POLISCOPE

The public record

LINCOLN (SACRAMENTO COUNTY)Minutes linked · not read herePartial coverage

Planning Commission Regular Meeting

Wednesday, June 17, 2026 · Government meeting record

The 30-second read

Record incomplete

Planning Commission Regular Meeting

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are linked at the source, but their text is not held here.

The publisher links minutes or an action agenda for this meeting, but its text is not held here. Nothing on this page is presented as a decision; open the linked record for outcomes.

Record text

No transcript is held for this meeting. Recording: Watch video

PLANNING COMMISSION REGULAR MEETING June 17, 2026 CITY OF LINCOLN PLANNING COMMISSION REGULAR MEETING June 17, 2026 Peter Gilbert Michele Hutchinson Tim Jackson Eric Johnson, Chair Jerry Johnson Tony Manning, Vice Chair AS A COURTESY, PLEASE TURN OFF ALL CELL PHONES & ELECTRONIC DEVICES DURING THE MEETING PLANNING COMMISSION 6:00 PM City Hall Council Chambers, 3rd Floor 600 Sixth Street Lincoln, CA 95648 OR VIRTUAL Meeting can be viewed on the City's YouTube Channel (accessed on the City's website) or WAVE Channel 18 and attended virtually via Zoom. Please join the Zoom Webinar from your computer, tablet or smartphone. You may participate in live public comment through this platform. Registration URL copy and paste this link: https://us06web.zoom.us/webinar/register/WN_1ZYwZYxjQQa7mmALR2w-ag. You can also dial in using your phone - US: +1 (669) 900-6833 and use *9 to raise your hand to speak. Webinar ID: 882 5285 9306 600 Sixth Street ◆ Lincoln, CA 95648 ◆ www.lincolnca.gov ◆ 916-434-2400

1. CALL TO ORDER 2. ROLL CALL 3. PLEDGE OF ALLEGIANCE 4. AGENDA MODIFICATIONS 5. INFORMATION ITEMS AND DISCLOSURES 6. PUBLIC COMMENT ON NON-AGENDA ITEMS WITHIN THE SUBJECT MATTER JURISDICTION OF THE COMMISSION *All speakers' time will be limited to three (3) minutes, unless extended by the Chairperson. All comments or questions should be addressed to the Chairperson and in most cases, the Commission is prohibited from discussing or taking action on any item not appearing on the posted agenda, but may engage in brief discussion, provide direction to City staff, or schedule items for future meetings. 7. CONSENT 8. PUBLIC HEARINGS CITY OF LINCOLN STAFF - Nita Wracker, Comm. Dev. Director Doug White, City Attorney Rommel Pabalinas, Comm. Dev. Planning Manager SP Mann, Senior Engineer Efren Sanchez, Senior Planner Mikaela Noble, Associate Planner Thomas Cruickshank, Associate Planner Eugenie Guadron, PC Secretary 7.A Approval of Meeting Minutes of May 20, 2026 Regular Planning Commission Meeting.(Eugenie Guadron) 8.A Windsor Cove Project (Mikaela Noble) 1. Determine that the project is exempt from the California Environmental Quality Act (CEQA). 2. Adopt a Resolution recommending City Council approval of the amendments to the Village 5 General Development Plan to include development standards for the project area (Area J-2). 3. Adopt a Resolution recommending City Council approval of a Large Lot Tentative Subdivision Map for the proposed Windsor Cove Project. 4. Adopt a Resolution recommending City Council approval of a Small Lot Tentative Subdivision Map for the proposed Windsor Cove Project. 8.B Village 7B Amendments Project (Mikaela Noble) 1. Adopt Resolution recommending City Council adopt the proposed Addendum and updated Mitigation Monitoring Plans (MMPs) for the certified 2010 Village 7 Specific Plan Environmental Impact Report (EIR) (SCH No. 2005062001) and the 2017 Village 5 Specific Plan EIR (SCH No. 2014052071). 2. Adopt a Resolution recommending City Council approval of the Village 7 Specific Plan Amendment. 3. Adopt a Resolution recommending City Council approval of the Village 5 Specific Plan Amendment. 4. Adopt a Resolution recommending City Council approval of the Village 7 600 Sixth Street ◆ Lincoln, CA 95648 ◆ www.lincolnca.gov ◆ 916-434-2400

9. GENERAL BUSINESS 10. INFORMATIONAL ITEMS FROM STAFF/DIRECTOR REPORTS 11. COMMISSIONER COMMENTS 12. ADJOURNMENT General Development Plan Amendment. 5. Adopt a Resolution recommending City Council approval of the Village 5 General Development Plan Amendment. 6. Adopt a Resolution recommending City Council authorize the submittal of an application to the Placer County Local Area Formation Commission (LAFCo) for the formal annexation of a portion of the adopted Village 5 Specific Plan area and a portion of the adopted Village 7 Specific Plan area. 10.A Planning Entitlement Tracker Discussion CITIZENS ADDRESSING THE COMMISSION Citizens may address the Planning Commission on any item on the agenda when the item is considered. Citizens wishing to speak may request recognition from the presiding officer by raising his or her hand and stepping to the podium when requested to do so. An opportunity will be provided for citizens wishing to speak on non-agenda items to similarly request recognition and address the Planning Commission. Three-minute time limits may be placed on citizen comments. APPEALS If you wish to appeal a decision of the Planning Commission, you must have participated in the Planning Commission review of the item by submitting written testimony or oral testimony at the public hearing. The appeal is limited to those issues raised at the Planning Commission meeting. APPEAL PERIOD There is a 10-day appeal period for most Planning Commission decisions. Appeals can be made by any interested party upon payment of the appropriate fee and submittal of the appeal request to the Lincoln City Clerk or the Planning Department, 600 Sixth Street, Lincoln. WRITTEN MATERIAL INTRODUCED INTO THE RECORD Any citizen wishing to introduce written material into the record at the hearing on any item is requested to provide a copy of the written material to the Planning Department prior to the hearing date, so that the material may be distributed to the Planning Commission prior to the hearing. 600 Sixth Street ◆ Lincoln, CA 95648 ◆ www.lincolnca.gov ◆ 916-434-2400

NOTE: Materials related to an item on this Agenda submitted to the Council/Redevelopment Successor Agency after distribution of the agenda packet are available for public inspection in the City Clerk's office at 600 Sixth Street, Lincoln, CA during normal business hours. Such documents are also available on the City of Lincoln's website at https://www.lincolnca.gov/ subject to staff's availability to post the documents before the meeting. In compliance with the American with Disabilities Act, the City will provide special assistance for disabled members of the public. The meeting room is wheelchair accessible and disabled parking is available. If you have a disability and need a disability-related modification or accommodation to participate in the meeting, please contact the City Clerk's Office at (916) 434-2490. As a courtesy, please make every effort to inform the Clerk of your needs at least 24 hours prior to the meeting so the City may make reasonable arrangements to ensure accessibility to this meeting. Pursuant to applicable laws and regulations, including without limitation, California Government Code Section 65009 and/or California Public Resources Code Section 21177, if you wish to challenge in court any of the above decisions (including any action regarding planning, zoning and/or environmental decisions), you may be limited to raising only those issues you or someone else raised at the public hearing(s) described in this notice/agenda, or in written correspondence delivered to the City at, or prior to, the public hearing. Levine Act Provisions -- The Levine Act requires a party (or the party's agent(s)) to a proceeding before the City of Lincoln that involves any action or consideration to their contract, license, permit, or other entitlement for use, to disclose any campaign contribution made to City elected or appointed officer totaling more than $500 within the 12 months before the City decision. This includes contributions to Councilmembers, Planning Commissioners and members of other City boards and commissions. 600 Sixth Street ◆ Lincoln, CA 95648 ◆ www.lincolnca.gov ◆ 916-434-2400

Showing the first 24,000 of 3,271,422 characters. The full document is at the source.

