Committee of the Whole

Tuesday, November 11, 2025 · Government meeting record

The 30-second read

Recorded outcome

Committee of the Whole

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

No later meeting or follow-up date is stated in the reviewed record.

An official outcome record - an action agenda or minutes - is published for this meeting.

Record text

No recording or transcript is held for this meeting.

VILLAGE OF NORTHBROOK, ILLINOIS COMMITTEE OF THE WHOLE MINUTES November 11, 2025 1 COMMITTEE OF THE WHOLE Committee of the Whole Minutes Terrace Room 1225 Cedar Lane Northbrook, IL 60062 Tuesday, November 11, 2025 5:30 PM 1. ROLL CALL Attendee Name Title Status Kathryn Ciesla Village President Present Robert Israel Trustee Present Heather Ross Trustee Absent Johannah Hebl Trustee Present Joy Ebhomielen Trustee Arrived Late Michelle Kohler Trustee Absent Matt Cassidy Trustee Present Also Present: Village Manager, Cara Pavlicek Deputy Village Manager, Jim Hawkins Village Clerk, Derek Gau CFO, Steve Drazner Deputy Director of Public Works, Matt Morrison 2. MINUTES APPROVAL A. October 28, 2025 Committee of the Whole Minutes for Approval RESULT: APPROVED [4 – 0] MOVER: Johannah Hebl, Trustee SECONDER: Robert Israel, Trustee AYES: Israel, Hebl, Cassidy NAYES: None ABSTAIN: Kathryn Ciesla, President ABSENT: Heather Ross, Trustee, Joy Ebhomielen, Trustee, Michelle Kohler, Trustee 3. DISCUSSION TOPICS A. Fiscal Year (FY) 2027-2031 Five-Year Capital Improvement Plan Steve Drazner, CFO presented the 2027–2031 CIP, covering the statues of FY 2026 projects and a five-year summary of funding sources and expenditures. B. Property Tax Levy Discussion for Tax Year 2025 (Fiscal Year 2027) CFO Drazner, led the discussion of the 2025 Property Tax Levy, explaining that the 2025 levy would rise by $2,844,348, an increase that covers general operations, required pension contributions, debt service not paid by other revenues, and the shift of vehicle sticker revenue into the levy.

VILLAGE OF NORTHBROOK, ILLINOIS COMMITTEE OF THE WHOLE MINUTES November 11, 2025 2 C. Discussion on the Staff Recommendation to Repeal Chapter 15, Article XIX (Vehicle Licenses) Effective May 1, 2026 CFO Drazner, led the discussion on repealing vehicle stickers, noting that the recommendation that the Village end the requirement starting with the 2026 season and shift the net annual revenue into the 2025 property tax levy. There was discussion of the recommendation and consensus to bring forward the matter to the next meeting for full consideration. D. Discussion Item Regarding General Fund Surplus CFO Drazner, led the discussion on the General Fund Surplus, the Village closed FY25 with a General Fund surplus of about $3.6 million, with 70 percent recommended for transfer to the Facility CIP Fund and the remaining balance staying in General Fund reserves. 4. REMARKS FOR THE GOOD OF THE ORDER Matt Morrison, Deputy Director of Public Works noted that Smart Meter notices of water usage increase, often called leak alerts via the new customer portal to date are accurate in detecting leaks in 60% of cases. The remaining usage alerts accurately reflect spikes in water use which are attributed to increase for changes in behavior, such as increased home use for various reasons. Cara Pavlicek, Village Manager noted work is underway with ComEd and may require confirming Board action related to authorization, engineering, and design by ComEd related to electrical services for the new Fire Station 11 at 820 Dundee. 5. CLOSED SESSION A motion by Trustee Hebl and seconded by Trustee Israel to go into closed session to discuss minutes pursuant to 5 ILCS 120/(c) (21), security procedures, and the use of personnel and equipment to respond to an actual, a threatened, or a reasonably potential danger to the safety of employees, staff, the public, or public property pursuant to 5 ILCS 120/(c) (8), setting the price for the purchase of property pursuant to 5 ILCS 120(c)(5), and setting the price for the sale of Village property pursuant to 5 ILCS 120(c)(6). RESULT: CONVENE INTO CLOSED SESSION AT 5:30 PM [4 – 0] MOVER: Johannah Hebl, Trustee SECONDER: Robert Israel, Trustee AYES: Israel, Hebl, Cassidy NAYES: None ABSTAIN: Kathryn Ciesla, President ABSENT: Heather Ross, Trustee, Joy Ebhomielen, Trustee, Michelle Kohler, Trustee RESULT: RECONVENE INTO OPEN SESSION AT 6:40 PM [4 – 0] MOVER: Johannah Hebl, Trustee SECONDER: Robert Israel, Trustee AYES: Israel, Hebl, Cassidy NAYES: None ABSTAIN: Kathryn Ciesla, President ABSENT: Heather Ross, Trustee & Michelle Kohler, Trustee

