POLISCOPE

The public record

MIAMI (MIAMI-DADE COUNTY) · LOCALHeld · official record pendingPartial coverage

Climate Resilience Committee Meeting

Monday, July 6, 2026 · Government meeting record

The 30-second read

Record incomplete

Climate Resilience Committee Meeting

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Record text

No transcript is held for this meeting. Recording: Watch video

Climate Resilience Committee Meeting — July 6, 2026 - 6:06 PM

Showing the first 24,000 of 104,929 characters. The full document is at the source.

609. >> all right. We'll start off with, uh, with a roll call from my right, please. Jenny lee molina. Allison weinstock. >> aaron dimeo. Silvio frank pupo. Nick atkinson, office of the city attorney.. >> sonia brubaker, chief resilience officer, city of miami. Miriam. >> miriam flores, office of resilience. Sustainability. Thank you. All right. We'll go to item two which is public comment. Anyone from the public would like to make a comment? Welcome. Uh my name is lindsay cain. I am a resident of miami dade. This is my first time at one of these committee meetings, but I've been to the city hall quite a few times this year fighting to save the trees that um are currently a threat all over the city. So currently citizens are asking for more parks, more green spaces and they all currently seem to be under attack. And I feel like when we talk about climate resilience trees should be a key factor. I feel like this summer especially has been so extremely hot and it's directly related to the more than 300 trees that have been cut down in miami this year alone and there's more planned. So allen morris park in brickell which is one of the only parks in brickell that's untouched is at threat planned to be demolished. I believe they're going to start that next week. Margaret pace park is planned for a huge renovation that will remove 105 trees. And there's another historic site in brickell with old trees that is set to be demolished. So it seems like every green space and the ones that aren't touched have a for sale sign. So at the meetings I've been reading the citizen bills bill of rights which states that it shall be the policy of the city to conserve and protect its natural resources and scenic beauty which policy shall include the abatement of air and water pollution and excessive and unnecessary noise? So I'm here in hopes that your committee can help change the dangerous trajectory that the city is currently on. I feel like we're becoming a city of hostile architecture anti-green decisions that will ultimately affect everybody's health. People want more parks, more green spaces, more trees in addition to saving the ones that already exist. Thank you. Thank you for your comments and your efforts and we'll talk more about park expansion and trees later on in the in the meeting. Any other public comments or any submitted online? None. >> all right. Let's move on to item three which is the approval of the JUNE 1st regular meeting minutes as well as the JUNE 18th budget workshop minutes. Do I have a motion to adopt approve both of those together? Second. >> I need a. Motion to approve both. Okay. Thanks. In a second. Second and a second. All right. All in favor? Aye. I oppose or abstain. All right. Those both pass. Thank you. So we'll move to item four which is presentations. We have uh a status update on the implementation of the 2024 stormwater master plan. Uh this is something that came before the crc and I think possibly the sea level rise committee many moons ago, uh a number of times during its creation and um, arella requested this at your first meeting and you know, I'm glad that we were able to get this on the agenda. So thank you all so much for joining us and really appreciate you being here. Good evening. Thank is it on? Yes. Okay. I have a cold so my ears are a little bit. Uh you might need to. Okay is that better? Much better. Good uh good evening. I'm clara sedan with the city of miami resilience and public works assistant director for stormwater and permitting and I have cdm the the the engineers who prepared the stormwater master plan. If you want to introduce. Yes. >> thank you. Uh good. Evening everyone. Uh, john goldman associate with cdm smith the author and engineer record of stormwater master plan with me today is doctor tom nye, our principal modeler for the firm. All right. We're going into the presentations and then questions afterwards. >> all right. So first I'd like to say it's been almost four years since we presented to this committee. Uh you had some really good input and kind of shaped a lot of the way that the, uh, the master plan was written and some of the things that were included the additional beyond just the the mathematics of the hydraulics and hydrology. And we really appreciate that. Uh, tonight on the agenda a little bit of an overview because it's been a while I know it's two giant volumes it's hard to sift through. I'm so sorry. Can you speak closer? >> yeah, sure. Thank you. >> is that is that better? Uh, I'll talk a little bit about the model parameters that were used. I know there was a bunch of questions on that and the boundary conditions and other things about the model itself. Uh, project prioritization and phasing. We'll talk in the city. We'll talk a little bit about that current status of some projects schedule budget, anything about grant funding that we can talk about cost tracking and metrics, a little bit about the shoreline hardening program that's going on. Um, any new technologies that have been incorporated parks and open spaces and of course water quality and restoration of biscayne bay, which fdp is kind of full circle coming back and doing it again. Right. So uh, a little bit of the overview and goals you've seen this before flood control, water quality protection, aquifer recharge and water supply conservation and harvesting where able you know, we was very big with your residents. Maybe one system doesn't do a lot but a thousand in an area really do help uh, operation and maintenance, uh, long term financing and of course community acceptance. There were two levels of service that we'll talk about and then