Financial Advisory Board

Tuesday, October 14, 2025 · Government meeting record

The 30-second read

Recorded outcome

Financial Advisory Board

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

No later meeting or follow-up date is stated in the reviewed record.

An official outcome record - an action agenda or minutes - is published for this meeting.

Recorded votes

Watch the meeting The recording is not indexed to individual votes.

1 recorded vote0 split

Split votes (0)

Every recorded vote passed unanimously.

Unanimous votes (1)

approved

Adjournment — unanimous

Record text

No transcript is held for this meeting. Recording: Watch video

1 NORTH BAY VILLAGE FINANCIAL ADVISORY BOARD MEETING MINUTES MEETING ID: 844 2624 3280 1666 KENNEDY CAUSEWAY, SUITE 101 NORTH BAY VILLAGE, FL. 33141 TUESDAY, OCTOBER 14, 2025| 6:30 P.M. 1. Call to Order / Roll Call: a. Commissioner Chervony asked for the two newest members of the FAB to be sworn in immediately to achieve quorum requirements. b. Isabel Betancourt, Assistant Village Clerk, swore in the two new members of the Financial Advisory Board: i. Ms. Elizabeth ‘Liz’ Avalos ii. Mr. Lars Schott c. Call to Order: Commissioner Chervony called the meeting to order at 6:35 p.m. d. Roll Call: i. Board Members Present: 1. Avalos, Liz, Board Member 2. Schott, Lars, Board Member [Acting Chair] 3. Siefken, Sandra, Secretary 4. Zuniga, Marco, Board Member 5. VACANCY ii. Board Members Absent: NONE iii. Village Staff Present: 1. Commissioner Richard Chervony 2. Mayte Gamiotea, Chief Financial Officer 3. Isabel Betancourt, Assistant Village Clerk e. Secretary Sandra Siefken advised the board that she must resign as Secretary, but will remain on the FAB as a member. Ms. Betancourt will prepare the minutes for October 14, 2025, while the FAB is in transition. f. Commissioner Chervony asked for someone to step in as Acting Chair since all seats remain unoccupied. Board Member Schott volunteered under Commissioner Chervony’s guidance. g. Board seat selections were deferred until the November meeting, after the remaining vacancy is filled.

2 2. Approval of Last Meeting Minutes: Draft Pending 3. Old Business: a. Update on TIES Project/New Community Center Project i. Groundbreaking has begun, and the foundation is being constructed. ii. ETA for completion March/April 2026. iii. The funds are available, and the construction timeline is on schedule. b. Update on the New Village Hall/Fire Station Project i. The scope of the project has expanded significantly in cost and size since it was first introduced. ii. Funding for the project was compromised due to mismanagement by former personnel. iii. The Village Budget is being adjusted to correct past errors, and the funds for this project have been allocated. iv. Plans to obtain the additional costs are in place. v. The new fire station is confirmed to be built, no matter what happens with the Village Hall side of the project. c. Update on the Status of Capital Improvements Project: Deferred until the November meeting. 4. New Business: a. Discussion on the Approved Budget for FY 2025-2026: Commissioner Chervony gave the Board a comprehensive explanation of the FY 2025-2026 Budget. 5. Staff / Commission Liaison Updates: a. Commissioner Chervony briefed the Board on upcoming projects that are scheduled to break ground in early/mid-2026, adding more funds to the Village coffers. b. He also informed the FAB of the intent to cancel the entryway signs project that the Village had previously approved. c. Plans for the final design of Civic Park are still being discussed. d. In January 2026, the Village Commission will approach Tallahassee to lobby for more funding. e. Commissioner Chervony answered questions about the purview of the Financial Advisory Board and explained what the Board members can do regarding Village finances. f. Commissioner Chervony asked Isabel Betancourt to share his contact details with the FAB. 6. Public Comments: NONE 7. Discussion of Agenda Items for Next Meeting: Wednesday, November 12, 2025 [adjusted for the Veteran’s Day holiday falling on Tuesday, 11/11]. a. Commissioner Chervony asked the following members of the Public Works team to be present at the November meeting: i. Mr. Roger Hogg, Capital Improvements Project Director ii. Ms. Christina Viala, Chief Resilience Officer 8. Adjournment: a. Motion to Adjourn: Introduced by Acting Chief Schott i. Vote: Unanimous voice approval b. Adjourned: 7:30 p.m. Submitted this 12 th day of November 2025, by: Isabel Betancourt, Assistant Village Clerk

