mr. David Jackson to go over the changes that were presented earlier this week. >> Good morning. >> Yes, Just wanted to walk through the couple of 11th hour changes we got. And one of the challenges we had in negotiating this amendment was the fact that Veolia, our construction manager, was simultaneously. Negotiating the design build contract with the design build contractor, CDM. So everything kind of had to flow up and flow down between those two agreements. >> So again, apologies for the late last minute, but Mr. Carton indicated it was kind of a necessary thing. So just to walk you through those real quickly, so our underlying agreement with Veolia has certain uncontrollable circumstances defined within it. These are certain acts that impact the contractor's ability to perform or the cost of their performance. And among the uncontrollable circumstances, there's a definition of change in law, which is adoption of a rule or law by A governmental body or issuance of an order to change applicable law. Which gets us to the issue of tariffs. While it's probably likely falls within that definition, it's obviously a big concern and they wanted just some clarification to eliminate any ambiguity with respect to tariffs. So the definition and change in law. They propose to add the language there to any adoption, you know, imposition of tariffs that take effect after February 20th. That was the day they locked in. Their GMP price that would increase the cost or the schedule to perform would enable them to seek a change order to account for that which Again, seems to fall within the definition we had but helped to eliminate that ambiguity. The second item was a, again, under uncontrollable circumstances, we had a definition for failure of a governmental body to timely Issue permits, and they included in their GMP some specific scheduling time frame for issuance of permits. So we have this table here specific to this project that they wanted included to allow them to seek some type Of relief if it were to. In terms of cost or time for performance, if that were to come up. The last thing that changed is actually ties back to the tariffs question. So under the definition of uncontrollable circumstances, while there are a number of things that are specifically included, there are also a number of things that are specifically excluded, including sales tax on tangible personal Property, or federal or state taxes that Impact the company's income. And they just added this part of the definition to make sure it was clear that the language we're proposing to include on tariffs would not fall under. The exclusion for their taxes. So. And those are the changes that kind of came in at the last minute. I'll turn it back over to Maribel. >> And with that, we request approval of the negotiated agreement amendment with Veolia for construction services in the amount of $145.1 million, which includes $8.1 for owner's allowances. And both David and I are ready to answer any questions. >> Commissioner Eggers? >> So just, you know, because this is obviously taking center stage at the national level, but what percentage of the products that we are ordering are. What percentage of our cost of 145 million is coming from overseas that we may be at risk with this contract? >> That's an excellent question. I do not have a concrete answer, but we can provide it later on after this meeting. >> So maybe I'm going to ask for something like, is it 10%? Are we 90%? Do we have a sense of.. What level of exposure we have with this? >> We do have Veolia in the audience, and I'd like for them to come up, please, and possibly talk about their funding through CDM Wither Materials. >> Yeah. >> But before that, I'm going to add that we did get your approval for early equipment purchases, which were major components of this project, and we secured the pricing early on. We have ordered most of the equipment using our owner's direct purchase program, which allows us to save the tax savings at a minimum. But I'm going to defer the rest of the question to Mr. Mike Kuhn. >> None of those that we've purchased are subject to any adjustments. >> What's that? Should not? >> Yeah. >> Or will not? >> Morning, Board. My name is Ryan Hageman. I'm with CDM Smith, the design builder. Just to build on what we were talking about there. Of this GMP, roughly $75 million is in construction cost that hasn't been bought yet. We've done a good job of buying early equipment totaling roughly $21 million. That should supersede the tariff risk. So that's coming off the table. Of the 75 million that's still to be bought, my expectation is less than 10% would be heavily subject to tariffs because the main process equipment, which is more predominantly procured overseas, is already bought. So our main risk would be things like steel for rebar and things of that nature. So I appreciate that part. And again, I'm going to go back to that word shoulder or will on the 21 million. Is that. I mean, is that because of the changing laws that we're talking about that they might reach back and get stuff that was done before any tariffs were put in place? >> I think that would be the concern. I'm not an expert on tariff law, certainly, but that equipment is already purchased under contract. Shop drawings are in hand and we're ready to release. So I believe it's unlikely, in my personal opinion, that they'd be able to claw back something that's ready to be put into fabrication. But again, it's a fairly fluid situation. >> We know where to find you when you. No kidding. So the 75 million, 10%, we're talking 7.5 million roughly remaining, that could be subject to the tariff issues that we're talking about. >> That's correct. So of the 7.5 million just influenced by tariffs, again, you'd have some percentage of cost change on that. It's not going to change 100%. >> Right. >> Some of the tariffs have been in the 15 to 25% range, generally speaking. So we could see something in that nature. >> Okay, thank you. And then the other question I had was relating to the permitting period. So these are the standard permitting timeframes that we're. That these organizations, these various organizations are saying. And so that if the permit period lasts longer than that, and it can be shown that our costs are going up because of that. That's what you're saying? >> Yes, sir. >> So we obviously don't control the permitting agencies. These are very standard, I would say even conservative duration. So I have every expectation that the various permitting agencies would meet these. But since they're not in our control. We typically like to have this type of clarification. One, because it's outside our control and two, we can utilize the government's expertise and collaboration with these permitting agencies to help spur that along. It allows us to work together as a team a little bit better. >> And we feel that our part of it and the submission of it is rock solid. So we're not worried about our part, right? Yes, sir. I'm always getting this like people pointing fingers, Right. So it was either the government or it's the client, but it's never, never us, the contractor. So I just was curious what your thoughts are on that. >> Yes, sir. The good news about this particular project is Tampa Bay Water, CDM, Smith and Veolia have all been involved for multiple phases going back 20 years. And so our existing knowledge on this type of a plant is pretty solid that we should be able to produce something that should be permitted relatively consistently with the past trains. >> We're comfortable with our process and it's just a matter of the various government agencies that we're protecting ourselves on. >> Yes, sir. >> No question. >> Okay, thank you. >> Appreciate it, Mr. Wostal. >> Thanks. My questions are going to be for you about the commodity products. I used to negotiate steel and aluminum, thousands of tons a year. So I have an idea of how that industry works. How far out, what's the timeline of us needing to expend the 75 million in construction materials like ever? Over what period of time are we looking at? >> So we would look to procure all of our subcontracts and material purchase orders immediately. So that would mitigate some form of that risk. Now our subcontractors or suppliers could also claim a change in loss scenario which would trigger that situation. >> The work is expected to be put In place in the next one to two years. So we could have like rebar put on site within a year to give you an idea on. Once it's in hand, there's no commercial issues. >> Yeah, most suppliers look a certain period of time out, but if you don't plan to put the steel on the ground until next year, then I guess you're probably going to be looking at having to buy some of the newly tariffed products. But maybe, I mean those people are smart, just give them. I mean they will shop different areas. They will look at where the tariffs are coming from. They will say, okay, well this supplier down here has not been hit with a tariff and they will go to that plant. So I'm not overly concerned by it, but very good. >> Thank you any additional questions? Just one last yes, Commissioner Anger. >> And this cost that we're talking about, how does that compare to the original cost that we estimated? >> So the total cost, if I go back to this slide in here with this contract today, we will be at $181.1 million. And we are right within the budget at this point. The budget approved in the current CIP program. >> Thank you. >> All right, seeing no further discussion, can we have a motion move approval. Second, we have a motion from Commissioner Whistle, seconded by Commissioner Oakley. Please record your vote. >> Mr. Chair, the motion passed unanimously. >> Thank you very much. And I just want to thank our legal counsel and Mr. Cardin and everyone that worked on this. I know these last minute changes caused some work on the to get ready for today's meeting, but I appreciate your reaching out to us with that information. We're going to move on now to item number C1, which is water Conservation Month proclamation and Tampa Bay Water Wise program Update. Good morning, Ms. Brown. >> Good morning, Mr. Chairman and members of the board. This morning you have the opportunity to proclaim April as Water Conservation Month. And after that action item, I'll provide a brief update on the Tampa Bay Waterwise conservation program. For 27 years, April has been declared as Water Conservation Month throughout Florida. And this effort is coordinated by the Florida section of the American Waterworks Association, Florida's water management districts and the Florida Department of Environmental Protection. This proclamation generates awareness about the need for water conservation in the driest months. This year's theme of the proclamation is irrigation system evaluations, which is highlighted as a way to underscore the importance of getting sprinkler systems checked and tuned up. Homes can use half or more of their water outdoors. And so this is a really important area to focus on, especially in the dry season. Tampa Bay Water has adopted this proclamation many times in the past and we do so alongside our member governments staff recommends the adoption of the proclamation that April is Water Conservation Month. >> Thank you very much. I just want to say that I was so sure that the board was going to do this that I signed it before the vote. But if for some reason it gets caught up, we'll, we'll, we'll rip it up. >> So if we say move denial or something, we'll have to do something with it. But I do want to say we're going to do it Nils county at our first meeting in April. And this is always a very, very good opportunity to remind people of the importance of conservation and the importance of the actions that they actually Take particularly related to their lawns and irrigation and how much water gets consumed that way. We have a motion from Commissioner Oakley, seconded by Councilman Miranda, to declare Water conservation month for April 2025. >> Mr. Chair, the motion passed unanimously. >> Okay, thank you. >> Thank you. And now I'll transition to a brief update on the Tampa Bay Water Wise Program, our regional water conservation rebate program in keeping with the theme of the proclamation just adopted, the theme of irrigation system evaluations. I'm pleased to let you know that the Tampa Bay Water Wise Program is piloting a sprinkler system rebate for residential customers. This pilot program has been developed by members of the working group which include member government staff, along with input from licensed irrigation contractors through the Florida Irrigation Society. Of note, the Florida Irrigation Society gave an award to Tampa Bay Water last year for our agency's current and long standing commitment to water conservation and collaboration. This pilot will launch in April and last six months going through September of this year. And the rebate program helps to provide an initial visit from a licensed irrigation contractor who will do that sprinkler system checkup and make sure the irrigation clocks are set properly and also identify opportunities to increase the efficiency of sprinkler systems. Rebates for high efficiency spray nozzles, spray bodies, rain shut off devices and capping any sprinkler heads that are no longer needed. Lastly, the working group is also looking at another pilot program, a pilot to increase the price for the toilet rebates to see if that has an impact on the number of rebates issued. You may recall in a previous board meeting a couple board members to suggested the idea of increasing those rebate prices for toilets and we're looking at that. This slide shows our savings to date for this fiscal year in the solid blue that is our savings to date, about 90,000 gallons per day combined with the projects that we have in progress which are under construction in the blue diagonal lines, that gets us to our low target for the year. So we are certain to exceed that low target. We did see a little bit of a slowdown in rebate activity after the storms last year, but that activity picked back up in January. And we are also currently working with some properties who are in the process of rebuilding after the storms. The bar on the right side of this graph shows the potential water savings that we have identified through pre inspections that have already been conducted at numerous properties and among those. So if so you can see that if all of those customers did all of those projects, we would very much exceed the high target, but it is a process to get those customers to finish the projects. Among these potential projects are some with local government buildings here in Pinellas county and that serves as a reminder that county and city facilities are eligible for these rebates as well. The program's outreach manager has reached out to each of your local governments to make sure that the right staff are aware of the program and know how to use it and that effort is ongoing. And lastly, just a few program updates. So far the program's cost effectiveness is the same as last year, coming in at $0.78 per thousand gallons, well below the cost of new water supply development which ranges from 3 to $11 per thousand gallons. The administrative costs from EGIA, who is our third party rebate administrator, are about 12% of total program costs. Last year that cost was about 15%. The agency is going to be soon reissuing a request for proposals for the third party rebate administrator as requested by the board for a new five year contract. Agency staff have reached out to other cities with rebate programs and identified more companies that could be potential bidders. Member government staff will serve on the selection committee and I will be back in a few months seeking board approval for the new contract with the successful bidder. And lastly, our marketing plan this year is supported with a larger marketing budget which was requested and approved by the working group and agency staff with the singular aim of increasing water savings. Specifically, this budget has allowed for more engagement with the commercial school sector and local government sectors. We've also invested in more earned media opportunities, basically getting in front of news cameras to tell the story about how these rebates are helping customers around the region. And lastly, our marketing efforts continue to support our member government's communication efforts. Member governments are a well-known and trusted entity which is why they are the second largest source for completed applications in this program. The number one source is direct web searches typing it into a search engine. So we encourage our members to continue and to expand their efforts to promote the program so that we can save more water together. And with that I'm happy to take any questions you mig