uh, all of that went through the miami forever bond and that was put into action and some projects started to be put out on the street. Uh, talk a little bit about the initial widespread problem. Yeah. Go ahead. Yeah. >> question oh yeah. Yeah. Uh water the widespread problem areas identification. So we remember we had workshops in each area of the city and people were putting dots on the maps and we were talking in different languages and having these workshops where is it flooding how long? So we got a lot of good data from that fema repetitive loss data you had at the time something called the county 311. You had to kind of sift through that sometimes a cat and a tree came under the flood, but we were able to get through that. I know aaron provided a ton of photos for us for our calibrations and we were able to also sift through all the media coverage and then send surveyors out and figure out the worst. So we have this hotspots map that we did in the gis and we kind of knew that's you know, basically where we were headed. It was pretty much agreeing with the lidar and where there were no positive systems for drainage. Oops that. There we go. Uh, a little bit about the level of service goals that we evaluated. It was a very lofty goal at the time, um, more than most of our other clients, the city really wanted to know what would it take for no flooding over the crown of the roadways in a ten year storm? Right. And you know, that's a lot of water on a very low flat area like this. So there was a secondary goal which was no floating over the crown of the roadways in a five year storm event. And this is a south florida water management district curve on the noaa atlas 14 data that we had records for uh and then it would be temporary flooding, uh, safe predictable death for short durations of time in known areas during that ten year event. And you know, the the district's curve has a kind of a flashy peak on the five year. So it did take a lot of the ten year with it. Um, so that was uh it's still a very robust goal. It was more practicable and potentially more affordable solution. So in general the city had recognized that the primary alternative which was that ten year might not be available to be met in all areas. There might be an area of just 4 or 5 houses that needed a south florida water management district sized pump station. It's just not feasible to put that in everybody's backyard. Uh, and where it couldn't be achieved or where it just wasn't economically feasible. The secondary alternative to was going to be used. And like I said, it's a very robust design you move five year storm is moving a lot of water out. So it's a very good design and it'll do a lot of much needed relief. When we were presenting this to most of the residents they said it's okay we're not flooding into our houses right now but if I could just get out of my house within a few hours and not be trapped for days and that was really the most important thing to them. So we listened to that and that's kind of how we uh geared a lot of these projects. Uh, the model considered a resolution down to 5 to 10 [Laughter] Acres. It was at a neighborhood level of detail. Given this. >> sorry, tom. Sorry I got carried away. Uh hi everyone. Um, so the first of all the model it's a hydrologic and hydraulic model called swim. It's from epa. Uh, there are other models that do very similar stuff in florida particularly there's something called storm wise that does something similar to the good part about the epa swim it's free. Anyone can download it. We the picture you're seeing is actually a in a proprietary model called pc swim that is a gui wrapped around the model but we could give the model in the free version and you would be able to run it and we also trained the city staff on it way back in the day. I don't know how many people are left who were in that training session, but a few people can still open the model, put new pipes in and test the model. So when we say a neighborhood level of service the there's a few thousand subbasins in the city and a few more outside the city because there's areas outside the city that drain into the city or share a waterway with the city. So you can see kind of you can see in that picture that the the city boundary has some extra space around it. Uh, the models previous to this one were like an order of magnitude bigger. So every sub basin was maybe 100 acres or you know, that's that's an entire neighborhood. This is getting down to the city block so we don't have every leader. So if you have an inlet in every corner of an intersection, we don't have all those little leaders. But that's more of a design detail when you're building something this is a master plan so it gets the trunk lines in there. Um there was a question on on whether we considered the county models. Uh we did both calibrate and run design models with inflows from the different canals that come in. So the main one is the miami river up by the airport the c6 canal but the other ones the other side of the airport, the c4 canal comes in from the west and up in the very north you have the c7 canal and then there's a little bit where the c3 is in the southwest portion of the model. So all those we have all those county models because at the time I was actually working with the county reviewing those models. So I had access to everything and we were able to run the models, uh calibrate to different design storms or to the different uh, storms that occurred some of them as we were building the model. If you remember back to 2020, there was quite a big storm and I think maybe the very next year also in MAY there was another big storm. So we had some models, we had some storms we could calibrate to as it was being built and uh, then we were on the design storms for for all our analysis for the alternatives, uh, the the surface storage is in the model. So when when the runoff as you can see today doesn't stay in the pipe system and gets up above ground. That's all in the model as well as storage curves based on a digital elevation model from lidar. Um, that's the topography it's we have the whole county so we were able to get the city this is a