VILLAGE OF NORTHBROOK, ILLINOIS COMMITTEE OF THE WHOLE MINUTES November 11, 2025 3 6. ADJOURN RESULT: ADJOURN AT 7:24 PM [4 – 0] MOVER: Johannah Hebl, Trustee SECONDER: Robert Israel, Trustee AYES: Israel, Hebl, Ebhomielen, Cassidy NAYES: None ABSTAIN: Kathryn Ciesla, President ABSENT: Heather Ross, Trustee & Michelle Kohler, Trustee

1. ROLL CALL 2. MINUTES APPROVAL A. October 28, 2025 Committee of the Whole Minutes for Approval 3. DISCUSSION TOPICS A. Fiscal Year (FY) 2027-2031 Five-Year Capital Improvement Plan B. Property Tax Levy Discussion for Tax Year 2025 (Fiscal Year 2027) C. Discussion on the Staff Recommendation to Repeal Chapter 15, Article XIX (Vehicle Licenses) Effective May 1, 2026 D. Discussion Item Regarding General Fund Surplus COMMITTEE OF THE WHOLE Committee of the Whole Agenda Village Hall 1225 Cedar Lane Northbrook, IL 60062 Tuesday, November 11, 2025 5:30 PM The Capital Improvement Plan (CIP) is a long-range planning document designed to inform anticipated capital needs in the Village including infrastructure improvements and capital purchases for which funding will be requested in the applicable fiscal year budget presented for adoption in April in advance of each May 1 fiscal year start date. The FY 2027-2031 CIP includes projects and cost projections for May 1, 2026 through April 30, 2031. Pursuant to State Statute a property tax levy must be adopted and filed with the Cook County Tax Extension Office by the last Tuesday of December each year. The components of the Village's levy are allocated among its Corporate (i.e. General) Fund, Debt Service Fund (bonds & interest), Police Pension Fund, and Fire Pension Fund. The Village also levies on behalf of the Northbrook Public Library which submits its levy request to the Finance Department each October. Pursuant to Village Code Chapter 15, Article 19, with few exceptions, a local vehicle license must be purchased for all vehicles registered within Northbrook's corporate boundaries. This requirement generates net revenue of approximately $450,000 per year. Due to the high administrative burden required to generate a relatively small amount of revenue, customer impact of license purchase and low compliance, staff is recommending repealing this section of the code and eliminating the local vehicle license (sticker) requirement effective with the 2026 annual renewal season. As discussed at the October 14, 2025, Village Board Committee of the Whole meeting, the Village ended FY25 with a calculated General Fund surplus of VILLAGE OF NORTHBROOK, ILLINOIS COMMITTEE OF THE WHOLE AGENDA November 11, 2025 1

