POLISCOPE

The public record

PITTSBURG (CONTRACOSTA COUNTY)Held · official record pendingPartial coverage

Planning Commission

Tuesday, August 12, 2025 · Government meeting record

The 30-second read

Record incomplete

Planning Commission

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Transcript and record text

Closed captionsWhat was said at the meeting, transcribed Aug 3, 2026. Speech is not a decision.
  • No speaker turns were supplied with this transcript.
  • This transcript has no source timestamps.
  • No speaker identities were supplied with this transcript.

This source published text without speaker turns, so speakers and timestamps are not shown.

The opening of 92,366 stored characters

>> COMMISSIONERS, THE WAS 12, 2025 REGULAR MEETING OF THE PITTSBURG TRAINING COMMISSION WILL NOW COME TO HER. MADAME CLERK, PLEASE CALL THE ROLL. IVELINA POPOVA. >> HERE. >> REILY KENT. >> PRESENT. >> DONNA FOSTER. >> PRESENT. >> DEANDRA STOKES. >> PRESENT . >> AS REQUIRED BY LAW, THE AGENDA FOR THIS MEETING WAS POSTED AT CITY HALL AT LEAST 72 HOURS PRIOR TO TONIGHT'S MEETING, ON THURSDAY, AUGUST 7th, 25 POINT MAY I ASK EVERYONE TO STAND FOR THE PLEDGE OF ALLEGIANCE? COMMISSIONER RILEY WILL BE LEADING. COMMISSIONER KENT. >> I PLEDGE ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA, AND TO THE REPUBLIC FOR WHICH IT STANDS, ONE NATION, UNDER GOD, INDIVISIBLE, WITH LIBERTY AND JUSTICE FOR ALL. >> MR. SECRETARY, OR THEIR ANY ITEMS LISTED ON THE AGENDA? >> GOOD EVENING MADAME SHARON COMMISSIONERS, THERE'S NO REQUESTS FOR DELETIONS OR WITHDRAWALS. CONTINUOUS TONIGHT . THANK YOU. AS A POINT OF REFERENCE FOR THE PUBLIC RECORD, THERE IS A CHANGE IN ORDER OF ITEMS TO BE HEARD FOR TONIGHT'S AGENDA. ITEM NUMBER 4 IN THE COMMISSION CONSIDERATIONS WILL BE CONSIDERED BY THE PLANNING COMMISSION PRIOR TO ITEM NUMBER THREE, THE PUBLIC HEARING. THANK YOU, MR. SECRETARY. >> IS A MEMBER OF THE AUDIENCE WOULD LIKE TO SPEAK ON ANY ITEM ON THE AGENDA OR ADDRESS THE COMMISSION ON A NON-AGENDA ISSUE, PLEASE FILL OUT A CITIZEN COMMENT CARD WITH THE YELLOW PAD FILE X TO THE PODIUM AND PLEASE HAND IT TO THE CLERK. MEADOWBROOK, ARE THERE ANY PUBLIC COMMENTS FOR NON-AGENDA ITEMS? >> THERE ARE. ADRIAN BADGER. >> STANDBY. HOW ABOUT THIS? THANK YOU. I CAN ACTUALLY HEAR MYSELF THIS TIME. READY? WE RESUME OUR NORMAL PROGRAM. THANK YOU. GOOD EVENING COMMISSIONERS. I'M ADRIAN BADGER, PITTSBURG RESIDENT AND I KNOW I HAVE THREE MINUTES TO SPEAK BUT I HAVE A LOT TO COVER SO I'LL BE AS FAST AND BRIEF AS POSSIBLE, AND I'M SORRY I WON'T BE LOOKING AT MUCH BECAUSE I'LL BE TRYING TO READ THIS IS MUCH AS POSSIBLE. I HAVE THE SPECIFICS FOR THE INFORMATION ABOUT TO SHARE WITH YOU ABOUT SHARE FOR YOU AVAILABLE WITH THE CLERK WHEN I'M DONE. RECENTLY I JOINED A SPARSELY ATTENDED COMMUNITY MEETING AT THE REC CENTER THAT FOCUSED AGAIN ON THE CITY'S PLANS TO IMPROVE OLDTOWN. AFTER THE PRESENTATION AND A QUESTION AND ANSWER PERIOD I REALIZED THAT THE PLANNING DEPARTMENT AND THE CITY LEADERSHIP IS UNAWARE OF WHAT COULD'VE BEEN IN OLDTOWN VERSUS WHAT IS NOW AVAILABLE TO BE IN TOWN. SO I'M HERE TODAY TO PROVIDE A LITTLE CONTEXT FOR YOU ABOUT THE CURRENT STATUS OF USABLE RETAIL RESTAURANT SPACE IN PITTSBURG'S OLDTOWN DISTRICT, SING DISTRICT IN THE EARLY 2000 WAS TO BECOME A PREMIER SHOPPING AND RESTAURANTS ESTIMATION FOR EAST COUNTY. THE SAME DISTRICT THAT WAS REDEVELOPED PRIOR TO 2009, 15 YEARS AGO. TODAY , BECAUSE OF DECISIONS MADE BY CITY LEADERSHIP AND APPROVED BY PLANNING COMMISSIONS AND CITY COUNCILS, WILL TOWN PITTSBURG IS NOT EVEN A STEP CLOSER TO BECOMING THE DESIRABLE DESTINATION FOR EAST BAY AND THE BAY AREA RESIDENTS THAT WAS ENVISIONED AND HONEST TO BE 15 YEARS AGO. THERE HAVE BEEN A SLEW OF SHORTSIGHTED, BADLY PLANNED AND IMPLEMENTED DECISIONS AFFECTING OLD TOWN OVER THE LAST 15 YEARS, BUT TODAY I'M ONLY HERE TO DISCUSS WHAT'S STILL LEFT IN OLD TOWN. SPECIFICALLY THE CRITICALLY IMPORTANT INVISIBLE RAILROAD AVENUE CORRIDOR. DESPITE WHAT YOU MAY THINK OR HAVE BEEN LED TO BELIEVE, AS OF AUGUST 12, TODAY, THE FOLLOWING IS THE MAKEUP OF EXISTING BUSINESSES OR UNITS ON RAILROAD AVENUE IN OLD TOWN. FOOD AND BEVERAGE LOCATIONS, 12 INCLUDING TWO SANDWICH SHOPS A BLOCK APART AND THREE BREAKFAST CAFES A BLOCK APART. RETAIL STORES, SEVEN INCLUDING ONE OWNED BY THE CITY. COMMUNITY SERVICE BUSINESSES, TWO. OFFICES, FOUR POINT PERFORMING ARTS SPACES, TWO. FITNESS, ONE. PERSONAL SERVICES, 52. I'M SORRY, 32. 32 PERSONAL SERVICE BUSINESS IS. SO TOTAL OCCUPIED SPACES ARE 58. THE MAJORITY OF WHICH ARE PERSONAL SERVICE. NOT RESTAURANT. NOT RETAIL. THERE ARE ONLY FIVE AVAILABLE LEASE SPACES IN OLD TOWN, ON RAILROAD . FIVE. THAT'S IT. THAT'S ALL THAT'S LEFT. ONE INTERESTING ADDITIONAL POINT, THERE IS ZERO DIRECT ACCESS TO PARKING LOTS FROM RAILROAD AVENUE. EVERYBODY THAT VISITS RAILROAD AVENUE MUST GO TO A SIDE STREET IN ORDER TO GET INTO A PARKING LOT. FOR THOSE OF YOU NOT FAMILIAR WITH MODERN DOWNTOWN DESIGN STANDARDS, HIGH DENSITY OF SERVICE BUSINESSES IS CONSIDERED INAPPROPRIATE FOR BUSINESS SHOPPING OESTREICH. EXCUSE ME, COULD YOU PLEASE WRAP IT UP YOU MAKE YOUR TIME IS UP. >> ABSOLUTELY, I GOT FIVE SECONDS LEFT BECAUSE THEY NEGATIVELY IMPACT PARKING AVAILABILITY AND THE WALK ABILITY OF THE DISTRICT, ESPECIALLY IN THE SUBURBS. GET HERE WE ARE. THINK THANK YOU. MADAME CLERK, ARE THERE ANY OTHER ADDITIONAL PUBLIC COMMENTS? THERE ARE NONE. >> THANK YOU. MR. SECRETARY, ANY PRESENTATIONS FOR TONIGHT'S MEETING NEXT >> MANAGER, THERE ARE NO PRESENTATIONS FOR TONIGHT. >> THANK YOU. I'M NOW CALLING FOR THE APPROVAL OF CONSENT CALENDAR. DOES ANYONE HAVE ANY ITEM THEY WANT TO HOLD THE CONSENT CALENDAR, TO BE CONSIDERED SEPARATELY, IF NOT? DO I HEAR A MOTION HE'LL COMMISSIONER POPOVA. >> A MOTION TO APPROVE THE CONSENT CALENDAR AS IS. >> COMMISSIONER STOKES. I SECOND. >> LET'S CAST OUR VOTES. >> THE MOTION PASSES UNANIMOUSLY. THANK YOU. WE NOW COME TO THE COMMISSION CONSIDERATION PORTION . MR. SECRETARY, PLEASE READ THE NEXT ITEM. >> YES, BUT EVENING MADAME SHARON COMMISSIONERS. AGAIN, ITEM NUMBER FOUR, COMMISSION CONSIDERATIONS. THAT WAS ON THE AGENDA, NOW IT'S ITEM NUMBER THREE SO THAT ITEM TONIGHT IS A RECOMMENDATION FOR ADOPTION [ INAUDIBLE ] CAPITAL IMPROVEMENT PROGRAM. ASSISTANT DIRECTOR OF PUBLIC WORKS WILL BE PROVIDING THE COMMISSION WITH THE PRESENTATION TONIGHT. THANK YOU. >> THANK YOU. GOOD EVENING CHAIR FOSTER AND NUMBERS OF THE PLANNING COMMISSION. MY NAME IS GINA HAYNES AND I'M ASSISTANT DIRECTOR OF PUBLIC WORKS OVER ENGINEERING. THANK YOU FOR GIVING ME THE OPPORTUNITY TO PRESENT THE CAPITAL IMPROVEMENT PROGRAM TONIGHT, SO I WILL BE PROVIDING YOU IN A DATE ON OUR DRAFT FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 25-26 THROUGH 29 TO 30. THE CIP BOOK IS A FINANCIAL DOCUMENT THAT SERVES AS A PLANNING TOOL TO IDENTIFY THE NEEDS OF THE CITY'S INFRASTRUCTURE, TO STRATEGICALLY ALLOCATE FUNDING TO SUPPORT LONG-TERM GROWTH, SAFETY, AND SUSTAINABILITY OF OUR COMMUNITY. EACH YEAR THE FIVE YEAR CIP IS UPDATED TO REFLECT PROJECTS THAT HAVE BEEN COMPLETED, THE STATUS OF ONGOING PROJECTS, AND ADDING NEW PROJECTS. THIS DOCUMENT ALSO INCLUDES FUNDING RECOMMENDATIONS FOR THE SCHOOL YEAR 25-26. FOR THIS YEAR WE HAVE CONDENSED OUR PROJECT CATEGORIES FROM 10 CATEGORIES TO SIX CATEGORIES LISTED HERE --ROADWAY INFRASTRUCTURE NOW INCLUDES PAVEMENT, TRAFFIC, AND SIGNAL PROJECTS. UNDERGROUND NOW INCLUDES UNITARY SEWER, WATER, AND STORM DRAIN PROJECTS AND COMMUNITY FACILITIES NOW INCLUDE IMPROVEMENTS TO CITY-OWNED FACILITIES, INCLUDING GENERAL PROJECTS AND BUILDING PROJECTS. WE CONSOLIDATE PROJECT CATEGORIES TO PROVIDE A MORE EFFECTIVE AND EFFICIENT WAY TO PRESENT PROJECTS IN SIMILAR CATEGORIES. SINCE THE LAST CIP WAS PRESENTED, WE HAVE COMPLETED A TOTAL OF 16 PROJECTS COSTING $24 MILLION. THIS INCLUDES PROJECTS SUCH AS ROAD REHABILITATION, STORM AND WATER INFRASTRUCTURE, TRAFFIC BUILDING REPAIRS. I'M GOING TO HIGHLIGHT A FEW OF OUR ACCOMPLISHMENTS FROM OUR LAST UPDATE. OUR FIRST PROJECT IS OUR FRONTAGE ROAD LIVING GREEN TRAIL PROJECT. THIS PROJECT COSTS $2.2 MILLION WITH $1.4 MILLION IN GRANT FUNDING. THIS PROJECT, CONSTRUCT A CLASS ONE TRAIL ON FRONTAGE ROAD FROM DOVER TO THE END OF THE EXISTING PEDESTRIAN TRAIL AT CHELSEA WAY. THE PROJECT ALSO INCLUDED THE INSTALLATION OF PATHWAY SWALES AND BIO RETENTION FEATURES AND EIGHT NEW SECURITY CAMERAS ALONG THE TRAIL. THE PROJECT WAS RECORD HIGHS AS A PROJECT OF THE YEAR BY THE A PWA NORTHERN CALIFORNIA CHAPTER. SO OUR 23-24 PAVEMENT MANAGEMENT PROGRAM, SO WE KICKED OFF OUR 10 YEAR PAVEMENT MANAGEMENT PROGRAM WITH THIS PROJECT SERVING ZONE THREE. THE AREA INCLUDED ALL RESIDENTIAL AND COLLECTOR STREETS ON THE NORTH AND SOUTH SIDE OF WEST LELAND ROAD BETWEEN DALY ROAD ANDOVER. TOTAL COST OF THIS PROJECT WAS $4.6 MILLION AND A MAJORITY OF THE FUNDING CAME FROM GENERAL FUND WITH FUNDING FROM HOW RECYCLED GRANT, YOU THE A AND RFRA. OUR CORPORATION YARD FUELING SYSTEM REPLACEMENT PROJECT --SO THIS PROJECT STARTED IN 2021 AND LOOTED THE REMOVAL OF THE TANKS AT OUR CITY'S CORPORATION YARD AS WELL AS THE NEW FUELING STATION FOR FLEET VEHICLES AT OUR ENVIRONMENTAL CENTER. THE PROJECT WAS A $1.9 MILLION PROJECT THAT NOW ALLOWS CITY VEHICLES TO REFUEL, PAYING BULK PRICES INSTEAD OF MARKED UP RATES AT PUBLIC STATIONS. OUR AMERICANA PARK BYPASS CHANNEL PROJECT WAS COMPLETED LAST YEAR FOR A COST OF $1.5 MILLION. THE PROJECT INCLUDED A FEDERAL GRANT OF $374,000. THE PURPOSE OF THIS PROJECT WAS TO REDUCE FLOOD HAZARDS AND MITIGATE STORMWATER OVERFLOWS. THE PROJECT SOLVED AN ONGOING FLOODING ISSUE ON NORTH PARKSIDE DRIVE BY DIVERTING STORMWATER TO ANOTHER GREEK WITH ADDITIONAL CAPACITY. OUR CITY PARK RESTROOM PROJECT. SO CITY PARK WAS THE FIRST PARK BUILT WITHIN THE CITY AND HAS REMAINED ONE OF THE MOST POPULAR PARKS TO DATE. THE PARK HAS TWO OUTDATED RESTROOM BUILDINGS THAT HAD REACHED THE END OF LIFE. THE PROJECT WE ARE CALLING PHASE ONE INCLUDED REPLACEMENT OF ONE OF THE RESTROOM BUILDINGS, A [ INAUDIBLE ] EIGHT STALL FACILITY THAT WAS COMPLETED LAST MONTH USING $990,000 OF ARPA FUNDS. CURRENTLY RESTROOMS ARE OPEN WITH SCHEDULED PARK PROGRAMS. SO WE HAVE 53 NEW