little older I don't know particularly in miami dade has a newer one yet but since we started in 2018 I believe it was from like 2017 it was new at the time uh which shouldn't change too much. You might have a little bit here and there that has changed especially where they're redoing roads and stuff but in general it should be the same. Um we used the miami dade was the future groundwater for the future conditions and the sea level rise conditions. So they had a 2040 future groundwater and we used that for the low level sea level rise. And then I think we extrapolated it for the higher level sea level rise so we can get a and what that does generally is it gives you less soil storage to infiltrate into. So there was a water table gets close to surface. You don't have the full column to to infiltrate into. So as as sea level rises and groundwater rises, you're going to have that issue. And the second issue is there's a lot of exfiltration in this city. That's the perforated pipes that run under your ground. Those need driving had to work. So if you have if you have an inlet at four in your groundwater levels at two you don't have a lot of driving head and with sea level rise if that goes up to 3 or 4 then you have no driving head. So our recommendation where you see us put in exfiltration I think our minimum was five and a half or six sorry I'm getting two different projects mixed up so I'm not positive. I think it was six in miami for that just so we could account for future groundwater levels. Um so we're trying to catch the water uphill with the filtration trench and a lot of the existing is at the bottom of the bowl and that's why it doesn't work very well. There's not enough there's not enough head at the bottom of the bowl, especially as the storm raises groundwater table regionally you don't get a lot of a lot of effectiveness from some of those old exfiltration trenches. Um we had a lot of ksat data from both the city and the county. That's what the south florida water management district uses to predict how well exfiltration trench will work at a given head. Uh, so, um, we use that data, um the no .14 rainfall which john already mentioned and uh, we originally started calibrating to irma which was 2017 actually wasn't that old at the time. It seems like forever ago now for me anyway. Uh, but like I said, we had a couple storms and as john mentioned, darren had some videos and some pictures for us that really helped. We got some other videos from uh um media sites and stuff and we were able to find some good calibration points and tweak the model a little bit, especially with soils infiltration, uh, rates where we weren't matching we would adjust soils infiltration most a lot of the other parameters are pretty much set. You can't really fake uh, impervious cover. You know, you don't want to play with stuff like that. Uh, but soils and some other smaller parameters are what we use to to validate and calibrate the model. Uh, we did do originally two sea level rise, uh, foot and a half and 2.5ft that way we wouldn't have to predict what year it happened. We would just say at one and a half of sea level rise this is how the models are going to react both in the existing condition and our alternative conditions. After we finished the fs 380 came out and it's four different elevations but they're very similar to what we used I think down here the lowest ones only a few inches but then it goes to a foot and both the 27 low and the 2040 high are very close to a foot. And then the 2070 high is very close to the two and a half we already use. So uh we ran those for a vulnerability study for the city. So we've we've got actually four but a lot of them are very similar and we did run a high tide and a high rain event at the same time. Um, and what I could say about that is if if you remember irma probably had a tide around 4navd in places I think further north but at least uh over three and a half here at the mouth of the miami river. So if you the problem with the existing city at least the way it was in 2020 was that with with tide that high when it rains you're not getting any water out even if you have a backflow preventer because the inlets are so low you gravity doesn't work anymore. There are so a lot of seawalls that are less than four and we did fly a special purpose lidar we did for this one too right? Yeah. We ran a special purpose lidar on the seawall specifically to get accurate seawall elevations all the way up the miami river and along the bay. And so we found a lot of places are less than four. So in the existing condition yes a high tide with any kind of rain is very problematic. Uh, since then I know the city has put in a lot of backflow prevention and are starting to raise seawalls. So in our alternatives the seawalls are higher so and the pump stations are going in. So now that kind of fixes all that problem. So for your high coincident rain and surge as long as the surge is below the seawall the pumps are doing all the work. There aren't a lot of gravity pipes left at all in the alternatives. I mean the ones that are existing stay in but they only work at low tide especially with sea level rise. But the the older one the um I'm sorry. So the all the alternative stuff is basically pumped unless there's some really high elevations near the water where you can still run gravity and I think there's maybe a handful of those but compared to hundreds of the other ones I think that's me. Yeah. >> let's see. I could talk to. this yeah yeah. Keep going. All right so yeah I mean we talked about this a little bit so I mean right now what you're looking at is a pre and post with the l2 uh version of the post condition at this scale you can't really see but if you have a copy of the master plan we get down to the neighborhood level with these flood maps and you you're going to see on the right picture that there's still places of flood some but and we're showing the ten yeah. So we're showing the ten so it doesn't the l2 doesn't meet the ten year level of service of no flooding above crown. So even in the even in l2 you will see some crowns with some flooding above the some roads with some flooding above the