4. REMARKS FOR THE GOOD OF THE ORDER 5. CLOSED SESSION 6. ADJOURN $3,628,306, above the 40% fund balance policy requirements. The Village of Northbrook is subject to the requirements of the Americans with Disabilities Act of 1990. Individuals with disabilities who plan to attend this meeting and who require certain accommodations in order to allow them to observe or participate in this meeting, or who have questions regarding the accessibility of the meeting or facilities, are requested to promptly contact the Village of Northbrook at (847) 272-5050, or the Illinois Relay Center at (800) 526-0844, to allow the Village of Northbrook to make reasonable accommodations for those persons. VILLAGE OF NORTHBROOK, ILLINOIS COMMITTEE OF THE WHOLE AGENDA November 11, 2025 2

Showing the first 24,000 of 721,603 characters. The full document is at the source.

1. ROLL CALL 2. MINUTES APPROVAL A. October 28, 2025 Committee of the Whole Minutes for Approval 3. DISCUSSION TOPICS A. Fiscal Year (FY) 2027-2031 Five-Year Capital Improvement Plan B. Property Tax Levy Discussion for Tax Year 2025 (Fiscal Year 2027) C. Discussion on the Staff Recommendation to Repeal Chapter 15, Article XIX (Vehicle Licenses) Effective May 1, 2026 D. Discussion Item Regarding General Fund Surplus COMMITTEE OF THE WHOLE Committee of the Whole Agenda Village Hall 1225 Cedar Lane Northbrook, IL 60062 Tuesday, November 11, 2025 5:30 PM The Capital Improvement Plan (CIP) is a long-range planning document designed to inform anticipated capital needs in the Village including infrastructure improvements and capital purchases for which funding will be requested in the applicable fiscal year budget presented for adoption in April in advance of each May 1 fiscal year start date. The FY 2027-2031 CIP includes projects and cost projections for May 1, 2026 through April 30, 2031. Pursuant to State Statute a property tax levy must be adopted and filed with the Cook County Tax Extension Office by the last Tuesday of December each year. The components of the Village's levy are allocated among its Corporate (i.e. General) Fund, Debt Service Fund (bonds & interest), Police Pension Fund, and Fire Pension Fund. The Village also levies on behalf of the Northbrook Public Library which submits its levy request to the Finance Department each October. Pursuant to Village Code Chapter 15, Article 19, with few exceptions, a local vehicle license must be purchased for all vehicles registered within Northbrook's corporate boundaries. This requirement generates net revenue of approximately $450,000 per year. Due to the high administrative burden required to generate a relatively small amount of revenue, customer impact of license purchase and low compliance, staff is recommending repealing this section of the code and eliminating the local vehicle license (sticker) requirement effective with the 2026 annual renewal season. As discussed at the October 14, 2025, Village Board Committee of the Whole meeting, the Village ended FY25 with a calculated General Fund surplus of VILLAGE OF NORTHBROOK, ILLINOIS COMMITTEE OF THE WHOLE AGENDA November 11, 2025 1

4. REMARKS FOR THE GOOD OF THE ORDER 5. CLOSED SESSION 6. ADJOURN $3,628,306, above the 40% fund balance policy requirements. The Village of Northbrook is subject to the requirements of the Americans with Disabilities Act of 1990. Individuals with disabilities who plan to attend this meeting and who require certain accommodations in order to allow them to observe or participate in this meeting, or who have questions regarding the accessibility of the meeting or facilities, are requested to promptly contact the Village of Northbrook at (847) 272-5050, or the Illinois Relay Center at (800) 526-0844, to allow the Village of Northbrook to make reasonable accommodations for those persons. VILLAGE OF NORTHBROOK, ILLINOIS COMMITTEE OF THE WHOLE AGENDA November 11, 2025 2