AND CURRENT PROJECTS WITH A TOTAL ESTIMATED COST OF $277 MILLION, FOR THE BENEFIT OF THE RESIDENTS OF PITTSBURG. THIS IS A BUSY SUMMER, AS WE HAVE NINE PROJECTS IN CONSTRUCTION OR NEARLY IN CONSTRUCTION. THIS PROJECT CONSISTS OF --THESE PROJECTS CONSIST OF VARIOUS FUNDING, FEDERAL, STATE AND LOCAL FUNDS, GRANTS, THE ONLY COULD DOUBLE FOR OUR CITY TO SUSTAIN AND GROW. THE CITY OF PITTSBURG CONTINUES OUR COMMITMENT TO THE COMMUNITY BY PRIORITIZING PAVING REHABILITATION THROUGHOUT THE CITY. WE ARE ON OUR SECOND ZONE, ZONE 4 PAVEMENT MANAGEMENT PROJECT THAT WAS IDENTIFIED IN OUR 10 YEAR PROGRAM. CONSTRUCTION KICKED OFF IN MAY AND WE ARE EXPECTED TO BE DONE NEXT MONTH. THIS WAS A $4.6 MILLION PROJECT. AS A PART OF THIS PROJECT, WE ADDED WE LOW-PASS ROAD AND RANGE ROAD. OUR DELTA DEANZA TRAIL MULTIMODAL TRAIL SAFETY IMPROVEMENT PROJECT IS A $5 MILLION PROJECT THAT INCLUDE THE INSTALLATION OF CRITICAL SAFETY AND OPERATION ENHANCEMENTS ALONG THE DELTA DIABLO CLASS ONE TRAIL. WE EXPECT TO START DESIGNING ON THIS PROJECT IN THE FALL. THE EFFORT WILL REQUIRE COORDINATION WITH EAST BAY REGIONAL PARK DISTRICT AND CONTRA COSTA COUNTY FOR THE IMPROVEMENTS LOCATED IN BAY POINT. THE PROJECT WILL CREATE A WELL-CONNECTED AND ATTRACTIVE TRANSPORTATION NETWORK FOR OUR PEDESTRIAN AND BIKE COMMUNITY. THE TRAIL IS ALSO PARALLEL TO SEVERAL IMPORTANT ROUTES THAT WILL BE BENEFICIAL FOR OUR BIKE FRIENDS. THE PROJECT IS BEING CONSTRUCTED USING $4.4 MILLION IN FEDERAL FUNDS. PITTSBURG PREMIER FIELD PROJECT IS A $6.8 MILLION PROJECT $1.9 MILLION OF ARPA FUNDS, PARK DEDICATION FUNDS AND MEASURE M FUNDS. CURRENTLY CONSTRUCTIONS ABOUT 70% COMPLETE AND WE EXPECT FINAL COMPLETION BY THE END OF OCTOBER. THE PROJECT INCLUDES SPORTS FIELD, LIGHTING, LANDSCAPING AND IRRIGATION, SITE FRONTAGE, STREET PLANTINGS AND RESTROOMS. THE PROJECT ALSO INCLUDES PARKING LOT, PAVED AND UNPAVED WALKWAYS AND TRAILS CIRCULATING THE FACILITY. OUR WATER TREATMENT PLANT FILTER IMPROVEMENT AND HYPOCHLORITE CONVERSION PROJECT, THIS, THE WATER TREATMENT PLANT WAS ORIGINALLY CONSTRUCTED IN THE 1950. THIS --THE PROJECT IMPROVEMENTS FOR THIS PROJECT INCLUDE CONSTRUCTION OF TREATMENT PLANT FILTRATION IMPROVEMENTS AND HYPOCHLORITE CONVERSION. IT WILL CONVERT THE EXISTING GAS FLOORING SYSTEM TO LIQUID AND IT WILL CONSTRUCT SIX NEW DUAL MEDIA FILTERS AND REPLACEMENT OF SOME EXISTING PIPING AND VALVES. WE STARTED THIS PROJECT IN 2024 AND EXPECT TO BE COMPLETED BY JANUARY OF 2028. THE CENTRAL HARBOR PARK AND BOAT LAUNCH PROJECT INCLUDES APPROVING A.D.A. PATHS, RESTROOM REPLACEMENTS, PARKING LOT IMPROVEMENTS, POLICE SUBSTATIONS WITH SECURITY CAMERAS AND OTHER IMPORTANT AMENITIES. THE PROJECT IS LOCATED NORTH OF MARINA BOULEVARD, ADJACENT TO THE PITTSBURG YACHT CLUB . THIS PROJECT WAS FUNDED WITH $4.2 MILLION STATE GRANTS AND $3.5 MILLION DELTA CONSERVANCY 22 GRANTS. WHILE THE RESTROOM AND BOAT LAUNCH IS CURRENTLY OPEN, WE EXPECT FINAL COMPLETION OF THE REMAINING IMPROVED MINTS IN OCTOBER OF 2025. SO OUR ZONE 7 PAVEMENT MANAGEMENT PROJECT IS OUR THIRD ZONE IN OUR PAVEMENT MANAGEMENT PROGRAM. IS BORDERED BY CARTER, BUCHANAN, THE PG&E PORTER AND LELAND ROAD. THIS IS A $4.2 MILLION PROJECT AND A MAJORITY OF THE FUNDING COMES FROM OUR MRA AND MEASURE M AS WELL AS MEASURE J AND WHO THE. OUR CURRENT PLAN IS TO DO THIS PROJECT IN TWO PHASES, DUE TO INADEQUATE FUNDING. THE HARBOR STREET SAFETY IMPROVEMENT PROJECT, THIS NEW PROJECT WILL CONSTRUCT SAFETY IMPROVEMENTS ALONG HARBOR STREET WITH A FOCUS ON THE AREAS AROUND PITTSBURG HIGH SCHOOL, HILLVIEW JUNIOR HIGH AND HIGHLANDS ELEMENTARY SCHOOL. PROJECT SCOPE INCLUDES IMPROVING SIGNAL HARDWARE AT INTERSECTIONS, NEW LIGHTING, UPGRADED PEDESTRIAN CROSSINGS. THIS PROJECT IS FUNDED WITH THE $2.6 MILLION HIGHWAY SEE IMPROVEMENT PROGRAM FUNDS WITH [ INAUDIBLE ] MATCHING FUNDS. THE DESIGN IS SET TO START IN FISCAL YEAR '26. THE WESLEYAN ROAD --THE WEST LELAND ROAD EXTENSION PHASE TWO WILL EXTEND WEST LELAND ROAD FROM ITS CURRENT TERMINUS NEAR SANTA TERESA IN A WESTERLY DIRECTION TO AVILA, PROVIDING CONDUCTIVITY FROM PITTSBURG TO CONCORD CITY LIMITS. THE NEW WILL BE APPROXIMATELY .6 MILES AND INCLUDE FOUR LANES WITH RAISED, SIDEWALKS, LANDSCAPING, AND A CLASS TO BIKE LANES. THIS $33.4 MILLION PROJECT IS FUNDED ENTIRELY BY EAST CONTRA COSTA REGIONAL FEE AND FINANCE AUTHORITY. WE EXPECT DESIGN IN THIS PROJECT TO BE COMPLETED BY FISCAL YEAR 20 SEVENDUST 28 AND CONSTRUCTION COMPLETED IN 28-29. THE PITTSBURG ANTIOCH HIGHWAY WIDENING PROJECT, THIS PROJECT WILL CONSIST OF WIDENING THE PITTSBURG ANTIOCH HIGHWAY FROM LOVERIDGE ROAD TO EASTERN CITY LIMITS AT RC LANE, FROM TULANE TO FOUR LANES. THE PROJECT WILL ACCOMMODATE CLASS 2 BIKE LANES, SIDEWALKS AND A RAISED LANDSCAPE MEDIUM. THE PROJECT IS FUNDED ENTIRELY BY $38.1 MILLION FUNDS. WE EXPECT THE DESIGN OF THIS PROJECT TO BE COMPLETED IN FISCAL YEAR 27-28 AND CONSTRUCTION IN 28-29. SO THE BAILEY ROAD IMPROVEMENT PHASE ONE. SO THIS PROJECT WILL WIDEN BAILEY ROAD FROM WEST LELAND ROAD TO THE SOUTHERN CITY LIMITS, FROM TWO LANES TO FOUR LANES. THE PROJECT WILL ACCOMMODATE CLASS 2 BIKE LANES, SIDEWALK ALONG BAILEY, ESTATES FRONTAGE, A RAISED CENTER MEDIAN. THE PROJECT WILL BE COMPLETED IN TWO PHASES. FUNDING WILL BE PROVIDED BY ACURA FOR. THAT'S 97% FUNDED AND THE REMAINING FUNDS COMING FROM DEVELOPER DEPOSITS. THIS IS THE $21 PROJECT. DESIGN IS SET TO START IN FISCAL YEAR 26. CONSTRUCTION COMPLETE IN FISCAL YEAR 2030. SO THE SLIDE SHOWS A SUMMARY OF THE PROJECT INCLUDED IN THE DRAFT FIVE-YEAR CAPITAL IMPROVEMENT, FISCAL YEARS 25-26 THREE 20 9-3. WE COMPLETED 16 PROJECTS FOR A TOTAL COST OF $22.5 MILLION AND WE HAVE ANOTHER 53 CURRENT OR NEW PROJECTS TOTALING $276.9 MILLION. WE HAVE $69 MILLION IN NEW PROJECTS FOR THIS FISCAL YEAR 25-26. PROJECTS INCLUDED IN THIS CAPITAL IMPROVEMENT PROGRAM ARE THOSE THAT ARE HIGH-PRIORITY AND ARE FULLY FUNDED, PARTIALLY FUNDED, OR UNFUNDED. THAT CONCLUDES MY PRESENTATION TONIGHT AND I'M AVAILABLE FOR ANY QUESTIONS. >> THANK YOU. I ASKED THE COMMISSIONERS, DO YOU HAVE ANY ACTUAL QUESTIONS OF STAFF? COMMISSIONER ROBINSON? >> THANK YOU FOR THE PRESENTATION. VERY INFORMATIVE AND IT'S GREAT TO SEE ALL THE WORK WE HAVE DONE SO FAR, AND THEN OF COURSE WE ARE PLANNING A LOT. THIS IS ONE OF THE VERY INTERESTING ONES THAT COME THROUGH ANNUALLY AND WE GET TO UPDATE AND THE CHANGES THAT HAVE BEEN MADE. FOR THE DELTA DEANZA TRAIL STAGE IMPROVEMENT, ONE QUESTION I HAD IS IF IT LIGHTING. >> YOU KNOW WE ARE JUST STARTING THE DESIGN. WE WOULD LIKE TO INCLUDE LIGHTING. IT REALLY IS GOING TO BOIL DOWN TO OUR FUNDING AND IF WE CAN MAKE IT STRETCH. OKAY. THANK YOU. WE ARE TRYING TO GET PEOPLE OFF THE ROAD, OUT OF VEHICLES, AND TAKING ALTERNATE MEANS OF TRANSPORTATION. BEING ABLE TO DO IT AROUND-THE-CLOCK WOULD BE PRETTY MUCH NECESSARY, SO PROVIDING SOME OF LIGHTING OR SAFE WOULD BE REALLY IMPORTANT FOR A PROJECT LIKE THIS. I THINK THAT'S MY MAIN QUESTION. I ALSO HAVE TO LOOK AT MY NOTES BUT THANK YOU. >> ANYONE ELSE? ADDITIONAL TAKERS? COMMISSIONER SMITH? >> THANK YOU MADAM CHAIR. THAT WAS A LOT OF INFORMATION. THANK YOU. I TRIED TO FOLLOW AND TAKE NOTES ALONG THE WAY AND MISSED SOME ALONG THE WAY. SO A QUESTION ABOUT THE PITTSBURG PREMIER FIELDS. I KNOW WE'VE HAD A LOT OF DISCUSSION ABOUT THAT, THAT'S COME OUR WAY, AND WE'VE GOT TO LOOK AT IT. WHERE IS THE FUNDING COMING FROM FOR THAT? HOW IS THAT LOOKING UP? >> IT ON THESE SHEETS SO I COULD GIVE YOU -- >> OKAY. SO FUNDING FOR THAT IS $1.8 MILLION IN ARPA FUNDS, ABOUT $2.1 MILLION IN GENERAL FUND FUNDS, $2.2 MILLION IN PARK DEDICATION FUNDS, AND 438,000 IN MEASURE M SURPLUS. OKAY. THANK YOU FOR THAT, AND ANOTHER QUESTION I HAVE IS ABOUT THE CENTRAL HARBOR PARK AND BOAT LAUNCH FACILITIES. I ALWAYS BRING UP THE RIVER. I THINK IT'S OUR GREATEST ASSET THAT WE HAVE HERE. IT REALLY IS A BEAUTIFUL PLACE, AND A LOT OF COMMUNITY MEMBERS HAVE COME AND ASKED ME, FIRST OF ALL, CAN I GET MY BOAT IN, SO IT LOOKS LIKE THE LAUNCH RAMP IS OPEN CURRENTLY, AND THERE IS DISCUSSION ABOUT IT BECOMING SOMETHING THAT WE WOULD CHARGE PEOPLE TO LAUNCH THEIR BOAT. IS THAT ON LIST ANYWHERE? >> YOU KNOW I DON'T HAVE THE ANSWER TO THAT QUESTION. I WOULD HAVE TO FOLLOW UP WITH THE MARINA. >> THAT'S A BIG ONE AND THAT'S A BIG CONCERN, OF COURSE, TO A LOT OF PEOPLE. AND THE OTHER QUESTION I HAVE TO GO WITH THAT IS, SO I KNOW THAT WE'VE RESURFACED THAT BIG ARCING AREA THAT USUALLY FLOODS IN THE WINTERTIME, PRETTY WELL. WHERE WOULD THE BOAT TRAILER PARKING BE? >> IT IS IN THAT PARKING LOT . >> JUST IN THAT PARKING LOT. THERE'S NO EXTENSIONS TO THAT? BECAUSE I KNOW THEY DON'T FIT AND SOMETIMES THEY'LL PARK ON THE ROAD TO. >> I DON'T KNOW IF YOU'VE BEEN DOWN THERE BUT THEY'VE COMPLETE RE-STRIPED IT AND HAVE IT MORE ORGANIZED, SO I THINK THE NEW STRIPING WILL ACCOMMODATE MORE USERS. >> OKAY, WELL THANK. >> I'M GOING TO ASK MY QUESTION. SLIDE 7, PLEASE. IT'S THE AMERICANA PARKWAY PAST CHANNEL. YES. >> WHAT WAS THE WORK INVOLVED? I MEAN WAS THERE SOME DREDGING? DID YOU JUST DO THE RIPRAP? >> GOSH. JULIAN MIGHT KNOW MORE ABOUT THIS. >> AND HOW MUCH FLOODING? WAS IT GOING TO THE STREET, FLOODING TO THE STREET SIDE? >> SO THE PROJECT WAS TO DIVERT THE RUNOFF THROUGH THE PG AND THE CORE DOOR AND BYPASS THE ROADWAY INTO THE CULVERT, TO ALLEVIATE THE FLOODING FROM THE ROADWAY. THERE IS STILL A PHASE 2 TO THE PROJECT TO WORK ON THE BASIN IN THE FUTURE AS GRANT FUNDS ARE AVAILABLE. >> AND HOW MUCH FLOODING -- LET'S SAY DURING THE BIG STORM OR IS IT EVERY WINTERTIME? ARE WE TALKING ABOUT FEED OR IS IT STOPPING VEHICLES? >> IT WAS USUALLY FOR HEAVY RAIN STORMS, YES. >> ABOUT A? >> YES. >> DOES THAT HAPPEN ON PITTSBURG ANTIOCH HIGHWAY, TOO, OR KNOW. BEEN KNOW WE HAVEN'T SEEN THAT ON PITTSBURG ANTIOCH HIGHWAY. THE ONLY DIFFERENCE BETWEEN PITTSBURG ANTIOCH HIGHWAY OR THE TREES ARE SUCKING UP SOME OF THAT WATER PLANTING TO HELP, I WOULD SAY SOME OF THE STORM RUNOFF, LIKE PUTTING FIRE RESISTANT TREES? >> YES, THERE'S A SECOND PHASE TO THE PROJECT TO INCLUDE SOME MITIGATION PLANTING, WHICH WE'LL BE MONITORING FOR THE NEXT FIVE YEARS. >> THAT'S WONDERFUL AND THAT'S MUSIC TO MY EARS. THANK YOU. >> I'LL FOLLOW UP QUESTION