1. Opening Items 1.A. Call to Order 1.B. Roll Call 1.C. Oath of Office: Swear-In for New Members: Elizabeth Avalos and Lars Schoett 2024 - 2026 - FAB - Oath of Office - Schoett 2024 - 2026 - FAB - Oath of Office - Liz Avalos 2. Approval of Meeting Minutes 2.A. Meeting Minutes: July 8, 2025 - Draft Pending 3. Old Business 3.A. Update on the Treasure Island Elementary School [TIES] Project 3.B. Update on the New Community Center Project 3.C. Update on the New Village Hall/Firestation Project 3.D. Update on the Status of Capital Improvements Project 2025-10-03 - NBV Capital Improvements Project Status Report.pdf NORTH BAY VILLAGE OFFICIAL AGENDA FINANCIAL ADVISORY BOARD VIRTUAL MEETING ZOOM MEETING ID: 844 2624 3280 TUESDAY, OCTOBER 14, 2025 at 6:30 PM 1

4. New Business 4.A. Discussion on the Approved Budget for FY 2025-2026 FY 2025-2026 Budget.pdf 5. Staff / Commission Liaison Updates 6. Public Comments 7. Agenda Items for Next Meeting: November 12, 2025 8. Adjournment THIS MEETING IS OPEN TO THE PUBLIC. IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1990, ALL PERSONS THAT ARE DISABLED; WHO NEED SPECIAL ACCOMMODATIONS TO PARTICIPATE IN THIS MEETING BECAUSE OF THAT DISABILITY SHOULD CONTACT THE OFFICE OF THE VILLAGE CLERK AT 305-756-7171 EXT. 45 NO LATER THAN FOUR DAYS PRIOR TO SUCH PROCEEDING. IN ACCORDANCE WITH THE PROVISIONS OF SECTION 286.0105, FLORIDA STATUTES, ANYONE WISHING TO APPEAL ANY DECISION MADE BY VILLAGE COMMISSION, WITH RESPECT TO ANY MATTER CONSIDERED AT THIS MEETING OR HEARING, WILL NEED A RECORD OF THE PROCEEDINGS AND FOR SUCH PURPOSE, MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE WHICH RECORD SHALL INCLUDE THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. AGENDA ITEMS MAY BE VIEWED AT THE OFFICE OF THE VILLAGE CLERK, NORTH BAY VILLAGE, 1666 KENNEDY CAUSEWAY. ANYONE WISHING TO OBTAIN A COPY OF ANY AGENDA ITEM SHOULD CONTACT THE VILLAGE CLERK AT 305-756-7171 EXT 45. A COMPLETE AGENDA PACKET IS ALSO AVAILABLE ON THE VILLAGE WEBSITE AT www.nbvillage.com. TO REQUEST THIS MATERIAL IN ACCESSIBLE FORMAT, SIGN LANGUAGE INTERPRETERS, INFORMATION ON ACCESS FOR PERSON WITH DISABILITIES, AND/OR ANY ACCOMMODATION TO REVIEW ANY DOCUMENT OR PARTICIPATE IN ANY VILLAGE-SPONSORED PROCEEDING, PLEASE CONTACT (305) 756-7171 FIVE DAYS IN ADVANCE TO INITIATE YOUR REQUEST. TTY USERS MAY ALSO CALL 711 (FLORIDA RELAY SERVICE). 2

Showing the first 24,000 of 189,430 characters. The full document is at the source.