PLANNING COMMISSION REGULAR MEETING June 17, 2026 CITY OF LINCOLN PLANNING COMMISSION REGULAR MEETING June 17, 2026 Peter Gilbert Michele Hutchinson Tim Jackson Eric Johnson, Chair Jerry Johnson Tony Manning, Vice Chair AS A COURTESY, PLEASE TURN OFF ALL CELL PHONES & ELECTRONIC DEVICES DURING THE MEETING PLANNING COMMISSION 6:00 PM City Hall Council Chambers, 3rd Floor 600 Sixth Street Lincoln, CA 95648 OR VIRTUAL Meeting can be viewed on the City's YouTube Channel (accessed on the City's website) or WAVE Channel 18 and attended virtually via Zoom. Please join the Zoom Webinar from your computer, tablet or smartphone. You may participate in live public comment through this platform. Registration URL copy and paste this link: https://us06web.zoom.us/webinar/register/WN_1ZYwZYxjQQa7mmALR2w-ag. You can also dial in using your phone - US: +1 (669) 900-6833 and use *9 to raise your hand to speak. Webinar ID: 882 5285 9306 600 Sixth Street ◆ Lincoln, CA 95648 ◆ www.lincolnca.gov ◆ 916-434-2400 1

1. CALL TO ORDER 2. ROLL CALL 3. PLEDGE OF ALLEGIANCE 4. AGENDA MODIFICATIONS 5. INFORMATION ITEMS AND DISCLOSURES 6. PUBLIC COMMENT ON NON-AGENDA ITEMS WITHIN THE SUBJECT MATTER JURISDICTION OF THE COMMISSION *All speakers' time will be limited to three (3) minutes, unless extended by the Chairperson. All comments or questions should be addressed to the Chairperson and in most cases, the Commission is prohibited from discussing or taking action on any item not appearing on the posted agenda, but may engage in brief discussion, provide direction to City staff, or schedule items for future meetings. 7. CONSENT 8. PUBLIC HEARINGS CITY OF LINCOLN STAFF - Nita Wracker, Comm. Dev. Director Doug White, City Attorney Rommel Pabalinas, Comm. Dev. Planning Manager SP Mann, Senior Engineer Efren Sanchez, Senior Planner Mikaela Noble, Associate Planner Thomas Cruickshank, Associate Planner Eugenie Guadron, PC Secretary 7.A Approval of Meeting Minutes of May 20, 2026 Regular Planning Commission Meeting.(Eugenie Guadron) 8.A Windsor Cove Project (Mikaela Noble) 1. Determine that the project is exempt from the California Environmental Quality Act (CEQA). 2. Adopt a Resolution recommending City Council approval of the amendments to the Village 5 General Development Plan to include development standards for the project area (Area J-2). 3. Adopt a Resolution recommending City Council approval of a Large Lot Tentative Subdivision Map for the proposed Windsor Cove Project. 4. Adopt a Resolution recommending City Council approval of a Small Lot Tentative Subdivision Map for the proposed Windsor Cove Project. 8.B Village 7B Amendments Project (Mikaela Noble) 1. Adopt Resolution recommending City Council adopt the proposed Addendum and updated Mitigation Monitoring Plans (MMPs) for the certified 2010 Village 7 Specific Plan Environmental Impact Report (EIR) (SCH No. 2005062001) and the 2017 Village 5 Specific Plan EIR (SCH No. 2014052071). 2. Adopt a Resolution recommending City Council approval of the Village 7 Specific Plan Amendment. 3. Adopt a Resolution recommending City Council approval of the Village 5 Specific Plan Amendment. 4. Adopt a Resolution recommending City Council approval of the Village 7 600 Sixth Street ◆ Lincoln, CA 95648 ◆ www.lincolnca.gov ◆ 916-434-2400 2

9. GENERAL BUSINESS 10. INFORMATIONAL ITEMS FROM STAFF/DIRECTOR REPORTS 11. COMMISSIONER COMMENTS 12. ADJOURNMENT General Development Plan Amendment. 5. Adopt a Resolution recommending City Council approval of the Village 5 General Development Plan Amendment. 6. Adopt a Resolution recommending City Council authorize the submittal of an application to the Placer County Local Area Formation Commission (LAFCo) for the formal annexation of a portion of the adopted Village 5 Specific Plan area and a portion of the adopted Village 7 Specific Plan area. 10.A Planning Entitlement Tracker Discussion CITIZENS ADDRESSING THE COMMISSION Citizens may address the Planning Commission on any item on the agenda when the item is considered. Citizens wishing to speak may request recognition from the presiding officer by raising his or her hand and stepping to the podium when requested to do so. An opportunity will be provided for citizens wishing to speak on non-agenda items to similarly request recognition and address the Planning Commission. Three-minute time limits may be placed on citizen comments. APPEALS If you wish to appeal a decision of the Planning Commission, you must have participated in the Planning Commission review of the item by submitting written testimony or oral testimony at the public hearing. The appeal is limited to those issues raised at the Planning Commission meeting. APPEAL PERIOD There is a 10-day appeal period for most Planning Commission decisions. Appeals can be made by any interested party upon payment of the appropriate fee and submittal of the appeal request to the Lincoln City Clerk or the Planning Department, 600 Sixth Street, Lincoln. WRITTEN MATERIAL INTRODUCED INTO THE RECORD Any citizen wishing to introduce written material into the record at the hearing on any item is requested to provide a copy of the written material to the Planning Department prior to the hearing date, so that the material may be distributed to the Planning Commission prior to the hearing. 600 Sixth Street ◆ Lincoln, CA 95648 ◆ www.lincolnca.gov ◆ 916-434-2400 3

NOTE: Materials related to an item on this Agenda submitted to the Council/Redevelopment Successor Agency after distribution of the agenda packet are available for public inspection in the City Clerk's office at 600 Sixth Street, Lincoln, CA during normal business hours. Such documents are also available on the City of Lincoln's website at https://www.lincolnca.gov/ subject to staff's availability to post the documents before the meeting. In compliance with the American with Disabilities Act, the City will provide special assistance for disabled members of the public. The meeting room is wheelchair accessible and disabled parking is available. If you have a disability and need a disability-related modification or accommodation to participate in the meeting, please contact the City Clerk's Office at (916) 434-2490. As a courtesy, please make every effort to inform the Clerk of your needs at least 24 hours prior to the meeting so the City may make reasonable arrangements to ensure accessibility to this meeting. Pursuant to applicable laws and regulations, including without limitation, California Government Code Section 65009 and/or California Public Resources Code Section 21177, if you wish to challenge in court any of the above decisions (including any action regarding planning, zoning and/or environmental decisions), you may be limited to raising only those issues you or someone else raised at the public hearing(s) described in this notice/agenda, or in written correspondence delivered to the City at, or prior to, the public hearing. Levine Act Provisions -- The Levine Act requires a party (or the party's agent(s)) to a proceeding before the City of Lincoln that involves any action or consideration to their contract, license, permit, or other entitlement for use, to disclose any campaign contribution made to City elected or appointed officer totaling more than $500 within the 12 months before the City decision. This includes contributions to Councilmembers, Planning Commissioners and members of other City boards and commissions. 600 Sixth Street ◆ Lincoln, CA 95648 ◆ www.lincolnca.gov ◆ 916-434-2400 4

SUBJECT: Approval of Meeting Minutes of May 20, 2026 Regular Planning Commission Meeting. (Eugenie Guadron) SUBMITTED BY: Eugenie Guadron DEPARTMENT: Community Development DATE: June 17, 2026 Item Number 7.A ATTACHMENTS: 7.A. Draft Meeting Minutes 05.20.2026 STAFF REPORT 5

MINUTES - DRAFT CITY OF LINCOLN PLANNING COMMISSION Regular Meeting May 20, 2026 1. CALL TO ORDER –Chair Eric Johnson called the meeting to order at 6:00 P.M. 2. ROLL CALL – Commissioners present: Gilbert, Hutchinson, Jackson, E.Johnson, J.Johnson. Commissioner Manning was absent with notification. Various Staff and Public were also in attendance in person. Note: One (1) Commissioner position is vacant 3. PLEDGE OF ALLEGIANCE was led by Commissioner Jerry Johnson. 4. AGENDA MODIFICATION – None. 5. PUBLIC COMMENT ON NON-AGENDA ITEMS WITHIN THE SUBJECT MATTER JURISDICTION OF THE COMMISSION – None. 6. INFORMATION ITEMS AND DISCLOSURES – None. 7. CONSENT – 7.A Approval of Meeting Minutes of April 15, 2026 Regular Planning Commission Meeting (Eugenie Guadron) Motioned (Offered by Commissioner Gilbert, seconded by Commissioner Hutchinson to approve the April 15, 2026 meeting minutes. Unanimously Approved by voice call vote with no opposition (5-0-0-1). 8. PUBLIC HEARINGS – 8.A Consideration of a Design Review application for the construction and operation of a new steel building measuring 100 feet x 135 feet to be used as a storage hangar at the Lincoln Regional Airport know as Lincoln Skyways Hanger 1. Adopt the proposed Addendum to the certified 2008 Lincoln Regional Airport Master Plan Environmental Impact Report (EIR) (State Clearinghouse (SCH) # 2007062027) pursuant to the California Environmental Quality Act (CEQA) Section 15162. Additionally, the project qualifies for a Categorical Exclusion determination in accordance with the National Environmental Policy Act (NEPA). No additional environmental analysis is necessary. 2. Adopt a Resolution approving the Design Review application for Lincoln Skyways Hangar (PLN25-00025) with project specific and typical conditions of approval. Rommel Pabalinas, Planning Manager, presented to the Commission, including the PowerPoint presentation, made a part of these minutes by mention thereof. The Commission discussed the project with Manager Pabalinas and Byron Maynard (applicant) responding to questions and comments. Chair E.Johnson opened and closed the public hearing with no comments at 6:17 P.M. Motioned (Offered by Commissioner Gilbert, seconded by Commissioner J.Johnson to Adopt the proposed Addendum to the certified 2008 Lincoln Regional Airport Master Plan Environmental Impact Report and Adopt a Resolution Approving the Design Review application for Lincoln Skyways Hangar with project specific and typical conditions of approval. Approved by the following roll call vote: Gilbert - Aye, J.Johnson – Aye, Hutchinson – Aye, Jackson – Aye and E.Johnson – Aye (5-0-0-1). 6

