POLISCOPE

The public record

PALMETTOBAY (MIAMI-DADE COUNTY) · LOCALHeld · official record pendingPartial coverage

Virtual Public Meeting for the Safe Routes to School Program

Tuesday, February 23, 2021 · Government meeting record

The 30-second read

Record incomplete

Virtual Public Meeting for the Safe Routes to School Program

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Transcript and record text

Closed captionsWhat was said at the meeting, transcribed Aug 3, 2026. Speech is not a decision.
  • No speaker turns were supplied with this transcript.
  • This transcript has no source timestamps.
  • No speaker identities were supplied with this transcript.

This source published text without speaker turns, so speakers and timestamps are not shown.

tatian agenda for tonight's powerpoint. Before we get started, I'll start off with a brief project overview where I can show you the project location and the proposed improvements as it relates to the three elementary . Then I'd like to jump right into the design and how this proposed sidewalk will affect existing condition of your neighborhood. Lastly, I'd like to conclude the presentation with similar projects that we've completed throughout south florida so that you can get an idea and a feel for what the finished product will look like. I'd like to kindly request that you save your questions and comments for the end of the presentation as the village manager previously mentioned actually Mr. Torres, the purpose of the federal safe the school program is to provide safety improvements to new and existing pedestrian modes of transportation for children . However, not only do these improvements enhance the safety of the children for school commuting but it also benefits the public community as a whole in providing neighborhood connectivity ada accessible pathways. Additionally, the program encourages physical activity among the children before and after school as well as promoting physical health among the remaining community demographic. As Mr. Torez mentioned previously, the three schools selected by the 2010 safe house the school federal grant included power drive. Coral reefs and prime use have all gone through extensive studies for our predecessors in determining which infrastructure improvements would benefit each school just like the intersections, the true corridors all within a two mile radius of the schools were also a result of this study. With that being said, the study reviewed and approved by the department of transportation determined that additional sidewalks and car sites with benefit these schools the most the proposed improvements for our drive elementary school include sidewalks curving crosswalks and drainage pools along the north side of the southwest 140 first street corridor, the east side of southwest eighty second ave. Just north of the color drain canal and along the east corridor of obama road from old cutler road to southwest 136 street synn. Similarly, the proposed improvements for coral reef elementary school include sidewalks curving crosswalks and drainage flumes along the south side of southwest one four eight three corridor that you cite of southwest 74000 in the south side of southwest 156 street coral reef elementary improvement also include a proposed special high emphasis crosswalk at the intersection of southwest sixty seven thousand south 150 second street. >> lastly, an elementary school has been proposed to receive new sidewalk curbing crosswalks and driving along the west sides of both the southwest 90 second and southwest seventy seven corridors by moving on to the existing conditions of each site here the southbound view of obama road at the party road intersection as you can see along the left hand side of the image, the right of way boundary runs alongside the existing fence line here as shown in this image from the construction set of plans we have proposed to construct a six foot wide sidewalk along the eastern edge of pavement the current florida greenbelt sidewalks adjacent to the edge of pavement are required to have a curb and gutter as a safety future for those sidewalks not adjacent to the roadway there must be a five foot wide clear zone between the pavement and the edge of sidewalk. So as such programs with ada detectable warnings and curb transitions have also been proposed at the intersections to accommodate the change in elevation. Additionally, all proposed crosswalks have been designed to be to be at a minimum of the edge of travel to ensure pedestrian safety as well. The as you can see here. in any event, I'll address a couple of the issues from the road has over 15 or 16 cars per day. You have the sidewalk within six inches of that street very unsafe. I mean you've got you've got to put curbing on there. so the fact is it's almost like a launch of the cars and it's very dangerous to have people on a curb street like this. We have three curbs on this street so to have a sidewalk within six inches of the street is very dangerous. I don't understand why they can't why this street is even involved in the original program. We're over a mile away from the school number one. And number two wouldn't be more beneficial and more useful for this particular street to be closer to the school. I mean for this sidewalk to be closer to the school in order to actually have some use we don't have any kids any bikes using our street to get to to the elementary school. So it just seems unrealistic to put this money in this sidewalk in this area in addition to having already nine of the residences who are on the road have have asked not to have it based on the survey either myrto or go to either of you have any statistics on safety metrics of a sidewalk in a curb by someone walking in a street or riding a bike in the street ? I don't know if that data exists. I don't know either of you May have that May be helpful here. >> I can speak on behalf of the sidewalk location in proximity to the roadway but I think you May know more why in the street was chosen. I mean there was studies done before we jumped on board if you want to elaborate on that. i mean the school has identified again there was exhaustive coordination among multiple stakeholders the school board, miami-dade mp, all of the otti miami-dade county public works when they look at say for us the school they look at is basically a two mile radius from the school and they look at if you're connected to major corridors which in this case you would basically have local learning with our southwest one thirty six which then in turn connects to our drive elementary. So that's the reason and I mean it's center in that residential area basically that northeast corner that you know of our village. This would be that the route that would be available again for primary school children and again for really for the use of all as far as safety and I think you alluded to earlier as well as far as basic roadway design guidelines, if it's less than a five foot horizontal clearance, that's why you would introduce the kerbis of protection. It's not meant to be the office around rupture. >> correct. And as you see in this image from the plans stated, that gray line is the existing right of way and as you can see we are right up against it with a six foot side blocking curving adjacent to the roadway. But this but erm I still want first camera. It's not a typical residential street it's a street loaded with cut through traffic. It's a very busy street from morning drop off for the all the parents that are taking their kids to schools down in the south to afternoon when they're picking up it's just not a normal street. I mean we have sixteen hundred cars a day on the street. There have been studies I will read revert back to a couple of other items. We had a meeting in twenty seventeen about the speed tables on our street. This was never brought up. As a matter of fact in the meeting with ed silver mayor cunningham they told us that by implementing the half a point for not having a sidewalk because they removed cut through traffic has a criteria for traffic calming. They told us that getting that sidewalk, removing that sidewalk and not having one would allow us to qualify for traffic coming in. Nobody ever made it. This application was done in twenty fifteen. Why did that not come up? We had that meeting. They told us that there was nothing.