WHEN THE PITTSBURG-ANTIOCH HIGHWAY WILL BE WIDENED, WILL THE TREES BE REPLANTED? BECAUSE MY UNDERSTANDING IS DURING A SUBCOMMITTEE MEETING THAT IT WILL BE WIDENED TOWARDS THE --YOU KNOW, TOWARDS THE CREEK, AND WE DO HAVE SOME OF THOSE OLD-GROWTH TREES THERE THAT'S HELPING WITH THE STORM WATER RUNOFF. >> SO THAT IS CERTAINLY SOMETHING THAT WILL COME UP IN THE ENVIRONMENTAL PHASE OF REVIEW OF THAT PROJECT. SO IF THERE IS MITIGATION PLANTING TO BE DONE, THAT WILL BE DONE. >> I HOPE SO, TOO, BECAUSE WE DON'T WANT ANY FLOODING THERE, WITH THE PLANS TO KIND OF MAKE IT ANOTHER, I WOULD SAY, LIKE BUSINESS CORRIDOR, FROM MY UNDERSTANDING, FROM OUR PUBLIC WORKS DIRECTOR. COMMISSIONER SMITH? >> THANK YOU MADAM CHAIR. I HAVE AN ADDITIONAL QUESTION. AS YOU JUST BROUGHT UP THE PITTSBURG-ANTIOCH HIGHWAY, ANOTHER ONE OF MY FAVORITE LOCATIONS TO CAN SITTER, WHERE IS THE WIDENING BEGINNING ON THIS? WHAT IS THE LENGTH OF THIS? PITTSBURG-ANTIOCH HIGHWAY IS A LONG STRETCH. >> SO IT STARTS AT EAST CITY LIMITS, SO RIGHT AT THE BORDER BETWEEN PITTSBURG AND ANTIOCH, AND GOES TO LOVERIDGE ROAD . >> IT GOES TO LOVERIDGE ROAD. >> DID YOU SAY RC LANE? THAT'S WHERE EAST CITY LIMITS ARE, THAT'S CORRECT. >> I GUESS I NEED TO LOOK AT A DIFFERENT TO UNDERSTAND THIS. SO THE CURRENT PITTSBURG-ANTIOCH HIGHWAY THAT IS ALSO CALLED 14th STREET IS PART OF THIS, CORRECT? OR NOT? >> IT DOESN'T GO THAT FAR. IT STOPS AT LOVERIDGE ROAD, SO IT STOPS AT THE ANTIOCH-TRAN07 CITY LIMITS AND STOPS AT LOVERIDGE ROAD. >> ALL RIGHT. THANK YOU. >> ARE THERE ANY OTHER QUESTIONS? MADAM CLERK, ARE THERE ANY COMMENTS FROM THE AUDIENCE? >> THERE ARE. JUST A MOMENT, PLEASE. >> THROUGH THE CHAIR, ALSO WANT TO OPEN UP FOR PUBLIC COMMENT, YOU NOTICE A COMMISSION CONSIDERATION ITEM BUT WE DO WANT TO -- >> DO I SAY OPEN THE PUBLIC HEARING? >> JUST OPEN IT FOR COMMENT. >> I'LL OPEN THIS ITEM FOR COMMENT, PUBLIC COMMENT. RUTH OLSON. >> THANK YOU. GOOD EVENING. I AM BRUCE OLSON, PITTSBURG 'S MR. BICYCLE, SPEAKING FOR PITTSBURG'S ICICLE COMMUNITY. FIRST, WELCOME HOME GINA HAYNES. WE LOVE YOU AND WE'RE GLAD YOU'RE HOME. THANK YOU. THE PITTSBURG BICYCLE COMMUNITY HAS ONE OR PROJECT FOR THE FIVE-YEAR CIP. THAT MAKES EXTRA WORK FOR GINA. THE LEAGUE OF AMERICAN BICYCLISTS, WHICH IS THE NATIONAL BICYCLE ADVOCACY ORGANIZATION, HAS AN AWARD THAT THE CITY CAN EARN TO BECOME A BICYCLE FRIENDLY COMMUNITY. 436 CITIES IN THE UNITED STATES HAVE APPLIED AND BECOME BICYCLE FRIENDLY COMMUNITIES. THE PITTSBURG ACTIVE TRANSPORTATION PLAN CALLS FOR US TO APPLY AND BECOME A BICYCLE FRIENDLY COMMUNITY. I VOLUNTEER TO HELP WITH THE APPLICATION AND TO SERVE ON THE BICYCLE ADVISORY COMMITTEE THAT IS FORMED AS PART OF THE REQUIREMENTS OF BECOMING A BICYCLE FRIENDLY COMMUNITY. PITTSBURG HAS ALREADY DONE THE HARD PART, AND THAT IS WE HAVE BUILT A NETWORK OF PEDESTRIAN AND BICYCLE PATHS AND BICYCLE LANES THROUGHOUT OUR COMMUNITY. THANK YOU VERY MUCH. THANK YOU MR. OLSON. MADAM CLERK, ARE THERE ANY OTHER PUBLIC COMMENTS? >> THERE ARE NONE. >> THANK YOU. COMMISSIONERS, IT'S TIME FOR DISCUSSION. WHAT SAY? WHAT IS YOUR PLEASURE? WOULD SOMEBODY MAKE A MOTION? COMMISSIONER SMITH, YOU HAVE ADDITIONAL COMMENTS? >> I DO. THANK YOU MADAM CHAIR. I GUESS I WANT TO ADD MY VOICE TO OUR CHAIRPERSON, BECAUSE I THINK WE REALLY NEED TO CONSIDER SOME HEAVY AND SERIOUS PLANTING IN THE AREAS THAT WE'RE RENOVATING, ESPECIALLY ON THE ROADWAYS, ESPECIALLY WHERE WE HAVE FLOODING. YES I'M INTERESTED IN THE PITTSBURG-ANTIOCH HIGHWAY, BUT LELAND, ALL OF WHERE WE ARE HAVING CHANGES TO OUR ROADWAYS, AND JUST IN LOOKING AT THE PHOTOS THAT YOU BROUGHT IN HERE, I'D LIKE TO SEE MORE TREES AND THAT ACTIVELY DONE SOONER RATHER THAN LATER, BECAUSE IT'S GOING TO HELP WITH NOT ONLY THE FLOODING BUT THE CONSERVATION OF WATER AS WELL SO IT HELPS THE ENVIRONMENT. WE DO A GOOD JOB WITH IT WHEN WE REALLY GET TO IT AND PAY ATTENTION TO IT AND I ALSO WANT TO ADD MY TWO CENTS ON THE PITTSBURG-ANTIOCH HIGHWAY. IT'S IN THE 14th STREET AREA WHERE THE BIG TREES HAD BEEN CUT DOWN ABOUT 10-PLUS YEARS AGO NOW BY PG&E AND THAT WERE PROMISED TO BE REPLANTED, AND I'M STILL WAITING. I LIVE IN THAT NEIGHBORHOOD. I SEE THAT EVERY DAY AND IT'S AN AREA WHERE WE HAVE A LOT GARBAGE THAT BLOWS UP AGAINST THE FENCE BY THE RAILROAD TRACKS, AND WHILE OUR CITY WORKERS DO A REALLY GOOD JOB KEEPING UP ON IT, I'M EXPECTING TO SEE PLANTING THEIR. IF WE ARE GOING BEAUTIFY THE PITTSBURG-ANTIOCH HIGHWAY AND MAKE IT MORE USABLE AND MORE ATTRACTIVE, WE NEED TO TAKE CARE OF ALL OF IT, NOT JUST ONE PIECE OF IT .SO I WANT TO ADD MY WORD TO THAT AGAIN BECAUSE THAT WAS A PROMISE PG&E MADE IN AN OPEN PLANNING COMMISSION MEETING, PROBABLY 12 YEARS AGO, RIGHT HERE. THANK YOU. >> THROUGH THE CHAIR I JUST WANT TO ADD ONE ADDITIONAL COMMENTS. WE DO HAVE THE URBAN FOREST MANAGEMENT PLAN, WHICH YOU ARE COMMISSION DID HERE, WHAT'S IT LIKE, MAYBE TWO OR THREE COMMISSIONS AGO? SO A LOT OF THOSE COMMENTS THAT YOU'RE THINKING ABOUT, YOUR THOUGHTS IN REGARDS TO HOW WE LOOK AT TREEPLANTING AND THE TREE CANOPY FOR THE ENTIRE CITY, WE ARE LOOKING AT THOSE ALONG THE HIGHWAYS, WE ARE LOOKING AT THOSE ALONG THE STREET, TOO SO JUST WANT TO ADD THAT AS A COMMENT. THANK YOU. >> BEFORE I CALL A MOTION TO APPROVE I ALSO HAVE AN ADDITIONAL COMMENT, YOU KNOW, WITH TREEPLANTING, THE ADVOCACY PART, BECAUSE BETWEEN THE BICYCLE AND PEDESTRIAN ADVOCACY, IF WE DO PLANT MORE TREES IT'S GOING TO ENCOURAGE PEOPLE TO BIKE AND WALK MORE. AND WHAT'S REALLY FORCING PEOPLE TO DRIVE, YOU KNOW IT'S NOT JUST BECAUSE OF THE DESIGN BUT ALSO I LOCK THE CITY FOR MAKING THOSE PEDESTRIAN IMPROVEMENTS, INCLUDING A RAILROAD. IT'S ALSO TO PLANT THOSE TREES, BECAUSE PLANTING OF TREES IN ROADWAYS TO HELP TRAVELERS HAD BEEN RECOGNIZED EONS AGO, EVEN AT THE --DURING THE TIME OF GENGHIS KHAN. HE PLANTED TREES ON THE SILK ROAD SO THAT THE MERCHANTS CAN REST ALONG THE WAY, SO THAT'S WHY TREES ARE IMPORTANT IN THAT CONTEXT, BECAUSE WE DO NEED THAT COOLING SHADE AND THE INVESTMENTS ON IT ARE JUST SO LITTLE COMPARED TO HAVING TO CREATE ARTIFICIAL INFRASTRUCTURE. SO WITH THAT, COMMISSIONER ROBINSON, ARE YOU MOVING ON? >> YES. AS INDICATED, I AM MOVING. I RECOMMEND ADOPTION OF THE FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM, GENERAL PLAN CONSISTENCY WITH DETERMINATION, AND IT'S GREAT TO HEAR SO MANY PEOPLE SPEAKING UP ABOUT TREES. IT'S SOMETHING THAT I KNOW WE DO HERE PRETTY REGULARLY BUT IT'S GREAT TO HEAR AND IT'S GREAT TO HAVE A PLAN THAT MR. FUNDERBURK MENTIONED IN PLACE. >> COMMISSIONER POPOVA. >> I WOULD BE AMISS TO NOT ACKNOWLEDGE THE IMPORTANCE OF TREES. THE 21st CENTURY, I FEEL LIKE WE MIGHT BE VERY CLEAR THAT'S WHAT WE WANT MORE OF SO WITH THAT I SECOND THE MOTION. >> LET'S CAST OUR VOTES. THE MOTION PASSES. NO APPEAL. >> NO DISCLOSURE, OF COURSE. FINALLY COME TO THE PUBLIC HEARING PORTION OF THE AGENDA. MR. SECRETARY, COULD THE NEXT ITEM? >> THANK YOU MADAM CHAIR AND COMMISSIONERS. PUBLIC HEARING ITEM FOR TONIGHT, USE PERMIT APPLICATION FOR 3 USES, RELIGIOUS ASSEMBLY, DAYCARE, OFFICE AND ADMINISTRATIVE BUSINESS OF OFFICE USE. THIS IS WITHIN A MULTITENANT BUILDING AT 640, 650 AND 670 CUMBERLAND. KELSEY GARNER, ASSOCIATE PLANNER, WILL BE PROVIDING YOUR COMMISSION WITH A PRESENTATION TONIGHT. THANK YOU. MR. FUNDERBURK AND GOOD EVENING CHAIR AND MEMBERS OF THE COMMISSION. YES I'LL BE PRESENTING ITEM NUMBER THREE NECK TONIGHT, A LITTLE OUT OF ORDER, I GUESS ITEM NUMBER 4 TONIGHT FOR BABY GAIL ACADEMY AND THE CITY OF THE LORD'S I AM CUMBERLAND PETITION FOR REPLICATION. APPLICATION FOR THIS WAS FILED ON JUNE 20th, 25 AND IS LOCATED WITHIN A MULTITENANT BUILDING OF WHICH THE PROPOSED ENTITLEMENT BEFORE YOU THIS EVENING PROPOSES TO OCCUPY ALL THREE TENANT SPACES WITHIN THAT MULTITENANT BUILDING. IT IS LOCATED IN OUR PEDESTRIAN COMMERCIAL ZONE, WHICH IS IN DOWNTOWN PITTSBURG IN THE PREVIOUS USING ONE OF THE TENANT SPACES WAS APPROVED BY YOUR COMMISSION IN 2021, AND IT WAS FOR A BOXING GYM , ANOTHER YOUTH-ORIENTED FACILITY. SO THE NEXT FEW SLIDES ARE GOING TO DESCRIBE THE THREE DIFFERENT USES OF THE THREE DIFFERENT BUILDINGS. THE USE PERMIT IS REQUESTING APPROVAL OF A DAYCARE, A RELIGIOUS ASSEMBLY AND AN OFFICE, BUSINESS AND ADMINISTRATIVE USE. THE OFFICE, BUSINESS AND ADMINISTRATIVE USE IS REALLY A PERMITTED USE WITHIN THE ZONING STREET BUT IT IS INCLUDED WITHIN THE ENTITLEMENT TODAY BECAUSE IT IS A SUPPORTING USE TO THE TWO OTHER USES AT 640 AND 650, WHICH DO REQUIRE A USE PERMIT FOR OPERATION. TO START, THE DAYCARE, IT IS A TODDLER, PRESCHOOL AND SCHOOL AGE DAYCARE FOR MULTIPLE AGES RANGING FROM 18 MONTHS TO 12 YEARS OLD. THE PROPOSED USE WILL HAVE A DESIGNATED ACCESSIBLE PICKUP AND DROP OFF AREA AS COMMISSION ENVISIONED AND IT WILL ALSO COMPLY WITH THE STAGGERED SCHEDULE TO REDUCE TRAFFIC CONGESTION FOR DROP-OFF AND PICKUP TIMES AND THE PROPOSED USE, WHILE TIMES THEY FLUCTUATE IT WILL GENERALLY OPERATE BETWEEN 6:00 A.M. AND 6:00 P.M. THE SECOND USE IS A RELIGIOUS ASSEMBLY USE AND AGAIN THE DAYS OF OPERATION FOR THIS USE ALSO MAY VERY PROPOSES TO BE IN OPERATION AT VARIABLE DAYS BUT MONDAY THROUGH SUNDAY. THE APPLICANT CAN SPEAK MORE TO THE HOURS OF OPERATION OF THEIR DIFFERENT USES. BUT THE RELIGIOUS ASSEMBLY USE DOES PROPOSE TO ACCOMMODATE UP TO 80 PERSONS AND THAT WOULD BE BY USING NON-FIXED SEATING, SO SOMETIMES WITHIN RELIGIOUS ASSEMBLIES YOU SEE FIXED CUES FOR THIS USE THEY DO NOT PUT THOSE TO INSTALL ANY PERMANENT SEATING AND ANY SERVICES WOULD RANGE IN TIME BETWEEN 8:00 A.M. AND 8:00 P.M... THE THIRD USE WITHIN THE THIRD TENANT SPACE WOULD BE THE OFFICE, BUSINESS AND ADMINISTRATIVE USE. AS I MENTIONED, IT WOULD BE SUPPORTIVE OF THE USES OF THE DAYCARE AND THE RELIGIOUS ASSEMBLY. THERE IS A KITCHENETTE AND THERE IS OFFICE SPACES WITHIN THIS THIRD TENANT SPACE AND IT WOULD BE USED AS NEEDED DURING THE HOURS OF OPERATIONS AND DAYS OF OPERATIONS OF THE ADJOINING USES. PROJECT IS LOCATED --IT CONSUMES ABOUT HALF OF A MULTITENANT THING. THE OTHER HALF FRONTS ON RAILROAD AND IS OCCUPIED BY DIFFERENT TENANTS THIS PROJECT SITE OCCUPY ALL THREE TENANT SPACES FACING CUMBERLAND STREET, SO IT'S LOCATED THERE IN THE PARCEL IS IN LIGHTER BLUE AND THE YELLOW IS KIND