To: Village Manager Cara Pavlicek From: Chief Financial Officer Steve Drazner Date: 2025-11-11 Subject: Fiscal Year (FY) 2027-2031 Five-Year Capital Improvement Plan Village Manager's Office MEMORANDUM Overview The Capital Improvement Plan (CIP) is a long-range planning document designed to inform anticipated capital needs in the Village including infrastructure improvements and capital purchases for which funding will be requested in the applicable fiscal year budget presented for adoption in April in advance of each May 1 fiscal year start date. The FY 2027-2031 CIP includes projects and cost projections for May 1, 2026 through April 30, 2031. Fiscal Impact The FY 2027-2031 Capital Improvement Plan proposes $202,733,095 in capital expenses over the five year period for all Funds which contain capital projects. Over this five year period, expenditures are broken down by Fund as follows: Infrastructure Capital Project Fund: $19,476,059 Stormwater Fund: $2,456,060 Water Fund: $45,136,805 Sanitary Sewer Fund: $2,382,530 General Fund: $22,727,200 Facility Capital Projects Fund: $92,611,126 Motor Fuel Fund: $14,561,894 Parking Fund: $1,036,138 Senior Housing Fund: $2,345,283 Approximately $71 million of the $203 million is being proposed for FY 2027 and this is the only year which will be legally appropriated and adopted as part of the FY 2027 operating budget by the Village Board in April 2026. However, between now and when the FY 2027 budget is adopted, Village staff and the Board may materially modify and/or refine some of the numbers prior to budget adoption in April. A breakdown for how the Village intends to fund/pay for the $71 million in FY 2027 is as follows: Grant proceeds $2,042,049 Operating revenues $3,979,624 MFT allotment $1,675,000 VILLAGE OF NORTHBROOK, ILLINOIS AGENDA 3

Debt proceeds $201,500 Drawdown of reserves $9,421,724 Other/Undetermined $53,627,864 The vast majority of funding sources categorized under the "Other/Undetermined" are related to the Facilities and Infrastructure CIP Funds and will most likely be funded by the issuance of general obligation bonds in relation to the replacement process for the Fleet Maintenance Garage, Fire Station 11, and portions of the Fire Headquarters and the Police Station. Recommendation Staff will present a synopsis of the Five-Year Capital Improvement Plan (CIP) including: The status of FY 2026 projects; A general overview of the five-year funding requests; and A review of the projects proposed in FY 2027. While no formal action is requested or required, staff would like feedback on the FY 2027 requests, as these amounts will be recommended for appropriation in the FY 2027 operating budget for adoption in April 2026, subject to the total revenue and expenditure requests for the fiscal year. Background The Capital Improvement Plan (CIP) is a long-range planning document designed to inform anticipated capital needs in the Village including infrastructure improvements and capital purchases for which funding will be requested in the applicable fiscal year budget presented for adoption each April in advance of the May 1 start of each fiscal year. Ultimately, the CIP’s goal is to ensure that the Village’s infrastructure can meet both the service demands of the public and operational needs of the organization. As one of the Village’s core planning documents, it is updated annually and focuses on the five fiscal years following the current year. The FY 2027-2031 CIP includes projects and cost projections for May 1, 2026 to April 30, 2031. As in prior years, the plan provides a significant level of detail for FY 2027 and less detail in the following years to develop a long-term perspective while maintaining flexibility as new needs or technologies arise. For this reason, the CIP should be viewed as a roadmap rather than an absolute guide. Each fiscal year of the CIP includes a summary highlighting single-year projected expenditures by fund, detailed project pages with pictures/maps (when available), justifications, and cost projections. The CIP document is formatted differently in two separate sections as follows: 1. The first section is the preferred format for review and shows five years of CIP projects sorted by Fund (i.e. General, Facilities, Infrastructure, Water, etc.) 2. The second section is based on the legacy format and shows the CIP projects for all Funds sorted by fiscal year. VILLAGE OF NORTHBROOK, ILLINOIS AGENDA 4