1. Opening Items 1.A. Call to Order 1.B. Roll Call 1.C. Oath of Office: Swear-In for New Members: Elizabeth Avalos and Lars Schoett 2024 - 2026 - FAB - Oath of Office - Schoett 2024 - 2026 - FAB - Oath of Office - Liz Avalos 2. Approval of Meeting Minutes 2.A. Meeting Minutes: July 8, 2025 - Draft Pending 3. Old Business 3.A. Update on the Treasure Island Elementary School [TIES] Project 3.B. Update on the New Community Center Project 3.C. Update on the New Village Hall/Firestation Project 3.D. Update on the Status of Capital Improvements Project 2025-10-03 - NBV Capital Improvements Project Status Report.pdf NORTH BAY VILLAGE OFFICIAL AGENDA FINANCIAL ADVISORY BOARD VIRTUAL MEETING ZOOM MEETING ID: 844 2624 3280 TUESDAY, OCTOBER 14, 2025 at 6:30 PM 1

4. New Business 4.A. Discussion on the Approved Budget for FY 2025-2026 FY 2025-2026 Budget.pdf 5. Staff / Commission Liaison Updates 6. Public Comments 7. Agenda Items for Next Meeting: November 12, 2025 8. Adjournment THIS MEETING IS OPEN TO THE PUBLIC. IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1990, ALL PERSONS THAT ARE DISABLED; WHO NEED SPECIAL ACCOMMODATIONS TO PARTICIPATE IN THIS MEETING BECAUSE OF THAT DISABILITY SHOULD CONTACT THE OFFICE OF THE VILLAGE CLERK AT 305-756-7171 EXT. 45 NO LATER THAN FOUR DAYS PRIOR TO SUCH PROCEEDING. IN ACCORDANCE WITH THE PROVISIONS OF SECTION 286.0105, FLORIDA STATUTES, ANYONE WISHING TO APPEAL ANY DECISION MADE BY VILLAGE COMMISSION, WITH RESPECT TO ANY MATTER CONSIDERED AT THIS MEETING OR HEARING, WILL NEED A RECORD OF THE PROCEEDINGS AND FOR SUCH PURPOSE, MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE WHICH RECORD SHALL INCLUDE THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. AGENDA ITEMS MAY BE VIEWED AT THE OFFICE OF THE VILLAGE CLERK, NORTH BAY VILLAGE, 1666 KENNEDY CAUSEWAY. ANYONE WISHING TO OBTAIN A COPY OF ANY AGENDA ITEM SHOULD CONTACT THE VILLAGE CLERK AT 305-756-7171 EXT 45. A COMPLETE AGENDA PACKET IS ALSO AVAILABLE ON THE VILLAGE WEBSITE AT www.nbvillage.com. TO REQUEST THIS MATERIAL IN ACCESSIBLE FORMAT, SIGN LANGUAGE INTERPRETERS, INFORMATION ON ACCESS FOR PERSON WITH DISABILITIES, AND/OR ANY ACCOMMODATION TO REVIEW ANY DOCUMENT OR PARTICIPATE IN ANY VILLAGE-SPONSORED PROCEEDING, PLEASE CONTACT (305) 756-7171 FIVE DAYS IN ADVANCE TO INITIATE YOUR REQUEST. TTY USERS MAY ALSO CALL 711 (FLORIDA RELAY SERVICE). 2

North Bay Village 1666 Kennedy Causeway, Suite 300 | North Bay Village, FL. 33141 Tel: (305) 756-7171 Fax: (305) 756-7722 Website: www.northbayvillage-fl.gov STATE OF FLORIDA COUNTY OF MIAMI-DADE NORTH BAY VILLAGE OATH OF OFFICE I, LARS VALENTIN SCHOETT, a legal resident of the State of Florida and being a FINANCIAL ADVISORY BOARD Member, do hereby solemnly swear that I will support and obey the Constitution of the United States and the State of Florida and that I will, in all respects, observe the provisions of the Charter and Ordinances of the Village. Signed: __________________________________ LARS VALENTIN SCHOETT RESIDENT SERVICES ADVISORY BOARD Sworn to and subscribed before me this 14TH day of OCTOBER 2025. ____________________________________________ Isabel Betancourt Assistant Village Clerk 3

