POLISCOPE

The public record

NORTHBAYVILLAGE (MIAMI-DADE COUNTY) · LOCALDecisions publishedPartial coverage

Meeting, Sustainability and Resiliency Task Force

Tuesday, April 28, 2026 · Government meeting record

The 30-second read

Recorded outcome

Meeting, Sustainability and Resiliency Task Force

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

No later meeting or follow-up date is stated in the reviewed record.

An official outcome record - an action agenda or minutes - is published for this meeting.

Record text

No transcript is held for this meeting. Recording: Watch video

NORTH BAY VILLAGE SUSTAINABILITY AND RESILIENCY TASK FORCE VIRTUAL MEETING MINUTES TUESDAY, APRIL 28, 2026, | 6:30 P.M. MEETING ID: 848 8743 1382 1. Call to Order / Roll Call: a. Chair Alisha Graham called the virtual meeting to order at 6:33 p.m. b. Roll Call i. Board Members Present: 1. Board Member Alisha Graham 2. Board Member Neil Krasner 3. Board Member David Doebler 4. Board Member Oliver Pfeffer (joined late) 5. Board Member Brenda (joined late) ii. Village Staff Present: 1. Mayor Rachel Streitfeld 2. NBV IT Dept 3. Frank Rollason, Village Manger 4. Roger Hogg, CIP Director 3. Christina Viala Chief Resiliency Officer iii. Additional Participants: None 2. Approval of Last Meeting Minutes: March 24, 2026 a. No changes or recommendations – Minutes approved. b. Board member N. Krasner made the motion to approve. Board member D. Doebler seconded it and the motion passed by unanimous vote. 3. Old Business 3A. Update on Stormwater Master Plan. Chief Resiliency Officer Christina Viala reported that the consultant BCC is no longer working on this project and now have 2 new consultants: EXP and Chen Moore, one responsible for Treasure Island and one for North Bay Island. They are proceeding with the

Sustainability & Resiliency Task Force April 28, 2026 Page 2 seawall design and outfall for Phase 1 of Harbor Island and NBI is ready for the construction phase pending an issue of property acquisition or a way around that. The resiliency update was attached to this item, so Christina Viala wanted to mention that this update is something that she shares with the Commission every month and can share with this SRTF. CIP Director Roger Hogg then gave a brief update on the item going to the Commission related to Stormwater Plans. Mayor Streitfeld confirmed with Roger that there is a scope of work on the Stormwater coming before the Commission soon, and he confirmed that is the goal. D. Doebler mentioned that in Key Biscayne, while they were undertaking a stormwater project and had community pushback and ended up going with a contractor (GIT) that provided more green infrastructure in terms of a system that ended up pumping less water out into the bay. Additional discussion ensued about having the engineers bring bids from subcontractors who specialize in Green Infrastructure and having NBV create a scoring matrix to help prioritize green infrastructure. Part of the decision will involve confirming the legal requirements, whether the bidding goes to the pool or a scoring matrix process. Christina also wanted to add one matter to this item regarding an “industry day” for some of our stormwater plans: UM Center for Urban and Community Design have a class in “sponge parks” working on concepts for these types of parks in the County. In the fall there would be 2 or 3 teams with a few designs getting input from the City. There was general agreement that this could be worthwhile pursuing as a possible source of design ideas. D. Doebler also mentioned that the County is offering free consulting services on reasonable assurance plan projects through Tetra Tech and ESA, and suggested that at the right time, it might make sense to get input from them. Roger mentioned that his department has interacted with Tetra Tech. He also pointed out that his understanding is that getting our project included in the reasonable assurance plan opens up the opportunity to receive project funding from the State. D. Doebler also mentioned that the Biscayne Bay Summit on May 20th will have a lot of great updates on information about the state of the Biscayne Bay. 3B. Update on Landfill Waste Diversion Strategy. Ms. Viala met with D. Doebler and also reached out to other municipalities doing composting, and she spoke with Francisco from Compost for Life regarding ways of implementing the process. D. Doebler mentioned that NBV has the opportunity to rethink our waste services, and that the most important consideration in our control is the actual language in the contracts we end up negotiating. He gave a presentation showing the idea of developing 3 simultaneous RFPs with the base idea of “pay as you throw”. The 3 RFPs would be for: 1) Residential Landfill; 2) Multifamily landfill and recycling; 3) Composting. Mayor Streitfeld mentioned that the category of Commercial would have to be added. The presentation included a proposal to ask the Commission to 1) direct staff to develop the 3 simultaneous RFPs; 2) Require Pay-As-You-Throw structure; 3) Require composting carve-