2575 Enterprise Road, Clearwater, FL 33763 Phone: 727.796.2355 / Fax: 727.791.2388 tampabaywater.org Board of Directors Harry Cohen Lisset Hanewicz Chopper Davis Dave Eggers Jack Mariano Charlie Miranda Ron Oakley Kathleen Peters Joshua Wostal General Manager Charles H. Carden General Counsel Kelly M. Fernandez Persson, Cohen, Mooney, Fernandez & Jackson, P.A. BOARD AGENDA March 17, 2025 – 9:30 AM REGULAR MEETING OPEN TO THE PUBLIC PUBLIC COMMENT The Tampa Bay Water Board of Directors welcomes comments from the public about any issue of concern. Opinions provide valuable input to the board members. However, we request that public comments be directed to issues and not directed personally against any board member or staff member. This provides a mutual respect between the board members and the public. Public comment may be provided in person, via teleconference during the public comment portion of the meeting, or by submitting written comments for the record and distribution to the Board. Anyone wishing to speak in person must submit a completed speaker card to the Agency Clerk prior to the beginning of the meeting. To submit written comment or to participate via teleconference, please contact Krista Simon at 727-791-2347 or ksimon@tampabaywater.org. by 4:00 p.m. on March 14, 2025. Each speaker shall have a maximum of three (3) minutes to address any matter on the agenda. The next Board Meeting is scheduled to be held on Monday, April 21, 2025 at 9:30 a.m. ACCOMMODATIONS Anyone requiring reasonable accommodations for this meeting as provided for in the Americans With Disabilities Act should contact the Records Department at 727-796-2355 x2401 or 813-996-7009 at least three working days prior to the public meeting. If a person decides to appeal any decision made by the Board, with respect to any matter considered at this meeting, he/she will need a record of the proceedings, and for such purposes, he/she may need to ensure that a verbatim record of the proceedings is made, such record includes the testimony and evidence upon which the appeal is to be based.