4

10/3/2025 Project No: SW-2304-01.00 - Stormwater Inlet Filters Project Manager: Roger Hogg/Timothy Smith Design/EOR: SOP Technologies CEI: N/A Contractor: SOP Technologies Project Overview: Project Budget: Contract WO No. Construction and Monitoring (Ph 1) Construction and Monitoring (Ph 2) Grants, Other Outside Funding Project Schedule: Status LPA0345 (FDEP) Design: Complete Complete Construction: Q4 2025 Ongoing Current Status: Next Steps Accomplishments 9/5 - Working on building the stormwater filters for Phase 2 and finalizing the analysis report for Phase 1. Contractor is aiming to deliver and install the first batch of filters in October. 1. Complete the analysis report for Phase 1 and deliver/install inlet filters for Phase 1 Capital Improvement/Public Works Project Status Report 300,000.00$ The VILLAGE intends to reduce roadway flooding and prevent pollutants from entering Biscayne Bay by installing custom, patented upward-flow drainage filters on existing storm inlets.The Project consists of installing the stormwater drainage filters on existing storm inlets throughout North Bay Village, installing patented QR Code Storm Drain Markers, providing software services associated with the storm drain markers, and to conduct data analysis for a period of 12 months following the installation of the stormwater filters and drain markers. Cost ($) 150,000.00$ 150,000.00$ 300,000.00$ 5

10/3/2025 Project No: SW-2410-01.00 - Stormwater Outfall Rehabilitation Project Manager: Roger Hogg Design/EOR: SArdurra Engineering CEI: N/A Contractor: N/A Project Overview: Project Budget: Contract WO No. Design and Eng: Ardurra Engineering 2023-005 004 Const: CEI Construction Contractor: Grants, Other Outside Funding Project Schedule: Status L0287 - State Appropriation Report: Q3 2025 Complete C2302 - FDEP Design: Q2 2025 Pending Construction: TBD Current Status: Next Steps Accomplishments Capital Improvement/Public Works Project Status Report -$ Cost ($) The initial phase of this project is to identify the existing outfall structures and ensure they function as intended. This phase had located 26 of the 37 total outfalls. The previous contractor performed the rehabilitation on 20 of these outfall pipes; this includes the cleaning and slip-lining the discharge pipe, and incorporation of a Tide-flex (i.e. check valve) at the terminal end of the pipe. The purpose of this new project is to reassess the condition of the existing outfalls and replace nineteen (19) of the remaining outfall check valves with in-line valves. 9/9 - Final report of outfall inspection submitted to the Village. A total of 44 outfalls were inventoried, inspected and confirmed connectivity with the existing stormwater network. A web dashboard of the assessment results can be found here: https://www.arcgis.com/apps/dashboards/3aea32cab7d74f68b4e81b699994a6c 4 1. Meet with Ardurra to review findings and recommendations from report 125,000.00$ 2,542,500.00$ 6

10/3/2025 Project No: TT-2111-01.00 - Treasure Island ADA Improvements - Phase II Project Manager: Jean Lilavois Design/EOR: SParsons/BCC Engineering CEI: EAC Consulting Contractor: Florida Engineering and Development Corp Project Overview: Project Budget: Contract WO No. Planning Design and Eng: BCC 2025-003 005 Const CEI: EAC Consulting 2025-003 013 Const Contractor: FEDC 2022-006 8766 Grants, Other Outside Funding Project Schedule: Status G2789 - FDOT Design: Completed Completed Construction: December 2025 Ongoing Current Status: Next Steps Accomplishments 9/12 - Contractor began work on installing conduit via directional bore at E Treasure and 1800 block. 9/19 - Change orders approved by consent on 9/16. Village still pursuing FDOT concurrence with CO's in order to execute, as well as extension of the construction agreement through December 2025, and Grant agreement through May 2026. 10/3 - Construction work is on target for completion no later than October 2025 according to the schedule provided by the contractor, after which tMiami-Dade DTPW will be notified for inspection and approval of the work. 1. Change order for contract time extension to be submitted by FEDC. Proposed extension will be to December 22, 2025. Extension request also has to be submitted to FDOT for concurrence. 2. Request for extension to grant deadline due to FDOT LAP Office (grant deadline currently 10/24/2025). Capital Improvement/Public Works Project Status Report 387,345.00$ includes the installaton of audible beacons along John F Kennedy Causeway, ADA detectable warning pads at crosswalks, improved crosswalk striping and signage,and sidewalk curb ramps. The Village has identified several ADA improvements. These include the installation of: - Audible Beacons along 79th Street Causeway (JFK) at Adventure Avenue, Hispanola Avenue, East Treasure Drive, and near the 1800 Block. - Missing Sidewalk, Curbs, Ramps, Truncated Domes at intersections within Treasure Island (local roads). Cost ($) 72,758.00$ 59,525.00$ 255,062.00$ 153,000.00$ 7