Sustainability & Resiliency Task Force April 28, 2026 Page 3 out; 4) require Sec 287.042 piggyback language; 5) authorize SRTF to review and issue written comments to staff. Task Force Member O. Pfeffer asked how yard waste would be handled, and the Mayor replied that the Village will still handle yard waste separately from these new proposed contracted services. The Mayor mentioned that moving forward this in a timely manner is important because as soon as Sunbeam breaks ground on the Grove by the Bay building, NBV will lose the location it currently parks its leased garbage vehicles. This item is planned to be discussed in some form at the next Commission meeting, perhaps voted upon as early as June. Next meeting SRTF will hopefully be in a position to make a formal recommendation. 4. New Business 4A. Discussion on Biscayne Bay Marine Health Summit on May 20, 2026. Tickets are available at restorebiscaynebay.org. 4.B. Discussion on the Sustainable Procurement Policy. Ms. Viala created a presentation on the work she is doing creating a Sustainable Procurement Policy for North Bay Village, which includes prioritizing sustainable materials, local sourcing, integrates resilience into infrastructure decisions, and requires annual public reporting. Also included in a Visible Community Impact with Food in terms of encouraging local sourcing and reduction of artificial products. Task Force O. Pfeffer mentioned that this policy could also include sustainable landscaping practices for Village managed grounds. 4.C. Green Infrastructure Policy Discussion. Ms. Viala included a draft Green Infrastructure Policy, presented it and all its components and requested any feedback. The Task Force will review and can recommend moving forward to the Village Commission. 5. Staff/Commission Liaison updates: 6. Poop Free NBV 2026 was a success. We had Francisco Torres from Compost for Life there and the staff did an amazing job. Summer meetings are third Tuesday in July and June. 6. Public Comments: None 7. Next Meeting: May 26, 2026 8. Adjournment:

Sustainability & Resiliency Task Force April 28, 2026 Page 4 a. Motion to Adjourn: O. Pfeffer motioned to adjourn, i. Second: Board Member A. Graham seconded. ii. Vote: All in favor – Voice Vote iii. Motion: Passed b. Adjourned: 8:16 pm Submitted by Secretary Oliver Pfeffer

1. Opening Items 1.A. Call to Order 1.B. Roll Call 2. Approval of Meeting Minutes 2.A. Approval of Meeting Minutes for Tuesday, March 24, 2026 3.24.2026 - SRTF - Minutes - ready for SRTF.pdf 3. Old Business 3.A. Update on the Stormwater Master Plan by Chief Resilience Officer, Christina Viala Resilience Update April 2026.pdf 3.B. Update on the Landfill Waste Diversion Strategy 3.C. Update on the Village's Project Submission to the Biscayne Bay Reasonable Assurance Plan 4. New Business 4.A. Discussion on the Biscayne Bay Marine Health Summit on May 20, 2026 NORTH BAY VILLAGE OFFICIAL AGENDA SUSTAINABILITY AND RESILIENCY TASK FORCE VIRTUAL MEETING ZOOM MEETING ID: 848 8743 1382 TUESDAY, APRIL 28, 2026 at 6:30 PM 1