In addition to the CIP document itself, staff also prepared a CIP Presentation to provide a very high level overview of major projects. As background, CIP is historically developed and presented as follows: Each November, the Five-Year CIP is presented at a Committee of the Whole and Year 1 of the CIP only includes those expenditures which staff anticipates will be appropriated in the annual budget; and In March annually, the Finance and Administration Committee of the Village Board meets to review the recommended Annual Budget; and In April annually, the Village Board adopts the Annual Budget; and On May 1 annual, the appropriation of funds pursuant to the Budget are legally in effect. While it is the Budget that appropriates funding, this past practice of capital expenditures in the Budget mirroring CIP Year 1 (with minor deviations only due to budget estimates or timing of construction) is a consistent practice in local government. It is also noted that during the time between the November presentation of the CIP, the April adoption of the Budget, and the May start of the new fiscal year, staff will often begin engineering, bidding and related project work often prior to the legal adoption of appropriations by the Board becoming effective in May. Capital expenditures have grown as a percentage of the adopted budget over the past several years as follows: In FY24, capital expenditures totaled 18.8% of the adopted budget. In FY24, actual capital expenditures totaled 11.5% of the total expenditures. In FY25, capital expenditures totaled 22.1% of the adopted budget. In FY25, actual capital expenditures totaled 20.8% of the total expenditures. Consistent with prior years, the FY 2027-2031 CIP is a long-range planning document designed to review the Village’s anticipated capital needs, infrastructure improvements, and capital purchases that the Village will make during the plan period as stated above. However, the capital expenditures identified in FY27 in the draft of the FY2027 – FY2031 CIP presented this year are not being tied to projected funding limitations in the FY2027 budget which is in process of being developed for presentation to the Administration and Finance Committee as noted above. This is in anticipation of the Strategic Planning process which will provide substantive guidance on the Village mission, vision and priorities. Strategic Plan priorities are scheduled to be identified by the Village Board in December 2025 and substantively reviewed for finalization in January 2026 with adoption in April concurrent with the FY27 Budget. As such, Departments are aware that Year 1 as presented in this Five- Year CIP is subject to modification to align with the Strategic Plan priorities and funding capacity in the FY27 upcoming recommended budget. Department Directors have been advised that engineering, bidding and related project work by staff and consultants may not begin prior to budget adoption in April 2026 with appropriations effective May 1, 2026 for new capital activities. Work related to already authorized projects, such as facilities, will continue within current appropriation parameters. VILLAGE OF NORTHBROOK, ILLINOIS AGENDA 5

COW Presentation CIP FY27-FY31.pdf FY27-31 CIP FINAL VILLAGE OF NORTHBROOK, ILLINOIS AGENDA 6

JANUARY 25, 2023 Annual State of the Village Address Kathryn Ciesla Village President NOVEMBER 11, 2025 CAPITAL IMPROVEMENT PLAN FY 2027-2031 Committee of the Whole 7

What is the Capital Improvement Plan? • A long-range planning document designed to review anticipated capital needs, infrastructure improvements, and capital purchases that the Village will make during the plan’s period. • The goal is to ensure that the Village’s infrastructure can meet both the service demands of the public and operational needs of the organization. • The FY 2027-2031 CIP includes projects and cost projections for the five- year period of May 1, 2026 to April 30, 2031. • The CIP should be viewed as a roadmap rather than an absolute guide. • FY 2027 as presented is subject to modification to align with the Strategic Plan priorities and funding capacity in the FY 2027 upcoming recommended budget. 8

Financial Cycle As one of the Village’s core planning documents, the Capital Improvement Plan is updated annually and focuses on the five fiscal years following the current year. 9

Funding Sources • Grant Proceeds Village staff applies for grant funding when relevant opportunities are available. • Operating Revenues • Fund Balance Draw Down • Debt Proceeds • To Be Determined Rather than assuming bonds will be issued in the out years, “To Be Determined” allows for flexibility as the project timeline approaches. Allows for use of available fund balance, reserves or bond issuance as needed. 10

Project Priority Codes A - Essential and immediate need B - Essential, but may be delayed C - Optional but beneficial to the Village through increased productivity, safety, etc. D - Optional but beneficial to the Village in social, cultural, or aesthetic ways F - Future project, no FY27 expenditures 11

