POLISCOPE

The public record

BURBANK (LOS ANGELES COUNTY)Decisions publishedPartial coverage

BWP Board Meeting

Thursday, June 4, 2026 · Government meeting record

The 30-second read

Recorded outcome

BWP Board Meeting

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

No later meeting or follow-up date is stated in the reviewed record.

An official outcome record - an action agenda or minutes - is published for this meeting.

Record text

No transcript is held for this meeting. Recording: Listen to audio · Watch video

Burbank Water and Power Board – June 04, 2026 Meeting Minutes 1 BURBANK WATER AND POWER BOARD MINUTES OF MEETING JUNE 04, 2026 Mr. Cherry called the meeting of the Burbank Water and Power Board to order at 5:00 p.m. in the third-floor board room of the BWP Ron E. Davis Administration Building, 164 West Magnolia Boulevard, Burbank, California. Mr. Cherry called for the Pledge of Allegiance to the Flag. ROLL CALL BOARD PRESENT: Mr. Altman; Mr. Cherry; Mr. Eskandar; Mr. LeMasters; Mr. Luddy; Mr. Smith BOARD ABSENT: None. STAFF PRESENT: Ms. Samra, General Manager-BWP; Mr. Riad, Chief Assistant General Manager-BWP; Mr. Wilson, Assistant General Manager-BWP; Mr. Lillio, Chief Financial Officer; Mr. Wilson, Assistant General Manager- Operational Technology; Mr. Aquino, Assistant General Manager- Customer Service Operations; Mr. Johnstone, Sustainability Officer; Mr. Casillas, Acting Administrative Officer-BWP; Ms. Kurihara, Senior Assistant City Attorney; Ms. Covarrubias, Administrative Analyst II; Ms. Elorde, Principal Civil Engineer-BWP; Mr. Sheikh, Manager Water Engineering and Planning; Mr. Chedid, Principal Electrical Engineer; Mr. Shehata, Electrical Engineer; Mr. Canyon, Marketing Manager; Ms. Di Domenico, Marketing Associate; Mr. Beckett, Water Maintenance and Construction Superintendent; Ms. Mahdavi, Administrative Analyst II; Mr. Hernandez, Transmission and Distribution Manager; Mr. Clark, Principal Electrical Engineer ORAL COMMUNICATIONS Mr. Donahue provided the Board with comments regarding Item 7B, Endorsement of the 2025 Urban Water Management Plan and Water Shortage Contingency Plan, highlighting the extensive work of staff who compiled these plans. BOARD AND STAFF RESPONSE TO ORAL COMMUNICATIONS Mr. Luddy expressed his appreciation to Mr. Donahue for attending the BWP Board meeting and providing his comments. Mr. Eskandar expressed his appreciation to Mr. Donahue for providing his comments. Ms. Samra thanked Mr. Donahue for attending the BWP Board meeting and highlighting the unfunded state mandates. Ms. Samra mentioned that BWP continues to have a presence at the state and federal levels.

Burbank Water and Power Board – June 04, 2026 Meeting Minutes 2 GENERAL MANAGER REPORT Ms. Samra began the General Manager’s report by highlighting OceanWell project and the Joint Powers Authority named the Southern California Regional Water Authority, to be used to finance and operate water projects. Additionally, Ms. Samra mentioned the Water Transfer Agreement with the San Diego County Water Authority, highlighting that Mr. Wilson will provide an update on this during the August regular meeting of the BWP Board. Ms. Samra informed the Board that the BWP Budget was adopted during the June 2, 2026, City Council meeting, thanking the Board for their work and discussions. Ms. Samra continued with her report by informing the Board of the completion of the installation of the new Vertical Lift Modules. Ms. Samra also noted that there will be no regular meeting of the BWP Board in the month of July. Ms. Samra mentioned to the Board about the next Customer Connections event that is scheduled for Saturday, June 6, 2026, at the Joslyn Adult Center. Furthermore, Ms. Samra provided the Board with an update on the Lobby Security Project, highlighting the modernization and strengthening of security for the customer service lobby. Following Ms. Samra’s report to the Board, Mr. Sleiman provided an update to the Board on a question from the last Board meeting regarding Data Centers and their use in the City. Mr. Sleiman continued his update by informing the Board of a few grants that will be going directly to the City Council, emphasizing the short turnaround time to accept the grants as the reason for this. Lastly, Ms. Samra thanked Mr. LeMasters for his time with the BWP Board, highlighting that the June Board meeting would be his last for his term. CONSENT CALENDAR MINUTES It was moved by Mr. LeMasters, seconded by Mr. Smith, and carried 6 – 0 to approve the meeting minutes of the regular meeting of May 14, 2026. END OF CONSENT CALENDAR REPORTS TO THE BOARD APPROVE AND AWARD BID SCHEDULE NO. 1545 TO PACIFIC HYDROTECH CORPORATION FOR THE CONSTRUCTION OF THE NEW CHLORAMINE BOOSTING SYSTEMS FOR RESERVOIRS 1, 4, AND 5 Ms. Elorde, Principal Civil Engineer-BWP, presented the award for Bid Schedule No. 1545. Mr. Sheikh, Ms. Elorde, Ms. Samra, and Ms. Kurihara responded to board member questions. It was moved by Mr. Eskandar, seconded by Mr. Smith, and carried 5 – 1, to find this project exempt from the California Environmental Quality Act under 14 CCR §15301; approve and award