4.B. Discussion on the Sustainable Procurement Policy NBV Sustainable Procurement.pdf Sustainable Procurement Policy.pdf 4.C. Discussion on the Green Infrastructure Policy Green Infrastructure Policy-Draft.docx 5. Staff / Commission Liaison Updates 6. Public Comments 7. Agenda Items for Next Meeting: Tuesday, May 26, 2026 8. Adjournment THIS MEETING IS OPEN TO THE PUBLIC. IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1990, ALL PERSONS THAT ARE DISABLED; WHO NEED SPECIAL ACCOMMODATIONS TO PARTICIPATE IN THIS MEETING BECAUSE OF THAT DISABILITY SHOULD CONTACT THE OFFICE OF THE VILLAGE CLERK AT 305-756-7171 EXT. 45 NO LATER THAN FOUR DAYS PRIOR TO SUCH PROCEEDING. IN ACCORDANCE WITH THE PROVISIONS OF SECTION 286.0105, FLORIDA STATUTES, ANYONE WISHING TO APPEAL ANY DECISION MADE BY VILLAGE COMMISSION, WITH RESPECT TO ANY MATTER CONSIDERED AT THIS MEETING OR HEARING, WILL NEED A RECORD OF THE PROCEEDINGS AND FOR SUCH PURPOSE, MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE WHICH RECORD SHALL INCLUDE THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. AGENDA ITEMS MAY BE VIEWED AT THE OFFICE OF THE VILLAGE CLERK, NORTH BAY VILLAGE, 1666 KENNEDY CAUSEWAY. ANYONE WISHING TO OBTAIN A COPY OF ANY AGENDA ITEM SHOULD CONTACT THE VILLAGE CLERK AT 305-756-7171 EXT 45. A COMPLETE AGENDA PACKET IS ALSO AVAILABLE ON THE VILLAGE WEBSITE AT www.nbvillage.com. TO REQUEST THIS MATERIAL IN ACCESSIBLE FORMAT, SIGN LANGUAGE INTERPRETERS, INFORMATION ON ACCESS FOR PERSON WITH DISABILITIES, AND/OR ANY ACCOMMODATION TO REVIEW ANY DOCUMENT OR PARTICIPATE IN ANY VILLAGE-SPONSORED PROCEEDING, PLEASE CONTACT (305) 756-7171 FIVE DAYS IN ADVANCE TO INITIATE YOUR REQUEST. TTY USERS MAY ALSO CALL 711 (FLORIDA RELAY SERVICE). 2

Showing the first 24,002 of 26,037 characters. The full document is at the source.

1. Opening Items 1.A. Call to Order 1.B. Roll Call 2. Approval of Meeting Minutes 2.A. Approval of Meeting Minutes for Tuesday, March 24, 2026 3.24.2026 - SRTF - Minutes - ready for SRTF.pdf 3. Old Business 3.A. Update on the Stormwater Master Plan by Chief Resilience Officer, Christina Viala Resilience Update April 2026.pdf 3.B. Update on the Landfill Waste Diversion Strategy 3.C. Update on the Village's Project Submission to the Biscayne Bay Reasonable Assurance Plan 4. New Business 4.A. Discussion on the Biscayne Bay Marine Health Summit on May 20, 2026 NORTH BAY VILLAGE OFFICIAL AGENDA SUSTAINABILITY AND RESILIENCY TASK FORCE VIRTUAL MEETING ZOOM MEETING ID: 848 8743 1382 TUESDAY, APRIL 28, 2026 at 6:30 PM 1