OF GENERALLY THE ENTIRE AREA OF THE PROJECT SITE. AND THIS IS THE PROPOSED FLOOR PLAN OF THE USE. IS SEPARATED BY THREE DIFFERENT TENANT SPACES. THE FIRST TENANT SPACE IS THE DAYCARE SO YOU ACCESS ON CUMBERLAND, WHICH IS ON THE RIGHT-HAND SIDE OF THE SCREEN. THERE IS A DROP OFF AREA THAT WILL ALSO HAVE SOME PLAY STRUCTURES FOR REQUIREMENTS OF DIFFERENT STATE, I BELIEVE, AGENCIES FOR THEM TO HAVE PLAY AREA AND THEN THERE'S AN OPEN SPACE OR IN THE BACK, WHICH IS THAT LARGER PORTION TOWARDS THE LEFT HAND SIDE OF THE SCREEN AND THAT WOULD HAVE SOME CUBICLES INSTALLED FOR SOME CLASSROOMS AND THE APPLICANT CAN SPEAK A BIT MORE TO THAT AS APPLICABLE. THE SECOND USE IS A RELIGIOUS ASSEMBLY USE AND SO THAT'S HIGHLIGHTED IN RED ON THE SCREEN. EXCELS OFF CUMBERLAND AND 80 PERSONS COULD BE SEATED IN NON-FIXED SEATING IN THE MIDDLE, AND THEN TOWARDS THE BOTTOM OF THAT RED RECTANGLE, THAT'S WHERE THE PROPOSED PASTORS STAND WOULD BE LOCATED. AND THEN THIS IS THE THIRD USE, SO AS YOU CAN SEE THERE, THERE ARE SOME WALLS PETITIONING THE ENTIRETY OF THAT TENANT SPACE SO THAT'S TO BE USED FOR OFFICE SPACE TO SUPPORT BOTH USES, PASTOR'S OFFICE AND ALSO A DAYCARE OFFICE, AND THERE'S KITCHENETTE AND/OR STAFF ROOM TO PREPARE LUNCHES, PREPARE FOOD PRODUCTS FOR BOTH THE CHURCH FACILITY, RELIGIOUS ASSEMBLY AND ALSO THE DAYCARE FACILITY. AS FOR CODE COMPLIANCE, USE PERMITS ARE REQUIRED IN THE CP DISTRICT FOR DAYCARE, GENERAL AND RELIGIOUS ASSEMBLY. TALKED ABOUT THE USE PERMIT ENTITLEMENT FOR THE OFFICE BUSINESS ADMINISTRATIVE USE PERMITTED BUT IN THIS CASE BECAUSE IT IS SUPPORTING USES WE REQUESTING THIS FOR IT AS WELL. AS YOU ARE AWARE, ALL USE PERMITS MUST MEET THE REQUIRED FINDINGS WITHIN TMC SECTION 18.16 .040, FURTHER ADDRESSED AND ANALYZED WITHIN THE PROPOSED RESOLUTION THE PROPOSED BUSINESSES ARE CONSISTENT WITH THE INTENT OF THE PEDESTRIAN COMMERCIAL GENERAL PLAN DESIGNATION AND THAT THEY'LL BRING ADDITIONAL VISITORS, PEDESTRIAN ORIENTED VISITORS TO OLD TOWN PITTSBURG. WHILE THERE ARE NO REQUIRED ARCING FACILITIES AS PART OF USES WITHIN THE CP ZONING DISTRICT, THAT ALSO MEANS THAT THERE ARE NO REQUIRED BICYCLE PARKING FACILITIES PURPOSE OF THE USE BEFORE YOU THIS EVENING DOES NOT PROPOSE ANY BICYCLE PARKING FACILITIES AND WE ARE NOT CONDITIONING ANY BICYCLE PARKING FACILITIES, FOR YOUR REFERENCE, WE WANTED TO INDICATE THE LOCATIONS OF THE SURROUNDING BICYCLE PARKING FACILITIES. THE PROPOSED PROJECT SITE IS INDICATED BY A RED STAR ON THE MAP AND THE YELLOW STARS ARE THE SURROUNDING LIKE PARKING FACILITIES IN CASE THEY ARE NEEDED. THERE ARE MULTIPLE KEY CONDITIONS OF APPROVAL. WITHIN THE PROPOSED RESOLUTION THERE IS A LONGER LIST BUT I WANTED TO IDENTIFY A FEW OF THOSE PURPOSE OF THE PROPOSED USE WOULD BE REQUIRED TO MAINTAIN AND OBTAIN ALL LOCAL, REGIONAL AND STATE LICENSING. WE ARE REQUIRING THE INSTALLATION OF PERMANENT OR SEMIPERMANENT LANDSCAPE PLANTERS TO FURTHER ENHANCE AND BEAUTIFY THE PROJECT SITE, AS PERMITTED WITHIN ZONING PEDESTRIAN COMMERCIAL BUILDINGS CAN OCCUPY THE ENTIRETY OF THE PARCEL SO THERE IS NO ROOM FOR INSTALLATION OF LANDSCAPING TO FURTHER ENHANCE OR TO ACCENTUATE THE FRONT OF THE BUSINESS. SO WE ARE REQUIRING THIS IN ORDER TO CREATE MORE OF A PEDESTRIAN SCALE WALKABLE FRIENDLY STREETSCAPE. AND THE BUSINESS OWNER OPERATOR IS RESPONSIBLE FOR MAINTAINING PEACE AND ORDER ON THE PREMISES, AS REQUIRED BY ALL USE PERMIT APPLICATIONS. IN ADDITION TO THOSE CONDITIONS AND THOSE IN THE RESOLUTION, I'VE ALSO HIGHLIGHTED THAT THE CONTRA COSTA FIRE PROTECTION DISTRICT HAS INCLUDED FIRE CONDITIONS OF APPROVAL REQUIRED TO PUBLIC HEALTH AND SAFETY. THE ENTIRETY OF THE PROPOSED USES, DUE TO CHANGES IN OCCUPANCY AND DUE TO THE SPECIFIC TEETH OF THE FUTURE OCCUPANTS, REQUIRING MULTIPLE TENANT IMPROVEMENT REQUIREMENTS AS PER THE CALIFORNIA FIRE CODE AND ONE OF THOSE JUST TO HIGHLIGHT, IS THE INSTALLATION OF FIRE SPRINKLERS PERCOCET FOR FIRE SAFETY AS WELL AS OCCUPANCY CHANGES IN TERMS OF EVACUATION RAMPS AND EMERGENCY EXITS ARE LEADING INTO THAT IS THE BUILDING CODE REQUIREMENTS. THE BUILDING DIVISION ALSO PROVIDED A LIST OF CONDITIONS OF APPROVAL. CALIFORNIA BUILDING CODE DOES HAVE ALSO SOME STRICT TENANT IMPROVEMENT REQUIREMENTS FOR CHANGES IN OCCUPANCY AND ALSO TO ADDRESS THE SENSITIVITY OF THE DIFFERENT USES, SO THEY'RE ALSO REQUIRING UP RATES TO THE STRUCTURE TO ENSURE ITS SAFE FOR ALL FUTURE OCCUPANTS AND THEN ALL FUTURE IMPROVEMENTS WILL BE REVIEWED AS PART OF THE TENANT IMPROVEMENT PROCESS TO BE APPLIED FOR IF THE APPLICANT RECEIVES ENTITLEMENT APPROVAL FROM THE PLANNING COMMISSION. THE PROPOSED BUSINESS ALSO SHALL OPERATE IN SUBSTANTIAL CONFORMANCE WITH THIS USE APPLICATION INCLUDING THE FLOOR PLAN SUBMITTED TO THE CITY ON JUNE 18th, 2025. AS FOR THE ENVIRONMENTAL, IT IS CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, SEQUEL. IT IS CONSIDERED AN EXISTING FACILITY AND THE PROPOSED USES WOULD OCCUPY AN EXISTING MULTITENANT BUILDING WITH NO EXPANSION OF BUILDING OR CHANGE IN INTENSITY OF THE LAND USE. AS SUCH, STAFF RECOMMENDS THE PLANNING COMMISSION TO ADOPT THE PROPOSED RESOLUTION APPROVING THE USE PERMIT APPLICATION NUMBER AP 25-0054 FOR BABY YALE ACADEMY AND CITY OF THE LORD ZION CUMBERLAND, SUBJECT TO CONDITIONS OF APPROVAL IN THE PROPOSED SOLUTION PURPOSE THAT IS AVAILABLE FOR QUESTIONS SHOULD YOU HAVE ANY IN THE APPLICANT IS ALSO WITH US TO SEE IF YOU HAVE ANY QUESTIONS FOR THEM. THANK YOU. >> THANK YOU SO MUCH. I'LL ASK MY COMMISSIONERS, DO YOU HAVE ANY QUESTIONS OF STAFF, PRETTY MUCH FACTUAL? COMMISSIONER KENT? >> I THANK YOU FOR THE PRESENTATION. I DID READ ABOUT STAGGERED PICKUP AND DROP-OFF TIMES. I THINK THAT WILL HELP ALLEVIATE A LOT OF THE TRAFFIC CONCERNS AND PARKING CONCERNS. IT DOES SEEM LIKE THERE ARE MEASURES IN PLACE TO DIRECT PEOPLE. ONE QUESTION I HAVE IS WHEN THOSE DROP-OFF TIMES OCCUR AND PICK UP TIMES OCCUR, HOW MANY PEOPLE DO WE EXPECT TO HAVE AT ONCE? >> THROUGH THE CHAIR, THANK YOU FOR THE QUESTION. I BELIEVE THEY'RE ABLE TO HAVE BY THEIR CONDITIONS, 3 TO 5 FAMILIES AT ANY TIME BUT THE APPLICANT CAN ALSO FURTHER ADDRESS THAT QUESTION IF YOU WOULD LIKE SOME SPECIFICS. AND AGAIN, THINGS HAPPEN AND SO THAT'S SUBJECT TO VERY BUT I WOULD SAY THEY HAD A GREAT STAGGERED PICKUP AND DROP OFF PLAN. >> OKAY, AND ANOTHER QUESTION I HAVE IS FOR THE RELIGIOUS ASSEMBLY FOR UP TO 80 PEOPLE, IS THAT SOMETHING WE EXPECT TO HAPPEN ALL AT ONCE, AND HOW MIGHT THAT IMPACT PARKING? >> SO AGAIN, THANK YOU FOR THE QUESTION. I THINK THAT ONE, THE QUESTION REGARDING WHETHER OR NOT THE 80 WILL BE THERE ALL AT ONCE, I THINK DIRECTED TO THE APPLICANT BUT THE ENTITLEMENT BEFORE YOU THIS EVENING WOULD BE PERMITTING THEM TO HAVE UP TO 80 PERSONS AND I THINK THE COMPANY BUILDING CODE ACTUALLY ALLOWS FOR MORE BUT THEY'RE NOT GOING TO --THEY'RE REQUESTING ONLY 80, AND IN TERMS OF PARKING, THE PROPOSED USES WITHIN THE DOWNTOWN COMMERCIAL ZONING DISTRICT OR PEDESTRIAN COMMERCIAL ZONING DISTRICT, THEY DON'T REQUIRE PARKING FACILITIES. THERE'S SURROUNDING STREET PARKING AVAILABLE TO ALL USERS AND THEN THERE'S ALSO CITY PARKING FACILITIES AND THAT WOULD BE THERE PROPOSED METHOD OF PARKING. >> THANK. I'LL RESERVE MY OTHER QUESTION FOR THE APPLICANT. THANK. COMMISSIONER POPOVA. THANK YOU. DO YOU THINK YOU COULD GO BACK TO THE SLIDE WHERE IT SHOWS THE THREE USES OF THE SPACE? MY UNDERSTANDING IS THE GREEN BOX IS WHERE THE KITCHENETTE IS GOING TO BE. THE KITCHENETTE IS SUPPORTING BOTH OF THE OTHER USES. DO WE HAVE A SENSE OF WHAT THE FOOT TRAFFIC LOOKS LIKE AMONG THESE THREE SECTIONS? >> SO THROUGH THE CHAIR, THANK YOU FOR THE QUESTION. THERE ARE INTERNAL DOORWAYS AND INTERNAL PASSAGEWAYS, WHICH AREN'T THE CLEAREST ON THIS HERE. IN ORDER TO ACCESS ALL THREE SITES, HELP BUILDING CODE AND FIRE CODE HAVE SPECIFIC REGULATIONS TO REQUIRE EACH ONE OF THE USES TO HAVE TWO DIFFERENT EXITS SO THERE WILL BE REQUIREMENTS TO INSTALL ADDITIONAL METHODS OF EXIT AND SO AS PART OF THAT PROCESS WE ANTICIPATE THEM BEING ABLE TO EXIT SOME SORT OF CORRIDOR, EXIT AROUND, IN ORDER TO FACILITATE THAT. >> SO IF I UNDERSTAND CORRECTLY, IF ANY TIME TRAFFIC IS CIRCULATING AMONG THESE THREE AREAS, DO WE KNOW IF THERE'S ANY WAY TO LIMIT ACCESS FROM -- LET'S SAY THE GREEN AREA TO THE RED AREA, TO THE DAYCARE IN PARTICULAR? I'M THINKING LIKE BAD ACCESS OR DOORS THAT ARE NOW HE. >> THANK YOU, THROUGH THE CHAIR, THANK FOR THE QUESTION. THE DOORS ARE LOCKING DOORS BUT THE PLANNING DIVISION DOESN'T REQUIRE THOSE TO BE LOCKING DOORS OR TO REQUIRE THEM TO HAVE ANY SORT OF LOCKING. I DO UNDERSTAND THE STATE HAZARD REQUIREMENTS FOR THE CHILD PROTECTION ASPECT OF IT SO AS PART OF THE TENANT IMPROVEMENT PLANS, THAT WOULD BE WITH THIS. >> THANK YOU AND 40 AREA THAT IS GOING TO BE USED BY THE CHURCH, DO WE KNOW IF THE CHURCH HAS ANY COMMUNITY EVENTS, WORKING MAYBE WITH [ INAUDIBLE ] IN A PRIVILEGED PORTION OF THE RESIDENCE? >> THROUGH THE CHAIR, THANK YOU FOR THE QUESTION, I BELIEVE THE APPLICANT WOULD BE BETTER SUITED. THANK YOU. >> COMMISSIONER ROBINSON. THANK YOU. THIS IS NOT THE FIRST TIME THAT WE'VE SEEN A DAYCARE PROPOSED FOR THIS PART OF THE CITY. AND I KNOW THAT WE'VE ENCOUNTERED SOME OBSTACLES WHEN IT CAME TO OTHER DAYCARE FACILITIES THAT WERE PROPOSED, BECAUSE OF THE BUFFER THAT COULD IMPACT SURROUNDING BUSINESSES. WHAT, IF YOU CAN TELL THEM, HOW BIG IS THAT? HOW MANY FEET IS THAT? THROUGH THE CHAIR, THANK YOU FOR THE QUESTION. YES, AS YOU MAY RECALL, I WAS PROJECT PLANNER ON THE PREVIOUS DAY CARE AND DIFFERENT REGULATIONS WERE IN PLACE AT THE TIME. WE WERE IN PROCESS OF ADOPTING OUR CREATING HEALTHY COMMUNITIES ODDMENTS OF THE CREATING HEALTHY COMMUNITIES ARE INTO SPECIFIC BUFFERS FOR SENSITIVE USES AND TOBACCO, CANNABIS AND ALCOHOL SO AT THAT TIME WE DID HAVE ANY BUFFERS OR REGULATIONS IN PLACE TO SEPARATE DISEASES AND TO SECURE ADEQUATE SENSITIVE USES MAINTAIN ADEQUATE DISTANCE . THAT ORDINANCE WAS RECOMMENDED BY THE PLANNING COMMISSION TO CITY COUNCIL FOR ADOPTION IT ACTUALLY WAS ADOPTED IN JULY SO NOW THAT THOSE BUFFERS ARE IN PLACE FOR THE AREAS OF SENSITIVITY, WE ARE NOW MOVING FORWARD WITH DIFFERENT APPLICATIONS LOCATED WITHIN SENSITIVE PROXIMITIES SO THIS PROPOSED USE IS A YOUTH-ORIENTED FACILITY, WHICH IS SUBJECT TO THE BUFFER OF 600 AND THE BUFFER REQUIREMENT IS NOT APPLICABLE TO PROPERTIES WITHIN THE TOWN OR DOWNTOWN PITTSBURG , IN ORDER TO FURTHER ECONOMIC DEVELOPMENT AND TO INCREASE THE STREAM TRAFFIC WE HAVE NOT REQUIRED BUSINESSES TO HAVE THE BUFFER IN THIS AREA. >> JUST MAKE THAT CLEAR, SO THROUGH THE CHAIR, WE DID TAKE A LOOK AT THAT AND MAKE SURE THAT THERE WAS CARVEOUTS FOR USES WITHIN THE OLD TOWN DOWNTOWN AREA WHERE THEY WOULDN'T BE RESTRICTED FOR SENSITIVE USES. SO WE HAVE PROVISIONS AND WE STUDIED THIS. WE LOOK AT THIS AND AS KELSEY HAS POINTED OUT, WE MADE SURE THAT [ INAUDIBLE ] IS FOR OLD TOWN DOWNTOWN, SO YOU WILL SEE THESE APPLICATIONS COMPORT, SOME OF THE SENSITIVE USES AND SOME ABUSES, THAT YOUR PURVIEW TO TAKE A LOOK AT IT AND MAKE A DETERMINATION AT THAT TIME, IS IN REGARDS TO IF THOSE USES CAN GO IN OR NOT. >> THANK YOU BOTH. THE CHAIR, IF I MAY, A CONDITION OF APPROVAL, PLANNING COMMISSION APPROVAL IS REQUIRED THE APPLICANT TO SIGN AN AFFIDAVIT THAT DIFFERENT USES CAN'T TAKE PLACE DOWNTOWN AND THAT INCLUDES SENSITIVE USES SUCH AS THE ALCOHOL AND TOBACCO USE SO I WANT TO MAKE THAT CLEAR AS WELL. THINKING. COMMISSIONER SMITH? >> THANK YOU MADAM CHAIR. LET'S SEE. IN TAKING A LOOK AT I THINK AT SLIDE EIGHT YOU SAID THAT THERE ARE DOORWAYS BE THREE, GOING FROM ONE SPACE TO THE NEXT BUT WE DON'T SEE THEM ON HERE, DO WE? >> THROUGH THE CHAIR, IT IS KIND OF HARD TO SEE NOW THAT I'VE ADDED THOSE. THIS MAY BE A LITTLE BIT CLEARER. IF YOU CAN SEE HERE, CAN YOU SEE MY CURSOR? YOU CAN SEE MY CURSOR? >> NO. >> THERE ARE DOORWAYS, AT THE VERY TOP IN THAT SPACE RIGHT HERE THAT HIGHLIGHTED HELLO, WHERE THAT L SHAPE IS, DO YOU SEE THAT? THAT'S ONE DOOR. THAN THE SECOND ONE THERE IS A DOOR AT THE BOTTOM RIGHT. DO YOU SEE IT THERE, THE LITTLE CARVEOUT THAT GOES INTO THE FRONT? RIGHT, I. YOU KNOW WE'VE TALKED ABOUT THIS WHOLE AREA HERE FOR AND WE HAD A COUPLE OF OTHER BUSINESSES THAT WANTED TO GO THERE. DO WE HAVE A BACK DOOR? IS THERE AN EXIT HERE? BECAUSE AT ONE POINT THE BUSINESS IN FRONT OF THIS, WHEN IT WAS THE BOX, THEY WERE USING THE GYM AS THERE KIND OF ESCAPE ROUTE IF THERE WAS A FIRE OR SMOKE OR SOMETHING LIKE THAT. WHAT IS THERE IN PLACE FOR THIS? ESPECIALLY WITH CHILDREN. >> THROUGH THE CHAIR, THERE IS A BACK DOOR BUT IT GOES THROUGH AN ADJACENT TENANT SPACE SO THAT'S NOT PERMITTED BY THE COMPANY BUILDING CODE OR CALIFORNIA FIRE CODE, SO THE APPLICANT, AS PART OF THE TENANT IMPROVEMENTS IF THEY GET APPROVED BY THE PLANNING COMMISSION WOULD BE REQUIRED TO SUBMIT PLANS SHOWING A SECOND EXIT IN CASE OF EMERGENCY. >> SO THEY WILL HAVE TO ADD THAT AND COULD BE ADDED ON EITHER SIDE RATHER THAN GOING THROUGH THE BUILDING? I'D HAVE TO GO DOWN THERE AGAIN AND I TOOK A LOOK AT THE BUILDING. IS THERE SPACE ON BOTH SIDES OF THIS BUILDING? >> THROUGH THE CHAIR, YES THERE'S SPACE ON BOTH SIDES. THEY WOULD HAVE TO MAKE SURE ALL THREE TENANT SPACES WOULD HAVE ACCESS AND THAT WOULD REQUIRE WORKING WITH THE ADJOINING PROPERTY OWNERS, BECAUSE BOTH PROPERTIES ARE OWNED BY SEPARATE PRIVATE ENTITIES. >> I DO HAVE ANOTHER COMMENT THAT I WILL WAIT UNTIL AFTER WE HEAR FROM THE APPLICANT. THANK YOU. >> THAT'S QUESTION TIME FOR ME. SENT'S THIS AREA IS GOING TO BE SENSITIVE USE, WHAT IS THE SPEED LIMIT ON CUMBERLAND? BECAUSE ONCE IT'S SENSITIVE USE OF WE HAVE TO REDUCE IT BY FIVE MILES AN HOUR? >> THROUGH THE CHAIR, I'M NOT FAMILIAR WITH THAT REQUIREMENT. BELIEVE THE SPEED LIMIT IS 35 POINT >> THROUGH THE CHAIR I THINK IT IS 35 ALONG THE CORRIDOR OF CUMBERLAND BUT THERE IS NO SPECIFIC REQUIREMENT IN THE PMC THAT WOULD REDUCE A SENSITIVE LANE USED TO THE SPEED LIMIT. THE SPEED LIMIT IS THE SPEED LIMIT THAT'S GOING THROUGH THE CITY OF PITTSBURG. >> THAT WOULD STATE, NOT FROM THE CITY. >> BECAUSE SCHOOLS ARE 25 MILES AN HOUR. >> I WANT TO LOOK AT A COUPLE THINGS BUT DEFINITELY SOMETHING I'M NOT REALLY FAMILIAR WITH IF IT IS A STATE REQUIREMENT. I KNOW THE PMC WOULD NOT REQUIRE THIS. THAT'S SOMETHING THROUGH, I WANT TO TURN OVER TO GINA AND JOANNA, MAYBE HELP ME OUT . >> PLEASE TAKE A LOOK AT THAT. >> THROUGH THE CHAIR, SPEED LIMITS ARE SET BY THE CALIFORNIA VEHICLE CODE AND THERE IS AN ENGINEERING AND TRAFFIC SURVEY THAT YOU DO TO SET SPEED LIMITS SO WE ACTUALLY GO OUT AND DO A SPEED SURVEY, SO WE'RE LOOKING AT THE SPEEDS OF 100 VEHICLES AND THAT IS GOING TO GIVE US CRITICAL SPEED, AND I WAS THERE ARE FACTORS THAT ARE NOT KNOWN TO A DRIVER, WHICH COULD BE MAYBE THESE SENSITIVE USES, YOU CAN'T LOWER IT BELOW --FIVE MILES AN HOUR BELOW THE CRITICAL SPEED, IT'S 25, YOU CAN'T LOWER IT UNLESS THERE IS UNFORESEEN FACTOR TO THE DRIVER. >> ARE YOU AWARE OF THE SPEED LIMIT REDUCTION LAW? THESE MAY BE FOR SOMETHING BECAUSE IT DOES ALLOW A REDUCTION OF SPEED AROUND SENSITIVE SPACES OR IF THERE'S FATALITIES. >> YES, THOSE ARE THE UNFORESEEN CONDITIONS THAT YOU CAN REDUCE IT BY FIVE MILES PER HOUR. THAT IS CORRECT. >> ALL RIGHT. WELL I TRIED. ANYWAYS, PARKING-WISE, SINCE THIS WOULD BE REALLY JUST ASSEMBLING, I LIVE WITHIN WALKING DISTANCE OF TWO CHURCHES. WE'LL GET A CRAP LOAD OF CARS. SOMETIMES I'LL HAVE TO SHOO PEOPLE FROM BLOCKING OUR DRIVEWAYS OR SOMETIMES THEY'LL WALK HANDICAPPED RAMPS, SO WHAT IS THERE IN PLACE TO MAKE SURE PEOPLE PARK PROPERLY, ESPECIALLY THE ONES WHO HAVE NICE CARS? THEY WANT TO PARK THEIR WHEELS ON THE SIDEWALK BECAUSE THEY DON'T WANT PASSING CARS TO PUT THEIR VEHICLES WHILE THEY'RE CRUSHING THE SIDEWALK UNDER THE WEIGHT OF THE CAR. >> THANK YOU SO MUCH FOR YOUR QUESTION. I WILL SAY THAT PARKING IS PROHIBITED ON SIDEWALKS SINCE THAT'S ENFORCED IN OUR MUNICIPAL CODE BY THE POLICE DEPARTMENT AND ILLEGAL PARKING AS WELL IS ENFORCED THE POLICE DEPARTMENT, SO THAT WOULD BE THE WAY TO ENFORCE THAT. SO THROUGH THE CHAIR, USUALLY WHAT WE -- THE APPLICANT IS RESPONSIBLE FOR MAINTAINING PEACE, ORDER, AND MAKING SURE THE PEOPLE THAT TRAVEL, THEY DO COME THERE AND PARK, SO WE WILL ENSURE THAT THESE CONDITIONS OF APPROVAL, THERE COMES A POINT WHEN CODE ENFORCEMENT IS INVOLVED, THEN WE CAN TALK TO THE APPLICANT TO MAKE SURE ANY OF THOSE PARKING ISSUES ARE ADDRESSED AT THAT TIME. AND FINALLY, BECAUSE A LOT OF THE FAITH GROUPS HAVE OLDER MEMBERS, ARE THERE PROBABLY WITH DISABILITIES, HAS THERE BEEN ANY CONSIDERATION TO WHERE THE HANDICAPPED RAMPS ARE? WILL THERE BE A REQUEST FOR HANDICAPPED PARKING? >> SO THROUGH THE CHAIR, THERE IS A REQUIREMENT TO INSTALL AN ACCESSIBLE SPACE AND ACCESSIBLE ACCESS TO ALL TENANT SPACES INCLUDED WITHIN THE BUILDING DIVISION CONDITIONS OF APPROVAL. >> ALL RIGHT. THANK YOU. >> MOVING RIGHT ALONG, THE PUBLIC HEARING IS NOW OPEN. I'M INVITING APPLICANT STEP FORWARD ON THE PODIUM, INTRODUCE YOURSELF, AND THE NATURE OF YOUR BUSINESS. HELLO COMMISSIONERS. MY NAME IS RITA REEVES AND I'M THE CEO OF BABY YALE ACADEMY INC. I'M ALSO THE PASTOR OF THE CHURCH. AND I'LL ENTERTAIN YOUR QUESTIONS. COMMISSIONER KENT. >> GOOD EVENING. I WANT TO FIRST COMMEND YOUR MISSION, INCLUSIVITY AND ACCESSIBILITY. I READ THAT AND I WAS REALLY MOVED BY THAT. ONE QUESTION I HAVE IS ABOUT THE DAYCARE. HOW MANY CHILDREN DO YOU ANTICIPATE TO HAVE AT ONCE AND WILL THE AGE GROUPS COMBINED IN THE SAME AREA? >> THEY WILL BE IN THE AREA BUT IT WILL BE BY CUBICLES. SO IT WILL BE PROBABLY TWO DIFFERENT PROGRAMS. THEY WILL NOT BE IN THE SAME CLASSROOM. THAT IS PROHIBITED BY LICENSING AND SO WE FOLLOWED THAT. SO THE AGE RANGES FROM 18 MONTHS THROUGH 12. THANK YOU. >> COMMISSIONER POPOVA. >> THANK YOU. >> GOOD EVENING, THANK YOU FOR BEING HERE TONIGHT. YOU HEARD MY QUESTION ABOUT FOOT TRAFFIC AND HOW IS ACCESS SECURED AMONG THE THREE DIFFERENT AREAS? >> OF THE THREE DIFFERENT AREAS -- >> THE THREE DIFFERENT USE SPACES. SO THE CHILDREN WILL REMAIN THE DAYCARE SPACE. THEY ARE NOT GOING TO BE GOING INSIDE OF THE CHURCH AREA DURING THE WEEK. THEY WILL NOT BE GOING OVER TO THE OFFICES SIDE AS WELL, SO IT WANTS --IF I'M UNDERSTANDING YOUR QUESTION, IT WON'T BE ANY TRAFFIC IN TERMS OF THAT. HOW ABOUT SEE, THERE'S FOOD PREPARATION HAPPENING IN THE KITCHENETTE, WHAT DOES NAVIGATING THOSE MEALS TO WHERE THEY ARE NEEDED LOOK LIKE HE'LL I'M SORRY, REPEAT. >> FOOD THAT IS BEING PREPARED IN THE KITCHEN AND HOW IS THAT BEING TAKEN TO WHERE IT IS TO BE, EITHER TO THE DAYCARE OR TO THE CHURCH FACILITIES? OKAY, SO IT'S REALLY A SMALL BUILDING. IS ONE OF MY SMALLEST ONES THAT I DO HAVE, SO IT'S JUST BY CART, JUST TAKEN OVER BY CART TO THE CLASSROOM. >> THEN THOSE DOORS, ARE THE CART SECURED, IS IT THE WALK, IS IT A KEY COMBINATION FOR CONTROLLING THE ACCESS FROM ONE SPACE TO THE NEXT? >> I AM SO SORRY, I'M HAVING A HARD TIME HEARING YOU, CAN YOU REPEAT IT? >> IS THAT LEAD FROM ONE AREA TO THE NEXT, ARE THEY CARD, KEY CARDS THAT ARE LIMITING THE ACCESS FROM ONE PLACE TO THE NEXT? IS IT KEYS WITH LOCKS? IS IT KEY COMBINATIONS THAT WILL BE PUNCHED IN? HOW IS THAT SECURED? GOT YOU. SO TO ENTER INTO THE DAYCARE, THERE WILL BE A CODE LOCK. SO THE PARENTS WILL HAVE TO HAVE A COUPLE TO GET INSIDE AND THAT'S FOR SAFETY AND SECURITY. FOR THE INSURANCE TO 670 AND 650, THERE IS A.D.A... PUSH THE BUTTON AND THE DOOR OPENS, AND ALSO THE OTHER DOOR ENTRANCES HAVE KEYS , ALTHOUGH THAT'S NOT -- I HAVEN'T REALLY COMPLETELY DECIDED HOW THAT'S GOING TO BE, IT COULD BE CARD ENTRANCE. IT JUST DEPENDS. >> AND I HAD ONE MORE QUESTION AROUND EVENTS THAT MAY BE RUN BY THE CHURCH, SPECIFICALLY AROUND MAYBE FEEDING THE PUBLIC. IS THAT SOMETHING YOU ARE PLANNING ON HAVING THERE? WHAT IS THE SCALE OF THE OPERATIONS EVENTUALLY? >> IT DEFINITELY WON'T BE AS LARGE A SCALE AS OUR ANTIOCH CHURCH, WHICH IS COMING, SO --BUT WE BELIEVE IN COMMUNITY. WE BELIEVE IN HELPING THE COMMUNITY. SO WE WILL PROVIDE SOME TYPE OF --FOR THOSE FAMILIES THAT HAVE FOOD INSECURITY. SO WE'LL TRY TO FIGURE OUT THE BEST WAY TO MANAGE THAT BUT THERE WILL BE SOME TYPE. BUT WE HAVE OTHER CHARGES SO DEFINITELY WE CAN DIRECT THEM TO THEIR AS WELL. >> ARE THE OTHER CHURCHES ALSO OPERATING WITH THE DAYCARE FACILITY OUTSIDE? >> MOST. >> MOST OF THEM, SO YOU ALREADY HAVE THE EXPERIENCE OF HOW TO NAVIGATE DIFFERENT ACTIVITIES? THAT'S IMPORTANT. THANK YOU FOR MENTIONING THAT. COMMISSIONER STOKES. THANK YOU. THANK YOU FOR CHOOSING PITTSBURG. WE ALWAYS WELCOME NEW BUSINESSES INTO OUR AREA BECAUSE IT DOES ENHANCE WHAT WE ARE TRYING TO DO WITHIN THE CITY. MY QUESTION IS REGARDING THE CHILDREN, IN TERMS OF I KNOW YOU HAVE THREE DIFFERENT BREAKDOWNS IN TERMS OF THE PROGRAMS. FOR THE SCHOOL AGE, IS THAT DAYCARE IN TERMS OF CHILDREN THAT GET OUT OF SCHOOL EARLY ENOUGH WHERE THE PARENT IS NOT ABLE TO PICK THEM UP YET AND THEN THEY HAVE A PLACE TO COME OVER, OR IS THAT A SCHOOL AGE PROGRAM WHERE, WHEN THEY ARE DONE WITH THAT, THEY CAN ALSO TRANSITION INTO A MIDDLE SCHOOL, AS WELL? >> SO FOR THE SCHOOL-AGE PROGRAM, IT'S MAINLY FOR --BECAUSE AS YOU KNOW, CALIFORNIA HAS UNIVERSAL CHILDCARE. SO THEY'RE GOING TO SCHOOL EARLIER AND EARLIER. NOW IT'S PRESCHOOL, TK AND K. SO WHEN WE GET OUT OF SCHOOL, WE ALSO HAVE A TRANSPORTATION DEPARTMENT, SO OUR VEHICLES PICK UP THE CHILDREN, BRING THEM BACK TO WHICHEVER CHILDCARE CENTER IS IN THEIR FACILITY. WE CURRENTLY HAVE SIX DAYCARE CENTERS WITH LIKE SIX MORE COMING BY THE END OF 2026. SO THOSE CHILDREN DO --WE MAYBE DROP THEM OFF. SOMETIMES THE PARENTS DROP THEM OFF BUT DEFINITELY PICK THEM UP AND BRING THEM BACK TO WHICHEVER FACILITY THEY'RE CLOSE TO OR WHICHEVER ONE THEIR PARENTS WANT THEM TO ATTEND. ALL RIGHT. SO IT COULD BE FIVE HOURS FOR THEM. IT COULD BE THREE HOURS. THE OLDER THEY GET, THE MORE TIME THEY'RE IN THE PUBLIC SCHOOL, AND THEN THEY COME BACK TWO HOURS. >> OKAY. ALL RIGHT. OKAY. THANK YOU. THANK YOU FOR THE VISION FOR THIS, TOO, BECAUSE JUST DEALING WITH CHILDREN, WHETHER IT'S YOUR OWN OR ESPECIALLY WHEN IT'S SOMEONE ELSE'S, IT'S A CHALLENGE, SO IT TAKES A SPECIAL TYPE OF SKILL SET AND WILLINGNESS TO BE ABLE TO TAKE THE TIME TO HAVE A SPACE WHERE CHILDREN CAN COME AND EITHER BE THERE AFTER SCHOOL AND ALSO TO LEARN WHILE THEY'RE THERE, TOO. SO WE APPRECIATE THAT VISION THAT YOU HAVE. THANK YOU. >> COMMISSIONER ROBINSON. THANK YOU. MY QUESTION IS WHAT ATTRACTED YOU TO THIS LOCATION AND TO BRING YOUR BUSINESS AND MODEL TO PITTSBURG? >> SO OUR CHURCH'S VISION IS TO REALLY BE PRESENT IN THE COMMUNITY IN ALL OF THE COMMUNITY, SO OUR GOAL IS TO BE A REPRESENTATION WITHIN ALL OF THE COMMUNITY. LIKE WE ALREADY HAVE A CENTER IN PITTSBURG. IT'S ON EAST LELAND. BUT FOR THOSE FAMILIES THAT LIVE ON THE SIDE WE ARE LOOKING AT FOR THIS CENTER, IT WAS, YOU KNOW, OUR OTHER CENTER IS KIND OF FILLING UP, SO WE LOOK AT THAT SPACE AND FELT LIKE IT'S RIGHT BY RESIDENTIAL HOME. WE ARE AN AWESOME CENTER. I MEAN OUR WHOLE ENTIRE GOAL, WE CALL OURSELVES THE PREMIER CENTER FOR INFANTS AND A LEARNING CENTER BECAUSE OUR GOAL IS TO CREATE LIFELONG LEARNERS, AND OUR NAME IS BABY YALE. OF COURSE WE WANT THEM TO REALLY WANT TO LEARN AND KNOWLEDGE BE THEIR NUMBER ONE GOAL. AND SO THAT'S HOW WE NAVIGATED OURSELVES DOWN HERE. OF COURSE THEY'RE VERY SMALL SO I'LL PROBABLY BE COMING BACK WITH ANOTHER ONE FOR PITTSBURG. I'VE ALREADY FOUND A LOCATION. I JUST HAVE TO BEGIN NEGOTIATIONS. SO WE REALLY WANT TO BE VERY PRESENT IN SCHOOL, IN THE COMMUNITY, AND WE WANT TO PROVIDE ANOTHER OPTION FOR PARENTS BECAUSE A LOT OF OUR STUDENTS THAT WE TAKE OUR LOW INCOME BUT WE ARE HIGH ECHELON IN TERMS OF HOW WE THINK, IN TERMS OF THE MATERIALS AND STUFF THAT WE PRESENT TO THEM. SO WE WANT THEM TO BE ABLE TO HAVE THE VERY BEST EDUCATION AND I PROMISED MY VERY FIRST CLASS AND MY VERY FIRST LOCATION, WHICH IS IN BRENTWOOD AT THE LITTLE TREE SHOPPING CENTER, I PROMISED THOSE KIDS THAT IF THEY WENT TO COLLEGE, IF THEY WENT TO SCHOOL AND WENT TO COLLEGE, WE WOULD PAY FOR THEIR COLLEGE. AND SO WE'VE BEEN IN BUSINESS FOR OVER 10 YEARS AND IT'S SLOWLY COMING UP, AND IF THEY CONTINUE TO STAY IN SCHOOL, I WILL MEET MY OWN PROMISE TO THOSE THAT STARTED WITH THIS. >> IT'S A BEAUTIFUL PLEDGE. APPRECIATE IT DEFINITELY GREAT TO HEAR HOW ENGAGED YOU ARE WITH THE COMMUNITY. YOU MUST BE VERY BUSY HAVING AT LEAST TWO CHURCHES THAT YOU ARE THE PASTOR OF AND THEN BABY YALE ALSO SO THANK YOU FOR SHARING THIS WITH US. >> I'M ALSO A TV HOST SO I HAVE A LOT ON MY PLATE BUT I SEPARATE FROM ANY OF IT. I LOVE IT ALL. >> DO WE HAVE ANY ADDITIONAL QUESTIONS, COMMISSIONER ROBINSON, BEFORE I ASK MY QUESTION? THANK YOU FOR SERVING A CRITICAL NEED, WHICH IS CHILDCARE IN OUR CITY, AND YOU KNOW I DID HAVE SOME POINTED QUESTIONS TO STAFF ABOUT CONDITION OF BUILDING BECAUSE IT IS OLD. IT WAS BUILT IN 1947. SO ARE YOU AWARE OF ANY --I SAY ANY SORT OF ISSUES WITH THE BUILDING THAT NEEDS TO BE CORRECTED? ACTUALLY KNOW. IT'S IN REALLY GOOD CONDITION, ALTHOUGH I THINK THAT THEY ARE DESCRIBING US AS AN I 4 BUT WE ARE REALLY E FOR EDUCATIONAL. WE ARE NOT A CUSTODIAL CARE SERVICE, WHICH IS I 4 BUT WE ARE EDUCATIONAL, WHICH IS V, SO IT'S VERY DIFFERENT. KIND OF SIMILAR BUT VERY DIFFERENT. SO THE BUILDING, IT'S IN PRETTY GOOD SHAPE. I DON'T EVEN KNOW THAT IT WAS THAT OLD BUT FROM WHAT I COULD SEE, IT'S PRETTY GOOD. >> I BELIEVE THE BUILDING IS STRUCTURALLY SOUND. SOMETIMES THE BUILDINGS WOULD HAVE SOME SORT OF LIMITATIONS BECAUSE THEY WERE CONSTRUCTED WAY BACK IN THE DAY SO I HOPE YOU DO HAVE A GOOD STAFF AND HIRING. I WOULD SAY THE BEST CONTRACTORS TO KEEP IT UP TO CODE AND NOT REPEAT SOME OF THE ISSUES FROM THE PRIOR TENANTS. SO THAT WAS REALLY MY ONLY CONCERN. IS NOT THE NATURE OF THE BUSINESS, I THINK IT'S MORE OF SIN THIS WAS GOING TO BE FOR SENSITIVE FOR CHILDREN, I DIDN'T WANT YOU TO BE IN A SITUATION THAT WOULD ENDANGER THE CHILDREN AND WHAT HAVE YOU. MY SECOND QUESTION IS SINCE YOU HAVE A CHURCH ASSEMBLY AND I DID SAY I LIVE WITHIN WALKING DISTANCE OF THE CHURCH. I SHOULD PROBABLY ASK STAFF WHERE OVERFLOW PARKING IS BECAUSE SINCE THERE'S GOING TO BE AN ACCOMMODATION UP TO 80 PEOPLE, NOT TO SAY THAT EACH PERSON WOULD BE A SINGLE OCCUPANCY DRIVER, CUMBERLAND CAN ONLY ACCOMMODATE SO MUCH SO DO YOU HAVE SOME SORT OF A TRAFFIC MANAGER JUST IN CASE YOU HAVE THOSE EVENTS THAT WOULD ATTRACT A LOT OF PEOPLE? BECAUSE THERE IS PARKING ON EIGHTH AND ALSO THE PARKING OVER AT THE HISTORICAL MUSEUM. WE DON'T WANT THE PARKING TO BE SO CRAZY THAT YOU KNOW THE OTHER BUILDING TENANTS WITH LARGE ANY COMPLAINTS. >> WELL I HAVE ACTUALLY VISITED THEIR ON THE WEEKENDS, SUNDAY SPECIFICALLY, AND THERE DOESN'T SEEM TO BE A PROBLEM. THERE IS A LAW OF PARKING ON THE STREETS ITSELF, THE STREETS OVER AND DOWN THE STREET, THERE SEEMS TO BE A LOT AND FAMILIES TEND TO ATTEND CHURCH SO ONE CAR COULD HAVE FIVE FAMILIES IN IT, AND SOME PEOPLE, WE PICK UP. WE UTILIZE THE SCHOOL'S VANS AND PICK UP SOME OF THE PEOPLE THAT WANT TO ATTEND. SO I REALLY DON'T SEE THAT AS BEING AN ISSUE BUT IF IT DID BECOME AN ISSUE, WE OF COURSE WOULD HAVE TO WORK IT OUT BECAUSE WE WANT THEM TO BE AT CHURCH AND WE WANT THEM TO BE ABLE TO WORSHIP FREELY. AND WE DON'T WANT SOMETHING AS SMALL AS PARKING TO GET IN THE WAY OF THEM BEING ABLE TO COME TO CHURCH. SO THERE'S A LOT OF DIFFERENT STREETS THERE, AND IT'S SUNDAY, AGAIN, SO IT'S NOT A LOT OF PEOPLE THERE. DURING SUNDAY. AND THEN I'VE ALSO COME DURING THE WEEK JUST TO GET A VIBE OF WHAT IT'S LIKE. I COME EVERY DAY DURING THE WEEK. ONE THURSDAY IT WASN'T A LOT OF PEOPLE BUT IT WAS A LOT OF MUSIC THAT WAS BEING PLAYED. I STILL DON'T KNOW WHERE THAT WAS COMING FROM, BUT THE STREETS WERE STILL EMPTY, PRETTY MUCH. >> I AGREE THE STREET WOULD LOOK EMPTY. I REMEMBER WHEN THE BOXING GYM WAS THERE. IT DID FILL UP PRETTY QUICK AND IT'S NOT EVEN 80 PEOPLE. I DON'T THINK YOU SEEN THAT SO IT'S JUST TO PROBABLY JUST FAIR WARNING THAT IF YOUR CONGREGANTS WILL BE BRINGING IN 40 TO 50 CARS TO PARK RESPONSIBLY, JUST TO AVOID ANY SORT OF COMPLAINTS FROM THE OTHER TENANTS AND CERTAINLY LOOKING FORWARD TO MORE TRAFFIC DOWNTOWN BECAUSE THAT DOES BUILD BUSINESS AND DRIVE MORE BUSINESS TO DOWNTOWN. >> THROUGH THE CHAIR, I JUST WANT TO POINT THAT OUT, THAT WE DID LOOK AT THE PARKING EXTENSIVELY AND WE WANTED TO MAKE SURE THAT THE USES, BOTH USES ONCE WE OPERATING AT THE SAME TIME SO THE ONE USE OPERATES ON SUNDAY WITH THE RELIGIOUS ASSEMBLY. THE DAYCARE OPERATION CEASES AT 6:00 P.M. SO THERE'S NOT AS MUCH TRAFFIC AS YOU WOULD THINK. WHEN WE ARE THINKING ABOUT PARKING AND LOOKING AT LOCATIONS, AND WHERE EVERYTHING WOULD BE CENTRALLY LOCATED, ACCESSIBLE, AND WE'RE TALKING ABOUT ALL THE A.D.A. REQUIREMENTS OF, THOSE WERE LOOKED AT BY STAFF SO DUE DILIGENCE HAS BEEN DONE. WE WANT TO MAKE SURE WE BRING YOU SOMETHING FORWARD THAT YOU ARE COMFORTABLE WITH. >> ONE FINAL COMMENT ON THAT. IT'S A NEW CHURCH SO WE DON'T EVEN HAVE ANY NUMBERS YET TO ATTEND THERE, SO WE'RE GOING TO HAVE TO BUILD, SO IT'S NOT GOING TO BE ALL AT ONCE, AT ONE TIME, SO WE WILL DO THAT AND OUT OF ALL THE CHURCHES, WE'VE NEVER BEEN FULL SO AS OUR GOAL IS TO GET OUT THERE AND EVANGELIZE BUT I DON'T THINK IT WILL BE A PROBLEM. >> THANK YOU. FEEL FREE TO TAKE A SEAT IF COMMISSIONER SMITH -- >> THANK YOU MADAM CHAIR. I DO HAVE ONE QUESTION FOR YOU AND THANK YOU FOR THE PRESENTATION, AND ALSO, CHASING PITTSBURG FOR THIS. THIS IS A PLAN THAT YOU HAVE AND LET'S HAVE A LOT OF ENERGY TO DO THIS. YOU MENTIONED A COUPLE OF TIMES AND COMMISSIONER POPOVA MENTIONED OR ASKED ABOUT THE SEPARATION OF THE AGE GROUPS OF THE KIDS. SO THE YOUNGER CHILDREN ARE GOING TO BE ON ONE SIDE OF THIS DAYCARE AREA, ON SLIDE 8, AND THEN THE OLDER ONES YOU SAID WOULD BE IN A CLASSROOM. I DON'T KNOW IF WE ARE TALKING ABOUT ONE CLASSROOM OR A COUPLE, OR HOW ARE YOU GOING TO BREAK IT DOWN BY AGE OR ABILITY, OR SUBJECT, AND BECAUSE YOU MENTIONED EDUCATION IN CLASSROOMS AND ON A TEACHER AND EDUCATOR, I KIND OF CURIOUS TO KNOW HOW YOU'RE RUNNING THE CLASSROOMS AND WHILE IT'S NOT PART OF OUR PLANNING COMMISSION GOAL, REALLY, WHAT IS IT THAT'S HAPPENING IN THE CLASSROOMS? >> SO AS I SAID, OUR MAIN GOAL IS TO ESTABLISH LIFELONG LEARNERS, SO WE ARE NOT A DAYCARE. WE LITERALLY TEACH THEM AND SO THEY ARE SEPARATED --I WAS LOOKING FOR THE SLIDE FOR THE CUBICLE SO WE COULD GET A BETTER IDEA OF WHAT IT WOULD LOOK LIKE BUT FOR SOME REASON I CAN'T FIND IT -- THROUGH THE CHAIR, IS IT ON THE SCREEN? >> YET, BUT IT'S EVEN MORE DETAILED AND I JUST GOT IT TODAY SO I HAVEN'T HAD A CHANCE TO GET IT TO YOU BUT IF YOU CAN LOOK AT THAT AND IMAGINE THREE CLASSROOMS IN THAT OPEN SPACE AREA, SO EACH PROGRAM WI

View Meeting - OnBase Agenda Online

Hide Media

Home

Meetings

Contact

Agenda

Agenda Packet

Switch to Accessible View

Copyright © 2015-2026 Hyland Software, Inc.

Showing the first 24,000 of 92,366 characters. The full document is at the source.

>> COMMISSIONERS, THE WAS 12, 2025 REGULAR MEETING OF THE PITTSBURG TRAINING COMMISSION WILL NOW COME TO HER. MADAME CLERK, PLEASE CALL THE ROLL. IVELINA POPOVA. >> HERE. >> REILY KENT. >> PRESENT. >> DONNA FOSTER. >> PRESENT. >> DEANDRA STOKES. >> PRESENT . >> AS REQUIRED BY LAW, THE AGENDA FOR THIS MEETING WAS POSTED AT CITY HALL AT LEAST 72 HOURS PRIOR TO TONIGHT'S MEETING, ON THURSDAY, AUGUST 7th, 25 POINT MAY I ASK EVERYONE TO STAND FOR THE PLEDGE OF ALLEGIANCE? COMMISSIONER RILEY WILL BE LEADING. COMMISSIONER KENT. >> I PLEDGE ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA, AND TO THE REPUBLIC FOR WHICH IT STANDS, ONE NATION, UNDER GOD, INDIVISIBLE, WITH LIBERTY AND JUSTICE FOR ALL. >> MR. SECRETARY, OR THEIR ANY ITEMS LISTED ON THE AGENDA? >> GOOD EVENING MADAME SHARON COMMISSIONERS, THERE'S NO REQUESTS FOR DELETIONS OR WITHDRAWALS. CONTINUOUS TONIGHT . THANK YOU. AS A POINT OF REFERENCE FOR THE PUBLIC RECORD, THERE IS A CHANGE IN ORDER OF ITEMS TO BE HEARD FOR TONIGHT'S AGENDA. ITEM NUMBER 4 IN THE COMMISSION CONSIDERATIONS WILL BE CONSIDERED BY THE PLANNING COMMISSION PRIOR TO ITEM NUMBER THREE, THE PUBLIC HEARING. THANK YOU, MR. SECRETARY. >> IS A MEMBER OF THE AUDIENCE WOULD LIKE TO SPEAK ON ANY ITEM ON THE AGENDA OR ADDRESS THE COMMISSION ON A NON-AGENDA ISSUE, PLEASE FILL OUT A CITIZEN COMMENT CARD WITH THE YELLOW PAD FILE X TO THE PODIUM AND PLEASE HAND IT TO THE CLERK. MEADOWBROOK, ARE THERE ANY PUBLIC COMMENTS FOR NON-AGENDA ITEMS? >> THERE ARE. ADRIAN BADGER. >> STANDBY. HOW ABOUT THIS? THANK YOU. I CAN ACTUALLY HEAR MYSELF THIS TIME. READY? WE RESUME OUR NORMAL PROGRAM. THANK YOU. GOOD EVENING COMMISSIONERS. I'M ADRIAN BADGER, PITTSBURG RESIDENT AND I KNOW I HAVE THREE MINUTES TO SPEAK BUT I HAVE A LOT TO COVER SO I'LL BE AS FAST AND BRIEF AS POSSIBLE, AND I'M SORRY I WON'T BE LOOKING AT MUCH BECAUSE I'LL BE TRYING TO READ THIS IS MUCH AS POSSIBLE. I HAVE THE SPECIFICS FOR THE INFORMATION ABOUT TO SHARE WITH YOU ABOUT SHARE FOR YOU AVAILABLE WITH THE CLERK WHEN I'M DONE. RECENTLY I JOINED A SPARSELY ATTENDED COMMUNITY MEETING AT THE REC CENTER THAT FOCUSED AGAIN ON THE CITY'S PLANS TO IMPROVE OLDTOWN. AFTER THE PRESENTATION AND A QUESTION AND ANSWER PERIOD I REALIZED THAT THE PLANNING DEPARTMENT AND THE CITY LEADERSHIP IS UNAWARE OF WHAT COULD'VE BEEN IN OLDTOWN VERSUS WHAT IS NOW AVAILABLE TO BE IN TOWN. SO I'M HERE TODAY TO PROVIDE A LITTLE CONTEXT FOR YOU ABOUT THE CURRENT STATUS OF USABLE RETAIL RESTAURANT SPACE IN PITTSBURG'S OLDTOWN DISTRICT, SING DISTRICT IN THE EARLY 2000 WAS TO BECOME A PREMIER SHOPPING AND RESTAURANTS ESTIMATION FOR EAST COUNTY. THE SAME DISTRICT THAT WAS REDEVELOPED PRIOR TO 2009, 15 YEARS AGO. TODAY , BECAUSE OF DECISIONS MADE BY CITY LEADERSHIP AND APPROVED BY PLANNING COMMISSIONS AND CITY COUNCILS, WILL TOWN PITTSBURG IS NOT EVEN A STEP CLOSER TO BECOMING THE DESIRABLE DESTINATION FOR EAST BAY AND THE BAY AREA RESIDENTS THAT WAS ENVISIONED AND HONEST TO BE 15 YEARS AGO. THERE HAVE BEEN A SLEW OF SHORTSIGHTED, BADLY PLANNED AND IMPLEMENTED DECISIONS AFFECTING OLD TOWN OVER THE LAST 15 YEARS, BUT TODAY I'M ONLY HERE TO DISCUSS WHAT'S STILL LEFT IN OLD TOWN. SPECIFICALLY THE CRITICALLY IMPORTANT INVISIBLE RAILROAD AVENUE CORRIDOR. DESPITE WHAT YOU MAY THINK OR HAVE BEEN LED TO BELIEVE, AS OF AUGUST 12, TODAY, THE FOLLOWING IS THE MAKEUP OF EXISTING BUSINESSES OR UNITS ON RAILROAD AVENUE IN OLD TOWN. FOOD AND BEVERAGE LOCATIONS, 12 INCLUDING TWO SANDWICH SHOPS A BLOCK APART AND THREE BREAKFAST CAFES A BLOCK APART. RETAIL STORES, SEVEN INCLUDING ONE OWNED BY THE CITY. COMMUNITY SERVICE BUSINESSES, TWO. OFFICES, FOUR POINT PERFORMING ARTS SPACES, TWO. FITNESS, ONE. PERSONAL SERVICES, 52. I'M SORRY, 32. 32 PERSONAL SERVICE BUSINESS IS. SO TOTAL OCCUPIED SPACES ARE 58. THE MAJORITY OF WHICH ARE PERSONAL SERVICE. NOT RESTAURANT. NOT RETAIL. THERE ARE ONLY FIVE AVAILABLE LEASE SPACES IN OLD TOWN, ON RAILROAD . FIVE. THAT'S IT. THAT'S ALL THAT'S LEFT. ONE INTERESTING ADDITIONAL POINT, THERE IS ZERO DIRECT ACCESS TO PARKING LOTS FROM RAILROAD AVENUE. EVERYBODY THAT VISITS RAILROAD AVENUE MUST GO TO A SIDE STREET IN ORDER TO GET INTO A PARKING LOT. FOR THOSE OF YOU NOT FAMILIAR WITH MODERN DOWNTOWN DESIGN STANDARDS, HIGH DENSITY OF SERVICE BUSINESSES IS CONSIDERED INAPPROPRIATE FOR BUSINESS SHOPPING OESTREICH. EXCUSE ME, COULD YOU PLEASE WRAP IT UP YOU MAKE YOUR TIME IS UP. >> ABSOLUTELY, I GOT FIVE SECONDS LEFT BECAUSE THEY NEGATIVELY IMPACT PARKING AVAILABILITY AND THE WALK ABILITY OF THE DISTRICT, ESPECIALLY IN THE SUBURBS. GET HERE WE ARE. THINK THANK YOU. MADAME CLERK, ARE THERE ANY OTHER ADDITIONAL PUBLIC COMMENTS? THERE ARE NONE. >> THANK YOU. MR. SECRETARY, ANY PRESENTATIONS FOR TONIGHT'S MEETING NEXT >> MANAGER, THERE ARE NO PRESENTATIONS FOR TONIGHT. >> THANK YOU. I'M NOW CALLING FOR THE APPROVAL OF CONSENT CALENDAR. DOES ANYONE HAVE ANY ITEM THEY WANT TO HOLD THE CONSENT CALENDAR, TO BE CONSIDERED SEPARATELY, IF NOT? DO I HEAR A MOTION HE'LL COMMISSIONER POPOVA. >> A MOTION TO APPROVE THE CONSENT CALENDAR AS IS. >> COMMISSIONER STOKES. I SECOND. >> LET'S CAST OUR VOTES. >> THE MOTION PASSES UNANIMOUSLY. THANK YOU. WE NOW COME TO THE COMMISSION CONSIDERATION PORTION . MR. SECRETARY, PLEASE READ THE NEXT ITEM. >> YES, BUT EVENING MADAME SHARON COMMISSIONERS. AGAIN, ITEM NUMBER FOUR, COMMISSION CONSIDERATIONS. THAT WAS ON THE AGENDA, NOW IT'S ITEM NUMBER THREE SO THAT ITEM TONIGHT IS A RECOMMENDATION FOR ADOPTION [ INAUDIBLE ] CAPITAL IMPROVEMENT PROGRAM. ASSISTANT DIRECTOR OF PUBLIC WORKS WILL BE PROVIDING THE COMMISSION WITH THE PRESENTATION TONIGHT. THANK YOU. >> THANK YOU. GOOD EVENING CHAIR FOSTER AND NUMBERS OF THE PLANNING COMMISSION. MY NAME IS GINA HAYNES AND I'M ASSISTANT DIRECTOR OF PUBLIC WORKS OVER ENGINEERING. THANK YOU FOR GIVING ME THE OPPORTUNITY TO PRESENT THE CAPITAL IMPROVEMENT PROGRAM TONIGHT, SO I WILL BE PROVIDING YOU IN A DATE ON OUR DRAFT FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 25-26 THROUGH 29 TO 30. THE CIP BOOK IS A FINANCIAL DOCUMENT THAT SERVES AS A PLANNING TOOL TO IDENTIFY THE NEEDS OF THE CITY'S INFRASTRUCTURE, TO STRATEGICALLY ALLOCATE FUNDING TO SUPPORT LONG-TERM GROWTH, SAFETY, AND SUSTAINABILITY OF OUR COMMUNITY. EACH YEAR THE FIVE YEAR CIP IS UPDATED TO REFLECT PROJECTS THAT HAVE BEEN COMPLETED, THE STATUS OF ONGOING PROJECTS, AND ADDING NEW PROJECTS. THIS DOCUMENT ALSO INCLUDES FUNDING RECOMMENDATIONS FOR THE SCHOOL YEAR 25-26. FOR THIS YEAR WE HAVE CONDENSED OUR PROJECT CATEGORIES FROM 10 CATEGORIES TO SIX CATEGORIES LISTED HERE --ROADWAY INFRASTRUCTURE NOW INCLUDES PAVEMENT, TRAFFIC, AND SIGNAL PROJECTS. UNDERGROUND NOW INCLUDES UNITARY SEWER, WATER, AND STORM DRAIN PROJECTS AND COMMUNITY FACILITIES NOW INCLUDE IMPROVEMENTS TO CITY-OWNED FACILITIES, INCLUDING GENERAL PROJECTS AND BUILDING PROJECTS. WE CONSOLIDATE PROJECT CATEGORIES TO PROVIDE A MORE EFFECTIVE AND EFFICIENT WAY TO PRESENT PROJECTS IN SIMILAR CATEGORIES. SINCE THE LAST CIP WAS PRESENTED, WE HAVE COMPLETED A TOTAL OF 16 PROJECTS COSTING $24 MILLION. THIS INCLUDES PROJECTS SUCH AS ROAD REHABILITATION, STORM AND WATER INFRASTRUCTURE, TRAFFIC BUILDING REPAIRS. I'M GOING TO HIGHLIGHT A FEW OF OUR ACCOMPLISHMENTS FROM OUR LAST UPDATE. OUR FIRST PROJECT IS OUR FRONTAGE ROAD LIVING GREEN TRAIL PROJECT. THIS PROJECT COSTS $2.2 MILLION WITH $1.4 MILLION IN GRANT FUNDING. THIS PROJECT, CONSTRUCT A CLASS ONE TRAIL ON FRONTAGE ROAD FROM DOVER TO THE END OF THE EXISTING PEDESTRIAN TRAIL AT CHELSEA WAY. THE PROJECT ALSO INCLUDED THE INSTALLATION OF PATHWAY SWALES AND BIO RETENTION FEATURES AND EIGHT NEW SECURITY CAMERAS ALONG THE TRAIL. THE PROJECT WAS RECORD HIGHS AS A PROJECT OF THE YEAR BY THE A PWA NORTHERN CALIFORNIA CHAPTER. SO OUR 23-24 PAVEMENT MANAGEMENT PROGRAM, SO WE KICKED OFF OUR 10 YEAR PAVEMENT MANAGEMENT PROGRAM WITH THIS PROJECT SERVING ZONE THREE. THE AREA INCLUDED ALL RESIDENTIAL AND COLLECTOR STREETS ON THE NORTH AND SOUTH SIDE OF WEST LELAND ROAD BETWEEN DALY ROAD ANDOVER. TOTAL COST OF THIS PROJECT WAS $4.6 MILLION AND A MAJORITY OF THE FUNDING CAME FROM GENERAL FUND WITH FUNDING FROM HOW RECYCLED GRANT, YOU THE A AND RFRA. OUR CORPORATION YARD FUELING SYSTEM REPLACEMENT PROJECT --SO THIS PROJECT STARTED IN 2021 AND LOOTED THE REMOVAL OF THE TANKS AT OUR CITY'S CORPORATION YARD AS WELL AS THE NEW FUELING STATION FOR FLEET VEHICLES AT OUR ENVIRONMENTAL CENTER. THE PROJECT WAS A $1.9 MILLION PROJECT THAT NOW ALLOWS CITY VEHICLES TO REFUEL, PAYING BULK PRICES INSTEAD OF MARKED UP RATES AT PUBLIC STATIONS. OUR AMERICANA PARK BYPASS CHANNEL PROJECT WAS COMPLETED LAST YEAR FOR A COST OF $1.5 MILLION. THE PROJECT INCLUDED A FEDERAL GRANT OF $374,000. THE PURPOSE OF THIS PROJECT WAS TO REDUCE FLOOD HAZARDS AND MITIGATE STORMWATER OVERFLOWS. THE PROJECT SOLVED AN ONGOING FLOODING ISSUE ON NORTH PARKSIDE DRIVE BY DIVERTING STORMWATER TO ANOTHER GREEK WITH ADDITIONAL CAPACITY. OUR CITY PARK RESTROOM PROJECT. SO CITY PARK WAS THE FIRST PARK BUILT WITHIN THE CITY AND HAS REMAINED ONE OF THE MOST POPULAR PARKS TO DATE. THE PARK HAS TWO OUTDATED RESTROOM BUILDINGS THAT HAD REACHED THE END OF LIFE. THE PROJECT WE ARE CALLING PHASE ONE INCLUDED REPLACEMENT OF ONE OF THE RESTROOM BUILDINGS, A [ INAUDIBLE ] EIGHT STALL FACILITY THAT WAS COMPLETED LAST MONTH USING $990,000 OF ARPA FUNDS. CURRENTLY RESTROOMS ARE OPEN WITH SCHEDULED PARK PROGRAMS. SO WE HAVE 53 NEW AND CURRENT PROJECTS WITH A TOTAL ESTIMATED COST OF $277 MILLION, FOR THE BENEFIT OF THE RESIDENTS OF PITTSBURG. THIS IS A BUSY SUMMER, AS WE HAVE NINE PROJECTS IN CONSTRUCTION OR NEARLY IN CONSTRUCTION. THIS PROJECT CONSISTS OF --THESE PROJECTS CONSIST OF VARIOUS FUNDING, FEDERAL, STATE AND LOCAL FUNDS, GRANTS, THE ONLY COULD DOUBLE FOR OUR CITY TO SUSTAIN AND GROW. THE CITY OF PITTSBURG CONTINUES OUR COMMITMENT TO THE COMMUNITY BY PRIORITIZING PAVING REHABILITATION THROUGHOUT THE CITY. WE ARE ON OUR SECOND ZONE, ZONE 4 PAVEMENT MANAGEMENT PROJECT THAT WAS IDENTIFIED IN OUR 10 YEAR PROGRAM. CONSTRUCTION KICKED OFF IN MAY AND WE ARE EXPECTED TO BE DONE NEXT MONTH. THIS WAS A $4.6 MILLION PROJECT. AS A PART OF THIS PROJECT, WE ADDED WE LOW-PASS ROAD AND RANGE ROAD. OUR DELTA DEANZA TRAIL MULTIMODAL TRAIL SAFETY IMPROVEMENT PROJECT IS A $5 MILLION PROJECT THAT INCLUDE THE INSTALLATION OF CRITICAL SAFETY AND OPERATION ENHANCEMENTS ALONG THE DELTA DIABLO CLASS ONE TRAIL. WE EXPECT TO START DESIGNING ON THIS PROJECT IN THE FALL. THE EFFORT WILL REQUIRE COORDINATION WITH EAST BAY REGIONAL PARK DISTRICT AND CONTRA COSTA COUNTY FOR THE IMPROVEMENTS LOCATED IN BAY POINT. THE PROJECT WILL CREATE A WELL-CONNECTED AND ATTRACTIVE TRANSPORTATION NETWORK FOR OUR PEDESTRIAN AND BIKE COMMUNITY. THE TRAIL IS ALSO PARALLEL TO SEVERAL IMPORTANT ROUTES THAT WILL BE BENEFICIAL FOR OUR BIKE FRIENDS. THE PROJECT IS BEING CONSTRUCTED USING $4.4 MILLION IN FEDERAL FUNDS. PITTSBURG PREMIER FIELD PROJECT IS A $6.8 MILLION PROJECT $1.9 MILLION OF ARPA FUNDS, PARK DEDICATION FUNDS AND MEASURE M FUNDS. CURRENTLY CONSTRUCTIONS ABOUT 70% COMPLETE AND WE EXPECT FINAL COMPLETION BY THE END OF OCTOBER. THE PROJECT INCLUDES SPORTS FIELD, LIGHTING, LANDSCAPING AND IRRIGATION, SITE FRONTAGE, STREET PLANTINGS AND RESTROOMS. THE PROJECT ALSO INCLUDES PARKING LOT, PAVED AND UNPAVED WALKWAYS AND TRAILS CIRCULATING THE FACILITY. OUR WATER TREATMENT PLANT FILTER IMPROVEMENT AND HYPOCHLORITE CONVERSION PROJECT, THIS, THE WATER TREATMENT PLANT WAS ORIGINALLY CONSTRUCTED IN THE 1950. THIS --THE PROJECT IMPROVEMENTS FOR THIS PROJECT INCLUDE CONSTRUCTION OF TREATMENT PLANT FILTRATION IMPROVEMENTS AND HYPOCHLORITE CONVERSION. IT WILL CONVERT THE EXISTING GAS FLOORING SYSTEM TO LIQUID AND IT WILL CONSTRUCT SIX NEW DUAL MEDIA FILTERS AND REPLACEMENT OF SOME EXISTING PIPING AND VALVES. WE STARTED THIS PROJECT IN 2024 AND EXPECT TO BE COMPLETED BY JANUARY OF 2028. THE CENTRAL HARBOR PARK AND BOAT LAUNCH PROJECT INCLUDES APPROVING A.D.A. PATHS, RESTROOM REPLACEMENTS, PARKING LOT IMPROVEMENTS, POLICE SUBSTATIONS WITH SECURITY CAMERAS AND OTHER IMPORTANT AMENITIES. THE PROJECT IS LOCATED NORTH OF MARINA BOULEVARD, ADJACENT