Regular Meeting Agenda MONDAY, MARCH 17, 2025 – 9:30 AM A. CONSENT ITEMS A.1 February 24, 2025 - Regular Meeting - Draft Agenda Minutes - Approve A.2 Tampa Bay Water Performance Dashboard Update - Receive Report A.3 Regional Water Supplies, Member Demands and Environmental Conditions - Receive Report A.4 Capital Improvement Program - Task Order Authorization - Approve A.5 South Hillsborough County Program Update - Receive Report A.6 South Hillsborough Pipeline, Projects 01610 and 01606 - Property Acquisition Status Report - Receive Report A.7 South Hillsborough Pipeline, Project Nos. 01610 and 01616 - Adopt Eminent Domain Resolution - Approve A.8 Conflict of Interest Waiver for GrayRobinson related to the South Hillsborough Pipeline Project - Approve A.9 Cosme Water Treatment Plant Yard Piping Improvements, Project No. 07131, Cancellation of Joint Project Agreement, No AGR 2015-007 - Approve A.10 Dam Safety Compliance Engineer of Record, Contract No. 2025043 with Gannett Fleming, Inc. - Approve A.11 Independent Annual Financial Statement Audit, and As-Needed Services for Fiscal Year 2025 Fees - Approve A.12 Contract Option Year Renewals - Approve A.13 Procurement Exceptions Vendor Limits - Approve B. GENERAL MANAGER & GENERAL COUNSEL B.1 General Manager's Report - Receive Report B.2 Legislative and Grant Funding Program Update - Receive Report 9:30 AM - CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL PUBLIC COMMENT - (3 Minutes per speaker) AGENDA REGULAR AGENDA

C. ACTION ITEMS C.1 Water Conservation Month Proclamation and Tampa Bay Water Wise Program Update - Approve C.2 Surface Water Treatment Plant Expansion, Project No. 01014, Amendment 2025-18 for Construction Phase Services of Agreement No. 2000-028 with Veolia Water North America Operating Services, LLC - Approve D. PRESENTATIONS & REPORTS D.1 Member Government Report - City of St. Petersburg - Presentation D.2 Long-term Master Water Plan Feasibility Program and Developmental Alternatives Study Status Report - Presentation D.3 Water Quality Update - Presentation E. OTHER ADMINISTRATIVE MATTERS AND OLD BUSINESS No items to report. F. RECEIVE & FILE F.1 Agency Division Activity Reports for February 2025 - Receive Report F.2 Legal Services Activity Report for February 2025 - Receive Report F.3 Legal Services Budget Report through February 2025 - Receive Report F.4 Comprehensive Check List with Delegated Check Approval Items for February 2025 - Receive Report F.5 Disposition of Fixed Assets for February 2025 - Receive Report F.6 Financial Statement - February 2025 - Receive Report F.7 Investment Schedules for February 2025 - Receive Report F.8 Potential True-Up of Fixed Costs between Member Governments through February 2025 - Receive Report F.9 Vendor's Status Report for February 2025 - Receive Report ADJOURNMENT

Showing the first 24,000 of 1,827,856 characters. The full document is at the source.

2575 Enterprise Road, Clearwater, FL 33763 Phone: 727.796.2355 / Fax: 727.791.2388 tampabaywater.org Board of Directors Harry Cohen Lisset Hanewicz Chopper Davis Dave Eggers Jack Mariano Charlie Miranda Ron Oakley Kathleen Peters Joshua Wostal General Manager Charles H. Carden General Counsel Kelly M. Fernandez Persson, Cohen, Mooney, Fernandez & Jackson, P.A. BOARD AGENDA March 17, 2025 – 9:30 AM REGULAR MEETING OPEN TO THE PUBLIC PUBLIC COMMENT The Tampa Bay Water Board of Directors welcomes comments from the public about any issue of concern. Opinions provide valuable input to the board members. However, we request that public comments be directed to issues and not directed personally against any board member or staff member. This provides a mutual respect between the board members and the public. Public comment may be provided in person, via teleconference during the public comment portion of the meeting, or by submitting written comments for the record and distribution to the Board. Anyone wishing to speak in person must submit a completed speaker card to the Agency Clerk prior to the beginning of the meeting. To submit written comment or to participate via teleconference, please contact Krista Simon at 727-791-2347 or ksimon@tampabaywater.org. by 4:00 p.m. on March 14, 2025. Each speaker shall have a maximum of three (3) minutes to address any matter on the agenda. The next Board Meeting is scheduled to be held on Monday, April 21, 2025 at 9:30 a.m. ACCOMMODATIONS Anyone requiring reasonable accommodations for this meeting as provided for in the Americans With Disabilities Act should contact the Records Department at 727-796-2355 x2401 or 813-996-7009 at least three working days prior to the public meeting. If a person decides to appeal any decision made by the Board, with respect to any matter considered at this meeting, he/she will need a record of the proceedings, and for such purposes, he/she may need to ensure that a verbatim record of the proceedings is made, such record includes the testimony and evidence upon which the appeal is to be based.

Regular Meeting Agenda MONDAY, MARCH 17, 2025 – 9:30 AM A. CONSENT ITEMS A.1 February 24, 2025 - Regular Meeting - Draft Agenda Minutes - Approve A.2 Tampa Bay Water Performance Dashboard Update - Receive Report A.3 Regional Water Supplies, Member Demands and Environmental Conditions - Receive Report A.4 Capital Improvement Program - Task Order Authorization - Approve A.5 South Hillsborough County Program Update - Receive Report A.6 South Hillsborough Pipeline, Projects 01610 and 01606 - Property Acquisition Status Report - Receive Report A.7 South Hillsborough Pipeline, Project Nos. 01610 and 01616 - Adopt Eminent Domain Resolution - Approve A.8 Conflict of Interest Waiver for GrayRobinson related to the South Hillsborough Pipeline Project - Approve A.9 Cosme Water Treatment Plant Yard Piping Improvements, Project No. 07131, Cancellation of Joint Project Agreement, No AGR 2015-007 - Approve A.10 Dam Safety Compliance Engineer of Record, Contract No. 2025043 with Gannett Fleming, Inc. - Approve A.11 Independent Annual Financial Statement Audit, and As-Needed Services for Fiscal Year 2025 Fees - Approve A.12 Contract Option Year Renewals - Approve A.13 Procurement Exceptions Vendor Limits - Approve B. GENERAL MANAGER & GENERAL COUNSEL B.1 General Manager's Report - Receive Report B.2 Legislative and Grant Funding Program Update - Receive Report 9:30 AM - CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL PUBLIC COMMENT - (3 Minutes per speaker) AGENDA REGULAR AGENDA

C. ACTION ITEMS C.1 Water Conservation Month Proclamation and Tampa Bay Water Wise Program Update - Approve C.2 Surface Water Treatment Plant Expansion, Project No. 01014, Amendment 2025-18 for Construction Phase Services of Agreement No. 2000-028 with Veolia Water North America Operating Services, LLC - Approve D. PRESENTATIONS & REPORTS D.1 Member Government Report - City of St. Petersburg - Presentation D.2 Long-term Master Water Plan Feasibility Program and Developmental Alternatives Study Status Report - Presentation D.3 Water Quality Update - Presentation E. OTHER ADMINISTRATIVE MATTERS AND OLD BUSINESS No items to report. F. RECEIVE & FILE F.1 Agency Division Activity Reports for February 2025 - Receive Report F.2 Legal Services Activity Report for February 2025 - Receive Report F.3 Legal Services Budget Report through February 2025 - Receive Report F.4 Comprehensive Check List with Delegated Check Approval Items for February 2025 - Receive Report F.5 Disposition of Fixed Assets for February 2025 - Receive Report F.6 Financial Statement - February 2025 - Receive Report F.7 Investment Schedules for February 2025 - Receive Report F.8 Potential True-Up of Fixed Costs between Member Governments through February 2025 - Receive Report F.9 Vendor's Status Report for February 2025 - Receive Report ADJOURNMENT