4.B. Discussion on the Sustainable Procurement Policy NBV Sustainable Procurement.pdf Sustainable Procurement Policy.pdf 4.C. Discussion on the Green Infrastructure Policy Green Infrastructure Policy-Draft.docx 5. Staff / Commission Liaison Updates 6. Public Comments 7. Agenda Items for Next Meeting: Tuesday, May 26, 2026 8. Adjournment THIS MEETING IS OPEN TO THE PUBLIC. IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1990, ALL PERSONS THAT ARE DISABLED; WHO NEED SPECIAL ACCOMMODATIONS TO PARTICIPATE IN THIS MEETING BECAUSE OF THAT DISABILITY SHOULD CONTACT THE OFFICE OF THE VILLAGE CLERK AT 305-756-7171 EXT. 45 NO LATER THAN FOUR DAYS PRIOR TO SUCH PROCEEDING. IN ACCORDANCE WITH THE PROVISIONS OF SECTION 286.0105, FLORIDA STATUTES, ANYONE WISHING TO APPEAL ANY DECISION MADE BY VILLAGE COMMISSION, WITH RESPECT TO ANY MATTER CONSIDERED AT THIS MEETING OR HEARING, WILL NEED A RECORD OF THE PROCEEDINGS AND FOR SUCH PURPOSE, MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE WHICH RECORD SHALL INCLUDE THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. AGENDA ITEMS MAY BE VIEWED AT THE OFFICE OF THE VILLAGE CLERK, NORTH BAY VILLAGE, 1666 KENNEDY CAUSEWAY. ANYONE WISHING TO OBTAIN A COPY OF ANY AGENDA ITEM SHOULD CONTACT THE VILLAGE CLERK AT 305-756-7171 EXT 45. A COMPLETE AGENDA PACKET IS ALSO AVAILABLE ON THE VILLAGE WEBSITE AT www.nbvillage.com. TO REQUEST THIS MATERIAL IN ACCESSIBLE FORMAT, SIGN LANGUAGE INTERPRETERS, INFORMATION ON ACCESS FOR PERSON WITH DISABILITIES, AND/OR ANY ACCOMMODATION TO REVIEW ANY DOCUMENT OR PARTICIPATE IN ANY VILLAGE-SPONSORED PROCEEDING, PLEASE CONTACT (305) 756-7171 FIVE DAYS IN ADVANCE TO INITIATE YOUR REQUEST. TTY USERS MAY ALSO CALL 711 (FLORIDA RELAY SERVICE). 2

1 NORTH BAY VILLAGE SUSTAINABILITY and RESILIENCE TASK FORCE MEETING MINUTES: WEDNESDAY, MARCH 24, 2026, 6:30 P.M. ZOOM MEETING ID: 848 8743 1382 1666 KENNEDY CAUSEWAY, SUITE 101 NORTH BAY VILLAGE, FL. 33141 1. Opening Items: a. Call to Order: Vice Chair Dave Doebler called the meeting to order at 6:33 p.m. b. Roll Call: i. Board Members Present: 1. Vice Chair Dave Doebler 2. Secretary Oliver Pfeffer 3. Board Member Neil Krasner 4. Board Member Brenda Krebs ii. Board Members Absent: 1. Chair Alisha Graham iii. Village Staff Present: 1. Mayor Rachel Streitfeld, ESQ. 2. Frank Rollason, Village Manager 3. Roger Hogg, Director – Capital Improvements Projects [CIP] 4. Christina Viala, Chief Resiliency Officer [CRO] 5. Johnny Saavedra, Chief Information Officer [CIO] 2. Approval of Last Meeting Minutes: Tuesday, January 27, 2026: a. Motion: Brenda Krebs made a motion to approve the minutes without changes/recommendations. b. Second: Board Member Neil Krasner seconded the motion. c. Vote: Upon voice vote, the motion passed unanimously 4 to 0. 3. Old Business: a. Update on the Living Sea Walls Project at Vogel Park: Village Manager Frank Rollason is waiting to understand how the finances and payment for the project will be handled. 3

2 Vice Chair David Doebler suggested it be handled through a non-profit entity. CRO Christina Viala agreed with the Village Manager on understanding the full scope of the project so that permitting can be finalized, and the project can proceed. 4. New Business: a. Discussion on W. Treasure Drive Stormwater Park: The deed to the land has been given to NBV, subject to some final review of the transfer documents. Vice Chair D. Doebler suggested that any salvageable material be sent to a recycling center when demolition occurs of the existing property. CRO Viala identified potential partners for the property. Secretary O. Pfeffer suggested an opportunity for an urban pocket park as part of the design. Mayor Streitfeld mentioned there might be an opportunity to incorporate the existing right-of-way and create a protective barrier or beam at the new park location. All the ideas for the park should be integrated with and incorporated into the new plans for the roadways, even though they are separate projects. Village Manager Rollason wanted to make sure that the design of the pumps by the engineers was coordinated with any new park designs. CIP Director R. Hogg confirmed that since the Village gained ownership of the property, coordination for the new park’s engineering design can begin. Board Member N. Krasner asked that the pumps be located such that operators can effectively remove water from the street in this area. Mayor Streitfeld advised that the plan for the new pump station is for the equipment to live under the street at this location. Vice Chair D. Doebler suggested that we could leverage this stormwater park project to advance creativity in design, perhaps through a competition. The Underline was very successful because of the input from the community through charities. Mayor Streitfeld agreed that community engagement is important. CRO Viala agreed that a charitable approach would be ideal, and NBV could coordinate the process. There was some discussion about a design competition being possible for a pitch portion, but not necessarily the design portion of the project. b. Discussion on Treasure Island Drainage / Road: CRO Viala gave an update that the Work Order between NBV and BCC has been dissolved. CIP Director R. Hogg confirmed that the previous Work Order between NBV and BCC on how to manage the stormwater project was too broad, and now the Village can undertake the management more effectively. 4