10/3/2025 Project No: TT-2401-01.00 - Treasure Island/Harbor Island Sidewalk and ADA Improvements - Phase III NBV Project Manager: Jean Lilavois Design/EOR: EAC Consulting CEI: N/A Contractor: N/A Project Overview: Project Budget: Contract WO No. Planning Design and Eng: EAC Consulting 2023-005 017 Const CEI: Not Selected Const Contractor: Not Selected Grants, Other Outside Funding Project Schedule: Status G2T36 - FDOT Design: TBD Ongoing Construction: TBD N/A Current Status: Next Steps Accomplishments 7/25 – CIP Manager Roger Hogg sent final ILA language to Miami-Dade Public works to satisfy their final concern. Once they review and accept, the ILA should be forwarded to the County Mayor for execution. 8/15 – CIP Manager scheduled a meeting for 8/19 with Miami-Dade DTPW to finalize the technical details of the ILA prior to final execution. 8/21 – The ILA has been finalized, signed by the Village and sent to Miami-Dade County for final execution. 9/16 - The final executed ILA was received from Miami-Dade County DTPW. 10/3 - Actively coordinating next steps with FDOT and EAC. 1. Coordinate finalization of design plans with EAC and submit to DTPW for permits, pending final execution of the ILA. 2. Finalize easement modification at MODA. 3. Finalize construction drawings, scope of work and specifications in preparation for bid process. Capital Improvement/Public Works Project Status Report 1,063,963.00$ The Village wishes to complete phase III of its ADA Improvements project to include other road safety features. This phase will replace broken sidewalk segments, remove trip hazards from uneven sidewalk segments, install missing sidewalk segments to ensure full connectivity for pedestrian safety, reconstruct curbs and gutters, implement traffic calming and pedestrian safety improvements that enhance traffic circulation, crosswalks, and striping for enhanced visibility of roadway features. These enhancements include the installation of approximately: • 1810 linear feet of missing sidewalks • Six (6) Mid-block crosswalks • 10,300 linear feet of sidewalk repaired Cost ($) 46,963.00$ 117,000.00$ 900,000.00$ 776,000.00$ 8

10/3/2025 Project No: TT-2208-01.00 - Entrance Way East Sign NBV Project Manager: Jean Lilavois Design/EOR: Stantec CEI: N/A Contractor: N/A Project Overview: Project Budget: Contract WO No. Design and Eng: Stantec Const CEI: Not Selected Const Contractor: Not Selected Grants, Other Outside Funding Project Schedule: Status Design: TBD Ongoing Construction: TBD N/A Current Status: Next Steps Project is on hold until further notice Accomplishments 6/5 – This date a virtual meeting took place with FDOT, NBV Public Works, and sign engineer consultant. It was finally determined that the sign will not fit within the area provided by FDOT (this decision seems to have taken almost 2 years!). The project (Bay Plaza North-Phase 2) will continue without the entrance sign element. FDOT will approve a grant extension past the September 2025 expiration date. Public Works will now work on locating another site for the entrance sign. We also received an overdue invoice for authorized work performed by the sign engineer but was not approved for payment for unknow reasons; invoice will be brought before the Commission for payment approval. 9/16 - PW Director has been in communication with FDOT and identified a viable location in the median on the east side of 79th st causeway, however the location will require modification of the design in order to meet required min. offset distance requirement. Entryway sign projects will be on October 2025 Regular Village Commission meeting agenda as a discussion item. Capital Improvement/Public Works Project Status Report 154,994.00$ The North Bay Village Commission previously adopted the new NBV Brand Guide. Based on the approved Brand Guide, the Village would like to develop plans for the entry sign on Kennedy Causeway / NE 79th Street. This phase of work will include one sign for Westbound traffic located at the east end of Treasure Island, on the north swale north of the bridge where other improvements are planned as part of the North Plaza project Cost ($) 154,994.00$ 9