FY 2026 Projects (Anticipated to be completed by 4/30/2026) • Bicycle & Pedestrian Improvement -Shermer Rd Walters to Willow ($2,806,097) • Downtown Streetscape Improvements -Shermer Meadow Rd ($2,388,643) • Street Reconstruction and Rehabilitation -Shermer Rd Maple to Techny Concrete ($1,577,574) -Shermer Rd Techny to Willow Asphalt ($1,492,702) • Water Meter Replacement ($4,423,948) • Vehicle and Equipment Replacements -Unit 041 & 050: Police Patrol ($131,240) -Unit 064: Ambulance ($456,277) -Unit 209: PW Medium Duty Dump Truck ($112,472) -Unit 252: PW Trailer Mounted Woodchipper ($150,000) 12

FY 2026 Projects in Progress • Sky Harbor Concrete Street Reconstruction. Complete first phase of concrete replacement. There will be two additional phases in the next two fiscal years. • Physical Security Enhancements. Necessary upgrades and expansion of security systems within various Village facilities to be completed as scheduled. • Crestwood Buildings Roof Replacement. Project to be completed in phases with the initial phase planned to start Fall 2025. • Facility Improvements. Design phase complete and construction planned for Fleet Maintenance Garage and Fire Station 11. The Village has continued to review various options for a Police Station site as well as reuse of the existing property. Work on this project continues. 13

FIVE YEAR SUMMARY Capital Expenditures by Fund TotalFY 2031FY 2030FY 2029FY 2028FY 2027 $22,727,200$3,481,027$6,486,410$6,074,301$2,428,559$4,256,903General Fund $14,561,894$1,960,087$3,514,964$1,655,772$3,199,798$4,231,273MFT Fund $19,476,059$1,423,710$1,873,634$3,506,240$6,545,868$6,126,607 Infrastructure Capital Projects Fund $92,611,126$0$0$0$42,606,997$50,004,129 Facility Capital Projects Fund $45,136,805$9,734,732$10,095,503$9,945,195$10,462,977$4,898,398Water Fund $2,382,530$557,178$411,115$408,141$473,646$532,450Sanitary Sewer Fund $2,456,060$0$800,000$0$1,529,946$126,114Stormwater Fund $1,036,138$686,813$229,325$0$120,000$0Parking Fund $2,345,283$95,737$271,295$409,588$796,776$771,887Senior Housing Fund $202,733,095$17,939,284$23,682,246$21,999,237$68,164,567$70,947,761 Total Capital Expenditures 14

FY 2027 15

FY 2027 Total Capital Expenditures $68,938,898** Infrastructure Capital Projects Fund 8.6% Stormwater Fund 0.2% Water Fund 6.9% Sanitary Sewer Fund 0.8% General Fund 6.0% Senior Housing Fund 1.0% Facility Capital Projects Fund 70.5% MFT Fund 6.0% **Total on page 4 of CIP document includes $2,008,863 in debt service expense 16

FY 2027 - 2031 Funding Sources 17

Grant Proceeds 18

FY 2027 Projects 19

General Fund Knox Box Key Replacement Equipment Replacement - Fire $378,300 Electronic Knox Box keys, which are secure and trackable, are now available and ensure only authorized users can access and use the keys. Hydraulic Rescue Tools Equipment Replacement - Fire $201,500 The replacement of all spreaders, cutters, rams, combi-tools, batteries, chargers, and 110-volt AC adapters. 20

Motor Fuel Tax Fund Dana Court, Donovan Glen, and Red Haw Ridge Subdivisions Asphalt Street Construction & Construction Oversight $898,418 Roads rated as in poor condition that needs necessary asphalt rehabilitation. Skokie Boulevard Asphalt Street Construction & Construction Oversight $2,017,049 STP Grant $941,042 Revenues/Reserves $2,958,091 Total Roads rated as having limited failures. Signs of road surface cracking and have small potholes beginning to form. 21

Infrastructure Fund Northbrook Highlands, Northfield Acres Subdivisions, and Walters Subdivisions Bicycle and Pedestrian Improvements - Sidewalk Replacement $ 483,296 22

Infrastructure Fund (Continued) Skokie Valley Trail – Bicycle & Pedestrian Improvements $ 1,336,878 Construction & Oversight $334,219 Design Engineering Dundee Road to Voltz Road • The proposed route for this project runs west of and parallel to the Edens Expressway and, once complete, would increase the Village’s total trail mileage to seven (7) miles. The Village is currently working with Lake and Cook Counties to plan and design this segment. 23

Enterprise Funds Water SCADA System Replacement $1,195,735 Grace Manor Water Main Replacement $162,078 Sanitary Sewer 2500 Dundee Road - Sanitary Lift Station Replacement $130,000 1400 Techny Road - Sanitary Lift Station Replacement $93,450 24

Facility Capital Projects Fund Fleet Maintenance Garage – Anticipated completion of Fall 2026 $8,760,217 Fire Station 11 – Anticipated completion of Fall 2026 $11,940,413 Fire Headquarters- Location to be determined $8,000,000 Police Station – Location to be determined $21,303,499 25

Facility Improvements Fire Station 12 Exterior Window Replacement $62,500 Public Works Center Snow Guard Installation $65,000 Village Hall Stairwell Structural Evaluation $50,000 Village Hall Renovations $145,000 Public Works Center HVAC System and BAS Replacement $200,000 26

Multi-Year / Recurring Projects 27

General Fund Body-Worn Cameras FY 27 $201,200 FY 28-31 $925,835 Network Upgrades & Replacement FY 27 $70,500 FY 28-31 $90,000 IT Equipment – Physical Security Enhancements FY 27 $215,000 FY 28-31 $495,000 End-User Computing Device Replacement FY 27 $100,000 FY 28-31 $860,000 28

General Fund (Continued) Technology Equipment Upgrades FY 27 $140,000 FY 28-31 $480,000 Automated License Plate Readers FY 27 $52,500 FY 28-31 $210,000 Village Hall Renovations FY 27 $145,000 FY 28-31 $775,000 29

Infrastructure Fund Downtown Streetscape Enhancements II FY 27 $300,000 FY 28 $2,000,000 LED Conversion Program FY 27 $110,250 FY 28-31 $364,948 Electric Vehicle Charging Stations FY 27 $120,652 FY 28-31 $271,467 30

Infrastructure Fund (Continued) Sky Harbor Concrete Street Reconstruction FY 27 $800,000 FY 28 $800,000 Minor Area Resurfacing FY 27 $120,000 FY 28-31 $480,000 Cherry Lane Conventional Bike Lanes FY 27 $182,708 FY 28-30 $706,220 31

Enterprise Funds Stormwater Koepke Road (MSMP Project #37) FY 27 $126,114 FY 28 $1,529,946 Water Various Main Replacements FY 27 $3,440,585 FY 28-31 $34,540,212 Sanitary Sewer Sewer Lining FY 27 $245,000 FY 28-31 $980,000 Manhole Rehabilitation FY 27 $64,000 FY 28-31 $256,000 32

Enterprise Funds (Continued) Senior Housing Crestwood Roof Replacement FY 27 $186,465 FY 28 $192,110 Crestwood Window & Door Replacement FY 27 $501,275 FY 28 $517,815 Crestwood Interior Building Elements FY 27 $84,147 FY 28-31 $551,068 33

Vehicles 34

General Fund Police Unit 031: 2021 Ford Explorer Utility Hybrid $65,620 Unit 034: 2021 Ford Explorer Utility Hybrid $65,620 Unit 036: 2021 Ford Explorer Utility Hybrid $65,620 Unit 037: 2021 Ford Explorer Utility Hybrid $65,620 Fire Unit 051: 2016 Ford Explorer Utility $59,550 Unit 054: 2018 Ford Escape $59,550 Unit 073: 2017 Ford Expedition $69,295 Unit 075: 2016 Ford Explorer Utility $59,550 35