3 c. Discussion on the Community Center Grand Opening: Mayor Streitfeld advised Village is currently seeking sponsors and partnerships to help fund the event, and that an Ad-Hoc Planning Committee is organizing the grand opening ceremony. She mentioned that the SRTF may want to have a table at the event. The date for the grand opening event is to be determined. Village Manager Rollason advised of plans for the staffing and itinerary of the new Community Center services. Board Member N. Krasner suggested an opportunity for volunteers to offer classes at the Community Center Vice Chair D. Doebler suggested that the Community Center be plastic-free to the greatest extent possible. He asked that vending machines be stocked with aluminum items and that any vendors or caterers be required to reduce the use of single-use plastic items as much as possible. Vice Chair D. Doebler mentioned installing water bottle refill stations to make the Community Center as self-sustaining as possible. Mayor Streitfeld suggested deferring discussions on this matter until the April meeting, when more details about the Community Center project have been determined. d. Discussion on Green Infrastructure Policy: CRO Viala added this item to inform the SRTF about a green infrastructure policy for NBV, which mandates green infrastructure guidelines. The guidelines within this policy will be mandated in future work orders. She is planning to share a more formal version of the draft document at the April meeting. 5. Staff Comments / Commission Liaison Updates: a. Status on Privatizing Trash/Recycling Services at NBV: Mayor Streitfeld provided an update about the plans to privatize trash services in North Bay Village. i. Vice Chair D. Doebler suggested that we should include a plan for composting pick up. ii. Mayor Streitfeld asked Village Manager Rollason how the Village can move forward with composting options. She mentioned private companies that provide composting services on a scale. He said he will seek ways to incorporate this suggestion from now on. iii. Vice Chair D. Doebler mentioned other sustainability practices, such as tool stream recycling, and other ways to eliminate as much as 50 percent of waste from going to the landfill. iv. Secretary O. Pfeffer suggested the importance of keeping Village Staff to work alongside the new company, not to privatize the entire function. Vice Chair D. Doebler agreed and added the importance of staff being able to handle recycling. There was additional discussion about how the staff will remain working at some level if trash/recycling services become privatized. v. Village Manager Rollason said there is a Miami-Dade County ordinance in process requiring municipalities to have a designated area to hold trash within their municipality. The opt-out option is to engage Miami-Dade County with a location to secure the excessive trash during a storm. vi. CRO Viala suggested creating a process to garner metrics with our trash going forward, so 5

4 if we add composting, we can see the effect on the net waste. vii. Vice Chair D. Doebler mentioned that trust in the recycling industry is very low and that we should instill trust by having our staff bring high-quality, uncontaminated material to the recycling facility. viii. CRO Viala would like to review the language in the City of Coral Gables contract to learn how they handle recycling programs. b. Possible Soccer Field on Treasure Island: Mayor Streitfeld said the Village is working to install a functional soccer field on the Treasure Island lot that Sunbeam recently donated. c. Harbor Island’s Living Sea Wall Endeavor: Mayor Streitfeld also mentioned that the Related Group project on Harbor Island was approved by the Shoreline Development Review and reminded us that the entire seawall will be a living biophilic seawall design. i. Vice Chair D. Doebler suggested that there is long-term monitoring to see exactly what the benefits are of these seawalls. ii. Village Manager Rollason mentioned that there is going to be a biologist monitoring the new seawall at the park. d. POOP-FREE NBV 2026: This year’s Poop-Free event, sponsored by Mayor Streitfeld, will be on Saturday, April 25, 2026, from 10 a.m. until NOON. 6. Public Comments: NONE 7. Agenda Items for next Meeting: Tuesday, April 28, 2026, 6:30 p.m. via ZOOM: a. Update on the Community Center Grand Opening Plans b. Update on the Green Infrastructure Policy by CRO Christina Viala 8. Adjournment: a. Motion to Adjourn: Introduced by Board Member Neil Krasner. i. Second: Secretary Oliver Pfeffer ii. Vote: Upon voice vote, the motion passed unanimously 4 to 0. b. Adjourned: 7:46 p.m. Drafted by: Oliver Pfeffer, Secretary Finalized by: Isabel Betancourt, Assistant Village Clerk April 16, 2026 / Approval pending April meeting [4/28/26]. 6