PC 05/20/26 Minutes - DRAFT 9. GENERAL BUSINESS – 9.A Open Space Discussion Sean Scully, City Manager, provided information to the Commission and discussion took place. No action was taken. 10. INFORMATIONAL ITEMS FROM STAFF/ DIRECTOR REPORTS. 10. A. Besides the Planning Entitlement Tracker included in the agenda, Community Development Director Nita Wracker briefly commented on an update to the Master Fee Schedule which will be brought to City Council for approval at the next City Council meeting. Community Development are continuing to remain a full cost recovery department. 11. COMMISSIONER COMMENTS – There were none. Joshua Varinsky, White Brenner – representative as City Attorney introduced himself. 12. ADJOURNMENT – Chair E.Johnson adjourned the meeting at 7:07 P.M. Submitted by: Eugenie Guadron, Planning Commission Secretary 7

8.A. Lincoln Skyways Hangar 8

Lincoln Skyways Hangar Building (PLN25-00025) Agenda Item 8A /Planning Commission/May 20, 2026/Mel Pabalinas, Planning Manager 9

Project Summary • Design Review Permit • Construction and operation of a 13,500 square feet metal hangar building • Within Lincoln Regional Airport (owned and operated by City of Lincoln) • Applicant: BPM Rentals (c/o Byron Maynard) 10

Project Location Map- Lincoln Regional Airport Project Site - Project site is within the City of Lincoln Regional Airport - Subject to the Lincoln Regional Airport Master Plan (LRAMP) 11

Detailed Project Location Map- Lincoln Regional Airport - Located on a portion of 3.5-acre parcel - Industrial-Planned Development land use and zoning designations - Surrounded by properties with existing hangar buildings and supporting airport improvements 12

Project Site Photos 13

Project Details- Project Area - Project Area: 0.97 acre would be impacted • Includes: Building Pad, Connection to existing utility service lines, Drainage, Staging area for construction -Access off Flightline Drive -Lease area (green outline): 200 feet x 150 feet - Hangar Building area (blue outline: 135 feet x 100 feet) 14

Project Details- Hangar Building - Hangar Building area 135 feet x 100 feet - Divided into to (2) hangar spaces; each space approximately 67 feet x 100 feet - Served by public utilities (water, sewer, drainage) 15

Project Details- Hangar Building - Maximum building height: 32 feet - Match exterior of existing hangar buildings Building Rendering 16

Analysis • Project is consistent with applicable: −General Plan policies −Zoning Ordinance development standards −Lincoln Regional Airport Master Plan (LRAMP) requirements • Reviewed and recommended for approval by City of Lincoln Design Review Board (November 25, 2025) • Environmental Conformance Determination −CEQA: Addendum to LRAMP EIR prepared −NEPA: Project qualifies for Categorical Exclusion 17

Recommendations • That the Planning Commission: 1) Adopt the proposed Addendum to the 2008 Lincoln Regional Airport Master Plan EIR pursuant to CEQA and deem the project to qualify for Categorical Exclusion pursuant NEPA 2) Adopt Resolution approving Design Review application (PLN25-00025) for the proposed Lincoln Skyways Hangar subject to conditions of approval 18

End of Presentation 19

9.A. Open Space 20

6 5 East Ave 1st St Ea st Joi ner P kw y McBean Park Dr L a k e s ide Dr Venture Dr I n g ra m Pk w y 7th St Fo othi lls Blv d N Twe l ve B ridges Dr F e r r a r i Ran c h R d S tone r id g e B lvd C a led o n C i r D e l W e b b Blvd S pr i n g V a l l e y Pk w y J o i ner Pk w y L i n c oln Blv d Nicolaus Rd O St Sun C i ty Bl v d Industrial Ave 9th St H S t 2 3 4 6 7 8 10 12 13 5 9 11 10 1 Miles Disclaimer: This map is provided as a guide to City facilities and routes within the City of Lincoln, and is not intended as a guarantee or warranty of the safety, condition, suitability or fitness of the facilities and routes shown on the map. Conditions of road, bikeway, points of interest and park facilities are subject to changes which can render them unusable or unsafe at any time. Any person using these facilities and routes is responsible to determine its suitability and whether the user’s skill level is appropriate for the facility or route. Legend Preserves Etiquette Open space preserves are located throughout the City of Lincoln and provide homes for many plants and animals. Preserves are unique in that they have native plant communities that have taken a long time to adapt and become established. These plant communities help grow and maintain the animal populations which include mallards, red-winged hawks, frogs, jackrabbits, and beavers. • All dogs must be on a leash while in public spaces; including open space preserve areas. • While in preserve areas, pedestrians, pets, and bicyclist should stay on designated trails. • Do not pick flowers or other vegetation from open space preserves. For more information visit https:// www.lincolnca.gov/parks- recreation-and-activities/ parks-fields-and-trails/ trails-and-open-spaces/. Art and Culture School Post Office Fire Station Police Station Library City Facility Open Space Preserve21

SUBJECT: Windsor Cove Project (Mikaela Noble) SUBMITTED BY: Mikaela Noble DEPARTMENT: Community Development DATE: June 17, 2026 Item Number 8.A STAFF RECOMMENDATION: Staff recommends that the Planning Commission conduct a public hearing, consider the information contained in the staff report as well as the testimony of the public and take the following actions: 1. Determine that the project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15182 (Projects Pursuant to a Specific Plan), because the residential project is undertaken pursuant to and in conformity with a specific plan (e.g., Village 5 Specific Plan) adopted under Government Code Title 7, Division 1, Chapter 3, Article 8; and, pursuant to CEQA Guidelines Section 15168(c)(2), that the project is within the scope of the Program EIR and that no subsequent environmental review is required under CEQA Guidelines Section 15162. Therefore, no new environmental document is required. 2. Adopt a Resolution recommending City Council approval of the amendments to the Village 5 General Development Plan to include development standards for the project area (Area J-2). 3. Adopt a Resolution recommending City Council approval of a Large Lot Tentative Subdivision Map for the proposed Windsor Cove Project. 4. Adopt a Resolution recommending City Council approval of a Small Lot Tentative Subdivision Map for the proposed Windsor Cove Project. BACKGROUND/INTRODUCTION: The Windsor Cove Project (project) is located within the Village 5 Specific Plan (see Attachments 1 and 2). The Village 5 Specific Plan (Specific Plan) and General Development Plan (GDP) provides direction for development of 2,737 acres of land within the City of Lincoln (City). The Specific Plan identifies land use and zoning designations for the plan area, the circulation system, utilities systems, parks and open space, and other planning considerations. In addition, the Specific Plan includes a wide range of goals and policies, design guidelines and development standards that will guide development within Village 5. The following is a brief timeline for the Village 5 Specific Plan and the Windsor Cove Project: December 12, 2017: City adopts the Specific Plan and General Development Plan, certifies an Environmental Impact Report (EIR) (SCH No. 2014052071) and adopts STAFF REPORT 22

Mitigation Monitoring Plan. September 7, 2018: Filing of application for Windsor Cove Project. September 14, 2021: City certifies partially recirculated EIR, adopts revised Mitigation Monitoring Plan, initiates annexation proceedings. February 2023: City approves Addendum to Village 5 EIR to remove mitigation measures that were superseded by adoption of Placer County Conservation Program (PCCP). September 13, 2023: Placer Local Area Formation Commission (LAFCo) approved the annexation of the entire Village 5 Specific Plan into the City. November 8, 2023: Following the procedural protest vote conducted by Placer LAFCo Executive Officer, the Village 5 Specific Plan annexation approval was reversed and officially terminated. January 2025: Following the unsuccessful annexation of Village 5 Specific Plan, a reduced portion of the plan area – known as Village 5A, consisting of 2,721 acres – was formally approved for annexation into the City. Village 5A contemplates development of approximately 5,700 dwelling units and 3.2 million square feet of commercial. Approximately 2,040 acres of the adopted Village 5 Specific Plan area were not included in that annexation due to opposition of the property owners. January 2025 to current: Since the annexation of Village 5A, no development has occurred within the plan area, although on-going master planning for major backbone infrastructure has been initiated in support of formal development entitlement application submittals. Project Location and Description The project site is located on approximately 90 acres in the City of Lincoln northeast of the Moore Road/Fiddyment Road intersection within the annexed portion of the Village 5 Specific Plan on Assessor’s Parcel Number 021-490-002-000 (see Attachments 1 through 3). The project site is bounded by Auburn Ravine and undeveloped land to the north and west; Moore Road and the Lincoln Wastewater Treatment Facility to the south; and existing homesteads within Placer County to the east. The Village 5 Specific Plan identifies that a new North-South arterial roadway – referred to as New Nelson Lane – will be constructed along the project site’s western property boundary. New Nelson Lane will provide connectivity between State Route (SR) 65 to the north and Fiddyment Road and Moore Road to the south. There are a number of existing structures on the project site associated with an inhabited rural residence, including a large metal outbuilding, sheds, hardscape and animal enclosures. The current inhabitants are aware that the proposed project would require removal during site preparation. Land Use Designations and Zoning The project would develop Village 5 Area J-2, which is zoned Village Country Estates (VCE), Village Low Density Residential (VLDR), and Village Open Space Preserve (VOSP). The VCE land use designation is intended for large traditional residential development and accessory structures, with a density range of 1.0 to 2.9 dwelling units per acre (du/ac). The VLDR land use designation is intended for single-family detached homes on standard or alley-loaded lots, with a density range of 3.0 to 5.9 du/ac. The VOSP land use designation is applied to natural resources within the Specific Plan Area including, but not limited to, creeks, seasonal wetlands, vernal pools, and swales. The project is subject to the Placer County Airport Land Use Compatibility Plan (ALUCP) due 23

