POLISCOPE

The public record

GLENDALE (LOS ANGELES COUNTY)Decisions publishedPartial coverage

Glendale Water & Power Commission Special Meeting

Thursday, September 5, 2019 · Government meeting record

The 30-second read

Recorded outcome

Glendale Water & Power Commission Special Meeting

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

No later meeting or follow-up date is stated in the reviewed record.

An official outcome record - an action agenda or minutes - is published for this meeting.

Record text

No transcript is held for this meeting. Recording: Listen to audio

1 September 5, 2019 4:00 PM 1. ROLL CALL Present: President Avanessian, Commissioner Carrasco, Commissioner Kedikian, Commissioner Lall and Commissioner Watson 2. CONSENT ITEMS a. Approval of the August 5, 2019 Meeting Minutes Motion to Approve: Moved by: Commissioner Watson Seconded by: Commissioner Kedikian Motion Passed. 3. GWP COMMISSION/ STAFF COMMENTS Commissioner Watson announced that the October GWP Commission meeting will be his last meeting since he will be resigning as he is moving out of state. Commissioner Carrasco thanked Commissioner Watson for his service. Commissioner Lall stated that Commissioner Watson made wonderful contributions to the GWP Commission and thanked him for her his service. Commissioner Kedikian and President Avanessian thanked Commissioner Watson for his service. Commissioner Carrasco thanked GWP staff for providing social media updates on the power outages as it is very important to keep the residents informed. Commissioner Watson inquired about the status of the power outages. Darrell Hahn, Electrical Services Administrator explained that GWP strives to balance its resources with its load demands. In order to protect the equipment from extreme heat, GWP will initiate rolling blackouts within the City in order to prevent major outages. The outages are controlled and are limited to one hour. Commissioner Watson inquired whether the Eagle Rock/Glenoaks Canyon fire caused any damage to GWP infrastructure. Mr. Hahn responded that to his knowledge there were no damages to any GWP infrastructure due to the fire. M I N U T E S SPECIAL MEETING OF THE GLENDALE WATER & POWER COMMISSION COUNCIL CHAMBER, City Hall – 613 E. Broadway, 2nd Floor Glendale, CA 91206

2 4. REPORTS – INFORMATION a. Transmission Mark Young, Deputy General Manager presented the Transmission report which included a map outlining the transmission lines. Mr. Young explained that there are two sources of supply: the local supply at the Grayson Power Plant facility and via transmission which is comprised of three tie lines. Mr. Young then discussed Glendale’s in-basin import capability through the Western Receiving State (WRS), Pacific Northwest DC Intertie, and the transmission to LADWP from Victorville-Adelanto. Mr. Young explained the de-rating or outages for the Pacific DC Intertie and their recurrence and provided information relating to the de-rates which occurred during the period of 2015-2018 for the Pacific DC Intertie and during 2014-2018 for the Victorville/Adelanto-LA. Mr. Young explained that GWP will need to demonstrate that it can meet load demands when a transmission line is down. Commissioner Lall inquired to whom/which entity we have to demonstrate that we can meet our load in the event a transmission line – more specifically the Pacific DC Intertie – is down. Mr. Young explained that this requirement is there because GWP/Glendale is a part of the Balancing Authority. President Avanessian inquired whether there were restrictions or limitations on the transmission lines. Mr. Young explained that the Pacific DC Intertie line is the one with the most restrictions; it would be the worst-case scenario. President Avanessian made an inquiry relating to solar energy and the limitation (or inability) for its import due to limitation on transmission lines. Mr. Young explained that if GWP reserved the capacity on a particular transmission line for solar or wind, then it would be not be able to use the transmission line for other sources. Commissioner Carrasco inquired about the shut-down of the western grid years ago. Mr. Young explained that the Sylmar fire was the cause of the failure of a portion of the Pacific DC Intertie line. b. Wildfire Mitigation Dorine Martirosian, Sr. Assistant City Attorney and Darrell Hahn, Electrical Services Administrator presented the upcoming Wildfire Mitigation Plan (“Plan”) as required by recent legislation. Ms. Martirosian provided the Commission with the legislative history and background (SB 1028, SB 901, SB 111 and SB 1054) which, in aggregate, mandate that all publicly owned electric utilities implement their Plan by January 1, 2020. The implementation includes an independent third-party review of the Plan and adoption by the governing board, which for Glendale is the City Council. Thereafter, the Plan must be submitted to the California Wildfire Safety Advisory Board by July 1, 2020. The California Wildfire Safety Advisory Board will review and comment on the Plan. Thereafter, the annual Plan adoptions and submissions to the Wildfire Safety Advisory Board are required, along with a comprehensive review and revisions to the Plan at least once every three years. Ms. Martirosian also provided a summary of the recent California Supreme Court decision issued on August 15, 2019, in City of Oroville v. Superior Court of Butte County, where the California Supreme Court decided its first inverse condemnation case in over two decades. The Supreme Court held that since the plaintiff, a dental practice, failed to install the legally (by local ordinance) required backflow prevention device, it could not prevail on its inverse condemnation action for sewer back-up and damage. Publicly owned utilities/cities are hopeful that this decision will set the precedent that so long as a city/utility acts reasonably in implementing all measures necessary to prevent