10/3/2025 Project No: TT-2208-01.00 - Entrance Way West Sign NBV Project Manager: Jean Lilavois Design/EOR: Stantec CEI: N/A Contractor: N/A Project Overview: Project Budget: Contract WO No. Design and Eng: Stantec Const CEI: Not Selected Const Contractor: Not Selected Grants, Other Outside Funding Project Schedule: Status Design: TBD Ongoing Construction: TBD N/A Current Status: Next Steps Project is on hold until further notice. Accomplishments 6/5 – Virtual meeting with FDOT took place. Current status is that approval from Miami is needed to allow NBV to submit for a sign permit with the City of Miami. 6/13 – Manager has placed this project on hold until a path forward is established for the east entry sign since the sign project is for both. 9/16 - PW Director has been in communication with FDOT and identified a viable location in the median, however the location will require modification of the design in order to meet required min. offset distance requirement. Entryway sign projects will be on October 2025 Regular Village Commission meeting agenda as a discussion item. Capital Improvement/Public Works Project Status Report 19,919.00$ In 2022, the North Bay Village Commission approved the NBV Brand Guide, which serves as a blueprint for developing design concepts for an entry sign along Kennedy Causeway / NE 79th Street. The Village now seeks to initiate a new phase of this branding and signage initiative for the development and installation of a west entry sign. In alignment with the NBV Brand Guide, plans for an eastbound sign at the southeast corner of 79th Street and Pelican Harbor Drive are set to be realized within FDOT right-of-way. Cost ($) 19,919.00$ 10

10/3/2025 Project No: RP-2206-01.00 - Civic Park Recreational Improvements NBV Project Manager: Roger Hogg Design/EOR: EAC Consulting CEI: Not Selected Contractor: Not Selected Project Overview: Project Budget: Contract WO No. Design and Eng: EAC Consulting Const EOR: Const CEI: Const Contractor: Contingency Project Schedule: Status Grants, Other Outside Funding Design: Complete DA-NBV-21-264 - FIND Construction: Pending/Postponed LW736 - FDEP Current Status: Next Steps Accomplishments Project design is 100% completed, however there issues with conflicts with the Harbor Island Phase 1 stormwater improvements, as well as apparent inadequacies with the designed seawall that will likely need improvements. Project is on hold indefinitely due to inadequate/loss of funding. Capital Improvement/Public Works Project Status Report 3,867,653.00$ This project is for the construction of the North Bay Village Civic pocket park on East Drive. It aims to construct a boating dock, picnic area with pavilion, nature trail with signage, lighting, landscaping and a bike rack. Cost ($) 61,003.00$ 96,779.00$ 322,597.00$ 3,225,975.00$ 161,299.00$ 60,000.00$ 850,000.00$ 11

10/3/2025 Project No: PB-1804-01.00 - New Village Hall Complex NBV Project Manager: Steven Buckland Design/EOR: EAC Consulting CEI: Not Selected Contractor: Not Selected Project Overview: Project Budget: Contract WO No. Planning Design and Eng: EAC Consulting Const Project Management: EXP Const Contractor: Const. Permitting: Contingency Project Schedule: Status Grants, Other Outside Funding Design: Complete Contributions Construction: Out for Bid Current Status: Next Steps Accomplishments 8/12 – Manager responded to 8/11 Tony Recio email stating that in the letter, a time requirement should be clearly stated that the Island Walk is required to be completed within 5 years of the completion of the Tennis Courts to Parking Lot Project. 8/15 – Cycle #1 County review completed on 08-12-25. 9/2 – RFQ evaluation completed and the responders have been short-listed. The list of recommended contractors will be presented for Commission approval on 9/16. PLEASE NOTE WE ARE NOW UNDER A CONE OF SILENCE FOR THE REQUEST FOR QUALIFICATIONS. 1. Solicitation of construction contractor is ongoing. Capital Improvement/Public Works Project Status Report 57,709,805.00$ Permitting, Design and Construction of a new Fire Station and Village Hall Complex to house North Bay Village's Government Administration, Police and Emergency Services. Cost ($) 3,052,032.00$ 462,395.00$ 49,873,701.00$ 1,080,000.00$ 3,241,677.00$ 49,685,256.00$ 12