to its proximity to the Lincoln Regional Airport. The project site is located within ALUCP Zones C1, C2, D and Wildlife Critical Zone (Attachment 4). The project would make minor changes to the boundaries of the land use designations within the project site (Attachment 5 and Table 1), as discussed below. Project Components The applicant has submitted a Small Lot Tentative Subdivision Map to allow for the creation of the specific lots within the project site (Attachment 10, Exhibit C). The subdivision map would create a total of 165 residential lots. Of the residential lots, there would be 52 VCE-zoned lots on 26.39 acres, with a density of 1.97 du/acre. In addition, there would be 113 VLDR- zoned lots on 20.04 acres, with a density of approximately 5.64 units per acre. The subdivision map also includes approximately 33 acres of open space/parks and recreation (8 lots) located in the northern and center portions of the project site. In addition, the applicant has included the option to install an onsite sewer lift station if required by the City to facilitate the project’s sewer system. The proposed park is located along an open space corridor and would connect to the pedestrian network within the project site, which ultimately connects with future pedestrian corridors throughout the Village 5 plan area. Final design of the park and the respective amenities have yet to be determined. The project would be developed with land uses and densities that are consistent with the adopted Specific Plan and General Development Plan. The acreage for each use would vary slightly from the adopted Specific Plan, as shown in Table 1 and Attachment 5. In addition, parcel boundaries would be modified slightly, including the boundaries for VOSP parcels. As a result, there would be an increase in approximately 20 acres of open space, with a corresponding decrease in amount of acreage for residential uses. The layout of the proposed project is shown in Attachment 6. Residential lot sizes would range from 5,233 to 31,564 square feet (SF) depending on zoning, with average lot sizes of approximately 5,900 SF and 19,300 SF for VLDR and VCE lots, respectively. Residential lots would range from 50 to 140 feet in width (most VLDR and VCE lots would be 50 feet and 120 feet wide, respectively) and 100 to 240 feet in depth. The 165 residential lots would be single or two-story single-family residences. The proposed project would be a private, gated community with a homeowner’s association (HOA) that will maintain internal subdivision roads, park facilities and other infrastructure and amenities. Table 1 Land Use Comparison Land Use/Zoning Adopted Specifi

Showing the first 24,000 of 69,188 characters. The full document is at the source.