crown but not a lot. It gets pretty close to the other one for about half the price this is going to show later. Um. What's next? Uh we were actually just talking with aaron before we started and shenandoah area there's a lot of bowls. There's just no positive outfalls from them. So every area like that in the city got looked at and got something in the alternatives. And what john said earlier about all two being short duration that means even if it didn't flood too deep but if it wouldn't go anywhere for hours then we still put something there and all too even if it was not so deep in a five year storm that it would need it if it lasted forever and never went anywhere. We went ahead and got some pipes in there as well that eventually would go to something like a pump station or if it was high enough had exfiltration. We always went with exfiltration first, especially in the higher parts of the city because you know that's more green for one, it gives you your water quality credits and you know we don't want all these pump stations to be, you know, new orleans size. So you know, we're trying to trying to get some water into the biscayne aquifer first, which is good because it's such a highly transmissible aquifer. You can put a lot of rainwater into it, uh, and then go into the pump stations second. Uh, but when we get to areas that are too low for exfiltration, anything below six feet and anything that's left over, even if it's higher that we just can't find enough room to put exfiltration in then we're pumping. And so there are a lot of pump stations I believe in all two it's in the 90s so yeah 90 some pump stations and all two throughout the city most of them along the most of them along the the bay or the river. But there are some that are inland and then very long force mains and especially when we start talking about the the um. Flagami area so south of blue lagoon because we couldn't put we couldn't pump into blue lagoon if I pumped into the blue if I tried to pump into blue lagoon I raised stages in the miami river and the c4 canal and that affects other parts of the city but it also affects our neighbors so we can't raise stages on the rest of the county. We can't raise stages in miami international airport so we couldn't pump directly to blue lagoon. So now we're moving a lot of water east further down river as far as we can. We have we have a lot of injection wells also to pump water into the aquifer because if we pump everything to the river when we're further west, we're just raising the river too much and we're causing problems elsewhere. So there's a lot of pump injection as much as we can do. Um uh when but to do pump injection you got to be west. You can't do you can't do I'm sorry you got to be east. You have to be a certain amount east to do pump injection because you want to pump into the saltwater zone and not the drinking water zone. So uh so there's a there's a line where we start doing pump injection. So we had to move water pretty far east just to get to that line. Um. Let's see what's next. Yeah, I'm going to go back to. Thank you tom. So some of the initial stormwater you can see how we got to the $3.1 billion price tag pretty quickly and a lot of those a lot of those force mains as they were heading to the bay have pop offs into wells so the poorest man can get smaller along the way. You might start off at twin 40 twos but by the time you're getting over towards the ultimate outfall we've put enough into the ground but that's limited by south florida water management. So it's a very delicate balancing act. There's a junior record that's going through that now for flagami uh trying to get through that process right now. So uh the first couple of project areas. So uh, we had a big internal meeting with the city and everybody talked about all the different pieces and parts and there was some political involvement of what should go first and how things go and you want to for the obviously miami forever bond, you need to spread the work equally throughout all the different areas. So uh, noted commission priority areas we sat one on one with each commissioner. Some of you were involved in that and asked you know, really what are your residents saying? What are your priorities? And they were very vocal and they understood their their worst areas. Sometimes it was just an intersection or this one area of calle ocho or just something some areas were a little more that were repetitive loss areas where uh, houses were repetitively flooding. So uh, and we phased that to remain within the available initial budget. You know, all the bond didn't come at once you qualify in tranches. So that was another constraint there. So really the highest number of the flooding complaints the highly visible areas the areas that are always on the media those were first and then uh areas of known capacity shortfalls that were already on the city's radar that you're trying to be getting to for the last 15 years those got put into the mix and they were spread throughout the city and of course they're all flexible so it can all be adapted. And you look at the master plan, you see what was supposed to be put in. If you have to upsize you can upsize or if you make a connection to something for the future uh, just so it could be expanded that was part of that process. So these were the initial 24 areas and clary, you want to talk. >> a little bit about these? So as the outcome of the stormwater master plan and all the meetings and all the recommendations, the critical areas, the repetitive uh, locations that were 24 neighborhood projects that were identified as priority, uh, based on historic flooding complaints, the damage claims, uh, potential risk to residents and uh, the available funding the uh, out of those 24 there were 12 projects that were funded through the miami

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Recording and media

Coverage and corrections

Records considered

  • Climate Resilience Committee Meeting
  • Climate Resilience Committee Meeting — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: dd34cb79b306a57a51900cd93249c453. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record