TO THE PITTSBURG YACHT CLUB . THIS PROJECT WAS FUNDED WITH $4.2 MILLION STATE GRANTS AND $3.5 MILLION DELTA CONSERVANCY 22 GRANTS. WHILE THE RESTROOM AND BOAT LAUNCH IS CURRENTLY OPEN, WE EXPECT FINAL COMPLETION OF THE REMAINING IMPROVED MINTS IN OCTOBER OF 2025. SO OUR ZONE 7 PAVEMENT MANAGEMENT PROJECT IS OUR THIRD ZONE IN OUR PAVEMENT MANAGEMENT PROGRAM. IS BORDERED BY CARTER, BUCHANAN, THE PG&E PORTER AND LELAND ROAD. THIS IS A $4.2 MILLION PROJECT AND A MAJORITY OF THE FUNDING COMES FROM OUR MRA AND MEASURE M AS WELL AS MEASURE J AND WHO THE. OUR CURRENT PLAN IS TO DO THIS PROJECT IN TWO PHASES, DUE TO INADEQUATE FUNDING. THE HARBOR STREET SAFETY IMPROVEMENT PROJECT, THIS NEW PROJECT WILL CONSTRUCT SAFETY IMPROVEMENTS ALONG HARBOR STREET WITH A FOCUS ON THE AREAS AROUND PITTSBURG HIGH SCHOOL, HILLVIEW JUNIOR HIGH AND HIGHLANDS ELEMENTARY SCHOOL. PROJECT SCOPE INCLUDES IMPROVING SIGNAL HARDWARE AT INTERSECTIONS, NEW LIGHTING, UPGRADED PEDESTRIAN CROSSINGS. THIS PROJECT IS FUNDED WITH THE $2.6 MILLION HIGHWAY SEE IMPROVEMENT PROGRAM FUNDS WITH [ INAUDIBLE ] MATCHING FUNDS. THE DESIGN IS SET TO START IN FISCAL YEAR '26. THE WESLEYAN ROAD --THE WEST LELAND ROAD EXTENSION PHASE TWO WILL EXTEND WEST LELAND ROAD FROM ITS CURRENT TERMINUS NEAR SANTA TERESA IN A WESTERLY DIRECTION TO AVILA, PROVIDING CONDUCTIVITY FROM PITTSBURG TO CONCORD CITY LIMITS. THE NEW WILL BE APPROXIMATELY .6 MILES AND INCLUDE FOUR LANES WITH RAISED, SIDEWALKS, LANDSCAPING, AND A CLASS TO BIKE LANES. THIS $33.4 MILLION PROJECT IS FUNDED ENTIRELY BY EAST CONTRA COSTA REGIONAL FEE AND FINANCE AUTHORITY. WE EXPECT DESIGN IN THIS PROJECT TO BE COMPLETED BY FISCAL YEAR 20 SEVENDUST 28 AND CONSTRUCTION COMPLETED IN 28-29. THE PITTSBURG ANTIOCH HIGHWAY WIDENING PROJECT, THIS PROJECT WILL CONSIST OF WIDENING THE PITTSBURG ANTIOCH HIGHWAY FROM LOVERIDGE ROAD TO EASTERN CITY LIMITS AT RC LANE, FROM TULANE TO FOUR LANES. THE PROJECT WILL ACCOMMODATE CLASS 2 BIKE LANES, SIDEWALKS AND A RAISED LANDSCAPE MEDIUM. THE PROJECT IS FUNDED ENTIRELY BY $38.1 MILLION FUNDS. WE EXPECT THE DESIGN OF THIS PROJECT TO BE COMPLETED IN FISCAL YEAR 27-28 AND CONSTRUCTION IN 28-29. SO THE BAILEY ROAD IMPROVEMENT PHASE ONE. SO THIS PROJECT WILL WIDEN BAILEY ROAD FROM WEST LELAND ROAD TO THE SOUTHERN CITY LIMITS, FROM TWO LANES TO FOUR LANES. THE PROJECT WILL ACCOMMODATE CLASS 2 BIKE LANES, SIDEWALK ALONG BAILEY, ESTATES FRONTAGE, A RAISED CENTER MEDIAN. THE PROJECT WILL BE COMPLETED IN TWO PHASES. FUNDING WILL BE PROVIDED BY ACURA FOR. THAT'S 97% FUNDED AND THE REMAINING FUNDS COMING FROM DEVELOPER DEPOSITS. THIS IS THE $21 PROJECT. DESIGN IS SET TO START IN FISCAL YEAR 26. CONSTRUCTION COMPLETE IN FISCAL YEAR 2030. SO THE SLIDE SHOWS A SUMMARY OF THE PROJECT INCLUDED IN THE DRAFT FIVE-YEAR CAPITAL IMPROVEMENT, FISCAL YEARS 25-26 THREE 20 9-3. WE COMPLETED 16 PROJECTS FOR A TOTAL COST OF $22.5 MILLION AND WE HAVE ANOTHER 53 CURRENT OR NEW PROJECTS TOTALING $276.9 MILLION. WE HAVE $69 MILLION IN NEW PROJECTS FOR THIS FISCAL YEAR 25-26. PROJECTS INCLUDED IN THIS CAPITAL IMPROVEMENT PROGRAM ARE THOSE THAT ARE HIGH-PRIORITY AND ARE FULLY FUNDED, PARTIALLY FUNDED, OR UNFUNDED. THAT CONCLUDES MY PRESENTATION TONIGHT AND I'M AVAILABLE FOR ANY QUESTIONS. >> THANK YOU. I ASKED THE COMMISSIONERS, DO YOU HAVE ANY ACTUAL QUESTIONS OF STAFF? COMMISSIONER ROBINSON? >> THANK YOU FOR THE PRESENTATION. VERY INFORMATIVE AND IT'S GREAT TO SEE ALL THE WORK WE HAVE DONE SO FAR, AND THEN OF COURSE WE ARE PLANNING A LOT. THIS IS ONE OF THE VERY INTERESTING ONES THAT COME THROUGH ANNUALLY AND WE GET TO UPDATE AND THE CHANGES THAT HAVE BEEN MADE. FOR THE DELTA DEANZA TRAIL STAGE IMPROVEMENT, ONE QUESTION I HAD IS IF IT LIGHTING. >> YOU KNOW WE ARE JUST STARTING THE DESIGN. WE WOULD LIKE TO INCLUDE LIGHTING. IT REALLY IS GOING TO BOIL DOWN TO OUR FUNDING AND IF WE CAN MAKE IT STRETCH. OKAY. THANK YOU. WE ARE TRYING TO GET PEOPLE OFF THE ROAD, OUT OF VEHICLES, AND TAKING ALTERNATE MEANS OF TRANSPORTATION. BEING ABLE TO DO IT AROUND-THE-CLOCK WOULD BE PRETTY MUCH NECESSARY, SO PROVIDING SOME OF LIGHTING OR SAFE WOULD BE REALLY IMPORTANT FOR A PROJECT LIKE THIS. I THINK THAT'S MY MAIN QUESTION. I ALSO HAVE TO LOOK AT MY NOTES BUT THANK YOU. >> ANYONE ELSE? ADDITIONAL TAKERS? COMMISSIONER SMITH? >> THANK YOU MADAM CHAIR. THAT WAS A LOT OF INFORMATION. THANK YOU. I TRIED TO FOLLOW AND TAKE NOTES ALONG THE WAY AND MISSED SOME ALONG THE WAY. SO A QUESTION ABOUT THE PITTSBURG PREMIER FIELDS. I KNOW WE'VE HAD A LOT OF DISCUSSION ABOUT THAT, THAT'S COME OUR WAY, AND WE'VE GOT TO LOOK AT IT. WHERE IS THE FUNDING COMING FROM FOR THAT? HOW IS THAT LOOKING UP? >> IT ON THESE SHEETS SO I COULD GIVE YOU -- >> OKAY. SO FUNDING FOR THAT IS $1.8 MILLION IN ARPA FUNDS, ABOUT $2.1 MILLION IN GENERAL FUND FUNDS, $2.2 MILLION IN PARK DEDICATION FUNDS, AND 438,000 IN MEASURE M SURPLUS. OKAY. THANK YOU FOR THAT, AND ANOTHER QUESTION I HAVE IS ABOUT THE CENTRAL HARBOR PARK AND BOAT LAUNCH FACILITIES. I ALWAYS BRING UP THE RIVER. I THINK IT'S OUR GREATEST ASSET THAT WE HAVE HERE. IT REALLY IS A BEAUTIFUL PLACE, AND A LOT OF COMMUNITY MEMBERS HAVE COME AND ASKED ME, FIRST OF ALL, CAN I GET MY BOAT IN, SO IT LOOKS LIKE THE LAUNCH RAMP IS OPEN CURRENTLY, AND THERE IS DISCUSSION ABOUT IT BECOMING SOMETHING THAT WE WOULD CHARGE PEOPLE TO LAUNCH THEIR BOAT. IS THAT ON LIST ANYWHERE? >> YOU KNOW I DON'T HAVE THE ANSWER TO THAT QUESTION. I WOULD HAVE TO FOLLOW UP WITH THE MARINA. >> THAT'S A BIG ONE AND THAT'S A BIG CONCERN, OF COURSE, TO A LOT OF PEOPLE. AND THE OTHER QUESTION I HAVE TO GO WITH THAT IS, SO I KNOW THAT WE'VE RESURFACED THAT BIG ARCING AREA THAT USUALLY FLOODS IN THE WINTERTIME, PRETTY WELL. WHERE WOULD THE BOAT TRAILER PARKING BE? >> IT IS IN THAT PARKING LOT . >> JUST IN THAT PARKING LOT. THERE'S NO EXTENSIONS TO THAT? BECAUSE I KNOW THEY DON'T FIT AND SOMETIMES THEY'LL PARK ON THE ROAD TO. >> I DON'T KNOW IF YOU'VE BEEN DOWN THERE BUT THEY'VE COMPLETE RE-STRIPED IT AND HAVE IT MORE ORGANIZED, SO I THINK THE NEW STRIPING WILL ACCOMMODATE MORE USERS. >> OKAY, WELL THANK. >> I'M GOING TO ASK MY QUESTION. SLIDE 7, PLEASE. IT'S THE AMERICANA PARKWAY PAST CHANNEL. YES. >> WHAT WAS THE WORK INVOLVED? I MEAN WAS THERE SOME DREDGING? DID YOU JUST DO THE RIPRAP? >> GOSH. JULIAN MIGHT KNOW MORE ABOUT THIS. >> AND HOW MUCH FLOODING? WAS IT GOING TO THE STREET, FLOODING TO THE STREET SIDE? >> SO THE PROJECT WAS TO DIVERT THE RUNOFF THROUGH THE PG AND THE CORE DOOR AND BYPASS THE ROADWAY INTO THE CULVERT, TO ALLEVIATE THE FLOODING FROM THE ROADWAY. THERE IS STILL A PHASE 2 TO THE PROJECT TO WORK ON THE BASIN IN THE FUTURE AS GRANT FUNDS ARE AVAILABLE. >> AND HOW MUCH FLOODING -- LET'S SAY DURING THE BIG STORM OR IS IT EVERY WINTERTIME? ARE WE TALKING ABOUT FEED OR IS IT STOPPING VEHICLES? >> IT WAS USUALLY FOR HEAVY RAIN STORMS, YES. >> ABOUT A? >> YES. >> DOES THAT HAPPEN ON PITTSBURG ANTIOCH HIGHWAY, TOO, OR KNOW. BEEN KNOW WE HAVEN'T SEEN THAT ON PITTSBURG ANTIOCH HIGHWAY. THE ONLY DIFFERENCE BETWEEN PITTSBURG ANTIOCH HIGHWAY OR THE TREES ARE SUCKING UP SOME OF THAT WATER PLANTING TO HELP, I WOULD SAY SOME OF THE STORM RUNOFF, LIKE PUTTING FIRE RESISTANT TREES? >> YES, THERE'S A SECOND PHASE TO THE PROJECT TO INCLUDE SOME MITIGATION PLANTING, WHICH WE'LL BE MONITORING FOR THE NEXT FIVE YEARS. >> THAT'S WONDERFUL AND THAT'S MUSIC TO MY EARS. THANK YOU. >> I'LL FOLLOW UP QUESTION WHEN THE PITTSBURG-ANTIOCH HIGHWAY WILL BE WIDENED, WILL THE TREES BE REPLANTED? BECAUSE MY UNDERSTANDING IS DURING A SUBCOMMITTEE MEETING THAT IT WILL BE WIDENED TOWARDS THE --YOU KNOW, TOWARDS THE CREEK, AND WE DO HAVE SOME OF THOSE OLD-GROWTH TREES THERE THAT'S HELPING WITH THE STORM WATER RUNOFF. >> SO THAT IS CERTAINLY SOMETHING THAT WILL COME UP IN THE ENVIRONMENTAL PHASE OF REVIEW OF THAT PROJECT. SO IF THERE IS MITIGATION PLANTING TO BE DONE, THAT WILL BE DONE. >> I HOPE SO, TOO, BECAUSE WE DON'T WANT ANY FLOODING THERE, WITH THE PLANS TO KIND OF MAKE IT ANOTHER, I WOULD SAY, LIKE BUSINESS CORRIDOR, FROM MY UNDERSTANDING, FROM OUR PUBLIC WORKS DIRECTOR. COMMISSIONER SMITH? >> THANK YOU MADAM CHAIR. I HAVE AN ADDITIONAL QUESTION. AS YOU JUST BROUGHT UP THE PITTSBURG-ANTIOCH HIGHWAY, ANOTHER ONE OF MY FAVORITE LOCATIONS TO CAN SITTER, WHERE IS THE WIDENING BEGINNING ON THIS? WHAT IS THE LENGTH OF THIS? PITTSBURG-ANTIOCH HIGHWAY IS A LONG STRETCH. >> SO IT STARTS AT EAST CITY LIMITS, SO RIGHT AT THE BORDER BETWEEN PITTSBURG AND ANTIOCH, AND GOES TO LOVERIDGE ROAD . >> IT GOES TO LOVERIDGE ROAD. >> DID YOU SAY RC LANE? THAT'S WHERE EAST CITY LIMITS ARE, THAT'S CORRECT. >> I GUESS I NEED TO LOOK AT A DIFFERENT TO UNDERSTAND THIS. SO THE CURRENT PITTSBURG-ANTIOCH HIGHWAY THAT IS ALSO CALLED 14th STREET IS PART OF THIS, CORRECT? OR NOT? >> IT DOESN'T GO THAT FAR. IT STOPS AT LOVERIDGE ROAD, SO IT STOPS AT THE ANTIOCH-TRAN07 CITY LIMITS AND STOPS AT LOVERIDGE ROAD. >> ALL RIGHT. THANK YOU. >> ARE THERE ANY OTHER QUESTIONS? MADAM CLERK, ARE THERE ANY COMMENTS FROM THE AUDIENCE? >> THERE ARE. JUST A MOMENT, PLEASE. >> THROUGH THE CHAIR, ALSO WANT TO OPEN UP FOR PUBLIC COMMENT, YOU NOTICE A COMMISSION CONSIDERATION ITEM BUT WE DO WANT TO -- >> DO I SAY OPEN THE PUBLIC HEARING? >> JUST OPEN IT FOR COMMENT. >> I'LL OPEN THIS ITEM FOR COMMENT, PUBLIC COMMENT. RUTH OLSON. >> THANK YOU. GOOD EVENING. I AM BRUCE OLSON, PITTSBURG 'S MR. BICYCLE, SPEAKING FOR PITTSBURG'S ICICLE COMMUNITY. FIRST, WELCOME HOME GINA HAYNES. WE LOVE YOU AND WE'RE GLAD YOU'RE HOME. THANK YOU. THE PITTSBURG BICYCLE COMMUNITY HAS ONE OR PROJECT FOR THE FIVE-YEAR CIP. THAT MAKES EXTRA WORK FOR GINA. THE LEAGUE OF AMERICAN BICYCLISTS, WHICH IS THE NATIONAL BICYCLE ADVOCACY ORGANIZATION, HAS AN AWARD THAT THE CITY CAN EARN TO BECOME A BICYCLE FRIENDLY COMMUNITY. 436 CITIES IN THE UNITED STATES HAVE APPLIED AND BECOME BICYCLE FRIENDLY COMMUNITIES. THE PITTSBURG ACTIVE TRANSPORTATION PLAN CALLS FOR US TO APPLY AND BECOME A BICYCLE FRIENDLY COMMUNITY. I VOLUNTEER TO HELP WITH THE APPLICATION AND TO SERVE ON THE BICYCLE ADVISORY COMMITTEE THAT IS FORMED AS PART OF THE REQUIREMENTS OF BECOMING A BICYCLE FRIENDLY COMMUNITY. PITTSBURG HAS ALREADY DONE THE HARD PART, AND THAT IS WE HAVE BUILT A NETWORK OF PEDESTRIAN AND BICYCLE PATHS AND BICYCLE LANES THROUGHOUT OUR COMMUNITY. THANK YOU VERY MUCH. THANK YOU MR. OLSON. MADAM CLERK, ARE THERE ANY OTHER PUBLIC COMMENTS? >> THERE ARE NONE. >> THANK YOU. COMMISSIONERS, IT'S TIME FOR DISCUSSION. WHAT SAY? WHAT IS YOUR PLEASURE? WOULD SOMEBODY MAKE A MOTION? COMMISSIONER SMITH, YOU HAVE ADDITIONAL COMMENTS? >> I DO. THANK YOU MADAM CHAIR. I GUESS I WANT TO ADD MY VOICE TO OUR CHAIRPERSON, BECAUSE I THINK WE REALLY NEED TO CONSIDER SOME HEAVY AND SERIOUS PLANTING IN THE AREAS THAT WE'RE RENOVATING, ESPECIALLY ON THE ROADWAYS, ESPECIALLY WHERE WE HAVE FLOODING. YES I'M INTERESTED IN THE PITTSBURG-ANTIOCH HIGHWAY, BUT LELAND, ALL OF WHERE WE ARE HAVING CHANGES TO OUR ROADWAYS, AND JUST IN LOOKING AT THE PHOTOS THAT YOU BROUGHT IN HERE, I'D LIKE TO SEE MORE TREES AND THAT ACTIVELY DONE SOONER RATHER THAN LATER, BECAUSE IT'S GOING TO HELP WITH NOT ONLY THE FLOODING BUT THE CONSERVATION OF WATER AS WELL SO IT HELPS THE ENVIRONMENT. WE DO A GOOD JOB WITH IT WHEN WE REALLY GET TO IT AND PAY ATTENTION TO IT AND I ALSO WANT TO ADD MY TWO CENTS ON THE PITTSBURG-ANTIOCH HIGHWAY. IT'S IN THE 14th STREET AREA WHERE THE BIG TREES HAD BEEN CUT DOWN ABOUT 10-PLUS YEARS AGO NOW BY PG&E AND THAT WERE PROMISED TO BE REPLANTED, AND I'M STILL WAITING. I LIVE IN THAT NEIGHBORHOOD. I SEE THAT EVERY DAY AND IT'S AN AREA WHERE WE HAVE A LOT GARBAGE THAT BLOWS UP AGAINST THE FENCE BY THE RAILROAD TRACKS, AND WHILE OUR CITY WORKERS DO A REALLY GOOD JOB KEEPING UP ON IT, I'M EXPECTING TO SEE PLANTING THEIR. IF WE ARE GOING BEAUTIFY THE PITTSBURG-ANTIOCH HIGHWAY AND MAKE IT MORE USABLE AND MORE ATTRACTIVE, WE NEED TO TAKE CARE

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsSource recordingread transcript
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Planning Commission
  • Planning Commission — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • The available transcript has no reliable timestamps.
  • Transcript coverage is partial.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: 9ddc1635b3ff3290978a7146224bb150. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record