AGENDA ITEM A.1 DATE: March 3, 2025 TO: Board of Directors FROM: Charles H. Carden, General Manager SUBJECT: February 24, 2025 - Regular Meeting - Draft Agenda Minutes - Approve SUMMARY On February 24, 2025, Tampa Bay Water's Board of Directors held its Regular Board Meeting. A quorum of the Board of Directors of Tampa Bay Water met in person at the Clearwater Administrative Offices. SUGGESTED ACTION Approve Minutes. COST/FUNDING SOURCE N/A DISCUSSION Draft minutes are attached for the Board's review and approval. Attachment (1) February 2025 Board Meeting Minutes DRAFT

___________________________________________________________________________ Tampa Bay Water Regular Meeting February 24, 2025 Minutes 9:30 AM - CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL Present: Chairman - Commissioner Harry Cohen, Hillsborough County Vice Chair - Lisset Hanewicz, City of St. Petersburg Mayor Chopper Davis, City of New Port Richey Commissioner Dave Eggers, Pinellas County Commissioner Jack Mariano, Pasco County Councilman Charlie Miranda, City of Tampa Commissioner Ron Oakley, Pasco County Commissioner Kathleen Peters, Pinellas County Commissioner Joshua Wostal, Hillsborough County Staff: Chuck Carden, General Manager Presenters: Chuck Carden, General Manager Kelly Fernandez, General Counsel Maribel Medina, Project and Planning Director Christina Sackett, Chief Financial Officer Warren Hogg, Chief Science Officer Rick Menzies, Construction Manager Garrett Marlowe, Mauldin & Jenkins General Counsel: Kelly Fernandez, General Counsel A list of others who were present and who signed the attendance roster was filed in the permanent files of Tampa Bay Water. Staff and consultants presenting to the Board are listed above. AGENDA ITEM A.1

Board of Directors March 3, 2025 Page 2 Chairman Cohen called the meeting to order at 9:30 a.m. The meeting was properly noticed in the Florida Administrative Register and a quorum present. PLEDGE OF ALLEGIANCE Vice Chair Hanewicz led the Pledge of Allegiance. ROLL CALL Roll call was taken. All Board Members were present. Chairman Cohen asked if there are any changes to the agenda. Chuck Carden, General Manager, stated there were no changes to the agenda. PUBLIC COMMENT - (3 Minutes per speaker) Chairman Cohen opened the Regular Board meeting to public comment. The following speaker(s) made public comment to the Board of Directors: David Ballard Geddis Public comment was duly recorded and is filed in the permanent records of Tampa Bay Water. AGENDA A) CONSENT ITEMS A.1 January 27, 2025 - Regular Meeting - Draft Agenda Minutes Approve Minutes. A.2 Tampa Bay Water Performance Dashboard Update Receive Report. A.3 2020 Management and Performance Audit Task Update Receive Report. A.4 Legislative and Grant Funding Program Update Receive Report. A.5 Regional Water Supplies, Member Demands and Environmental Conditions

Board of Directors March 3, 2025 Page 3 Receive Report. A.6 Hurricane Response on Tampa Bay Water's Infrastructure for Hurricanes Helene and Milton Receive Report. A.7 South Hillsborough County Program Update Receive Report. A.8 Water Quality Update Receive Report. A.9 Tampa Bay Water Wise Update Receive Report. A.10 Long-term Master Water Plan Feasibility Program and Developmental Alternatives Study Status Report Receive Report. A.11 Capital Improvements Program Executive Quarterly Report Receive Report. A.12 Capital Improvement Program - Task Order Authorization Approve Task Orders. A.13 Surface Water Treatment Plant Expansion, Project No. 01014, Project Status Report Receive Report. A.14 South Hillsborough Pipeline, Projects 01610 and 01606 - Property Acquisition Status Report Receive Report. A.15 South Hillsborough Pipeline, Project Nos. 01610 and 01616 - Adopt Eminent Domain Resolution It is recommended that the Board adopt the attached Resolution 2025-005 declaring the public purpose of the South Hillsborough Pipeline, determining the necessity of acquiring the parcels for the project, and authorizing the initiation of eminent domain proceedings. A.16 Eldridge-Wilde Wellfield Pumps and Motors Replacement and Underground Powerline Replacement, Project No's. 50016 and 50040 - Contract No. 2016-031 First Amendment with Black and Veatch Approve First Amendment to Contract No. 2016-031 with Black and Veatch.

Board of Directors March 3, 2025 Page 4 A.17 Cross Bar Ranch Wellfield Water Transmission Main Utility Conflict, Project No. 07153 - Submittal of Environmental Resource Program Permit Application Approve submittal of the Environmental Resource Program Permit Application for the Cross Bar Ranch Wellfield Transmission Utility Conflict Project No. 07153. A.18 Cosme Water Treatment Plant Yard Piping Improvements, Project No. 07131, Contract No. 2021-046 Task Authorization Approve negotiated work assignment with Amici Engineering Contractors under Contract No. 2021-046. A.19 As Needed Professional Services Agreement - Second Amendment for Name Change from WSP USA Environment & Infrastructure, Inc. to WSP USA, Inc. and Exercise the First Option Year Renewal, Contract No. 2022-031 Approve the Second Amendment to Contract No. 2022-031 with WSP USA Inc., formerly known as WSP USA Environment & Infrastructure, Inc. A.20 Security Guard Services, Contract No. 2025714 with Universal Protection Service, LLC d/b/a Allied Universal Security Services, LLC in the amount of $1,162,950.00. Approve Contract No. 2025714 with Universal Protection Service, LLC d/b/a Allied Universal Security Services, LLC in a not to exceed value of $1,162,950.00. A.21 Sole-Source Procurement No. 2025-509 for Analytical Equipment, Replacement Parts and Consumable Supplies with Hach Company Approve Sole-Source Procurement for Hach Company Analytical Equipment, Replacement Parts and Consumable Supplies. A.22 Contract Option Year Renewals Approve contract renewals. A.23 Fiscal Year 2024 Year-end Reporting of Encumbered and Unencumbered Funds Transfers Receive Report. Motion: Councilman Miranda moved to Approve CONSENT ITEMS. Mayor Davis seconded the motion. Vote: The motion CARRIED by a vote of 9 - 0.

Board of Directors March 3, 2025 Page 5 REGULAR AGENDA B) GENERAL MANAGER & GENERAL COUNSEL B.1 General Manager's Report Receive Report. Chuck Carden, General Manager, provided an update on the agency’s regional system, PFAS litigation, Knowledge to Implementation (K2i) platform, City of Tampa Permit Renewal, General Manager’s Quarterly Travel, the agency’s Hurricane Response - Improvement Report, and recent outreach efforts. Mr. Carden congratulated the agency’s Finance Team for receiving the GFOA’s Award for Outstanding Achievement in Popular Annual Finance Reporting, and the Purchasing Department for receiving the Award for Excellence in Public Procurement from the Florida Association of Public Procurement Officials. Mr. Carden addressed questions concerning fueling options during hurricanes, meeting with member governments to discuss strengths and weaknesses, and easement issues and concerns. B.2 General Counsel Contract Renewal Approve Contract 2025-045. Kelly Fernandez, General Counsel, spoke briefly about the renewal of the contract and the proposed changes to the contract. Ms. Fernandez noted that she and David Jackson have spoken to each board member on the renewal and changes. Ms. Fernandez addressed Board comments and questions concerning the contract increase and termination date. Motion: Council Member Hanewicz moved to Approve the General Counsel Contract Renewal as amended to extend the contract for one year with the proposed increase, with no automatic renewal and no automatic increase, and to schedule a discussion for contract renewal at least 60 days prior to termination of the contract. Councilman Miranda seconded the motion. Vote: The motion CARRIED by a vote of 9 - 0. C) ACTION ITEMS C.1 South Hillsborough Pipeline, Restated and Amended Joint Project Agreement with Hillsborough County Maribel Medina, Projects and Planning Director, provided an update on the South Hillsborough Pipeline, Restated and Amended Joint Project Agreement (JPA) with