SPEAKER 1 (COUNCIL): MEMBERS OF THE PUBLIC MAY VIEW AND LISTEN TO THE MEETING TONIGHT ON WAVE CHANNEL 18 AND ONLINE THROUGH THE CITY'S YOUTUBE CHANNEL. SPEAKER 1 (COUNCIL): IF YOU WOULD LIKE TO PARTICIPATE IN LIVE PUBLIC COMMENT VIA THE ZOOM PLATFORM, PLEASE REFER TO THE AGENDA FOR INSTRUCTIONS. SPEAKER 1 (COUNCIL): CHAIR ERIC JOHNSON WILL BEGIN THE MEETING MOMENTARILY. SPEAKER 1 (COUNCIL): I CALL THE JUNE 17TH, 2026 CITY OF LINCOLN PLANNING COMMISSION MEETING TO ORDER. SPEAKER 2 (COUNCIL): SECRETARY, MAY WE HAVE ROLL CALL, PLEASE? SPEAKER 1 (COUNCIL): COMMISSIONER GILBERT? SPEAKER 1 (COUNCIL): HERE. SPEAKER 1 (COUNCIL): COMMISSIONER HUTCHINSON? HERE. SPEAKER 1 (COUNCIL): COMMISSIONER JERRY JOHNSON. SPEAKER 1 (COUNCIL): VICE CHAIR MANNING? HERE. SPEAKER 1 (COUNCIL): CHAIR ERIC JOHNSON? HERE. SPEAKER 1 (COUNCIL): AND COMMISSIONER JACKSON IS ABSENT WITH NOTIFICATION. SPEAKER 1 (COUNCIL): THANK YOU. SPEAKER 1 (COUNCIL): WE'LL MOVE ON TO ITEM NUMBER 3, PLEDGE OF ALLEGIANCE. SPEAKER 2 (COUNCIL): AND WE'LL HAVE, COMMISSIONER HUTCHINSON PLEASE LEAD US IN THE PLEDGE TONIGHT. THANK YOU, IT'LL BE MY HONOR. EVERYONE JOIN ME. SPEAKER 2 (COUNCIL): BYE. COUNCIL: UNITED STATES. SPEAKER 2 (COUNCIL): STATES OF AMERICA. COUNCIL: AND TO THE REPUBLIC FOR WHICH IT STANDS. SPEAKER 2 (COUNCIL): ONE NATION, UNDER GOD, INDIVISIBLE. SPEAKER 3 (COUNCIL): WITH LIBERTY AND JUSTICE FOR ALL. SPEAKER 2 (COUNCIL): THANK YOU. SPEAKER 2 (COUNCIL): ITEM NUMBER 4, AGENDA MODIFICATIONS. DO WE HAVE ANY AGENDA MODIFICATIONS THIS EVENING? SPEAKER 2 (COUNCIL): NO, MR. CHAIR, WE DO NOT. SPEAKER 2 (COUNCIL): THANK YOU. SPEAKER 2 (COUNCIL): SEEING NONE, WE'LL MOVE ON TO ITEM NUMBER 5, INFORMATION ITEMS AND DISCLOSURES. SPEAKER 2 (COUNCIL): DO ANY OF MY FELLOW COMMISSIONERS HAVE ANY INFORMATION ITEMS TO SHARE? SPEAKER 2 (COUNCIL): WE'LL START WITH, COMMISSIONER GILBERT, PLEASE. SPEAKER 2 (COUNCIL): I MET… EXCUSE ME, MR. CHAIRMAN. I MET WITH ONE OF OUR APPLICANTS PRIOR TO THE MEETING TO GET BRIEFED. SPEAKER 2 (COUNCIL): ON… SPEAKER 3 (COUNCIL): AN AGENDA ITEM. SPEAKER 3 (COUNCIL): I HAD A VERY BRIEF EMAIL EXCHANGE WITH ONE OF OUR APPLICANTS. SPEAKER 2 (COUNCIL): NOTHING TO REPORT. OH, YEAH. AND, I AS WELL HAD A VERY BRIEF EMAIL EXCHANGE WITH, ONE OF OUR APPLICANTS. SPEAKER 2 (COUNCIL): TONIGHT. SPEAKER 2 (COUNCIL): ALL RIGHT, ITEM NUMBER 6, PUBLIC COMMENT ON NON-AGENDA ITEMS WITHIN THE SUBJECT MATTER JURISDICTION OF THE COMMISSION. SPEAKER 2 (COUNCIL): CITIZENS MAY ADDRESS THE PLANNING COMMISSION ON ANY ITEM ON THE AGENDA WHEN THE ITEM IS CONSIDERED. CITIZENS WISHING TO SPEAK SPEAKER 2 (COUNCIL): MAY I REQUEST TO SPEAK BY RAISING YOUR HAND. SPEAKER 2 (COUNCIL): WHEN REQUESTED TO DO SO, THIS IS AN OPPORTUNITY TO SPEAK ON NON-AGENDA ITEMS. SPEAKER 2 (COUNCIL): PLEASE LIMIT YOUR COMMENTS TO 3 MINUTES. SPEAKER 2 (COUNCIL): SECRETARY, DO WE HAVE ANY RAISED HANDS ONLINE, OR DO WE HAVE ANYONE IN THE CHAMBERS THAT WISHES TO SPEAK? SPEAKER 1 (COUNCIL): CHAIR JOHNSON, I DID NOT RECEIVE ANY CARDS BEFORE THE MEETING. SPEAKER 1 (COUNCIL): I DO NOT SEE ANY HANDS RAISED ONLINE. SPEAKER 1 (COUNCIL): AND DOES ANYBODY WANT TO SPEAK IN THE ROOM? COUNCIL: I SEE NO HANDS RAISED IN THE ROOM. SPEAKER 2 (COUNCIL): THANK YOU. SPEAKER 2 (COUNCIL): WE'LL MOVE ON TO ITEM NUMBER 7, CONSENT. SPEAKER 2 (COUNCIL): ALL MATTERS ON THE CONSENT AGENDA ARE CONSIDERED ROUTINE BUSINESS AND WILL BE ENACTED BY ONE MOTION. SPEAKER 2 (COUNCIL): THERE WILL BE NO SEPARATE DISCUSSION OF THESE ITEMS UNLESS A REQUEST TO REMOVE A SPECIFIC ITEM FOR SEPARATE ACTION IS RECEIVED. SPEAKER 2 (COUNCIL): ANY ITEMS REMOVED WILL BE CONSIDERED AFTER THE REMAINDER OF THE CONSENT AGENDA. SPEAKER 2 (COUNCIL): DO ANY OF MY COLLEAGUES WISH TO REMOVE AN ITEM FROM THE CONSENT AGENDA, WHICH WE HAVE ONE ITEM ON THERE. SPEAKER 3 (COUNCIL): APPROVAL OF THE ONE ITEM ON THE AGENDA, MR. CHAIRMAN? SECOND. SPEAKER 2 (COUNCIL): MOTION AND SECOND. WE'LL DO A VOICE CALL. SPEAKER 1 (COUNCIL): BOISE CALL IS FINE. OKAY, SO ALL IS IN FAVOR? SPEAKER 2 (COUNCIL): TO SAY AYE? AYE. ANY OPPOSED? SPEAKER 2 (COUNCIL): CONVENTIONS, AND WE HAVE ONE ABSENT. SPEAKER 2 (COUNCIL): AYE. SPEAKER 1 (COUNCIL): 001. PERFECT. SPEAKER 2 (COUNCIL): ALRIGHT. SPEAKER 2 (COUNCIL): THAT BRINGS US TO ITEM NUMBER 8, PUBLIC HEARINGS. SPEAKER 2 (COUNCIL): SO, ITEM 8A IS THE WINDSOR COVE PROJECT. SPEAKER 2 (COUNCIL): AND WE HAVE MICHAELA NOBLE, ASSOCIATE PLANNER, WHO WILL PLEASE GIVE US THE STAFF REPORT TONIGHT. SPEAKER 2 (COUNCIL): GOOD EVENING, COMMISSIONERS. JUST GIVE ME ONE MOMENT TO SET UP. SPEAKER 2 (COUNCIL): ALRIGHT. SPEAKER 2 (COUNCIL): WONDERFUL. SPEAKER 2 (COUNCIL): GOOD EVENING, COMMISSIONERS. MICHAELA NOBLE, ASSOCIATE PLANNER WITH THE COMMUNITY DEVELOPMENT DEPARTMENT. SPEAKER 4 (COUNCIL): THE PROJECT WE HAVE BEFORE YOU IS THE WINDSOR COVE PROJECT. SPEAKER 4 (COUNCIL): THIS IS JUST A SUMMARY OF THE STAFF REPORT MATERIALS THAT WERE PROVIDED TO YOU, SO IT'S A LITTLE BRIEF, BUT WE CAN DEFINITELY GO INTO MORE DETAIL AS WE GO ALONG. SPEAKER 4 (COUNCIL): TONIGHT, WE'LL DISCUSS THE FOLLOWING ITEMS PERTAINING TO THE WINDSOR COVE PROJECT. REQUESTED ENTITLEMENTS, PROJECT COMPONENTS, STAFF FINDINGS, ENVIRONMENTAL DETERMINATION, AND STAFF RECOMMENDATIONS. SPEAKER 4 (COUNCIL): THE APPLICANT, RON SMITH, IS REQUESTING TO APPROVE AN AMENDMENT TO THE VILLAGE 5 GENERAL DEVELOPMENT PLAN. SPEAKER 4 (COUNCIL): A LARGE LOT TENTATIVE SUBDIVISION MAP, AND A SMALL LOT TENTATIVE SUBDIVISION MAP. SPEAKER 4 (COUNCIL): THE PROJECT WILL REQUIRE A DEVELOPMENT AGREEMENT, WHICH IS UNDERGOING A SEPARATE NEGOTIATION AND WILL BE PROCESSED AT A LATER DATE. SPEAKER 4 (COUNCIL): THE PROPOSED PROJECT CONSISTS OF APPROXIMATELY 90 ACRES WITHIN THE VILLAGE 5 SPECIFIC PLAN AREA. SPEAKER 4 (COUNCIL): THE PROJECT SITE IS LOCATED IN THE SOUTHEASTERN PORTION OF THE VILLAGE 5A PLAN AREA. SPEAKER 4 (COUNCIL): LITTLE BACKGROUND, VILLAGE 5 IS THE WHOLE PLAN AREA, BUT ONLY A PORTION KNOWN AS VILLAGE 5A WAS ANNEXED INTO THE CITY, AND THAT PORTION IS OUTLINED IN THE BLUE ON THE SCREEN. SPEAKER 4 (COUNCIL): EXCITINGLY, THIS IS THE FIRST PROJECT WITHIN THE VILLAGE 5A AREA TO COME FORWARD FOR YOUR REVIEW. SPEAKER 