3 the damages at issue, it cannot be found liable under the doctrine of inverse condemnation. Mr. Hahn provided the Commission with the technical history, mandates and elements of the Plan. Mr. Hahn provided an overview of the largest wildfires since 1932, discussing their pattern, size and impact. Mr. Hahn explained the overall GWP approach – which is to engineer, construct, maintain, and operate the GWP electric transmission and distribution system in a manner which will minimize the risk of catastrophic wildfires which are caused by electrical lines and equipment. Mr. Hahn explained GWP’s existing mitigation, which is comprised of limiting ignition by disabling devices which would reclose after automatically opening upon detection of a fault; visual inspections of feeders after automatically opening a circuit upon detection of a fault; preemptive de-energization during high-risk periods, and aggressive vegetation management/tree trimming. Mr. Hahn explained that the existing mitigation limits the spread of wildfires to GWP assets within zones with vegetation management plans. Additionally, in the event of a wildfire, Glendale Fire Department’s response, coupled with proper vegetation management implementation, greatly limits the spread of wildfires. Mr. Hahn then discussed future mitigation plans, which include limiting ignition through more aggressive tree trimming; trimming those trees which could fall onto lines from above; utilizing tailored solutions such as covered tree wire; additional automated protection scheme; moving conductors underground; more frequent inspections and the replacement of aging equipment; converting to “no-spark” fuses; utilizing conductor spacers to prevent lines from touching; and integrating other advances technologies as they become available. Commissioner Carrasco inquired whether GWP is looking to have an in-house meteorologist and whether GWP has cameras in-house to monitor its facilities in the wildfire zones. Mr. Hahn explained that Glendale’s weather is very similar to Burbank and other neighboring cities and Glendale does have staff who can translate the red-flag warning issued by the neighboring cities. With regard to the cameras, Mr. Hahn explained that at this point GWP is not actively looking and installing cameras, however, that is always a possibility should GWP’s assessment deem cameras helpful. Commissioner Carrasco inquired regarding preemptive de-energization and whether the level of public notification. Mr. Hahn explained that the intent for now is to minimize the instances of public safety power shut off. The intent is to mitigate through other measures (tree trimming) to minimize wildfires, thus not having the need to de-energize. Commissioner Carrasco inquired whether GWP maintains a list of those customers who require electricity for medical equipment. Mr. Hahn explained that GWP maintains such a list and will be working on a detailed plan relating to how to notify the customers with medical needs. Commissioner Carrasco inquired whether the GWP Commission will be presented with the Plan. Mr. Hahn stated that the Plan will be presented to the GWP Commission. President Avanessian inquired why wildfires have increased. Mr. Hahn explained that the data on wildfire frequency and size climate of the west has gotten drier as time has progressed, thus creating more wildfires and worse wildfires.

4 5. ORAL COMMUNICATIONS None 6. AGENDA FORECAST The following items are expected on the upcoming GWP Commission agendas: for the October meeting - Customer Services Update, Legislative Update, and an informal update/report on how the electrical system and infrastructure is functioning in the extreme heat. For the November meeting – Draft Wildfire Mitigation Plan; for the December meeting: Utility Modernization Update and Strategic Plan Update; a general update on smart meter data and how GWP is able to track conservation data. 7. ADJOURNMENT Motion to Adjourn: Moved by: Commissioner Kedikian Seconded by: Commissioner Carrasco Motion Passed. The meeting was adjourned at 4:56 pm.

SEPTEMBER 05, 2019

4:00 PM

1. ROLL CALL

2. CONSENT ITEMS

The following are routine and may be acted upon by one motion. Any member of the Commission or the audience requesting separate

consideration may do so by making such request before motion is proposed.

a. Approval of the minutes for the August 5, 2019 Meeting

3. GWP COMMISSION/STAFF COMMENTS

4. REPORTS - INFORMATION

a. Transmission

b. Wildfire Mitigation

5. ORAL COMMUNICATIONS (5) Minutes

Discussion is limited to items NOT part of this agenda. Each speaker is allowed five (5) minutes – Commission may question or

respond to the speaker, but there will be no debate or decision. The General Manager may refer the matter to appropriate staff for

investigation and report.

6. AGENDA FORECAST

7. ADJOURNMENT

Next Meeting is scheduled for October 7, 2019

A G E N D A

SPECIAL MEETING OF THE GLENDALE WATER & POWER

COMMISSION

COUNCIL CHAMBER, City Hall – 613 E. Broadway, 2nd Floor

Glendale, CA 91206

Welcome to the meeting of the Glendale Water & Power Commission. Meetings are broadcast live on cable channel 6 (GTV6) and rebroadcast throughout the week.

Call (818) 548-4013 for program schedules. DVDs of the proceedings are available for purchase in the City Clerk’s Office by calling (818) 548-2090. Meetings are also

archived on the City Website for viewing anytime at www.ci.glendale.ca.us/video_archives.asp. PLEASE TURN OFF CELLULAR PHONES AND PAGERS WHILE

INSIDE THE COUNCIL CHAMBER.

In compliance with the Americans with Disabilities Act (ADA) of 1990, auxiliary hearing aids, sign language translation, and Braille transcripts are available upon

request. Assisted listening devices are available same-day upon request. At least 48 hours (or two business days) notice is required for requests regarding sign

language translation and Braille transcription services. All documents related to open session items on this agenda that are received less than 72 hours prior to this

meeting, and are public records, will be available for review in the GWP Administration Office 141 N. Glendale Avenue 4th Floor, Glendale, CA 91206. If you have any

question about matters on the agenda, or requests for assistance, please contact Catalina Lee (818) 548-2107 during regular business hours.

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Recording and media

Coverage and corrections

Records considered

  • Glendale Water & Power Commission Special Meeting — Minutes
  • Glendale Water & Power Commission Special Meeting

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: e90f57d694cf187a7c35723864b78e80. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools