POLISCOPE

The public record

WINTERHAVEN (POLK COUNTY) · LOCALHeld · official record pendingPartial coverage

City Commission Meeting

Monday, August 25, 2025 · Government meeting record

The 30-second read

Record incomplete

The Winter Haven City Commission will meet to discuss infrastructure projects, utility management, and local policy updates. Key items include construction contracts for park and road improvements, wastewater system planning, and a potential legal challenge regarding Senate Bill 180.

Why it matters

The Commission will vote on infrastructure contracts, utility assessments, and legal participation that directly impact city service delivery, construction timelines, and local tax rolls.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Record text

No recording or transcript is held for this meeting.

Showing the first 60,000 of 2,350,384 characters. The full document is at the source.

DATE: Monday, August 25, 2025, 6:00 p.m. LOCATION: City Hall - John Fuller Auditorium 451 Third Street NW Winter Haven, FL 33881 1. CALL TO ORDER - Nathaniel J. Birdsong, Jr., Mayor 2. ROLL CALL - Vanessa Castillo, MMC, City Clerk 3. INVOCATION - Pastor Danny Bennett, St. John's United Methodist Church 4. PLEDGE OF ALLEGIANCE - Vanessa Castillo, MMC, City Clerk 5. PRESENTATIONS 5.A Recognition of the 2025 Certified Public Manager (CPM) Program Graduates 6. DEVELOPMENTS OF NOTE 7. MINUTES 7.A August 6, 2025, Special City Commission Meeting Minutes (Utility Budget) 7.B August 6, 2025, City Commission Agenda Review Session Minutes 7.C August 11, 2025, Regular City Commission Meeting Minutes 8. COMMENTS FROM THE AUDIENCE 9. ORDINANCE(S) - SECOND READING - PUBLIC HEARING 10. CONSENT AGENDA CITY COMMISSION MEETING Staff Contact: T. Michael Stavres, City Manager, mstavres@mywinterhaven.com Staff Contact: Vanessa Castillo, MMC, City Clerk, vcastillo@mywinterhaven.com 2025-08-06 DRAFT Special City Commission Workshop Minutes with Link Staff Contact: Vanessa Castillo, MMC, Vanessa Castillo, MMC, vcastillo@mywinterhaven.com 2025-08-06 DRAFT Agenda Review Session Minutes with Link Staff Contact: Vanessa Castillo, MMC, City Clerk, vcastillo@mywinterhaven.com 2025-08-11 DRAFT Regular City Commission Meeting Minutes with Link CITY COMMISSION MEETING – AUGUST 25, 2025 1

10.A Florida Department of Environmental Protection (FDEP), LPA0441 Grant, Amendment #1 10.B ITB-25-31 - Award of AMI Infrastructure Installation Services, Re-Bid 10.C ITB-25-32 - Award of Utility Extensions to Winter Haven Water Administration Facility 10.D Reclaim Bypass to WWTP#2 - Phase 2 and 3 Material Purchase 10.E Authorization of Travel & Training - Florida League of Cities (FLC) Legislative Policy Committee meetings (Birdsong, Yates, Dantzler, Dollison, Mercer) 10.F South Lake Howard Nature Park Expansion - Guaranteed Maximum Price Construction - Phase II Amendment 10.G Design-Build Contract, Guaranteed Maximum Price (GMP) with Whitehead Construction Inc. - Construction Phase for Motor Pool Road and Pedestrian Connectivity Elements (RFQ-22-03) 10.H State Housing Initiatives Partnership (S.H.I.P) Annual Report Staff Contact: Gary M. Hubbard, Water Department Director, ghubbard@mywinterhaven.com Summary - Florida Department of Environmental Protection, LPA0441 Grant, Amendment #1 FDEP LPA0041 Grant Agreement, Amendment #1 LPA0441-Sapphire necklace Creation (3-17-23) Staff Contact: Gary M. Hubbard, Water Department Director, ghubbard@mywinterhaven.com Summary - Recommendation of Award ITB-25-31 AMI Infrastructure Installation Services Re-Bid ITB-25-31 Bid Tab Sheet ITB-25-31 Recommendation of Award Location Map Staff Contact: Gary M. Hubbard, Water Department Director, ghubbard@mywinterhaven.com Summary - Recommendation of Award ITB-25-32, Utility Extensions to Winter Haven Water Administration Facility ITB-25-32 Bid Tab Sheet ITB-25-32 Recommendation of Award Off-site Utility's -Water Department Admin Complex Staff Contact: Gary M. Hubbard, Water Department Director, ghubbard@mywinterhaven.com Summary - Reclaim Bypass to WWTP 2 - Phase 2 and 3 Material Purchase Ferguson Waterworks, Bid B581174, PH 2 (07-29-25) Ferguson Waterworks, Bid B579351, PH 3 (06-24-25) Motor Pool Road Improvements Staff Contact: T. Michael Stavres, City Manager, mstavres@mywinterhaven.com Summary - FLC Legislative Policy Committee meetings Confirmation of committee liaisons and meeting dates 2025 Staff Contact: Brittany Hart, Public Works Director, bhart@mywinterhaven.com South Lake Howard Nature Park Expansion Guaranteed Maximum Price Construction Phase II Amendment Whitehead Construction GMP Amendment Construction Phase II Proposal Staff Contact: Brittany Hart, Public Works Director, bhart@mywinterhaven.com Summary - Motor Pool Road GMP - Whitehead Construction Whitehead Construction Proposal GMP Amendment CITY COMMISSION MEETING – AUGUST 25, 2025 2

11. RESOLUTION(S) 11.A R-25-41 - Approval of Asset Management Plan for the City's Wastewater Utility System 11.B R-25-42 - Certification of Code Compliance Special Assessments for the 2025 Tax Roll 11.C R-25-43 - Adopting the 2025 Polk County Multi-Jurisdictional Local Mitigation Strategy (LMS) 11.D R-25-44 - Renewal of Statewide Mutual Aid Agreement 11.E R-25-45 - Administrative Plat Approval Policy 12. ORDINANCE(S) - FIRST READING 13. NEW BUSINESS 14. CITY COMMISSIONERS/LIAISON REPORTS 15. CITY ATTORNEY REPORT 15.A Discussion Regarding Senate Bill 180 Legal Challenge Staff Contact: Nancy Hurley, Affordable Housing Compliance Manager, nhurley@mywinterhaven.com Summary - State Housing Initiatives Annual Report Winter Haven SHIP AR Report Close out 2022-23 Winter Haven SHIP AR Certification Close out 2022-23 Staff Contact: Gary M. Hubbard, Water Department Director, ghubbard@mywinterhaven.com Summary - Resolution R-25-41 Approval of Asset Management Plan for the Wastewater Utility System R-25-41 Asset Management Plan for the City's Wastewater Utility System with Exhibit A Staff Contact: Tanya Ayers, Safe Neighborhoods Director, tayers@mywinterhaven.com Summary - Resolution R-25-42 Certification of Code Special Assessments for the 2025 Tax Roll R-25-42 Adoption of 2025 NAVA Roll Exhibit A - NAVA TRIM Data DOR Form 408A Staff Contact: Brittany Hart, Public Works Director, bhart@mywinterhaven.com Summary - R-25-43 Resolution R-25-43 Polk County 2025 Multi- Jurisdictional Local Mitigation Strategy LMS- Executive Summary condensed version FDEM Approval Pending Adoption Letter Staff Contact: Drew Neubrand, Fire Chief, dneubrand@mywinterhaven.com Summary - R-25-44 Renewal of Statewide Mutual Aid Agreement Resolution R 25-44 Statewide Mutual Aid Agreement Statewide Mutual Aid Agreement 2023 Staff Contact: Eric Labbe, Economic Opportunity and Community Investment Director, elabbe@mywinterhaven.com Summary Resolution R-25-45 Resolution R-25-45 (Administrative Plat Approval Policy) Staff Contact: John Murphy, City Attorney, fjm@bosdun.com CITY COMMISSION MEETING – AUGUST 25, 2025 3

16. CITY MANAGER REPORT 17. DEPUTY CITY MANAGER REPORT 18. CITY CLERK REPORT 19. EMERGENCY MATTERS NOT RECEIVED FOR THE AGENDA 20. ADJOURNMENT Summary - Senate Bill 180 Challenge - Resolution Form Resolution Authorizing Participation in Lawsuit Relating to SB 180 If a person decides to appeal any decision made by the Commission with respect to any matter considered at such meeting or hearing, they will need a record of the proceedings, and that, for such purpose, they may need to ensure that a verbatim record of the proceeding is made which record includes the testimony and evidence upon which the appeal is to be based (FS 286.0105). In accordance with the Americans with Disabilities Act and Florida Statutes, Section 286.26, persons with disabilities needing special accommodations to participate in this proceeding, should contact the City Clerk's Office, 451 Third Street, NW, Winter Haven, Florida 33881, in writing, not later than 48 hours prior to the proceeding; if not in writing, then not later than four (4) days prior to the proceeding at (863) 291-5600. Vision or hearing impaired please call (800) 955-8771 for assistance. CITY COMMISSION MEETING – AUGUST 25, 2025 4

SPECIAL CITY COMMISSION WORKSHOP MEETING MINUTES UTILITY BUDGET DATE: Wednesday, August 6, 2025, 5:30 p.m. LOCATION: City Hall – John Fuller Auditorium 451 Third Street NW, Winter Haven, FL 33881 NOTE: PowerPoint slides of certain agenda items were also presented during this meeting. Link to PowerPoint here: https://acrobat.adobe.com/id/urn:aaid:sc:VA6C2:af22771f-362b-4c03-9d57-7411926450d6 A hard copy of the PowerPoint would be attached to the original signed minutes. 1. CALL TO ORDER - Mayor Birdsong called the meeting to order at 5:30 p.m. 2. ROLL CALL - Vanessa Castillo, MMC, City Clerk Commissioners Present: Mayor Nathaniel J. Birdsong, Jr.; Commissioner Tracy Mercer; and Commissioner Clifton E. Dollison. Commissioners Absent: Mayor Pro Tem Brian Yates and Commissioner Bradley T. Dantzler Staff Present: City Manager T. Michael Stavres; Deputy City Manager Michael “M.J.” Carnevale; City Attorney John Murphy; City Clerk Vanessa Castillo; Assistant City Manager for Public Safety Charlie Bird; Economic Opportunity and Community Investment Director Eric Labbe; Winter Haven Water Director Gary Hubbard; Parks, Recreation and Culture Director Julie Adams; Public Affairs and Communications Director Katrina Hill; Winter Haven Regional Airport Director Troy Heidel; Public Works Director Brittany Hart; Chief Financial Officer Colleen “C.J.” Scott; and Fire Chief Drew Neubrand. 3. WINTER HAVEN WATER DEPARTMENT PROPOSED FY 2025/2026 BUDGET WORKSHOP A. Winter Haven Water Department Proposed FY 2025-2026 Budget Overview - T. Michael Stavres, City Manager City Manager Stavres introduced this item and said everything the Commission would hear tonight had been presented previously in the budget presentation. He said that the budget process could include a postscript in September before final approval, as changes could occur between the tentative and final versions. These adjustments could stem from updated State revenue projections or unencumbered projects that needed to roll forward. While these changes typically did not alter the overall financial outlook, the budget should be viewed as a two-year window, encompassing both the wrap-up of the current fiscal year and anticipated activities for the next. He also showed a Winter Haven Water Budget Proposal Fiscal Year 2025-2026 PowerPoint (see link/attached). The budget was built around the Strategic Plan's six pillars, as shown on the slide, with a primary focus on Community Safety: 1. Quality of Life – The priorities also tied back to this and economic stability. 2. Community Safety – Ensure safe, contaminant-free drinking water; maintain sufficient water pressure for firefighting needs; remove asbestos pipes following strict protocols; and upgrade telemetry systems to detect pressure drops and treatment plant issues. 5

SPECIAL CITY COMMISSION WORKSHOP MEETING – August 6, 2025 Page 2 of 5 3. Infrastructure – Build new water production facilities at Cypresswood and Pollard Road; complete significant wastewater treatment plant upgrades; and develop a new administration campus on Buckeye Loop Road. 4. Responsible Government – Conducted a rate study last year to update fees and charges; adjusted connection fees to ensure growth costs are covered by growth drivers; established a repair and renewal fund for aging infrastructure; and actively pursue grants to support infrastructure projects. He also recognized Wastewater Treatment Plant Operator Frank O’Neal and Wastewater Treatment Plant Chief Operator Brett Martin who were awarded the Joseph V. Towery Award by the Florida Water and Pollution Control Operators Association for demonstrating competency and dedication to reclaimed water to the entire reclaimed water industry. 5. Environmental Stewardship – Expanded the smart cover program to prevent utility spills and advanced septic-to-sewer projects, including work around Lake Hartridge, to reduce environmental risks. 6. Economic Sustainability – The priorities also tied back to this and quality of life. BUDGET HIGHLIGHTS (slide) City Manager Stavres and Winter Haven Water Director Hubbard explained this slide in more detail: Several major capital projects highlighted to include continued septic-to-sewer conversions, potable water well drilling at the Pollard Road and Cypresswood water production facilities (WPF) with construction at Pollard Road expected to begin in early 2026, and the start of recharge well drilling and wetland construction at the Bradco Farms property acquired in December 2023. A new 50,000-square-foot utility complex on Buckeye Loop Road will consolidate administration, maintenance, equipment storage, and customer service operations. The City will also undertake a major rehabilitation and expansion of Wastewater Treatment Plant #3, one of the most significant and costly projects in its history, along with installing improved screening and filtration systems there to support future growth. For the FY 2025–26 budget, utility services debt issuance was contemplated at $24.7 million. After the 2024 rate study, it contemplated a greater debt occurrence in FY 2026 with a bond issuance or some combination of borrowing in the approximate amount of $258 million. Future borrowing of $60–$80 million was anticipated in late 2025 or early 2026, with potential additional borrowing within 12–24 months. The City had approval to move forward with $171 million in borrowing directly through the federal Water Infrastructure Finance and Innovation Act (WIFIA) loan program, which could only account for 49% of City projects. Other funding sources could include State Revolving Fund (SRF) loans, municipal bonds, and possible grants. The City’s strategy was to stagger borrowing to align with project timelines, avoid early interest costs, and take advantage of potentially lower interest rates. Additionally, $2.4 million was budgeted for repair and replacement work funded by a dedicated water bill charge. The Water Department employed 136 total employees with some new positions planned for the upcoming year. MONTHLY USER FEE COMPARISON (slide) City Manager Stavres explained this slide in more detail: In the current fiscal year, Winter Haven’s water and sewer user fees were among the lowest in Polk County, ranking second lowest for water rates. Beginning October 1, 2025, as part of a five-year fee schedule adopted last year, water rates would increase by 2.5% and wastewater or sewer rates by 7.5%, marking the second year of planned adjustments. Even with these changes, the City would remain the third lowest in Polk County, which is notable given the costs in neighboring jurisdictions. Rate comparisons were based on 5,000 gallons of monthly use, a standard benchmark, though over 76% of single-family homes in Winter Haven used less than that amount, and over 56% used under 3,000 gallons. As a result, most residents paid less than the benchmark rate, underscoring the City’s ability to keep utility costs low despite ongoing investments. CONNECTION FEE COMPARISON (slide) City Manager Stavres explained this slide in more detail: Effective January 1, 2025, the City increased its water system connection fees, which were currently the highest in Polk County. While there was concern this might slow development, data from January through July 2025 showed otherwise, with 498 single-family home permits issued during that period, including 93 in July alone. The higher fees had not hindered growth, but helped ensure that new development paid for its impact on the water system. 6

SPECIAL CITY COMMISSION WORKSHOP MEETING – August 6, 2025 Page 3 of 5 TOTAL REVENUES: UTILITY FUND (slide) City Manager Stavres explained this slide in more detail: The Utility Fund’s total revenues for the upcoming fiscal year included approximately $24.6 million in anticipated debt proceeds, a figure that could increase if additional borrowing occurred later in the year. Water and sewer sales accounted for about 44% of overall revenues, while connection fees contributed roughly 10%, and grants were projected to provide another 10%, with potential for a higher share if more grants were awarded. Additional revenue sources included service charges and setup fees for new accounts, administrative and inspection fees, and miscellaneous revenues such as late payment penalties and proceeds from recycling obsolete water meters. Interest earnings and reimbursements from the Polk Regional Water Cooperative (PRWC) were also included, with the PRWC set to repay the City for installing a raw water line to the Pollard Road water production facility. Lastly, the Utility Fund received a refuse billing fee from the Solid Waste Division for managing its billing services. TOTAL EXPENDITURES: UTILITY FUND (slide) City Manager Stavres explained this slide in more detail: Within the Utility Fund, the largest portion of expenditures, approximately 45% was allocated to capital projects, which were essential to operations and held within the fund rather than in a separate construction fund as in the General Fund. Operating costs accounted for roughly 22%, and personnel expenses made up about 12%. Other expenditures included an approximate $6.1 million transfer to the General Fund, departmental fees supporting shared services such as Human Resources, Information Technology, Fleet Maintenance, and Facilities Maintenance, annual debt service on prior bonds, and investments in the repair and replacement program. UTILITY FUND (slide) City Manager Stavres explained this slide in more detail: For the Fiscal Year 2025–2026 budget, the Utility Fund was projected to generate about $7.3 million more in revenues than FY 2024–2025 and spend approximately $6.1 million more, resulting in an ending cash balance of roughly $50.6 million. However, much of this balance is restricted since funds from connection fees can only be used for service expansions and other portions are reserved for debt service. Only about $6.2 million, or 12.3%, was unrestricted and available for discretionary use, meaning the majority of the fund balance, around 87–88%, was already committed. City Manager Stavres noted the complexities of proprietary fund accounting, which operated under business-like principles, requiring specialized handling for items such as depreciation and capitalization of interest, distinct from General Fund practices. PROPOSED: NEW POSITIONS (slide) City Manager Stavres explained this slide in more detail: For FY 2025–26, Winter Haven Water was adding several new positions to support its growing operations. A fiscal manager would oversee complex financial aspects, including federal and state grant compliance and large-scale projects. Two additional utility service workers [in Water Distribution] would assist with expanding infrastructure, including lift stations, meters, and valve maintenance. Customer service would gain one new staff member to help manage adjusted lobby hours and call volume, which would take effect September 1, 2025 and a part-time electrician would support lift station electrical systems alongside existing maintenance crews. The department managed a total of 43,833 meters, with roughly 40,500 serving residential accounts, 66% within City limits and 34% in the unincorporated service area. With new meters installed weekly as development continues, these staffing additions were essential to maintaining service and meeting the growing demand from new homes and customers. OPERATING BUDGET: SIGNIFICANT ITEMS (slide) Winter Haven Water Director Hubbard explained this slide in more detail: The remainder of the presentation focused on the capital investment plan over the next five years, but highlighted that the operating budget included significant maintenance and upgrades that impacted daily operations. Some examples included $2 million for repairs to water plant storage tanks, $1.5 million for work on the aeration basins at Wastewater Plant #3, and $1.2 million for upgrades at the AdventHealth Fieldhouse and Conference Center master lift station. These projects were included in the FY 2025–26 budget for Commission approval later on. 7

SPECIAL CITY COMMISSION WORKSHOP MEETING – August 6, 2025 Page 4 of 5 CAPITAL INVESTMENT PROGRAM: UTILITIES (slide) Winter Haven Water Director Hubbard explained these slides in more detail: From a capital investment perspective, the FY 2025–26 budget allocated funds across multiple divisions, with approximately $16.8 million designated for the new water utility complex on Buckeye Loop Road. Wastewater treatment received approximately $8 million, water treatment approximately $4.7 million, and other divisions shared remaining costs. Nearly 6% of capital expenditures, or approximately $2.3 million, was allocated to the repair and replacement program, and the budget also included approximately $2 million for land acquisition in the coming year. CAPITAL INVESTMENT PROJECTS: FIVE-YEAR PLAN (slides) Winter Haven Water Director Hubbard explained these slides in more detail: Over the next five years, the Winter Haven Water Department’s capital projects spanned water treatment, wastewater, distribution, and repair programs. Key water treatment projects included the Pollard Road facility, with phased spending of $1.65 million in FY 2025–26, $2.2 million in FY 2026–27, and additional costs through FY 2027–28, coming online when PRWC delivered water in October 2028. Engineering projects, including Bradco Farms wetland restoration, aquifer recharge, and the new utility administration complex, were projected at $45 million for engineering over five years, with $24 million spent over the next two years. Wastewater projects focused on Treatment Plant #3, the Logistics Parkway facility, and the new water resource facility, the latter represented nearly $173 million of the five-year plan. Water distribution investments included new mains, asbestos replacements, septic-to-sewer conversions, lift station repairs (over 230 stations), sewer extensions, reclaimed water loops, and aquifer storage and recovery wells. Innovative projects included a trailer-mounted direct potable reuse treatment system for demonstration and community use. The repair and replacement program was projected at $14 million over five years and $37.3 million in FY 2025–26, with $335 million projected over the next 5-year period. UTILITY FUND: FIVE-YEAR MAJOR CAPITAL PROJECTS (slides) Winter Haven Water Director Hubbard explained these slides in more detail: Key initiatives included Wastewater Treatment Plant #3 and the Water Resource Facility at roughly $173 million, wetland restoration projects at approximately $17 million, upgrades to water treatment plants at $33 million, and the new administration and maintenance complex at $24 million, with additional projects contributing to the overall capital investment plan. Over the next five years, Winter Haven’s major utility projects were projected to total approximately $240 million. MAJOR CAPITAL: WATER TREATMENT PLANTS (slide) Winter Haven Water Director Hubbard explained this slide in more detail: The City was planning to construct two new water treatment facilities: Cypresswood and Pollard Road. The existing Cypresswood plant was in poor condition, while drilling had already begun at Pollard Road, reaching depths of 900– 1,000 feet into the upper zone of the Lower Floridan Aquifer. Water from this zone was not currently limited by the Southwest Florida Water Management District (SWFWMD), unlike the upper portion of the aquifer, which would soon be capped at roughly 11.5–12 million gallons per day (MGD) based on 2025 demand. The Pollard Road plant would be an 8 MGD facility, half sourced from PRWC for distribution to Auburndale and Lake Alfred, with the remainder meeting City of Winter Haven needs. Cypresswood would be a 1.5–2 MGD facility. The City was pursuing a 50-year water use permit from SWFWMD for 18.3 MGD from the upper Florida zone, contingent on recharging the upper aquifer, and expects preliminary results on water quality from the upper zone of the Lower Floridan Aquifer within the next month, following successful drilling examples from nearby Davenport. MAJOR CAPITAL: WATER RESOURCE FACILITY (slide) Winter Haven Water Director Hubbard explained this slide in more detail: The City was planning a new water resource facility to address aging infrastructure and consolidate operations. Currently, Plant #2 (north), a 1.7 million MGD facility, became operational in 1971, and Plant #3, a 7.5 million MGD facility, began in 1976. Combining these two facilities is seen as a timely and efficient approach. The City would evaluate how to transfer flow from Plant #2 to Plant #3 and explore options for system redundancy on the east side. The new facility, designed by Kimley-Horn and Associates, Inc. and under contract with Wharton-Smith, Inc. since January 2025, would initially have a 12 million MGD capacity and include upgraded screening and filtration, with early construction packages expected this year. 8

SPECIAL CITY COMMISSION WORKSHOP MEETING – August 6, 2025 Page 5 of 5 MAJOR CAPITAL: SAPPHIRE NECKLACE AT BRADCO FARM (slide) Winter Haven Water Director Hubbard explained this slide in more detail: The Sapphire Necklace Project, also known as the Bradco Farms project, began with an unsolicited proposal from Resource Environmental Solutions, LLC (RES) in March 2023. The City initially purchased 370 acres in December 2023, and the project is expected to expand to 450–500 acres through additional property acquisitions. Construction preparations were underway, including plans to drill a recharge well on the site using the contractor already engaged for Pollard Road and Cypresswood wells, with drilling expected to begin in November or December 2025. Wetland restoration efforts were anticipated to start in summer 2026, marking significant progress on this long-planned initiative. MAJOR CAPITAL: UTILITY ADMINISTRATION AND OPERATIONS FACILITY (slide) City Manager Stavres explained this slide in more detail: As part of the Bradco Farms purchase, the City acquired 10 acres of high ground to develop a new utility administration facility. The planned layout includes a 3,700-square-foot administration building with potential expansion into a 25,000-square-foot warehouse and operations center to house work crews. Additional structures, such as pole barns, would accommodate utility equipment. Construction was expected to take 12 to 16 months, potentially starting as early as December 2025, marking a major milestone in the City’s upcoming utility infrastructure projects. MAJOR INITIATIVES (slide) Winter Haven Water Director Hubbard explained this slide in more detail: The City’s major utility initiatives for the coming year focused on expanding and modernizing infrastructure. The City was currently about 60% complete with its automated meter infrastructure and planned to increase coverage to 95% or greater by installing additional towers. Approximately 10,000 water meters would be replaced annually to ensure reliability. Lead and copper replacements across the distribution system were on track to meet EPA deadlines. The City was also bringing its unidirectional flushing and valve exercise program in-house, adding two new positions and equipment to implement the program internally. Grant funding was a major focus, advocating for as much as 50%, with the City targeting up to 40% support over five years, significantly higher than the 5% assumed in last year’s rate study. These efforts were designed to strengthen Winter Haven’s water system and set the stage for long-term sustainability. City Manager Stavres emphasized that the Winter Haven Water Department was the City’s largest operational department, with costs exceeding those of the entire General Fund, including Public Safety and other departments. The figures presented in the tentative budget, shared two weeks prior, were associated with the General Fund and had no impact on the City’s 6.59 millage rate, as the utility department’s revenues cover its own expenses. The budget anticipated borrowing to fund these projects, likely at levels higher than initially forecasted. However, the existing utility fee schedule was designed to generate sufficient revenue to cover debt service, ensuring the City was well-positioned to manage future borrowing while maintaining financial stability. 4. ADJOURNMENT – 6:20 p.m. ATTEST: CITY, FLORIDA ___________________________ _________________________ Vanessa Castillo, MMC Nathaniel J. Birdsong, Jr. City Clerk Mayor 9

CITY COMMISSION AGENDA REVIEW SESSION MINUTES DATE: Wednesday, August 6, 2025, 5:30 p.m. LOCATION: City Hall – John Fuller Auditorium 451 Third Street NW, Winter Haven, FL 33881 NOTE: PowerPoint slides of certain agenda items were also presented during this meeting. Link to PowerPoint here: https://acrobat.adobe.com/id/urn:aaid:sc:VA6C2:c2e566e2-67d8-4017-b9a2-00639a8627d5 A hard copy of the PowerPoint will be attached to the original signed minutes. 1. CALL TO ORDER - Mayor Birdsong called the meeting to order at 6:25 p.m. (began later than the usual time for this meeting due to a Special City Commission Workshop Meeting that commenced at 5:30 p.m.). 2. ROLL CALL - Vanessa Castillo, MMC, City Clerk Commissioners Present: Mayor Nathaniel J. Birdsong, Jr.; Commissioner Tracy Mercer Commissioner; and Clifton E. Dollison Commissioners Present: Mayor Pro Tem Brian Yates and Commissioner Bradley T. Dantzler Staff Present: City Manager T. Michael Stavres; Deputy City Manager Michael “M.J.” Carnevale; City Attorney John Murphy; City Clerk Vanessa Castillo; Assistant City Manager for Public Safety Charlie Bird; Economic Opportunity and Community Investment Director Eric Labbe; Winter Haven Water Director Gary Hubbard; Parks, Recreation and Culture Director Julie Adams; Public Affairs and Communications Director Katrina Hill; Winter Haven Regional Airport Director Troy Heidel; Public Works Director Brittany Hart; Chief Financial Officer Colleen “C.J.” Scott; and Fire Chief Drew Neubrand. PRESENTATION(S) A. *** AGENDA REVIEW ONLY *** Strategic Plan Presentation: Infrastructure Deputy City Manager Carnevale gave an overview of this item and showed a FY 25 Strategic Pillar Update – Infrastructure – Update 2 PowerPoint presentation (see link/attached). He noted that the infrastructure pillar encompassed all of the essential systems that kept the City functioning daily, including roads, bridges, sidewalks, water and sewer systems, airport facilities, buildings, and fiber networks. He added that this update also introduced a few new staff members who would present on these initiatives. Winter Haven Regional Airport Director Heidel said that tonight’s agenda focused on key infrastructure and planning initiatives essential to the City’s growth, safety, and operational efficiency with emphasis on infrastructure reliability and resilience. Each initiative contributed to improved service delivery, supported future growth, and ensured safety and connectivity throughout the City. Airport Taxi Lane Project (slide) Director Heidel explained this slide in more detail: The Florida Department of Transportation (FDOT) conducted statewide airfield pavement inspections on a three- year cycle, with the most recent inspection completed in 2024. The airfield received a Pavement Condition Index (PCI) score of 83, rated as satisfactory, with most areas in good condition. However, the T-hangar taxi lanes on the south side showed wear, ranging from fair to very poor. Plans included milling and overlaying areas in fair condition and fully reconstructing those in very poor condition, as those taxi lanes were vital for daily operations, tenant 10

CITY COMMISSION AGENDA REVIEW SESSION – August 6, 2025 Page 2 of 5 satisfaction, and hangar value. The Commission recently approved an FDOT grant for the project’s design phase, positioning the airport to reach a top 10% PCI ranking statewide once completed. Additionally, during a June 2025 visit to the FAA Technical Center in Atlantic City, he and City Manager Stavres observed advanced pavement testing that informs national airfield pavement standards, directly benefiting the City’s maintenance practices. City Manager Stavres said that Director Heidel, General Palumbo, and himself visited the FAA’s large indoor laboratory in Atlantic City, the biggest of its kind in North America. This facility featured a 900-foot test track where massive aircraft tires simulated the weight and movement of jumbo jets to evaluate asphalt performance. He noted that while the City’s airport would never host aircraft of that size, the research provides valuable confidence in the asphalt designs planned for the taxi lanes leading to the T-hangars. Remote Tower Update (slide) Director Heidel explained this slide in more detail: The primary purpose of the FAA visit was to tour the remote tower facility, which was in full operation and testing mode during the visit. FAA staff and air traffic controllers expressed strong support for the project, which was expected to significantly modernize traffic control at the airfield. After several years of discussion, the project was nearing completion. Currently, the City of Bartow’s control console was in place, and an identical setup for Winter Haven was being installed in the same room. The physical tower infrastructure for the City was scheduled to arrive between late this year and early next year, with the system anticipated to go online between mid-2026 and mid- 2027, pending final requirements. Airport Layout Plan (slide) Director Heidel explained this slide in more detail: The airport layout plan (ALP) served as a critical planning tool for funding and development, guiding both FAA and FDOT review processes. Key future projects include Commerce Park phases one and two, new T-hanger rows on the south side, and corporate T-hangars on the east side. The ALP also designated areas for advanced air mobility (AAM), which involved electric vertical takeoff aircraft, positioning Winter Haven as an ideal hub due to its location between Tampa and Orlando and its strong local tourism. These developments aimed to enhance travel times, connectivity, and the airport’s role in emerging aviation technologies. 8 th Street NW Project (slide) Capital Projects and Strategic Initiatives Manager Tyler Williams explained this slide in more detail: The 8th Street and Avenue L Complete Streets project, funded through the FDOT, aimed to enhance infrastructure around the Lake Howard area, improving safety and connectivity for drivers and pedestrians while linking into downtown. The 8th Street segment would extend from Lake Howard Drive to Mirror Terrace, and Avenue L would run from 8th Street to US 17, near locations such as Northgate Shopping Center, St. Paul’s Church, and Beymer Church. Although initial FDOT funding was removed due to carbon reduction fund cuts, strong collaboration with the Polk Transportation Planning Organization (TPO) had made this Polk County’s top priority for complete streets projects. FDOT has committed over $167,000 for design in fiscal year 2026, with design expected to begin in spring 2026 and plans completed by spring 2027, paving the way for construction in fiscal year 2028. The project underscored the City’s focus on maintaining strong partnerships with transportation organizations to address safety and infrastructure needs effectively. 3rd St. Concept Plan (slide) Capital Projects and Strategic Initiatives Manager Tyler Williams explained this slide in more detail: The downtown traffic improvement project, previously discussed at a Commission meeting, focused on enhancing traffic flow and safety through the addition of two new roundabouts. The project also aimed to improve pedestrian connectivity with upgraded sidewalks and crosswalks, linking key facilities such as the Trailhead [Park] playground, the Garden Center, the Senior [Adult] Center, tennis courts, and Dr. Martin Luther King, Jr. (MLK) Park. Kimley Horn had completed the 60% design phase and was now progressing to the 90% phase. The FDOT had allocated nearly $1.7 million in construction funding for the current fiscal year, with construction anticipated to begin next summer. Proposed improvements included roundabouts, new crosswalks, minor landscaping, and enhancements to Avenue E and F Northwest to better connect downtown facilities. 11

CITY COMMISSION AGENDA REVIEW SESSION – August 6, 2025 Page 3 of 5 Transportation Improvement Program (slide) Capital Projects and Strategic Initiatives Manager Tyler Williams explained this slide in more detail: Earlier this year, the City highlighted its largest repaving effort in Winter Haven’s history, completing work on 31 roads with the poorest Pavement Condition Index (PCI) ratings between October and December. In addition, the City implemented double micro surfacing, applying two successive layers of micro surfacing material, for the first time during the 2023 Avenue C Southwest Complete Streets Project and expanded this treatment to roads including 4th Street Southeast, Oleander Drive Southeast, and areas off 10th Street Southeast in 2024. In April, the City collaborated with Pavement Technologies to rejuvenate 15 miles of roadways by applying restorative oils, which extended road life, while Asphalt Paving Systems (APS) completed crack sealing over the summer to prevent pothole formation. Later this year, APS would return for additional double micro and cape seal applications, timed for cooler weather to ensure proper bonding. Looking ahead, the City was preparing a list of roads for future repaving efforts, combining remaining TIP funds with the proposed budget, and would launch an interactive online map to allow residents to track completed work, upcoming projects, and PCI ratings throughout the community. Harmony Master Lift Station (slide) Lift Stations Superintendent Dalton Glover explained this slide in more detail: The Harmony Master lift station was designed to mirror the Chain of Lakes master lift station while also diverting some flow away from the Chain of Lakes to improve overall system efficiency. Key upgrades include a new PLC card called Specific Energy, which monitored the efficiency of all four pumps and suggested adjustments to optimize performance. Gate valves had been replaced with new wheel valves that allowed a single person to operate them safely and efficiently. Additional improvements include upgraded pumps with impeller springs to prevent debris buildup, exterior lighting for safety, and reuse lines in the wet well to manage debris circulation. The lift station was intended to enhance connections between Plant #2 and Plant #3 while boosting the efficiency of the wastewater system. SCADA Radio Comms and Fiber Connections (slide) Fairfax Water Plant Chief Operator Damon Irvis explained this slide in more detail: The City had made significant improvements to its SCADA system to address previous communication failures and enhanced the reliability of water treatment operations. New equipment, including radios, cables, antennas, and grounding rods, had been installed to improve system bandwidth and ensure better communication and control between components. The SCADA interface allows operators to monitor and manage five elevated tanks, track water levels, pressures, pump activity, and chlorine residuals across all water plants, including Eloisewood. Additional enhancements included frequency cards for lift stations and water plants, properly aligned antennas, and ongoing collaboration with the [Technology Services] Department to improve fiber connectivity. These upgrades strengthened the overall communication framework, ensuring efficient and consistent delivery of high-quality water service. Pollard and Cypresswood Well Drilling (slide) Fairfax Water Plant Chief Operator Bjorn Wint explained this slide in more detail: The City provided an update on its well drilling operations at Pollard Road, where drilling has reached approximately 800 feet with a target depth of 1,200 feet to access the upper zone of the Lower Floridan Aquifer. Visuals included casings, drill bits, and the drilling equipment. Successfully reaching this aquifer was critical, as it would determine the quality of water available and enabled the construction of the new Pollard Road and Cypresswood water plants. Commissioner Mercer requested to see the three wells. Deputy City Manager Carnevale said this would be arranged. City Manager Stavres highlighted the value of having frontline staff present directly to the City Commission, showcasing their passion and expertise. The speakers emphasized the complexity of City operations, particularly the advanced technology and monitoring capabilities within the SCADA system, and praised staff for their skill in managing and operating these systems effectively. Overall, it underscored both the dedication and technical proficiency of the team. Deputy City Manager Carnevale reminded everyone that the next pillar update on economic sustainability would take place in September. 12

CITY COMMISSION AGENDA REVIEW SESSION – August 6, 2025 Page 4 of 5 5. DEVELOPMENTS OF NOTE - None 6. MINUTES A. July 9, 2025, City Commission Agenda Review Session Minutes There were no questions or discussion. 8. COMMENTS FROM THE AUDIENCE – N/A 9. ORDINANCE(S) – SECOND READING – PUBLIC HEARING - None 10. CONSENT AGENDA A. Reappointment of Two Airport Advisory Committee Members City Manager Stavres gave an overview of this item. There were no questions or discussion. B. ITB-25-28 - Award of Landscape Maintenance of Rights-of-Way, Parks, and Trails - Two Year Contract City Manager Stavres gave an overview of this item. There were no questions or discussion. C. Replacement of P320 Duty Weapon with Glock 47 City Manager Stavres gave an overview of this item. There were no questions or discussion. 11. RESOLUTION(S) A. R-25-34 - Request by KRPC Willowbrook, LLC to accept a portion of the improvements, infrastructure, and dedication in favor of the City of Winter Haven and modify the Performance Bond submitted to the City to insure completion of the additional required improvements for the Willowbrook North Subdivision City Manager Stavres gave an overview of this item. There were no questions or discussion. 12. ORDINANCE(S) - FIRST READING – None 13. NEW BUSINESS - None 14. CITY COMMISSIONERS/LIAISON REPORTS – No report 15. CITY ATTORNEY REPORT – No report 16. CITY MANAGER REPORT A. City Commission Liaison Request – Construction Manager at Risk Services for Cypresswood & Pollard Road Water Production Facilities RFQ City Manager Stavres gave an overview of this item. There were no questions or discussion. 13

CITY COMMISSION AGENDA REVIEW SESSION – August 6, 2025 Page 5 of 5 B. Commission Liaison assignment – Request for Applications for the Local Governmental Area of Opportunity (LGAO) City Manager Stavres gave an overview of this item. There were no questions or discussion. 17. DEPUTY CITY MANAGER REPORT – No report 18. CITY CLERK REPORT – No report 19. EMERGENCY MATTERS NOT RECEIVED FOR THE AGENDA – None 20. ADJOURNMENT – 6:58 p.m. ATTEST: CITY OF WINTER HAVEN, FLORIDA ___________________________ _________________________ Vanessa Castillo, MMC Nathaniel J. Birdsong, Jr. City Clerk Mayor 14

REGULAR CITY COMMISSION MEETING MINUTES DATE: Monday, August 11, 2025 6:00 p.m. LOCATION: City Hall – John Fuller Auditorium 451 Third Street NW, Winter Haven, FL 33881 NOTE: PowerPoint slides of certain agenda items were also presented during this meeting. Link to PowerPoint here: https://acrobat.adobe.com/id/urn:aaid:sc:VA6C2:0e5335ba-8659-48c2-9244-530e76f68402 A hard copy of the PowerPoint will be attached to the original signed minutes. 1. CALL TO ORDER - Mayor Birdsong called the regular meeting to order at 6:00 p.m. 2. ROLL CALL - Vanessa Castillo, MMC, City Clerk Commissioners Present: Mayor Nathaniel Birdsong; Commissioner Tracy Mercer; and Commissioner Clifton Dollison Commissioners Absent: Mayor Pro Tem Brian Yates and Commissioner Brad Dantzler Staff Present: City Manager T. Michael Stavres; Deputy City Manager Michael “M.J.” Carnevale; City Attorney John Murphy; City Clerk Vanessa Castillo; Assistant City Manager for Public Safety Charlie Bird; Economic Opportunity and Community Investment Director Eric Labbe; Public Affairs and Communications Director Katrina Hill; Chief Financial Officer Colleen “C.J.” Scott; Winter Haven Regional Airport Director Troy Heidel; and Police Chief Vance Monroe. 3. INVOCATION – Pastor John Halman, St. Paul Worship Center 4. PLEDGE OF ALLEGIANCE – Vanessa Castillo, MMC, City Clerk 5. PRESENTATION(S) – None 6. DEVELOPMENTS OF NOTE – None 7. MINUTES A. July 9, 2025, City Commission Agenda Review Session Minutes B. July 14, 2025, Regular City Commission Meeting Minutes C. July 23, 2025, City Commission Agenda Review Session Minutes D. July 23, 2025, Special City Commission Workshop Meeting Minutes E. July 28, 2025, Regular City Commission Meeting Minutes Motion by Commissioner Mercer to approve the minutes as presented. 15

CITY COMMISSION MEETING – August 11, 2025 Page 2 of 4 Mayor Birdsong stated that anyone wishing to speak to the minutes could make comments now by coming to the podium and stating their name and address for the record and make comments. No one spoke for or against. Motion carried 3:0. 8. COMMENTS FROM THE AUDIENCE Desiree Howell, representing Courtyard by Marriott located at 6625 Cypress Gardens Boulevard in Winter Haven, expressed concerns about ongoing trash runoff for the past 6 ½ years between Chase Bank and their property, which flowed into the lake in front of the hotel and raised environmental and aesthetic concerns. With plans for a new hotel nearby, the owner sought assistance and a collaborative resolution to address the problem. Deputy City Manager responded and explained that the drainage issue near the hotel fell under the Florida Department of Transportation (FDOT) jurisdiction and responsibility, since Cypress Gardens Boulevard was a state road and part of the state’s drainage network. The City has worked with FDOT over the years to help keep the area clean, but would continue to press for a resolution. In addition, the City team had also made efforts to provide some on-site cleaning support when possible. City Manager Stavres said they would try to get the Natural Resources Division to assist, even though it was outside the area that the City normally maintained. Sherry Groover, representing her mother at 595 Lake Martha Drive Northeast in Winter Haven and the City’s visitors and residents, read a statement from the City of Winter Haven regarding employee standards to uphold professionalism, respectfulness, honesty, and courtesy. She expressed concerns about accountability in her brother’s cardiac call incident from 11 years ago and encouraged others to visit her YouTube channel, “Cookie CBI,” regarding government accountability. 9. ORDINANCE(S) – SECOND READING – PUBLIC HEARING – None 10. CONSENT AGENDA A. Reappointment of Two Airport Advisory Committee Members B. ITB-25-28 - Award of Landscape Maintenance of Rights-of-Way, Parks, and Trails - Two Year Contract C. Replacement of P320 Duty Weapon with Glock 47 Motion by Commissioner Mercer to approve the Consent Agenda as presented. Mayor Birdsong closed the Regular City Commission Meeting and opened a Public Hearing stating anyone wishing to speak to the Consent Agenda could come to the podium and state their name and address for the record. No one spoke for or against. Mayor Birdsong closed the Public Hearing and reopened the Regular Commission Meeting. Motion carried 3:0. 11. RESOLUTION(S) A. R-25-34 - Request by KRPC Willowbrook, LLC to accept a portion of the improvements, infrastructure, and dedication in favor of the City of Winter Haven and modify the Performance Bond submitted to the City to insure completion of the additional required improvements for the Willowbrook North Subdivision City Attorney Murphy read Resolution R-25-34 by title only and City Manager Stavres presented. Motion by Commissioner Mercer to approve Resolution R-25-34. Mayor Birdsong closed the Regular City Commission Meeting and opened a Public Hearing stating anyone wishing to speak to this Resolution may come to the podium and state their name and address for the record. No one spoke for or against. Mayor Birdsong closed the Public Hearing and reopened the Regular Commission Meeting. Motion carried 3:0. 16

CITY COMMISSION MEETING – August 11, 2025 Page 3 of 4 12. ORDINANCE(S) - FIRST READING – None 13. NEW BUSINESS 14. CITY COMMISSIONERS/LIAISON REPORTS Commissioner Mercer reported the following: attended the Talbot House Ministries [Center for Women and Children] Grand Opening and said that they had purchased the building [320 Martin Luther King Boulevard Northwest] from the Salvation Army for a dedicated homeless shelter. She also attended the Public Safety Oath of Office of new and promoted staff and thanked them for all they did. Commissioner Dollison reported the following: attended a Planning Commission Meeting; attended the Talbot House Ministries event and prayed over the facility, which would have over 60 beds and said there were already about 13 families on the waiting list. Mayor Birdsong reported the following: attended the Talbot House Ministries event; attended a reception at Aria [Restaurant] on Central with the Winter Haven Economic Development Council (WHEDC); chaired a Central Florida Regional Planning Council (CFRPC) Meeting; and “double” chaired a Polk Regional Water Cooperative (PRWC) Meeting at the AdventHealth Fieldhouse and Conference Center, which got hacked via Zoom. 15. CITY ATTORNEY REPORT – None 16. CITY MANAGER REPORT A. City Commission Liaison Request - Construction Manager at Risk Services for Cypresswood & Pollard Road Water Production Facilities RFQ City Manager Stavres presented this item and requested a Commission Liaison. Commissioner Mercer agreed to serve. B. Commission Liaison assignment - Request for Applications for the Local Government Area of Opportunity (LGAO) City Manager Stavres presented this item and requested a Commission Liaison. Commissioner Dollison agreed to serve.  City Manager Stavres reported the following: • First day of school - Today City staff and law enforcement stationed in school zones to remind motorists that school was back in session and help ensure safety. Patience requested as families adjust to new routines, particularly around Lake Elbert Elementary, where the City was working closely with school administrators, Polk County School Bord (PCSB) Superintendent [Frederick] Heid’s office, and the [Polk County] Sheriff’s Safe School Team to manage traffic flow. While the first day went well overall, it typically takes 1-2 weeks for congestion to ease. • Polk County Legislative Delegation Meeting - Tomorrow at 1:00 p.m. at the Polk County Board of County Commission (BoCC) Chambers in Bartow. The City was preparing for the upcoming Florida legislative session, which would begin in January, 2026. Key points for the three-minute presentation at the Legislative Delegation Meeting included property tax reform, tourist development taxes, protecting community redevelopment agencies, concerns with Senate Bill 180, and the city’s primary appropriation request: the official transfer of ownership of the Florida Citrus Building to Winter Haven. Since acquiring the lease in 2017, the City had invested over $3 million in improvements and continues to make the facility available for community use, supporting a strong case for the transfer. • Skate Park - Following the July 28, Regular City Commission Meeting, Parks, Recreation and Culture Department and City Manager’s Office staff inspected the skate park on July 29 and found that all graffiti had been painted over, reflecting the park’s standard practice of promptly addressing vandalism. Feedback from users indicated that traditional paint created a slick surface, so alternative paints with better grip were being considered. The Police Department had increased surveillance with multiple daily visits, and the Technology Services Department was exploring security camera options using either fiber optic or 17

CITY COMMISSION MEETING – August 11, 2025 Page 4 of 4 cellular connections. Additional improvements under consideration include solar and programmable lighting, new benches, seating, and potentially fencing. Regarding access to drinking water, the City was evaluating options such as a vandal-proof vending machine due to infrastructure limitations. Overall, staff would continue to address vandalism proactively, recognizing the importance of maintaining a safe and well-maintained skate park. • City Vehicle – Today, the City experienced an unfortunate incident when a City vehicle was completely destroyed by fire outside the Garden Center during routine improvement work. One employee sustained injuries and was transported to Tampa General Hospital for treatment of burns, but was reported to be doing well and expected to be released soon. The vehicle was a total loss, with only minor components potentially salvageable. City leadership commended the police and fire [Public Safety] Department for their swift, professional, and compassionate response in assisting the injured employee. • 2025 Florida League of Cities (FLC) Conference – Mayor Birdsong, Mayor Pro Tem Yates, Commissioners Mercer and Dollison would be attending this conference in Orlando from Wednesday evening through Saturday morning to learn about legislative issues and FLC initiatives. City Manager Stavres and Public Affairs and Communications Director Hill would also be present to support in any way. During the Saturday session, the Mayor would serve as Winter Haven’s voting delegate, with staff providing support throughout. Deputy City Manager Carnevale would manage City operations while the team is away. 17. DEPUTY CITY MANAGER REPORT – No report 18. CITY CLERK REPORT – No report 19. EMERGENCY MATTERS NOT RECEIVED FOR THE AGENDA – None 20. ADJOURNMENT – 6:29 p.m. ATTEST: CITY OF WINTER HAVEN, FLORIDA ___________________________ _________________________ Vanessa Castillo, MMC Nathaniel J. Birdsong, Jr. City Clerk Mayor 18

CITY COMMISSION MEETING August 25, 2025 FACT SHEET MY WIN T ER H A V EN. C OM PAGE 1 OF 2 DATE: August 8, 2025 TO: Honorable Mayor and City Commissioners VIA: T. Michael Stavres, City Manager M.J. Carnevale, Deputy City Manager FROM: Gary Hubbard, Water Department Director SUBJECT: Florida Department of Environmental Protection (FDEP), LPA0441 Grant, Amendment #1 BACKGROUND On March 17, 2023, the City of Winter Haven and Florida Department of Environmental Protection (FDEP) entered into Grant Agreement LPA0441 for partial funding of the Sapphire Necklace Creation project. The funding will support the preconstruction design activities for the Sapphire Necklace wetland storage nature park located at the Bradco property. The original agreement was scheduled to expire on December 31, 2025. Due to delays in securing the P3 consultant, HGS, LLC (RES Environmental Operating Company), the City and FDEP have agreed to execute Amendment #1 for a time extension. The project completion date has been extended to December 31, 2026. FINANCIAL IMPACT There are no financial impacts associated with the LPA0441 Grant Amendment #1. STRATEGIC PLAN ALIGNMENT  Pillar: Infrastructure  Goal: 3.3 – Ensure an actionable strategy is in place for the future of water resources.  Strategy: 3.3.4 – Maintain relationships with local, regional, state, and federal regulatory and cooperative agencies directly related to integrated water resource management. 19

CITY COMMISSION MEETING August 25, 2025 FACT SHEET MY WIN T ER H A V EN. C OM PAGE 2 OF 2 RECOMMENDATION Staff recommends the City Commission approve Amendment #1 for the FDEP LPA0441 Grant Agreement and authorize City Manager or his designee to take all necessary actions required of the City in order to implement the FDEP LPA0441 grant agreement. ATTACHMENTS  FDEP LAP0441 Grant Agreement, Amendment #1  LPA0441 – Sapphire Necklace Creation (executed 3-17-23) 20

DEP Agreement No. LPA0441, Amendment No. 1, Page 1 of 3 AMENDMENT NO. 1 TO AGREEMENT NO. LPA0441 BETWEEN FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND CITY OF WINTER HAVEN This Amendment to Agreement No. LPA0441 (Agreement) is made by and between the Department of Environmental Protection (Department), an agency of the State of Florida, and the City of Winter Haven (Grantee), on the date last signed below. WHEREAS, the Department entered into the Agreement with the Grantee for Sapphire Necklace Creation (Project), effective March 17, 2023; and, WHEREAS, the Grantee has requested an extension of the Agreement due to delays in the subcontracting; and, WHEREAS, other changes to the Agreement are necessary; and, WHEREAS, the parties have agreed to amend the Agreement as set forth herein. NOW THEREFORE, the parties agree as follows: 1. Section 3. of the Standard Grant Agreement is hereby revised to change the Date of Expiration to December 31, 2026. The Department and the Grantee shall continue to perform their respective duties during this extension period pursuant to the same terms and conditions provided in the Agreement. 2. Section 6. of the Standard Grant Agreement is hereby revised to the following: Department’s Grant Manager Grantee’s Grant Manager Name: Julie N. Roberts Name: Mark Bombard Address: Florida Dept. of Environmental Protection Address: 401 6 th Street, SW 3900 Commonwealth Blvd. Winter Haven, FL 33884 Tallahassee, FL 32399-3000 Phone: 850-245-2906 Phone: 863-291-5853 Email: Julie.N.Roberts@FloridaDEP.gov Email: MBombard@MyWinterHaven.com 3. Section 2.d. of Attachment 1 is deleted and replaced as follows: This Agreement may be amended, through a formal amendment or a change order, only by a written agreement between both parties. A formal amendment to this Agreement is required for changes which cause any of the following: (1) an increase or decrease in the Agreement funding amount; (2) a change in Grantee’s match requirements; (3) a change in the expiration date of the Agreement; and/or (4) changes to the cumulative amount of funding transfers between approved budget categories, as defined in Attachment 3, Grant Work Plan, that exceeds or is expected to exceed twenty percent (20%) of the total budget as last approved by Department. (5) any changes to the terms and conditions of the Agreement other than the specific instances enumerated below when a change order may be used. A change order to this Agreement may be used when: (1) task timelines within the current authorized Agreement period change; (2) the cumulative transfer of funds between approved budget categories, as defined in Attachment 3, Grant Work Plan, are less than twenty percent (20%) of the total budget as last approved by Department; 21

DEP Agreement No. LPA0441, Amendment No. 1, Page 2 of 3 (3) changing the current funding source as stated in the Standard Grant Agreement; and/or (4) fund transfers between budget categories for the purposes of meeting match requirements. This Agreement may be amended to provide for additional services if additional funding is made available by the Legislature. 4. The following is hereby added to Attachment 1 in Section 8: State Funds Documentation. Pursuant to section 216.1366, F.S., if Contractor meets the definition of a non-profit organization under section 215.97(2)(m), F.S., Contractor must provide the Department with documentation that indicates the amount of state funds: i. Allocated to be used during the full term of the contract or agreement for remuneration to any member of the board of directors or an officer of Contractor. ii. Allocated under each payment by the public agency to be used for remuneration of any member of the board of directors or an officer of the Contractor. The documentation must indicate the amounts and recipients of the remuneration. Such information must be posted on the State’s contract tracking system and maintained pursuant to section 215.985, F.S., and must be posted on the Contractor’s website, if Contractor maintains a website. 5. Section 11. of Attachment 2 is hereby revised as follows: Subcontracting The Grantee may subcontract work under this Agreement without the prior written consent of the Department’s Grant Manager except for certain fixed-price subcontracts pursuant to this Agreement, which require prior approval. Regardless of any subcontract, the Grantee is ultimately responsible for all

Official record

ArtifactSourceState
AgendaNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Official pages

Coverage and corrections

Records considered

  • City Commission Meeting — Packet

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • Official outcomes have not been published.
  • A transcript is not available.
  • No audio or video recording is linked.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: cee543067e9ff8868f4d51109a00a504. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record