AGENDA

SRTS Public Meeting – Tuesday, February 23, 2021

Page 1 of 1

VILLAGE OF PALMETTO BAY

In accordance with the Americans with Disabilities Act of 1990, persons needing special

accommodation, a sign language interpreter, or hearing impaired to participate in this

proceeding should contact the Village Clerk at (305) 259-1234 for assistance no later

than four days prior to the meeting.

AGENDA

VIRTUAL PUBLIC MEETING:

SAFE ROUTES TO SCHOOL PROGRAM

TUESDAY, FEBRUARY 23, 2021 – 7:00 PM

____________________________________________________________________________

1. INTRODUCTIONS AND WELCOME

a. Village of Palmetto Bay Public Services Department

b. Kimley-Horn and Associates

2. UPDATE ON SAFE ROUTES TO SCHOOL PROGRAM

a. Village Manager Nick Marano

3. PUBLIC COMMENTS

4. PRESENTATION ON PROPOSED SIDEWALK FOR FARMER ROAD

BETWEEN SW 136TH STREET AND OLD CUTLER ROAD

5. QUESTION AND ANSWER SESSION

6. NEXT STEPS

7. ADJOURNMENT

tatian agenda for tonight's powerpoint. Before we get started, I'll start off with a brief project overview where I can show you the project location and the proposed improvements as it relates to the three elementary . Then I'd like to jump right into the design and how this proposed sidewalk will affect existing condition of your neighborhood. Lastly, I'd like to conclude the presentation with similar projects that we've completed throughout south florida so that you can get an idea and a feel for what the finished product will look like. I'd like to kindly request that you save your questions and comments for the end of the presentation as the village manager previously mentioned actually Mr. Torres, the purpose of the federal safe the school program is to provide safety improvements to new and existing pedestrian modes of transportation for children . However, not only do these improvements enhance the safety of the children for school commuting but it also benefits the public community as a whole in providing neighborhood connectivity ada accessible pathways. Additionally, the program encourages physical activity among the children before and after school as well as promoting physical health among the remaining community demographic. As Mr. Torez mentioned previously, the three schools selected by the 2010 safe house the school federal grant included power drive. Coral reefs and prime use have all gone through extensive studies for our predecessors in determining which infrastructure improvements would benefit each school just like the intersections, the true corridors all within a two mile radius of the schools were also a result of this study. With that being said, the study reviewed and approved by the department of transportation determined that additional sidewalks and car sites with benefit these schools the most the proposed improvements for our drive elementary school include sidewalks curving crosswalks and drainage pools along the north side of the southwest 140 first street corridor, the east side of southwest eighty second ave. Just north of the color drain canal and along the east corridor of obama road from old cutler road to southwest 136 street synn. Similarly, the proposed improvements for coral reef elementary school include sidewalks curving crosswalks and drainage flumes along the south side of southwest one four eight three corridor that you cite of southwest 74000 in the south side of southwest 156 street coral reef elementary improvement also include a proposed special high emphasis crosswalk at the intersection of southwest sixty seven thousand south 150 second street. >> lastly, an elementary school has been proposed to receive new sidewalk curbing crosswalks and driving along the west sides of both the southwest 90 second and southwest seventy seven corridors by moving on to the existing conditions of each site here the southbound view of obama road at the party road intersection as you can see along the left hand side of the image, the right of way boundary runs alongside the existing fence line here as shown in this image from the construction set of plans we have proposed to construct a six foot wide sidewalk along the eastern edge of pavement the current florida greenbelt sidewalks adjacent to the edge of pavement are required to have a curb and gutter as a safety future for those sidewalks not adjacent to the roadway there must be a five foot wide clear zone between the pavement and the edge of sidewalk. So as such programs with ada detectable warnings and curb transitions have also been proposed at the intersections to accommodate the change in elevation. Additionally, all proposed crosswalks have been designed to be to be at a minimum of the edge of travel to ensure pedestrian safety as well. The as you can see here. in any event, I'll address a couple of the issues from the road has over 15 or 16 cars per day. You have the sidewalk within six inches of that street very unsafe. I mean you've got you've got to put curbing on there. so the fact is it's almost like a launch of the cars and it's very dangerous to have people on a curb street like this. We have three curbs on this street so to have a sidewalk within six inches of the street is very dangerous. I don't understand why they can't why this street is even involved in the original program. We're over a mile away from the school number one. And number two wouldn't be more beneficial and more useful for this particular street to be closer to the school. I mean for this sidewalk to be closer to the school in order to actually have some use we don't have any kids any bikes using our street to get to to the elementary school. So it just seems unrealistic to put this money in this sidewalk in this area in addition to having already nine of the residences who are on the road have have asked not to have it based on the survey either myrto or go to either of you have any statistics on safety metrics of a sidewalk in a curb by someone walking in a street or riding a bike in the street ? I don't know if that data exists. I don't know either of you May have that May be helpful here. >> I can speak on behalf of the sidewalk location in proximity to the roadway but I think you May know more why in the street was chosen. I mean there was studies done before we jumped on board if you want to elaborate on that. i mean the school has identified again there was exhaustive coordination among multiple stakeholders the school board, miami-dade mp, all of the otti miami-dade county public works when they look at say for us the school they look at is basically a two mile radius from the school and they look at if you're connected to major corridors which in this case you would basically have local learning with our southwest one thirty six which then in turn connects to our drive elementary. So that's the reason and I mean it's center in that residential area basically that northeast corner that you know of our village. This would be that the route that would be available again for primary school children and again for really for the use of all as far as safety and I think you alluded to earlier as well as far as basic roadway design guidelines, if it's less than a five foot horizontal clearance, that's why you would introduce the kerbis of protection. It's not meant to be the office around rupture. >> correct. And as you see in this image from the plans stated, that gray line is the existing right of way and as you can see we are right up against it with a six foot side blocking curving adjacent to the roadway. But this but erm I still want first camera. It's not a typical residential street it's a street loaded with cut through traffic. It's a very busy street from morning drop off for the all the parents that are taking their kids to schools down in the south to afternoon when they're picking up it's just not a normal street. I mean we have sixteen hundred cars a day on the street. There have been studies I will read revert back to a couple of other items. We had a meeting in twenty seventeen about the speed tables on our street. This was never brought up. As a matter of fact in the meeting with ed silver mayor cunningham they told us that by implementing the half a point for not having a sidewalk because they removed cut through traffic has a criteria for traffic calming. They told us that getting that sidewalk, removing that sidewalk and not having one would allow us to qualify for traffic coming in. Nobody ever made it. This application was done in twenty fifteen. Why did that not come up? We had that meeting. They told us that there was nothing.

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsSource recordingread transcript
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Virtual Public Meeting for the Safe Routes to School Program
  • Virtual Public Meeting for the Safe Routes to School Program — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • The available transcript has no reliable timestamps.
  • Transcript coverage is partial.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: deb900244a50f8790f7d41b55119cd02. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record