Board of Directors March 3, 2025 Page 6 Hillsborough County. She noted that Hillsborough County approved the Amended JPA at their February 19, 2025 Board meeting. The Amended JPA includes the addition of the county-requested infrastructure and identifies the location of the new Point of Connection at the Balm (AgMart) Water Resources Department future Water Campus, and adds the design and construction for improvements at the County’s Lithia Water Treatment Plant. The requests will be funded 100% by the County. Motion: Commissioner Eggers moved to Approve the Amended and Restated Joint Project Agreement with Hillsborough County. Commissioner Wostal seconded the motion. Vote: The motion carried by a vote of 9 - 0. C.2 Surface Water Treatment Plant SCADA System Upgrade, Project No. 06912, Amendment 2025-17 for Design Phase Services of Agreement No. 2000-028 with Veolia Water North America - South, LLC Approve Amendment 2025-17 of Agreement 2000-028 with Veolia Water North America - South, LLC. Maribel Medina, Projects and Planning Director, provided an update on the Surface Water Treatment Plant SCADA System Upgrade. Ms. Medina stated the upgrade is included in the agency’s Capital Improvement Program (CIP). The project, which will take place in two phases. Phase 1 includes the design of upgrades and improvements of the existing SCADA system with the expanded facilities. Motion: Council Member Hanewicz moved to Approve the Surface Water Treatment Plant SCADA System Upgrade, Amendment 2025-17 of Agreement 2000-028 with Veolia Water North America - South, LLC. Commissioner Wostal seconded the motion. Vote: The motion CARRIED by a vote of 9 - 0. D) PRESENTATIONS & REPORTS D.1 Reports of Certified Public Accountants Regarding Financial Statements for the Year Ended September 30, 2024 Receive Report. Christina Sackett, Chief Finance Officer, stated an independent audit of the agency’s financial statements for fiscal year 2024 was completed by Mauldin & Jenkins. Ms. Sackett introduced Garrett Marlowe, auditor with Mauldin & Jenkins, to provide the audit results. Mr. Marlowe provided a brief history of Mauldin & Jenkins. Mr. Marlowe stated Mauldin & Jenkins have issued an unmodified opinion, which is the highest form of assurance they can render with regards to the fairness of the financial statements. No significant difficulties were encountered

Board of Directors March 3, 2025 Page 7 or issues discussed with management and there was no auditor proposed adjustments, no uncorrected misstatements and no disagreements with management. Mr. Marlowe reviewed statistical schedules for 2024 including water sales, operating expenses, revenues by member government for 2023 and 2024, and the total debt and capital assets from 2015 through 2024. D.2 Annual Demand Forecast Update and Evaluation Receive Report. Warren Hogg, Chief Science Officer, provided an update on the Annual Demand Forecast. Mr. Hoggs stated the forecast projections are for seven Water Demand Planning areas that coincide with member government service areas. This updated demand forecast is for the Tampa Bay area for Fiscal Years 2025 through 2044. Mr. Hogg stated the median demand for the year 2044 has decreased by approximately 3 million gallons per day (mgd) since last year’s update. Next, Mr. Hogg reviewed the probabilistic demand forecast and next steps. Mr. Hogg addressed questions on meeting water requirements, zoning changes, decrease from 2023 to 2024, adjusting for urban growth, and water supplies. D.3 Capital Improvements Program - Construction Update Receive Presentation. Rick Menzies, Construction Manager, provided an update on the Capital Improvement Program Construction. Mr. Menzies provided updates on the seven active projects, nine upcoming projects, and recently completed projects. Mr. Menzies addressed questions concerning Cross Bar Ranch. Mr. Carden addressed questions concerning the desalination facility. E) OTHER ADMINISTRATIVE MATTERS AND OLD BUSINESS E.1 Election of Officers - Board Organizational Action Elect a Chairman and Vice-Chairman to serve for a one-year term of office. Chairman Cohen passed the gavel to Chuck Carden, General Manager. Mr. Carden opened the nominations for the position of Chairman of the Tampa Bay Water Board of Directors. Councilman Miranda nominated Commissioner Cohen as Chairman. With no other nominations, Mr. Carden closed nominations and requested a vote on Commissioner Cohen as Chairman to serve for a one-year term of office. Vote: Commissioner Cohen was elected Chairman by vote of 9-0 of the Board.

Board of Directors March 3, 2025 Page 8 Chairman Cohen opened the nominations for Vice Chairman of Tampa Bay Water Board of Directors. Councilman Miranda nominated Council Member Hanewicz as Vice Chairman. With no other nominations, Chairman Cohen closed nominations and requested a vote on Council Member Hanewicz as Vice Chairman to serve for a one-year term of office. Vote: Council Member Hanewicz was elected Vice Chairman by a vote of 9-0. PUBLIC COMMENT - (3 Minutes per speaker) Chairman Cohen stated there was another individual requesting the opportunity to make public comment. The following speaker made public comment to the Board of Directors: Mary Odum Public comment was duly recorded and is filed in the permanent records of Tampa Bay Water. F) RECEIVE & FILE F.1 Agency Division Activity Reports for January 2025 Receive and File. F.2 Legal Services Activity Report for January 2025 Receive and File. F.3 Legal Services Budget Report through January 31, 2025 Receive and File. F.4 Comprehensive Check List with Delegated Check Approval Items for January 2025 Receive and File. F.5 Disposition of Fixed Assets for January 2025 Receive and File. F.6 Financial Statement - January 2025 Receive and File. F.7 Investment Schedules for January 2025 Receive and File. F.8 Potential True-Up of Fixed Costs between Member Governments through January 2025 Receive and File. F.9 Vendor's Status Report for January 2025 Receive and File.

Board of Directors March 3, 2025 Page 9 Motion: Councilman Miranda moved to Approve RECEIVE & FILE. Commissioner Wostal seconded the motion. Vote: The motion CARRIED by a vote of 9 - 0. ADJOURNMENT The meeting adjourned at 10:49 a.m. Attest: _____________________________________ Charles H. Carden, General Manager/Secretary Date: _____________________________________

AGENDA ITEM A.2 DATE: March 4, 2025 TO: Board of Directors THRU: Charles H. Carden, General Manager FROM: Shane Johnson, Continuous Improvement Director SUBJECT: Tampa Bay Water Performance Dashboard Update - Receive Report SUMMARY Tampa Bay Water's performance dashboard measures key performance indicators against Tampa Bay Water's internal benchmarks and policies and American Water Works Association's water utility industry benchmarks. The attached performance dashboard provides overall agency performance to the Board of Directors. SUGGESTED ACTION Receive Report. COST/FUNDING SOURCE N/A DISCUSSION Tampa Bay Water staff updated the Board Performance Dashboard to measure key performance indicators identified in the strategic plan and established by agency staff. Regular reports on performance are provided to the Board of Directors with the agenda package. The Board Performance Dashboard has been updated to include metrics aligned with the updated strategic plan, and the most recent benchmarks from the 2022 American Water Works Association Utility Benchmarking Study. These metrics are intended to provide the Board of Directors with a snapshot of the Agency's current

performance. BACKGROUND Tampa Bay Water strives to continually improve and become more efficient in operating and maintaining the water supply system and planning for the region’s future drinking water needs. In 2023, the Agency’s Board of Directors approved the current strategic plan. The Agency assigned key performance indicators to the strategic plan goals for measuring against Tampa Bay Water's internal benchmarks and policies, and the American Water Works Association’s water utility industry benchmarks using a performance dashboard. The dashboard uses key performance indicators created as part of the update to the strategic plan and established by agency staff. Attachment (1) Tampa Bay Water Overall Performance Dashboard March 2025