NORTH BAY VILLAGE – RESILIENCE UPDATE REPORTING MONTH: APRIL 2026 pg. 1 From the Chief Resilience Officer Happy Earth Week! April has been a month of meaningful progress for the Resilience office. I had the honor of representing the Village at the Water as Leverage workshop alongside regional partners, including the Miami Beach CRO, the Broward County Deputy CRO, and Mayor Daniella Levine Cava, during a visit that also included Their Majesties King Willem-Alexander and Queen Máxima of the Netherlands. It was an important reminder of the value of keeping North Bay Village engaged in regional and international resilience conversations. Here at home, we finalized the Adaptation Plan 2.0 grant work plan, now moving into signatures. We are introducing a Sustainable Procurement Policy to the Sustainability and Resilience Task Force, and presenting our Green Infrastructure Policy to support stronger, nature-based project standards across the Village’s capital projects. We’ve also begun exploring ways to reimagine waste, with an early focus on expanding composting opportunities to reduce our environmental footprint. Thank you for your continued commitment to building a resilient and sustainable North Bay Village. Christina Viala Chief Resilience Officer Figure 1 Water Leverage Workshop April 14, 2026 7

NORTH BAY VILLAGE – RESILIENCE UPDATE REPORTING MONTH: APRIL 2026 pg. 2 1. Adaptation Plan Grant With the Resilient Florida Adaptation Plan 2.0 grant work plan now finalized, the project is officially moving into the signature phase between the State and Village leadership. This milestone positions North Bay Village to begin developing an updated adaptation plan that expands on nature‑based solutions, integrates advanced stormwater and coastal resilience strategies, and delivers a public-facing Resilience Dashboard to track progress, equity metrics, and community priorities. This work continues to build on the Village’s commitment to planning for future sea-level rise, improving water quality, and strengthening long‑term resilience. 2. Green Infrastructure Policy The Green Infrastructure Policy establishes requirements for integrating Green Stormwater Infrastructure (GSI) and Low Impact Development (LID) strategies into Village Capital Improvement Projects. The policy introduces new definitions, mandates nature‑based stormwater practices wherever feasible, and aligns public infrastructure with nationally recognized sustainability frameworks such as Envision, LEED, SITES, and WEDG. This policy will strengthen flood resilience, support Biscayne Bay recovery, and expand the use of demonstration projects across public spaces. 3. Sustainable Procurement Policy The Sustainable Procurement Policy strengthens the Village’s commitment to reducing environmental impacts through purchasing decisions, prioritizing sustainably certified products, waste reduction, healthy food procurement, and alternatives to single-use plastics. It establishes clear responsibilities for Village departments, vendors, and procurement processes to support energy efficiency, waste minimization, safer materials, and long-term 8

NORTH BAY VILLAGE – RESILIENCE UPDATE REPORTING MONTH: APRIL 2026 pg. 3 lifecycle value. The policy aligns with NBV100 goals and positions North Bay Village to lead by example in climate‑conscious municipal operations. Looking Ahead In the months ahead, North Bay Village will explore opportunities to expand organic waste diversion as part of a broader effort to rethink waste and reduce environmental impacts. The Office of Resilience will also participate in the Sustainability Directors Network Annual Meeting from May 4–7, with registration and lodging funded by the organization—an opportunity to bring back best practices and strengthen regional partnerships. Later in the month, the Village will join partners across Miami-Dade County for RAP Day at the Biscayne Bay Marine Health Summit on May 19, continuing efforts to advance stormwater projects and secure funding. 9