10/3/2025 Project No: PB-1804-01.00 - New Community Center NBV Project Manager: Steven Buckland Design/EOR: PFL CEI: PFL Contractor: PFL - MG3 Project Overview: Project Budget: Contract WO No. Site Demolition (Chin Diesel) 9021 Soil Management (Kimley Horn) 2023-005 001 Construction - PFL Reimbursement NBVConstruction Contribution Construction - Third Floor Project Schedule: Status Grants, Other Outside Funding Design: Complete Contributions Construction: Ongoing Current Status: Next Steps Accomplishments 7/31 – On 7/24/25 Miami-Dade County RER/DERM certified that the new Community Center has adequate sewer treatment and transmission capacity to move forward with construction. 8/1 – On 7/31 MG3 loaded the 1st Phase Construction Plans for the Community Center Building Shell permit in the NBV Building Department system for review. The plans have been distributed to all Disciplines for review and comments. 9/11 - Foundation Permit BLDC-000201-2025 has been issued. Construction is ongoing. Capital Improvement/Public Works Project Status Report 7,432,693.00$ Permitting, Design and Construction of a new community center in partnership with PFL. Cost ($) 100,000.00$ 78,624.00$ 3,954,069.00$ 1,200,000.00$ 2,100,000.00$ 5,300,370.00$ 13

10/3/2025 Project No: SW-2301-01.00 - North Bay Island Stormwater Improvements NBV Project Manager: Roger Hogg/Christina Viala Design/EOR: Parsons (formerly BCC Engineering) CEI: N/A Contractor: David Mancini & Sons (formal award pending) Project Overview: Project Budget: (PHASE 1) Contract WO No. Design 2023-005 007 Construction CEI Construction EOR Construction Contractor Grants, Other Outside Funding Project Schedule: Status C2108 - FDEP Design: Complete 22SRP53 - FDEP Construction (Phase 1): TBD Pending Current Status (Phase 1): Next Steps Accomplishments Phase 1 construction contractor has been selected and award is pending 9/12 - Agenda item to enter into formal negotiations with Mr. Singh for the subject property needed for the project is on the 9/16 commission meeting agenda. 9/16 - Above agenda item was approved on consent. CIP Dept is actively engaging with consultant pool to procure CEI services for the project (selection scheduled for October 1) 10/3 - Firm selected for CEI services, negotiations currently ongoing. Major stormwater/infrastructure workshop scheduled for November 13, 2025. 1. Acquire property equipment/maintenance easement 2. Negotiate/procure CEI and EOR services 3. Formally award construction contract. 11,623,151.00$ 600,000.00$ Capital Improvement/Public Works Project Status Report 13,337,963.00$ The stormwater improvements for NBI have been broken down into four (4) phases. The first two (2) phases focus on implementing the two (2) pump station systems, including pollution control structures, trash racks, filter elements, energy dissipator structures and other appurtenances. The last two (2) phases consist of the remaining upstream improvements which will interconnect the remainder of the Island and add needed capture and conveyance capacity for the overall system. Each phase includes a portion of the proposed roadway raising for each respective area. Cost ($) 293,999.00$ 241,340.00$ 1,179,473.00$ 1,500,000.00$ 14