4 (COUNCIL): THE ADOPTED VILLAGE 5 GENERAL DEVELOPMENT PLAN INCLUDES PLANNING LEVEL DETAILS FOR PLANNING AREAS A1 AND A2, WHICH ARE OUTLINED IN… OR IN THE PINK AREA ON THE SCREEN. SPEAKER 4 (COUNCIL): IT WAS ESTABLISHED THAT IN ORDER TO DEVELOP THE AND IMPLEMENT THE VILLAGE 5 SPECIFIC PLAN, SUBSEQUENT ENTITLEMENTS MUST BE PROCESSED AND APPROVED BY THE CITY, INCLUDING GENERAL DEVELOPMENT PLAN AMENDMENTS OR THE CREATION OF NEW GENERAL DEVELOPMENT PLANS FOR AREAS B THROUGH J IN THE PLAN AREA. SPEAKER 4 (COUNCIL): THE WINDSOR COVE PROJECT IS LOCATED WITHIN AREA J, OUTLINED IN RED HERE. SPEAKER 4 (COUNCIL): AND THEREFORE, MUST PROCESS A GENERAL DEVELOPMENT PLAN AMENDMENT IN ORDER TO BE DEVELOPED. SPEAKER 4 (COUNCIL): HERE'S THE PROPOSED LARGE LOT TENTATIVE SUBDIVISION MAP FOR THE WINDSOR COVE PROJECT, WHICH WAS INCLUDED IN YOUR STAFF REPORT AS ATTACHMENT 9, EXHIBIT C. SPEAKER 4 (COUNCIL): THE PARCEL IS APPROXIMATELY 90 ACRES IN SIZE, AND IS BEING PROPOSED TO BE DIVIDED INTO LARGE PARCELS BASED ON VARYING LAND USE DESIGNATIONS TO ALLOW FOR FINANCING AND PHASING. SPEAKER 4 (COUNCIL): AND HERE IS THE SMALL LOT TENTATIVE SUBDIVISION MAP FOR WINDSOR COVE, WHICH WAS INCLUDED AS ATTACHMENT 10, EXHIBIT C IN THE STAFF REPORT. SPEAKER 4 (COUNCIL): THE MAP FEATURES 165 RESIDENTIAL LOTS ACROSS ROUGHLY 46 ACRES OF LAND, AND 8 OPEN SPACE AND PARK LOTS, ACCOUNTING FOR APPROXIMATELY 33 ACRES. SPEAKER 4 (COUNCIL): 113 OF THE RESIDENTIAL LOTS ARE DESIGNATED AS VILLAGE LOW DENSITY RESIDENTIAL, AND THE REMAINING 52 LOTS ARE DESIGNATED AS VILLAGE COUNTRY ESTATES. SPEAKER 4 (COUNCIL): RESIDENTIAL LOT SIZES RANGE FROM 5,200 SQUARE FEET TO 31,500 SQUARE FEET. SPEAKER 4 (COUNCIL): TWO ACCESS POINTS WILL PROVIDE ACCESS TO THE SITE. SPEAKER 4 (COUNCIL): AS SEEN HERE, THESE TWO RIGHT HERE. SPEAKER 4 (COUNCIL): THE INTERNAL SUBDIVISION CIRCULATION SYSTEM CONSISTS OF A CONNECTED INTERNAL LOCAL STREET SYSTEM ORGANIZED INTO TWO CONNECTED LOOPS. SPEAKER 4 (COUNCIL): THE PROJECT SATISFIES THE CITY'S MINIMUM LOT SIZES AND TYPICAL SETBACK REQUIREMENTS, WITH VILLAGE COUNTRY ESTATE LOTS SUBJECT TO GREATER LOT DIMENSION AND AREA MINIMUMS, AS WELL AS INCREASED SETBACK REQUIREMENTS. SPEAKER 4 (COUNCIL): WITH THIS MAP, THE OWNER… EXCUSE ME, THE APPLICANT HAS PROVIDED AN ALTERNATIVE SITE LAYOUT TO INSTALL AN ON-SITE SEWER LIFT STATION IN THE SOUTHWEST CORNER OF THE PROJECT SITE. SPEAKER 4 (COUNCIL): SO ROUGHLY WHERE LOTS 10 AND 11 ARE. SPEAKER 4 (COUNCIL): IF IT'S REQUIRED BY THE CITY TO FACILITATE THE PROJECT'S SEWER SYSTEM. IDEALLY, WE WOULD HAVE A GRAVITY SEWER SYSTEM, BUT THERE MAY BE SOME CONSTRAINTS THAT WE MAY NEED A SEWER LIFT STATION. NOT OUR PRIORITY, NOT THE APPLICANT'S PRIORITY, BUT IF IT'S NOT FEASIBLE TO DO GRAVITY SEWER, THAT WOULD BE AN ALTERNATIVE. SPEAKER 4 (COUNCIL): IN SUMMARY, THE PROPOSED PROJECT PROVIDES FOR 52 VILLAGE COUNTRY ESTATES UNITS AND 113 VILLAGE LOW-DENSITY RESIDENTIAL UNITS. THE PROJECT INCLUDES APPROXIMATELY 33 ACRES OF OPEN SPACE AND PARKS. SPEAKER 4 (COUNCIL): AS THIS IS THE FIRST DEVELOPMENT WITHIN THE VILLAGE 5 PLAN AREA, THERE'S NO EXISTING TRAIL SYSTEM IN THAT PLAN AREA, AS IT WAS PREVIOUSLY COUNTY LAND. SPEAKER 4 (COUNCIL): AS MORE DEVELOPMENT OCCURS IN THE AREA, THE VILLAGE 5 TRAIL SYSTEM WILL DEVELOP, AND THE WINDSOR COVE SUBDIVISION TRAIL SYSTEM WILL CONNECT TO THAT SYSTEM. SPEAKER 4 (COUNCIL): AS ILLUSTRATED BY THE TABLE ABOVE, THE ACREAGE FOR EACH LAND USE WOULD VARY SLIGHTLY FROM THE ADOPTED SPECIFIC PLAN. THERE'S ONE THING I DO WANT TO POINT OUT, THE PROJECT, HAS 33 ACRES OF OPEN SPACE, LIKE I MENTIONED, WHICH IS ALMOST TRIPLE THE AMOUNT THAT WAS DELINEATED WITHIN THE VILLAGE 5 SPECIFIC PLAN. SPEAKER 4 (COUNCIL): STAFF ANALYZED THE PROPOSED ENTITLEMENT REQUESTS AND CONCLUDED THAT THEY ARE CONSISTENT WITH THE GOALS, POLICY, AND INTENT OF THE CITY'S GENERAL PLAN, THE VILLAGE 5 SPECIFIC PLAN AND GENERAL DEVELOPMENT PLAN, AND THE CITY SUBDIVISION ORDINANCE. SPEAKER 4 (COUNCIL): ENVIRONMENTALLY, THE VILLAGE 5 SPECIFIC PLAN ENVIRONMENTAL IMPACT REPORT AND PARTIALLY RECIRCULATED REPORT WERE CERTIFIED BY CITY COUNCIL IN 2017 AND 2021, RESPECTIVELY. SPEAKER 4 (COUNCIL): THE VILLAGE 5 ENVIRONMENTAL IMPACT REPORT ANALYZED THE WINDSOR GO PROJECT AT A PROJECT LEVEL, AND TODAY'S DEVELOPMENT PLANS ARE CONSISTENT WITH WHAT WAS PREVIOUSLY ANALYZED. SPEAKER 4 (COUNCIL): THEREFORE, NO ADDITIONAL ENVIRONMENTAL REVIEW IS REQUIRED UNDER CALIFORNIA ENVIRONMENTAL QUALITY ACT GUIDELINES. SPEAKER 4 (COUNCIL): THE WINDSOR COVE PROJECT WILL NEED TO IMPLEMENT ALL APPLICABLE MITIGATION MEASURES, WHICH ARE INCLUDED IN THE MITIGATION MONITORING PLAN THAT WAS PROVIDED WITH THE STAFF REPORT. SPEAKER 4 (COUNCIL): CITY STAFF HAS PREPARED DRAFT CONDITIONS OF APPROVAL FOR THE PROJECT TO ENSURE ORDERLY AND TIMELY IMPLEMENTATION. SPEAKER 4 (COUNCIL): STANDARD AND PROJECT-SPECIFIC CONDITIONS HAVE BEEN APPLIED. SPEAKER 4 (COUNCIL): THE CONDITIONS OF APPROVAL ALSO INCLUDE ALL OF THE APPLICABLE MITIGATION MEASURES. SPEAKER 4 (COUNCIL): ALL CONDITIONS WILL BE SUBJECT TO VERIFICATION OF COMPLIANCE BY CITY DEPARTMENTS. SPEAKER 4 (COUNCIL): THEREFORE, STAFF RECOMMENDS THE PLANNING COMMISSION DETERMINE NO ADDITIONAL ENVIRONMENTAL REVIEW IS REQUIRED PURSUANT TO CEQA. SPEAKER 4 (COUNCIL): ADOPT A RESOLUTION RECOMMENDING CITY COUNCIL APPROVE THE PROPOSED AMENDMENTS TO THE VILLAGE 5 GENERAL DEVELOPMENT PLAN, ADOPT A RESOLUTION RECOMMENDING CITY COUNCIL APPROVE THE LARGE LOT TENTATIVE SUBDIVISION MAP FOR THE WINDSOR GOVE PROJECT, AND ADOPT A RESOLUTION RECOMMENDING CITY COUNCIL APPROVE THE SMALL LOT TENTATIVE SUBDIVISION MAP FOR THE WINDSOR COVE PROJECT. SPEAKER 4 (COUNCIL): UP UNTIL THIS POINT, WE ONLY RECEIVED TWO PUBLIC INQUIRIES. SPEAKER 4 (COUNCIL): THAT WERE PROMPTED BY THE SENDING OF THE PUBLIC NOTICES, 20 DAYS BEFORE THE MEETING. PEOPLE WERE JUST ASKING FOR SOME MORE INFORMATION ABOUT THE PROJECT. AT THIS POINT, WE HAVE NOT RECEIVED ANY FORMAL PUBLIC COMMENTS. SPEAKER 4 (COUNCIL): WE DO HAVE MEMBERS OF THE APPLICANT TEAM WHO ARE AVAILABLE FOR ANY QUESTIONS. IN THE MEANTIME, THANK YOU FOR YOUR TIME. SPEAKER 2 (COUNCIL): ALRIGHT. SPEAKER 2 (COUNCIL): THANK YOU FOR YOUR PRESENTATION. SO I'LL BRING IT BACK TO THE COMMISSION AT THIS POINT. DO ANY OF MY COLLEAGUES HAVE ANY QUESTIONS? SPEAKER 2 (COUNCIL): PLEASE. SO, THE ONE THING WHEN I WENT THROUGH THIS IN THE STAFF REPORT, INITIALLY I WAS EXCITED TO SEE THAT THEY INCREASED NEARLY 3… I'M SORRY, IS THAT BETTER FOR YOU? ALRIGHT. NEARLY 3 TIMES THE AMOUNT OF OPEN SPACE. SPEAKER 5 (COUNCIL): WHICH I THINK WE WOULD ALL AGREE IS NICE. WE'RE PRESERVING OUR ENVIRONMENT AND THE BEAUTY OF OUR COMMUNITY. SPEAKER 5 (COUNCIL): BUT IT DREW A QUESTION, WHY? TYPICALLY. SPEAKER 5 (COUNCIL): IT'S THE OTHER WAY AROUND. SO, IT'S TO SAY, ARE WE ROBBING PETER TO PAY PAUL FROM ANOTHER DEVELOPMENT DOWN THE ROAD? WHAT'S THE REASON? WHY DO WE DO THAT? SURE, SO… SPEAKER 4 (COUNCIL): TWOFOLD. WE HAVE THE AIRPORT, COMPATIBILITY OVERLAY ZONE THAT'S IN THE AREA, SO THAT KIND OF AFFECTS SOME OF THE RESIDENTIAL DENSITY, HENCE WHY THE COUNTRY ESTATES ARE KIND OF LOCATED ON THE EASTERN SIDE OF THE PROPERTY, AND LOW DENSITY TO THE WESTERN SIDE. SPEAKER 4 (COUNCIL): WITH THOSE REQUIREMENTS, YOU'RE ABLE TO DO SOMETHING CALLED OPEN LAND, AND NOT TO BE MORBID, BUT IT ALLOWS, ESSENTIALLY, MORE LAND TO… FOR A PLANE TO POTENTIALLY CRASH IN THE AREA, AND YOU CAN KIND OF ADD A LITTLE BIT MORE DENSITY CLUSTER TOGETHER. SO THAT'S ONE REASON. THE SECOND REASON IS AUBURN RAVINES RIGHT THERE. SPEAKER 4 (COUNCIL): SO, WITH THE PLACER COUNTY CONSERVATION PROGRAM, YOU'RE ESSENTIALLY PROHIBITED FROM DOING ANY RESIDENTIAL DEVELOPMENT WITHIN WHAT THEY CALL THE STREAM SYSTEM, AND THAT INCLUDES THE RAVINE AS WELL AS THE 100-YEAR FLOODPLAIN, KIND OF WHEREVER THAT FEMA… WHEREVER THAT BOUNDARY IS THE FURTHEST AWAY. SPEAKER 4 (COUNCIL): MAJORITY OF THAT LAND IS ALL A 100-YEAR FLOODPLAIN FOR FEMA, SO THERE'S REALLY NO RESIDENTIAL DEVELOPMENT THAT'S ALLOWED IN THAT AREA, SO WE DID HAVE TO REORGANIZE, SPEAKER 4 (COUNCIL): AND SHIFT THOSE LOTS TO THE SOUTH. SO THOSE ARE THE TWO MAIN REASONS WHY THERE IS MORE OPEN SPACE IN THAT AREA. SPEAKER 4 (COUNCIL): THIS IS… SPEAKER 5 (COUNCIL): IT'S SOMETHING THAT WE JUST… SPEAKER 5 (COUNCIL): FIGURED OUT, OR… BECAUSE THAT… THE ROBIN RAVINE'S ALWAYS BEEN THERE, AND THE INITIAL AGREEMENT WAS A HIGHER… HIGHER DENSITY WITH LESS OPEN SPACE. SPEAKER 4 (COUNCIL): SO, THE SPECIFIC PLAN WAS ADOPTED BACK IN 2017, SO THOSE LAND USES WERE ESTABLISHED. HOWEVER, WE ADOPTED THE PLACER COUNTY CONSERVATION PROGRAM IN 2021, I THINK THE TIME WAS, SO THERE WERE SOME CONFLICTS WITH THOSE TWO PLANS. SPEAKER 4 (COUNCIL): AND WE DID HAVE DISCUSSIONS WITH THE APPLICANT OF WHETHER WE COULD GO DOWN THE PATH OF AMENDING THE PCCP DOCUMENTATION. SPEAKER 4 (COUNCIL): GRANTED, THAT'S NOT NECESSARILY IN OUR CONTROL AND WOULD TAKE A LOT OF TIME TO DO, OR THEY COULD AMEND THE LAND USE PLAN TO REFLECT, BECAUSE AT THE END OF THE DAY, THOSE PERMITS WITH THE ENVIRONMENTAL AGENCY ARE WHAT'S GOING TO DETERMINE HOW QUICKLY YOU CAN BUILD AND WHETHER YOU CAN BUILD. SO… SPEAKER 4 (COUNCIL): IT WAS KIND OF THE PATH OF LEAST RESISTANCE TO FOLLOW THAT. SPEAKER 4 (COUNCIL): RATHER THAN JUST OUR SPECIFIC ZONING. I APPRECIATE THE EXPLANATION. THANKS. SPEAKER 2 (COUNCIL): GREAT QUESTION. YEAH, I HAD THE SAME QUESTION. SPEAKER 4 (COUNCIL): A LITTLE SKEPTICAL WITH THAT, I TOTALLY UNDERSTAND. USUALLY IT'S THE… SPEAKER 2 (COUNCIL): TONY SAID THE OTHER WAY AROUND. GO AHEAD. SPEAKER 3 (COUNCIL): IF I RECALL BACK IN 17, SPEAKER 3 (COUNCIL): WHEN I WAS ON THE CITY COUNCIL. SPEAKER 3 (COUNCIL): IT WAS A LITTLE CONVERSATION ABOUT SOME TOPOGRAPHY. SPEAKER 3 (COUNCIL): CONCERNS IN THIS AREA THAT ALSO LENT ITSELF, WHERE YOU DIDN'T HAVE A A COMPLETELY FLAT, EASILY DEVELOP SPEAKER 3 (COUNCIL): PARCEL. SO, YOU KNOW, SOMETIMES TO BUILD ON HILLS. COUNCIL: OR… SPEAKER 3 (COUNCIL): UNDULATIONS IS VERY EXPENSIVE. SPEAKER 3 (COUNCIL): SO I THINK A LOT OF TIMES, SPEAKER 3 (COUNCIL): THE DEVELOPER IS, KIND OF… DRIVEN BY THE SHAPE. SPEAKER 3 (COUNCIL): AND A LOT OF OTHER CONCERNS ABOUT THE PARTICULAR LAND. THEY, OF COURSE, WANT SPEAKER 3 (COUNCIL): TO UTILIZE IT IN THE BEST POSSIBLE WAY, AND SOMETIMES THAT'S NOT SPEAKER 3 (COUNCIL): DENSITY SOMETIMES IS OTHER CONSIDERATIONS, SO… BUT I AGREE, IT'S A GOOD QUESTION, TONY. SPEAKER 3 (COUNCIL): ONE THING I DO WANT TO ADD IS THAT, BOTH SITUATIONS, PCPTA REGARDING THE AIRPORT, AND PCTA. SPEAKER 6 (COUNCIL): AP HAVE REVIEWED THE MAPS, SO THEY'RE IN SUPPORT OF THIS MAP. SPEAKER 6 (COUNCIL): I'M GONNA ECHO THAT. SPEAKER 2 (COUNCIL): GREAT, THANK YOU. SO, WE'LL GO AHEAD AND MOVE ON TO THE NEXT PART OF IT. I'LL NOW OPEN TO THE PUBLIC HEARING. SPEAKER 2 (COUNCIL): CITIZENS WISHING TO SPEAK ON THIS ITEM MAY REQUEST TO SPEAK. SPEAKER 2 (COUNCIL): BY RAISING THEIR HAND WHEN REQUESTED TO DO SO. SPEAKER 2 (COUNCIL): PLEASE LIMIT YOUR COMMENTS TO 3 MINUTES, AND I'LL, YEAH, IF THE APPLICANT WOULD, LIKE TO SAY A FEW WORDS. SPEAKER 2 (COUNCIL): PLEASE. SPEAKER 2 (COUNCIL): GOOD EVENING, TONY FRAZIER WITH FRAZIER DESIGN GROUP. ON BEHALF OF THE LANDOWNER, WE HAVE RON SMITH. ON BEHALF OF… SPEAKER 7 (COUNCIL): OF THE OWNERSHIP. I'D LIKE TO THANK YOU, COMMISSIONER, FOR HAVING US HERE TONIGHT. THIS HAS BEEN A LONG JOURNEY, 9 YEARS. SPEAKER 7 (COUNCIL): AND WE APPRECIATE MICHAELA AND MEL AND EVERYBODY. SHE'S A GOOD JOB, SO I'M NOT GOING TO GO INTO DETAIL OF REPEATING WHAT SHE SAID, BUT WE SPENT 9 YEARS WORKING ON THIS PROJECT. I THINK THE MOST PRODUCTIVE WAS THE LAST 9 MONTHS TO BE HERE, SO THANK YOU FOR ALLOWING US TO BE HERE. SPEAKER 7 (COUNCIL): YOU BROUGHT UP GOOD QUESTIONS ABOUT THE OPEN SPACE, BECAUSE WE JUST LEFT A COUPLE WEEKS AGO HERE, AND WE'RE TALKING ABOUT, YOU KNOW, IS IT REASONABLE TO DO A BIG OPEN SPACE? WHERE? SPEAKER 7 (COUNCIL): THIS IS A PLACE WHERE IT WAS REVERSED. YES, WE HAVE AUBURN RAVINE, SO WE HAVE SETBACKS THERE. WE HAVE FEMA, SO WE COULD HAVE DELAYED THE PROJECT PROBABLY ANOTHER MAYBE 2 YEARS TO GET THIS BATTLE. SPEAKER 7 (COUNCIL): I REALLY WANTED TO WIN AGAINST PCB BECAUSE, YOU KNOW, THEY SHOULD HAVE DONE SOMETHING THAT RESPECTS WHAT THE CITY DOES ALLOW, AND THE SPECIFIC PLAN, BUT THE REQUIREMENT RIGHT NOW IS YOU DON'T PUT HOUSES, YOU CAN PUT ANYTHING