§ 36.26 – Sustainable Procurement (A) Purpose The Village recognizes its responsibility to minimize the environmental, human health, and economic impacts of goods, services, materials, and food purchased, used, or disposed of in municipal operations and capital projects. This section aims to: - Promote sustainability, resilience, and public health in procurement decisions - Reduce greenhouse gas emissions, waste generation, and toxic material use - Support lifecycle cost eƯiciency and long-term asset performance - Encourage healthy, plant-forward, and locally sourced food options in city operations (B) Environmentally Preferable Purchasing (EPP) The Village shall establish and maintain an EPP Program covering: 1. Ongoing consumables: paper, toner, binders, batteries, desk accessories 2. Building materials and fixtures: lamps, low-toxicity cleaning products, paints, coatings 3. Durable goods: oƯice equipment, appliances, electrical and mechanical equipment 4. Food procurement (all city-operated facilities, events, and contracted services) (C) Sustainable Purchasing Criteria Purchases should, where practicable, meet one or more of the following: - Recycled content or reused/repurposed materials - Locally or regionally sourced goods (within 500 miles) - Rapidly renewable materials - Durable, low-toxicity, or low-emission products - Third-party certifications (e.g., FSC, Energy Star, EPEAT) (D) Solid Waste and Materials Management 10

- Recycle paper, cardboard, plastics, glass, and metals - Safely store and dispose of batteries and mercury-containing lamps - Maintain at least 75% waste diversion or conduct waste audits every five years (E) Toxic Material Reduction - Minimize hazardous materials in procurement, including mercury - Prefer non-toxic, biodegradable, and low-emission products (F) Sustainable Procurement Evaluation Criteria Procurement decisions shall consider: 1. Environmental: energy, water, emissions, waste, resource depletion, biodiversity 2. Resilience: durability, redundancy, flexibility, adaptation to climate 3. Economic: lifecycle cost, operational costs, long-term value 4. Social Equity: local business participation, fair labor, environmental justice (G) Roles and Responsibilities 1. Village Manager / Procurement: integrate sustainability criteria, maintain guidance 2. Departments: incorporate sustainability into specifications, reduce unnecessary consumption 3. Chief Resilience OƯicer: provide technical review for climate and resilience standards (H) Sustainable Food Procurement 1. All food and beverages purchased or served by the Village shall prioritize: - Nutritious, balanced, and healthy options - Locally and regionally sourced products - Seasonal, sustainably produced food 11

- Low-impact packaging and reduction of food waste 2. Plant-based Guidance (WELL-inspired): - At least one plant-based option must be available at each Village event - Balanced plant-based protein should be included - Limit artificial ingredients 3. Food Procurement Default: - Locally sourced, sustainably produced, and plant-forward options shall be the preferred default - Written justification required if alternative selections are made 4. Vendor Requirements: - Compliance with Village healthy and sustainable food standards - Disclosure of sourcing practices - EƯorts to reduce packaging and single-use plastics 5. Reporting: - Include food procurement in annual sustainable procurement report (I) Reporting - Annual public report shall include: - Total procurement expenditures - Percentages of reused, repurposed, locally sourced, environmentally preferable, and plant-forward food purchases - Waste reduction/diversion outcomes - Key initiatives and performance trends (J) Continuous Improvement - Village shall seek to progressively increase sustainable purchases and plant-based food availability over time 12

Sustainable Procurement Policy C H R I S T I N A V I A L A , N O R T H B AY V I L L A G E C H I E F R E S I L I E N C E O F F I C E R 13

Where Our Procurement Dollars Go OFFICE SUPPLIES FOOD EVENTS 14

Current Procurement Policy 15

What The New Policy Does Prioritizes reused and sustainable materials Supports local sourcing Integrates resilience into infrastructure decisions Requires annual public reporting 16

Proven Regional Models & Standards Cities Leading the Way ◦ Miami Beach: Resilient procurement (climate + durability) ◦ Orlando: Sustainable purchasing + supplier standards Sustainability Frameworks: LEED for Cities and Communities ◦ Prioritizes local sourcing & reuse ◦ Requires public reporting Health & Wellness Standards: WELL Building Standard ◦ Encourages plant-forward food options ◦ Focus on nutrition & reducing artificial ingredients 17