General Fund – Other Equipment Public Works Unit 228: 2009 International Dump Truck $262,597 Fire Apparatus Unit 056: 2004 Pierce Sabre Engine $969,653 Unit 068: 2016 Ambulance Replacement $519,328 36

Questions? 37

VILLAGE OF NORTHBROOKFI V E Y E A R C A P I T A L I M P R O V E M E N T P L A N F Y 2 027 - 203 1 38

VILLAGE MANAGER’S OFFICE October 21, 2025 The Honorable President Ciesla & Board of Trustees Village of Northbrook 1225 Cedar Lane Northbrook, Illinois 60062 Enclosed is the Village’s the Five-Year Capital Improvement Plan (CIP) 2027-2031 which was compiled based on department director and village engineer requests, along with a high-level review by Finance, Information Technology and the Village Manager’s Office. Appreciation is extended to all department directors and staff who have made a significant effort and put in a great deal of analysis and work to present this information. I also want to recognize the extensive review and evaluation of the document performed by CFO Drazner and Deputy CFO Bozic. Historically, the CIP is developed and presented as follows:  Each November, the Five-Year CIP is presented at a Committee of the Whole and Year 1 of the CIP only includes those expenditures which staff anticipates will be appropriated in the annual budget; and  In March annually, the Finance and Administration Committee of the Village Board meets to review the recommended Annual Budget; and  In April annually, the Village Board adopts the Annual Budget; and  On May 1 annual, the appropriation of funds pursuant to the Budget are legally in effect. While it is the Budget that appropriates funding, this past practice of capital expenditures in the Budget mirroring CIP Year 1 (with minor deviations only due to budget estimates or timing of construction) is a consistent practice in local government. It is also noted that during the time between the November presentation of the CIP, the April adoption of the Budget, and the May start of the new fiscal year, staff will often begin engineering, bidding and related project work often prior to the legal adoption of appropriations by the Board effective in May. Capital expenditures have grown as a percentage of the adopted budget over the past several years as follows:  In FY24, capital expenditures totaled 18.8% of the adopted budget.  In FY24, actual capital expenditures totaled 11.5% of the total expenditures.  In FY25, capital expenditures totaled 22.1% of the adopted budget.  In FY25, actual capital expenditures totaled 20.8% of the total expenditures. The FY 2027-2031 CIP is, consistent with prior years, a long-range planning document designed to review the Village’s anticipated capital needs, infrastructure improvements, and capital purchases that the Village will make during the plan period. 39

VILLAGE OF NORTHBROOK, ILLINOIS However, the capital expenditures identified in FY27 in the FY2027 – FY2031 CIP presented this year are not being tied to projected funding limitations in the FY2027 budget which is in process of being developed for presentation to the Administration and Finance Committee as noted above. This is in anticipation of the Strategic Planning process which will provide substantive guidance on the Village mission, vision and priorities. The Strategic Plan priorities are scheduled to be identified by the Village Board in December 2025 and substantively reviewed for finalization in January 2026 with adoption in April concurrent with the FY27 Budget. As such, Departments are aware that Year 1 as presented in this Five-Year CIP is subject to modification to align with the Strategic Plan priorities and funding capacity in the FY27 upcoming recommended budget. Department Directors have been advised that engineering, bidding and related project work by staff and consultants may not begin prior to budget adoption in April 2026 with appropriations effective May 1, 2026 for new capital activities. Work related to already authorized projects, such as facilities, will continue within current appropriations. Thank you in advance for your review and feedback on this five-year plan. Sincerely, Cara Pavlicek Village Manager 40

Official record

ArtifactSourceState
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Committee of the Whole — Minutes
  • Committee of the Whole
  • Committee of the Whole — Packet

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • No audio or video recording is linked.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.