Tampa Bay Water Overall Performance Dashboard Available Capacity Meeting Projected Reservoir Storage Volume Planned Maintenance Time Water Shortage Mitigation Water Sources / Water Use Permits / Water Quality Stakeholder Outreach Fiscal Year To Date Email Campaign Reach 19,986 Social Media Reach 402,188 Website Visits 328,161 Digital Reach Member Government Meetings 61 Board Outreach 35 Community Outreach 36 Engagement and Outreach Apr 24 May 24 Jun 24 Jul 24 Aug 24 Sep 24 Oct 24 Nov 24 Dec 24 Jan 25 Feb 25 Mar 25 200 250 300 350 205.3 203.6 201.9 203.1 202.0 200.9 199.1 197.2 197.4 197.7 197.6 197.9 Permitted Capacity = 270.0 12 Month Running Average Demand Feb 24 Mar 24 Apr 24 May 24 Jun 24 Jul 24 Aug 24 Sep 24 Oct 24 Nov 24 Dec 24 Jan 25 0% 20% 40% 60% 80% 100% Planned Maintenance Ratio(%) 88% 94% 89% 79% 79% 79% 83% 82% 74% 68% 84% 84% AWWA Benchmark = 80% (75th Percentile) This indicator provides a measure of the time spent on planned maintenance shown as a percent of total maintenance time. Utilities should strive to be above the AWWA 2022 benchmark. This indicator shows how much water the utility is permitted to use and the 12 month running average demand. Average demand should not exceed permitted capacity. This chart highlights the current stage of Water Shortage Mitigation Plan of Tampa Bay Water. Apr 24 May 24 Jun 24 Jul 24 Aug 24 Sep 24 Oct 24 Nov 24 Dec 24 Jan 25 Feb 25 Mar 25 0 5 10 Reservoir Storage (Billion Gallons) Consolidated Water Use Permit Safe Drinking Water Act Compliance South-Central Hillsborough Wellfield Permit This indicator provides the 12-month running average for groundwater pumping rate from 10 wellfields and corresponding permit limit. This indicator quantifies the percentage of time each year that the utility meets all standards in the Safe Drinking Water Act National Primary Drinking Water Regulations averaged over the previous 12 months. AWWA Benchmark: 100% This indicator provides the 12-month running average for groundwater pumping rate from the South-Central Hillsborough Wellfield against its approved pumping limit. 0 20 60 80 100 86.83 100.0% 0 5 10 15 20 25 Average production (million gallons per day) 24.78 These charts show stakeholder outreach activities of the agency by digital means and through other engagements. Total Production by Sources Fiscal Year To Date This chart provides the percentage distribution of sources used to supply water. Stage 4 - Water Supply Crisis Stage 3 - Regional Water Shor Stage 2 - Drought Warning Stage 1 - Drought Alert Normal Conditions Permit Limit 90 Permit Limit 24.95 Ground- water 50.14% Surface 40 Page 1 of 2American Water Works Ass

Showing the first 24,000 of 89,528 characters. The full document is at the source.