Visible Community Impact (Food) At least one plant-based option with balanced plant-based protein at every Village event Limit artificial ingredients Encourage local sourcing 18

The Ask I’m asking for your: Feedback before finalization Support for the policy direction Thank you! 19

🔷 1. ADD NEW DEFINITIONS (Amend § 53.103) Capital Improvement Project (CIP): A project undertaken, funded, or managed by the Village involving the construction, reconstruction, or major improvement of public infrastructure or facilities, including but not limited to streets, parks, public buildings, drainage systems, and waterfront improvements. Green Stormwater Infrastructure (GSI): A range of natural and engineered systems and practices that use or mimic natural processes to infiltrate, evapotranspire, detain, capture, reuse, or treat stormwater runoff at or near its source. GSI includes, but is not limited to, bioretention areas, bioswales, rain gardens, green roofs, permeable pavement, infiltration trenches, cisterns, urban tree canopy, and restored natural systems. Low Impact Development (LID): A site design strategy intended to maintain or replicate pre- development hydrology by minimizing impervious surfaces, preserving natural features, and managing stormwater runoff through distributed, small-scale controls that promote infiltration, evapotranspiration, and reuse. Impervious Surface: Any surface that prevents or significantly restricts infiltration of stormwater into the soil, including but not limited to rooftops, pavement, compacted soils, and concrete or asphalt surfaces. Green Stormwater Infrastructure Network: An interconnected system of natural and engineered stormwater features designed to collectively manage runoff, improve water quality, enhance resilience, and provide ecological and community benefits. Stormwater Management Plan: A site-specific or capital project-specific plan demonstrating compliance with stormwater quantity and quality requirements, including use of GSI, LID, and Best Management Practices, consistent with Village, County, State, and applicable federal requirements. Envision Rating System: A sustainability and resilience framework developed by the Institute for Sustainable Infrastructure used to evaluate and certify the sustainability of civil infrastructure 20

projects across quality of life, leadership, resource allocation, natural world, and climate and resilience categories. LEED (Leadership in Energy and Environmental Design): A green building certification program developed by the U.S. Green Building Council that provides a framework for healthy, efficient, carbon- and cost-saving buildings and communities. SITES (Sustainable SITES Initiative): A comprehensive rating system for sustainable land design and development that promotes ecosystem services, water management, soil health, and climate resilience in site planning and landscape projects. WEDG (Waterfront Edge Design Guidelines): A rating system and set of guidelines that promote resilient, ecological, and publicly accessible waterfront design, developed by the Waterfront Alliance. 🔷 2. NEW SECTION (CIP-FOCUSED) § 53.116 – Green Stormwater Infrastructure Requirements for Capital Improvement Projects (A) Intent To enhance flood resilience, improve water quality, and protect Biscayne Bay by requiring the integration of Green Stormwater Infrastructure (GSI) and Low Impact Development (LID) strategies into Village Capital Improvement Projects. (B) Applicability This section shall apply exclusively to all Capital Improvement Projects (CIP) undertaken, funded, or managed by the Village. (C) Required Integration of Green Stormwater Infrastructure All Capital Improvement Projects shall: 1. Incorporate Green Stormwater Infrastructure (GSI) and Low Impact Development (LID) strategies to the maximum extent practicable. 2. Minimize stormwater runoff volume and pollutant discharge 21

3. Reduce impervious surfaces where feasible 4. Preserve or enhance natural drainage patterns where practicable (D) Stormwater Management Plan Requirement All Capital Improvement Projects shall include a Stormwater Management Plan demonstrating:  Compliance with applicable FDEP, Miami-Dade Count

Official record

ArtifactSourceState
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Recording and media

Coverage and corrections

Records considered

  • Meeting, Sustainability and Resiliency Task Force — Minutes
  • Meeting, Sustainability and Resiliency Task Force
  • Meeting, Sustainability and Resiliency Task Force — Packet

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: 888af37e75b744db881447c669b93edc. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record