10/3/2025 Project No: SW-2301-02.00 - Treasure Island Stormwater Improvements NBV Project Manager: Roger Hogg/Christina Viala Design/EOR: EXP (Phase 1); Chen Moore and Associates (Phase 2) CEI: N/A Contractor: N/A Project Overview: Project Budget: PHASE 1 & 2 Contract WO No. Design (Phase 1) 2023-005 EXP2401 Design (Phase 2) 2023-005 CMA2401 Construction Phase 1 - EOR Construction Phase 1- CEI Services Construction Phase 1- Contractor Construction Phase 2- EOR Project Schedule: Status Construction Phase 2- CEI Services Design: Q2 2026 Ongoing Construction Phase 2- Contractor Construction: TBD Pending Current Status: Next Steps/Challenges Accomplishments Phase 1 (EXP) Design is 60% complete. Phase 2 (Chen Moore) design is 30% complete. 8/29 - NBV submitted a formal notice of interest to apply for a FDEM Flood Mitigation Grant in support of this project. 10/3 - Major stormwater/infrastructure workshop scheduled for November 13, 2025. Phase 1 (EXP) 1. Easement acquisition needed for proposed outfall and elevated power and control panel equipment at the corner of W Treasure and N Treasure Drive. 2. Traffic features (i.e. bulb outs) interfere with proposed drainage flow paths. EXP is recommending removing or otherwise reconfiguring some or all of these obstructions to maximize drainage. 3. EXP needs clarity on the proposed road elevations for this design. 4. Tidal survey will be required prior to submittal for permitting Phase 2 (Chen Moore and Associates) Road elevations and proposed outfall locations are both major impediments to progress of the design. Consultant is unable to proceed without a satisfactory resolution to these issues. 20,533,975.09$ 2,053,397.51$ Capital Improvement/Public Works Project Status Report 49,440,184.49$ The stormwater improvements for TI have been broken down into six (6) phases. The first three (3) phases focus on implementing the three (3) pump station systems, including pollution control structures, trash racks, filter elements, energy dissipator structures and other appurtenances. The last three (3) phases consist of the remaining upstream improvements which will interconnect the remainder of the Island and added needed capture and conveyance capacity for the overall system. Each phase includes a portion of the proposed roadway raising for each respective area. Cost ($) 1,747,921.06$ 1,916,819.27$ 406,739.14$ 2,033,695.72$ 20,336,957.20$ 410,679.50$ 15

10/3/2025 Project No: SW-2301-03.00 - Harbor Island Stormwater Improvements NBV Project Manager: Roger Hogg/Christina Viala Design/EOR: Ribbeck Engineering (Phase 1) CEI: N/A Contractor: N/A Project Overview: Project Budget: Phase 1 Contract WO No. Design (Phase 1) 2023-005 RIB2401 Construction (EOR) Construction (CEI) Construction- Contractor Grants, Other Outside Funding Project Schedule: Status Design (Phase 1): Q2 2026 Ongoing Construction: TBD Pending Current Status: Next Steps Accomplishments 1. Review and comment on the work order proposal for Harbor Island Phases 2 and 3 stormwater improvements. 2. Confirm pump station emergency operation run time 3. Authorize proposed FPL pad/transformer location in right-of way 4. Request work order proposal/change order for design of the seawall @ the proposed Civic Park location 8/20 - NBV team met with design consultants. Phase 1 design is currently at 60% completion. 10/3 - Major stormwater/infrastructure workshop scheduled for November 13, 2025. Capital Improvement/Public Works Project Status Report 10,283,462.00$ The stormwater improvements for HI have been broken down into three (3) phases. The first phase focuses on implementing the new pump station system, including pollution control structures, trash racks, filter elements, energy dissipator structures and other appurtenances. The last two (2) phases consist of the remaining upstream improvements which will interconnect the remainder of the Island and added needed capture and conveyance capacity for the overall system. Cost ($) 660,511.00$ 171,838.00$ 859,192.00$ 8,591,921.00$ 16

10/3/2025 Pr

Official record

ArtifactSourceState
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Recording and media

Coverage and corrections

Records considered

  • Financial Advisory Board — Minutes
  • Financial Advisory Board
  • Financial Advisory Board — Packet

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.