>> Good morning, everyone, and welcome to this Regular Meeting of Tampa Bay water for Monday, March 17, 2025. This meeting was noticed in the Florida Administrative Register and on the Tampa Bay Water website. The meeting is available for viewing through live streaming and a recording of the meeting will be posted on the agency's website. Commissioner Kathleen Peters and Commissioner Jack Mariano both had conflicts this morning and they wanted their absences excused. Absences noted for the record. And Vice Chair Hanewicz was unable to attend the meeting and informed us of her absence prior to today. So with that, Madam Clerk, can we please call the roll? >> [ CALLING ROLL] >> Mr. Chair, we have a quorum. >> Thank you very much. Commissioner Oakley, would you now please lead us in the pledge of Allegiance. >> I pledge allegiance to the Flag of the United States of America and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all. >> At this time we will open the meeting for public comment. We have three people signed up for public, public comment this morning. The first is Karen Hillary, followed by David Ballard Geddes Jr. and then Mark Clutho. So, Ms. Hillary, good morning. You have three minutes. Thank you. >> Thank you. Hi. Hello. My name is Karen Hillary and I live in Brandon. Prior to the meeting, I sent all of you an email that detailed and outlined the south county pipeline that was handled and the way it was handled in my neighborhood based on the number of Brandon residents I've spoken. Spoken to. I've lived in Brandon almost my entire life, so I know a lot of people in Brandon. Without a doubt, the project was handled just as poorly along the route as it was in my neighborhood. I'm not here to get explanations. At this point, your explanations seem to be an excuse that you feel to help you, make you feel better that this was done properly today. I'm strictly here to put into the public records that as an entire branding community, we, we were not informed of the pipeline properly until it was too late. We were not given input that was actually heard and used. We have been told there is nothing we can do and this pipeline is coming to us no matter what. At the very first community meeting we had, that's what we were told as a tax paying citizen in Hillsborough county for over 30 years. That's a very tough pill to swallow and I think all of you who sit on the board would not feel any differently. This pipeline is not being placed to benefit our community. At all. It's being placed to serve the poor planning and the lack of growth management that has happened in south Hillsborough county that's been allowed to happen. In the document I sent each of you, I detailed years of communication with Tampa Bay Water where I was given incorrect information, false information or no information at all due to errors on the part of the Tampa Bay Water and their staff. I have been told the route was diverted here at this board meeting to at a board meeting to go through the heart of Brandon due to cost. But your own people that you hire stated at that same meeting that it was more likely to have a higher cost in the route that you ended up voting on due to the right of ways and easements. I have also been told this route better serves the needs of Hillsborough county for easier connections to the west for future plans. I've lived in Hillsborough county almost my entire life, and to this day I find it very difficult to believe that Hillsborough county is going to adhere to some plan that they've made with just this pipeline alone. Changes to Hillsborough county plans have been made by running this pipeline through an EPC protected area of my neighborhood that we have been told numerous times is not allowed to be touched. But now it's going to be allowed to be dug up, dewatered and put the pipeline through not far from my neighborhood, about another mile south over the Alafaya. Previously, a bridge could not be built due to the environmental sensitivity of the area. Now the pipeline is going to be allowed to go underneath the Alafaya and that's going to be okay. Makes no sense whatsoever as a community we're supposed to trust. I have been told numerous times that any concern that we bring up will be addressed and handled competently. Based on all my experience through this whole process, which has been years, I find it really hard to believe. It is frustrating to know that none of you live in the pipeline route nor in the area of the pipeline. None of you will feel the inconvenience and the negative impact that a 12 to 15 foot deep trash. >> Thank you very much. >> And dewatered in your house and placed three to six feet underneath. >> Thank you. >> You voted without looking at schools, neighborhoods and their businesses that will be impacted. Since nothing can be done, I will end with saying, I just want you to take time. Think about how profoundly you negatively impacted a community with your vote. And before you ever vote again on something that's so costly that will so deeply impact a community, please ask yourself, would I want to stun where I live? >> Thank you, Mr. Geddes and then Mark Plutho. >> Hi, good morning. David Ballard, Geddes Jr. I live on Georgia Avenue in Palm Harbor. The Mosaic Phosphate Mining Company held a public meeting in Plant City last Tuesday on March 11th to inform us that they are intending on injecting the wastewater from their phosphate mining operations into the ground. The Mosaic Phosphate Company wants to take the same type of toxic sludge that. The Piney Point disaster spilled into Tampa Bay and pump their toxic caustic wastewater into the ground, infecting the groundwater with the caustic waste fluids of their phosphate mining operations. The Mosaic phosphate mining has unearthed nearly half of central Florida in search of nitrogen based fertilizer and raw material that is ultimately refined down into the making of plutonium, desecrating the Florida landscape. In its process, the phosphate mining has proven to be a horrible steward of the eco structure. When Mosaic tries to explain this logic of theirs injecting caustic, noxious, corrosive wastewater into a confined salty layer of the substrate in our aquifer, what could possibly. Go wrong with their logic? Trust me, I don't trust them or their chemistry in. Intermixing chemicals or components into a confined salty, saline or brine like substrate could very well cause a chemical reaction underground using the salty substrate as a catalyst, causing things to react, causing an expansion of such an eruption or even an explosion underground. Once the phosphorus wastewater is interjected underground. Such potential catalyst will remain in the substrate indefinitely. Interjecting toxins and possible carcinogens causing gases to build up underground could cause an explosion. This is a ticking time bomb just waiting to go off. I think we have a national security issue before us with the injecting of caustic phosphate mining wastewater in our ground. Thank you, . >> Thank you. And Mark Clutho. >> Mark Lutho, Largo look at this agenda here and it's just unbelievable. You know, you talk about environmental conditions and you know, water wise and I look at the plants that you're building here and what the water will do to make them grow. And then they have to be mutilated because they can't grow. They'll be over the parking lot, over the sidewalk. Doggone shame, isn't it a waste? Here we have the weakened Trump. Oh, here we go. Pledge to reverse the Biden administration focus on climate change. Well, you know what that's going to do, don't you? Science can't keep up with the warming planet. Yeah, Hurricane Milton is terrifying and it's just the start. More hurricanes are slamming the Gulf coast and this is the new normal. Yeah. And I remember that dumb fool that came here to say, this is the first public green building in Tampa Bay. Daily daylit. And you stupid fools still have those lights shining on the wall out there, like you have some pictures hanging there. Where's Doge? Doge needs to be here to illuminate the waste that you fools are doing. It's so pathetic. It's absolutely ridiculous. How many dollars are wasted just on the lighting in this room alone. It's like you planned on doing appendectomies in here. >> Thank you, Mr. Clutho. That is all of the people that we had signed up for public comment today. At this time, we are going to move on to the consent agenda. There were not items pulled for discussion. And so at this time, we will entertain a motion move for approval. >> Excuse me. >> Yes, Commissioner Akos. >> Just if we could have just brief conversation about A8 and A13, I would appreciate it. >> Yes, sir. >> A8 is an item, Kelly. I believe. >> The explanation on A8 is that gray Robinson is handling the South Hillsboro pipeline project eminent domain work for Tampa Bay Water. They have a partner who joined them who represents the Hillsborough County School Board. There's two parcels of the project of the Hillsboro South Hillsboro pipeline project that involve Hillsborough County School Board properties. And so we don't anticipate there being any issues between the two parties in negotiating the acquisition of those temporary construction easements. But if for some reason the negotiations fail, then each party will have to retain separate counsel. It is not Gray Robinson. So I was accepting of the request for a conflict waiver. >> And you're comfortable with this? >> Yes, I am. >> Okay. A13 is the procurement exceptions vendors list. Our purchasing policy allows me as the general manager to sign contracts our purchases up to 100,000. The interpretation from our previous legal general counsel was that it's an accumulative hundred thousand going back to the start of when Tampa Bay Water was formed in 1998. So as we approach over the 100,000, we bring this back to you. I believe about once a year is what our finance team has done. So this is the current list that will go over the 100 grand, which is my delegated authority. >> So are we going to keep the cumulative thing or are we going to get rid of it? >> I would like to have an internal discussion to change it to be on an annual basis of 100,000. And rather than the going all the way back to 1998. >> And what do we have to do to get to that? >> We have to change our purchasing policies internally. >> Okay. And you'll bring that back here? >> Yes, sir. >> Okay. >> All right, thank you. >> Any other questions on the consent agenda? >> Move approval. >> Second. >> We have a motion from Commissioner Oakley. Seconded by Commissioner Wostal. Please record your vote. >> Mr. Chair the motion passed unanimously. >> Thank you very much. We're going to move on now to the regular agenda. Mr. Cardin, I will turn the meeting over to you at this time. >> Yes, sir. B1 will be the general management report. And so I wanted to start with our environmental conditions and report to you that we are in very good shape. We're doing very well. But I did want to show you some graphs and go through them. This is a new graph that updates on how we use our multiple sources. And so each bar of the month is an average water delivery from our regional system. Where you see the red in the bar? That's the reservoir usage. And blue represents the river water. And yellow represents the production from our desal facility. The green in each bar is our groundwater pumping from all of our well fields. So when we use water from the reservoir and the river water and the desal. So the red, blue and yellow, that has an impact on the green. So when we have those available to us, we can adjust how much we're pumping out of the ground groundwater. So this is what this is showing you. We set monthly targets every month and well, we actually set them at the beginning of the fiscal year. And this is going to show you how well we have been doing based upon our management of the system and some things that we cannot control. Mother Nature. In February, we projected demands to be about 195 million gallons a day. And our actuals were 192.2 million gallons a day. For our future months. This graph is showing you that we are expecting to deliver more