ELSE. YOU CAN PUT A ROAD, OR A PARK, ETC. SPEAKER 7 (COUNCIL): SO WE HAD TO REMOVE SOME HOUSES AT LAST MINUTE, AND WE WENT BACK WITH THE APPLICATION. SO WE EXPANDED MORE OPEN SPACE BECAUSE OF THE LACK OF BUILDING IN FEMA'S TERRITORY. SPEAKER 7 (COUNCIL): BUT ALSO, WE PRESERVE MORE WETLAND AND TREES, SO REALLY, A LOT OF THE GROUPINGS ARE AROUND THE OPEN SPACE. SO THAT'S GOING TO BE GRANTED TO THE CITY. THERE'S SOME OPEN SPACE WOULD BE HOAS, THIS IS A PRIVATE COMMUNITY, BUT THE MAJORITY OPEN SPACE WILL BE GUARANTEED TO THE CITY. THAT WOULD BE CONTIGUOUS TO AUBURN RAVINE. SPEAKER 7 (COUNCIL): I REALLY APPRECIATE A LOT OF THE EFFORT WENT INTO THIS, A LOT OF SPEAKER 7 (COUNCIL): BRAINPOWER, BEING THE FIRST VILLAGE, MOVING FORWARD IN VILLAGE 5, SO WE HAD TO… GOT TO KEEP GOING. AS MICHAELA MENTIONED, SEWER, I THINK WE'RE WORKING ON THE GRAVITY. SPEAKER 7 (COUNCIL): WE'RE PUSHING FOR IT TO GO TO THE 3-MONTH PLAN, BUT ALWAYS YOU WANT TO HAVE A BACKUP PLAN, SO WE HAVE IT ON THE PLAN, SO WE DON'T HAVE TO COME BACK AND AMEND THE PLAN FOR IT. SPEAKER 7 (COUNCIL): REALLY, I WANT TO MAKE IT SHORT, SO I APPRECIATE YOU, I APPRECIATE THE TEAM. I'M HERE FOR ANY OTHER QUESTION YOU MAY HAVE. WE TRY TO PUT IN THIS PROJECT EVERYTHING THAT EVERYBODY DESIRES. WE TALKED TO THE NEIGHBOR, I TRIED TO KNOCK ON EVERYBODY'S DOOR, NOT A LOT OF GATES. THE ONES WE WERE ABLE TO TALK SPEAKER 7 (COUNCIL): NOBODY HAS ANY ISSUES. WE'RE NOT TAKING ANYTHING FROM THEM. ACTUALLY, A FEW OF THEM COMPLAINED THEY WERE NOT ANNEXED BEFORE. SPEAKER 7 (COUNCIL): BUT THAT'S NOT OUR PROBLEM, THAT'S BETWEEN THEM AND CITY AND VILLAGE 5. SPEAKER 7 (COUNCIL): BUT I APPRECIATE EVERYBODY'S TIME AND EFFORT, AND WE THANK YOU FOR HELPING US TO GO THROUGH TONIGHT, AND HOPEFULLY MAKE IT TO CITY COUNCIL. THANK YOU. SPEAKER 7 (COUNCIL): MR. CHAIRMAN? YES. COULD I, ASK… COULD I ASK A QUESTION OF. SPEAKER 3 (COUNCIL): PERHAPS… SPEAKER 2 (COUNCIL): THAT'S AT THE END. OKAY. IF THAT'S OKAY. SURE. BECAUSE MAYBE WE'LL HAVE SOME OTHER QUESTIONS COME UP. SPEAKER 2 (COUNCIL): THANK YOU. SECRETARY, DO WE HAVE ANY HANDS RAISED ONLINE, OR ANYONE IN THE CHAMBERS THAT WISHES TO SPEAK? SPEAKER 1 (COUNCIL): I DID NOT RECEIVE ANY CARDS, BEFORE THE ITEM IS HEARD. SPEAKER 1 (COUNCIL): THERE WERE NO HANDS RAISED ONLINE. SPEAKER 1 (COUNCIL): DOES ANYBODY ELSE IN PUBLIC HERE IN THE ROOM WOULD LIKE TO SPEAK? SPEAKER 1 (COUNCIL): I SEE NO HANDS RAISED IN THE ROOM. OKAY, THANK YOU. SPEAKER 2 (COUNCIL): SO SEEING NONE, I'LL NOW CLOSE THE PUBLIC HEARING AND BRING IT BACK TO MY COLLEAGUES. SPEAKER 2 (COUNCIL): DOES ANYONE HAVE ANY ADDITIONAL COMMENTS OR QUESTIONS? SPEAKER 2 (COUNCIL): COMMISSIONER JOHNSON. I DO. SPEAKER 2 (COUNCIL): ONE OF THE THINGS THAT… SPEAKER 3 (COUNCIL): WHAT BOTHERS ME WITH THIS PLAN. SPEAKER 5 (COUNCIL): IS THAT IT'S, THIS… THESE… SPEAKER 5 (COUNCIL): THIS NEIGHBORHOOD SEEMS TO BE ISOLATED FROM THE REST OF THE VILLAGE. SPEAKER 7 (COUNCIL): AND ONE OF THE REASONS FOR THAT IS THE WAY… SPEAKER 8 (COUNCIL): THERE'S ONLY TWO, TO VEHICULAR ACCESSES. SPEAKER 8 (COUNCIL): BOTH FROM THE SOUTHERN END. SPEAKER 8 (COUNCIL): THERE'S ONE PEDESTRIAN ACCESS JUST SOUTH OF THE OPEN SPACE 3. SPEAKER 8 (COUNCIL): YOU CAN KIND OF BARELY SEE THAT, BUT… SPEAKER 8 (COUNCIL): I BELIEVE THAT IS A, A WALKWAY OR A PASEO. SPEAKER 8 (COUNCIL): MY THOUGHT IS THAT IT NEEDS AT LEAST SPEAKER 8 (COUNCIL): ONE, WALKWAY PASEO MID… MID PARCEL, SO IT GOES ACROSS BOTH THE HIGHER DENSITY AREA AND… SPEAKER 8 (COUNCIL): THE LORD IS… SPEAKER 4 (COUNCIL): I'M GONNA HAVE IT PULL UP THE SLIDE THAT I HAVE ON SCREEN TO HOPEFULLY… SPEAKER 4 (COUNCIL): HELP FACILITATE THE CONVERSATION. THAT WOULD BE PROJECT LAYOUT, IF YOU WOULD. YEP. SPEAKER 4 (COUNCIL): SO, JUST FOR A SUMMARY, WHAT… SPEAKER 4 (COUNCIL): COMMISSIONER JOHNSON'S REFERRING TO IS THIS TRAIL CORRIDOR THAT WOULD CONNECT TO THE NEW NELSON LANE, AND BASED ON WHAT YOU'RE SAYING, YOU'D KIND OF WANT A CONNECTION, ANOTHER PEDESTRIAN CONNECTION MIDPOINT? SPEAKER 8 (COUNCIL): YES. SPEAKER 8 (COUNCIL): THROUGH… THROUGH ALL THE STREETS, UNTIL YOU GET TO THE… THE EASTERNMOST STREET. SPEAKER 4 (COUNCIL): SO YOU WOULD WANT IT TO CUT ALL THE WAY ACROSS TO HERE. SPEAKER 8 (COUNCIL): YES. SPEAKER 8 (COUNCIL): YOU KNOW, WE'RE TALKING ABOUT 12 FEET, OR… OR SO. SPEAKER 4 (COUNCIL): OH, EXCUSE ME, SORRY, YOU WERE JUST REFERRING TO CUTTING IN THROUGH TO THIS ROADWAY RIGHT HERE, CENTER? NO, IT'LL GO ALL THE WAY THROUGH TO, TO NELSON. SPEAKER 4 (COUNCIL): FROM THE NEIGHBORHOOD, THOUGH. RIGHT. OKAY. UNDERSTOOD. SO, ESSENTIALLY, IT'D BE… ROUGHLY, THAT'S A 100-FOOT LOT DEPTH, SO… YEAH, BUT THEN IT WOULD… SPEAKER 8 (COUNCIL): WHO WOULD THEN MAKE ANOTHER CONNECTION AT THE… SPEAKER 8 (COUNCIL): YOU KNOW, KEEP IT GOING UNTIL YOU GET TO THE VERY LAST VERTICAL STREET. SPEAKER 8 (COUNCIL): ON THE HIGHER DENSITY PARCEL. SPEAKER 4 (COUNCIL): SO, ARE YOU MEAN THE LOWER DENSITY, THE VILLAGE COUNTRIES? OH, LOWER DENSITY, I'M SORRY, YEAH. SPEAKER 8 (COUNCIL): OKAY. SPEAKER 8 (COUNCIL): SO… TONY'S DONE A REMARKABLE JOB IN FITTING EVERY POSSIBLE LOT IN THERE, BUT, HE'S PROBABLY GOT… SPEAKER 8 (COUNCIL): SOME WIGGLE ROOM. SPEAKER 8 (COUNCIL): BUT I'D LIKE TO HEAR HIS, HIS TAKE ON THAT. SPEAKER 4 (COUNCIL): SO I, YOU KNOW, I WILL SAY, IF WE WERE TO DO THAT, IT WOULD ESSENTIALLY BE REORGANIZING THE CIRCULATION SYSTEM WITHIN THE NEIGHBORHOOD, AND THAT'S A SUBSTANTIAL CHANGE, AND WE WOULD HAVE TO PUSH THIS PROJECT TO A LATER DATE. I DO WANT TO ACKNOWLEDGE THAT WITH THE APPLICANT, SPEAKER 4 (COUNCIL): OUR ORIGINAL PLAN, THIS IS ACTUALLY SUBMITTAL 11 FOR THIS MAP, AND THE ORIGINAL WAS BACK IN 2017 OR 2018. WE DID HAVE RESIDENTIAL ESSEN

Official record

ArtifactSourceState
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Recording and media

Coverage and corrections

Records considered

  • Planning Commission Regular Meeting — Minutes
  • Planning Commission Regular Meeting
  • Planning Commission Regular Meeting — Packet
  • Planning Commission Regular Meeting — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: d0fa1c675a19d2e67490488656cd4f4e. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record