water in March through May of this year than what we predicted back in October. On a yearly basis. Running average from October 2024 through February, we are averaging 195.1 million gallons a day. And our budget is for 209.7 million gallons a day. Next slide. You've seen this slide many times in Warren's presentation. It shows our consolidated permit monthly pumping rate and it shows it all the way back through October of 23. The 12 month running average is currently at 86.8 million gallons a day at the end of February. And we expect to remain below or at our permit limit for the rest of the year. We are having good river flow this year. We have a full reservoir and the desal plant is back online. The February pumping from the CWOP was 66.8 just for the month of February. And we targeted 82.7. So quite a bit lower than what our plans were. This graph is another way of looking at the production from our consolidated well field permit. The same graph I showed you, but just differently. On this one previously, where you see the red all by itself, that's where we pump more water from the well fields than we targeted. Where you see the blue all on its own, that is where we actually pumped less than we targeted. So the permit limit is 90 million gallons a day as it's shown in the red line. And the 12 month running average pumping rate is the blue going out further right. Those haven't happened yet, but you can see how we're tracking. This graph shows the same information from the consolidated well field permit, but only for the south central Hillsborough well field. By itself, the average through February, it drops slightly below the permit limit. It's at 24.78. The current permit is 24.95 million gallons a day. And as you can see the dotted line, that is action that the board took last month. We transferred some permits from I think Tampa Electric and Hillsborough county and we are modifying the permit with swift mud. It was presented to them I think on Friday. So the 26.92 million gallons a day would be the new permit limit if approved by the district later this year. And getting to my favorite graph, this is the graph of our reservoir. And as you can see, there's a lot of blue and blue is good. The orange line is what we targeted. And you can see during the various months right now, if we all go down to March, we are supposed to be a little bit over 10 million, 10 billion gallons a day, almost 11. But we are completely full still. We're at 15 million gallons. With yesterday's rain, I would expect that should stay that way for a little bit longer. So here we are in the dry season with a full reservoir. And that's the first that's ever occurred. A few outreach slides. We have a partnership with the Pasco County Schools and we sponsor the Tampa Bay Water Environmental Stewardship Award at the Pasco Science and Engineering Showcase. This award was presented to this student for her work that focused on environmental conservation and sustainability of our water resources. We also joined the Tampa Bay Times Community Conversation. Diving Deep and How can we Improve Tampa Bay's Water Quality? Warren Hogg represented the agency and he was joined by other leaders from the Tampa Bay Estuary Program. The Tampa Bay Watch, USF and Mosaic. They all participated in a presentation and round robin on the stage. Tampa Bay Water also sponsored and exhibited at the Tampa Bay Water Days at the Museum of Science and Industry in celebration of the World Water Day. I believe that's coming up on March 22nd. This occurred just this weekend, so it was Friday and Saturday. We did the participation and our sponsorship funded field Trips for Title 1 students for those two days. And just a few notes that I would like to give to you. Items F6 and F8 you've already approved through the consent, but F6 is our financial statement through February and we are not quite six months. We're almost what, five months through the fiscal year. And you can see the condition of the agency. We are I think running $19 million ahead of our expenditures at this time. So all on track under our financial conditions. And then the other is the true up for our member governments. We include that every month to give an idea to the different members. How are they tracking against our true up at the end of the year? At the end of the year we look at what they took and their percentage. Either give money back or you will get an invoice. So it's showing currently that Pinellas county and the cities of Newport, Richey and Tampa will be refunded some moneys if the fiscal year ended today. And then St. Petersburg, Pasco and Hillsborough county will have a balance due if it ended today. I did want to let you know that next month we're planning to bring a permit to the board for approval. It's for the Alafaya River. We've been operating the river under an emergency order by Swift Mud for more than a year now. It is currently set to expire at the end of March. But it allows us to take higher flow when we're in high flows than the permit. 19% in high flows versus 10% is the permit. We're also asking the board, the Swift Mud to allow the permit to take up to 75 million gallons a day instead of the 60 million gallons a day we've been going around talking to the various stakeholders and getting their feedback. I'm told that it's been all positive including the district. And so we will be presenting a permit to you next month for approval to be submitted to make this a permanent permit. Change the budget. We are getting real close to presenting with all of the members the proposed budget. The workshop is scheduled for next month's meeting and I have scheduled a one on one meeting with each of the board members prior to that. So I think over the next two weeks I'll be meeting one on one with each of the board members to give you a high level overview of what we are proposing in our budget. And then lastly, last week we conducted an internal strengths, weaknesses and opportunities threats analysis. And so we're putting together the notes from that and I'll be happy to share that with each of the board members when we have it available. But we did do a lot analysis and so it was very timely and I think it was very informative. And that, Mr. Chair, is my report under B1. >> Commissioner Eggers? >> Yeah. I think this past week you sent us a letter or a memo just briefly summarizing our approach over the last couple of years as it relates to the comments from Karen Hillary on the pipeline. So if you don't mind, I just, just that commentary just kind of sitting out there and I'd like to just, if you could talk about that just briefly about the methods that we did, if there's any shortfalls, the improvements that we need to make sure that we're going through in the future. >> Yes, sir. >> And actually I have Brandon Moore here to speak to that. >> Morning board members. Yeah. So I think to the, to the first question, Commissioner Eggers, we've had about nearly 100 communications between 2019 and today with various channels that we've used like mailings, emails, social media, community meetings, door hangers, website updates. So those are the types of things that we've used. Some of them. >> How many, how many did we do before the decision was made of the hundreds that we were talking about? >> Well, those were, those were mainly postcards and surveys. So we collected input before the decision was made on the criteria that the engineers were using to design the routes. So that was we. And we used an advertising campaign to reach as many residents as we could. I'm not sure the quantity of postcards that went out, but I could find that out for you. >> I'm just not. Again, maybe I'm not asking the question right. I'm not liking the answer. So I need a little bit more. What did we have from a public interaction standpoint before we made this decision on this route? That's what I'm asking. Did we have public engagement or was it just simply sending cards out to people and hoping they might respond to us? I mean, I'm just trying to make sure I'm clear on what we actually did to get input from our residents. >> Yes, the actual efforts were postcards, collected data input through a survey and then followed up with emails when as things. Changed on the board. So no public hearings. We did not have no public conversations, no public outreaches in the community at all. >> We had one virtual public meeting on the long term master water plan update and the pipeline project. >> So we had one virtual community meeting before the decision was made? >> Yes. >> Okay. >> Well, it again sounds like we maybe could have done a little bit more to engage our public, give them opportunities. I know that Hillsborough county has done some of that. So I just was trying to get an overall sense of how we reached out. And I'm not saying I'm not hearing maybe Hillsborough county did more. >> Thank you, Commissioner Wostal >> Thank you. I remember, as many of you might know, I'm kind of a political outsider and unknown when I ran, but one of the first meetings I was watching was the county was pushing a. A countywide sales tax. And it's illegal for a county to market something. It's against the state's laws. So what they did is they went through and they used this other third party to develop a playbook to do it. But essentially the county spent about a million dollars marketing and pushing. Not marketing, but marketing and pushing this tax through the county. They had all of these info graphs printed out. They did all of these community meetings all around Hillsborough county, which is about 1.6 million people, as many of you know. And Commissioner Cohen might not remember. But during the board meeting, he asked Woppert how many people did they eventually get to show up? And basically 7 tens of the county. So 0.0007% of the county population showed up after a million dollars of expenditures with all of this big push from the staff and these infographics. And my point is that even after that million dollars, it brought out such low participation. And it really opened my eyes to how difficult it is to get people to see what we' when we're notifying them and them to show up. I mean, it really opened my eyes and I just don't know how much money it would take to make a meaningful impact on Tampa Bay water or Hillsborough county to notify people that, hey, we're going to build this big pipeline. I don't really have a question. I just wanted to make that point in defense of whatever efforts we're doing. It's extremely difficult. So I appreciate. >> I would just. Thank you. That was. I recall what you're referring to. Many of us were here when we made the decision about the pipeline. And it's been a couple of years. It was 2022, I think, when it came in front of us. But what I remember was that there was a pretty robust discussion about it at the time. It wasn't like it went on for a series of meetings. It was definitely discussed at the Board of County Commissioners in Hillsboro. I do think it would be a good idea, though, to answer your questions, Commissioner Eggers, and perhaps we could get you some information on what Hillsborough did at the time that all this was going on here at Tampa Bay Water. But I remember there were people that were coming to public comment and speaking to us about it and weighing in on it from the community over the period of meetings that we had to discuss it. >> Okay, well, again, that makes me feel a little better that we were at least reaching out somewhere along the ways to have either virtual interactions. We seem to have them all over the place. Our s

Official record

ArtifactSourceState
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsSource recordingread transcript
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Board of Directors — Minutes
  • Board of Directors
  • Board of Directors — Packet
  • Board of Directors — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • The available transcript has no reliable timestamps.
  • Transcript coverage is partial.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: f199fb7b1cd8b57263393d148ea5fd23. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record