Burbank Water and Power Board – June 04, 2026 Meeting Minutes 3 the contract documents for Bid Schedule No. 1545 – Construction of the New Chloramine Boosting Systems for Reservoirs 1, 4, and 5 (Contract) to Pacific Hydrotech Corporation, in the amount of $7,538,100; and authorize the BWP General Manager to execute the Contract and any other ancillary documents, including amendments, in form and substance satisfactory to the City Attorney’s Office and up to an amount available within the City Council-approved Fiscal Year 2025-26 Budget. ENDORSEMENT OF THE 2025 URBAN WATER MANAGEMENT PLAN AND WATER SHORTAGE CONTINGENCY PLAN Mr. Sheikh, Manager Water Engineering and Planning, presented the 2025 Urban Water Management Plan. Ms. Samra and Mr. Sheikh responded to board member questions. It was moved by Mr. Luddy, seconded by Mr. Smith, and carried 6 – 0, to endorse the 2025 Urban Water Management Plan, which includes the Water Shortage Contingency Plan, for approval and adoption by the City Council. RECOMMEND THE INTRODUCTION AND APPROVAL OF AN ORDINANCE AMENDING THE BURBANK MUNICIPAL CODE TO UPDATE THE SUSTAINABLE WATER USE ORDINANCE Mr. Johnstone, Sustainability Officer, presented an Ordinance to amend the Burbank Municipal Code to update the Sustainable Water Use Ordinance. Mr. Johnstone and Ms. Samra responded to board member questions. It was moved by Mr. Eskandar, seconded by Mr. Smith, for a 3 – 3 tie vote to recommend that the Burbank City Council adopt an Ordinance amending and restating Title 8, Article 3, of the Burbank Municipal Code. BURBANK WATER AND POWER’S OPERATIONS AND FINANCIALS REPORT This item was rescheduled for the following regular meeting of the BWP Board. INFORMATION FROM STAFF ELECTRIC SERVICES UPDATE Mr. Sleiman introduced his team members, who provided two separate updates to the Board. Mr. Chedid provided the Board with an update on the Town Substation outage that occurred on April 2, 2026. Mr. Shehata provided the Board with an update on the 4kV to 12kV conversion progress. Ms. Samra, Mr. Sleiman, and Mr. Shehata responded to board member questions. COMMUNICATIONS & OUTREACH UPDATE Ms. Di Domenico provided the Board with an update on Burbank Water and Power’s Key Accounts Program, highlighting its evolution, its purpose, how it connects with key account customers, and its future.

Burbank Water and Power Board – June 04, 2026 Meeting Minutes 4 Ms. Samra responded to board member questions. COMMENTS AND REQUESTS FROM BOARD MEMBERS Mr. Cherry thanked Mr. LeMasters for his service to the BWP Board. Additionally, Mr. Cherry reminded the Board about the upcoming nominations for Board Chair and Vice Chair during the August regular Board meeting. Mr. LeMasters spoke about his tenure on the BWP Board, highlighting how much it meant to him to serve. Mr. Smith thanked Mr. LeMasters for his service. Mr. Smith also requested an agenda item on overtime use versus hiring additional staff for the August regular Board meeting. Mr. Luddy thanked Mr. LeMasters for all he has contributed to the Board. Mr. Luddy requested that staff provide advanced notice on agenda items for upcoming meetings so the Board has ample time to review and contribute to a healthier discussion. Mr. Cherry provided additional context for his reason for voting against Item 7A. Approve and Award Bid Schedule No. 1545 to Pacific HydroTech Corporation for the Construction of the New Chloramine Boosting Systems for Reservoirs 1, 4, and 5, noting that the actual contract was not provided to the Board in advance. ADJOURNMENT The regular meeting was adjourned at 7:25 p.m. The next regular board meeting is scheduled for August 06, 2026, and will be held in the third- floor board room at Burbank Water and Power Ron E. Davis Administration Building. Armando Casillas Mandip Kaur Samra Acting Administrative Officer-BWP General Manager-BWP Recording Secretary Secretary to the Board Tim Cherry, BWP Board Chair

Showing the first 24,000 of 727,058 characters. The full document is at the source.

CITY OF BURBANK BURBANK WATER AND POWER BOARD JUNE 04, 2026 A regular meeting of the Burbank Water and Power (BWP) Board will be held on June 04, 2026, at 5:00 p.m. in the board room on the third floor of the BWP Ron E. Davis Administration Building – 164 West Magnolia Boulevard, Burbank, California. This facility is disabled accessible. Auxiliary aids and services are available for individuals with speech, hearing, or visual impairments (48-hour notice is required). To make arrangements, please contact Armando Casillas via email at ACasillas@burbankca.gov or by phone at (818) 238-3550. Interpretation Requests: If you would like to participate in public comments and require an interpreter, please telephone the City Clerk’s Office at (818) 238-5851 at least 48 hours before the meeting. Si desea participar en los comentarios públicos y necesita un intérprete, por favor llame a la Oficina de la Secretaría Municipal al (818) 238-5851 al menos 48 horas antes de la reunión. Եթե ցանկանում եք մասնակցել հանրային մեկնաբանություններին և թարգմանիչ եք պահանջում, խնդրում ենք զանգահարել քաղաքապետարանի գրասենյակ՝ (818) 238-5851 հեռախոսահամարով հանդիպումից 48 ժամ առաջ Each member of the public will have a total of three minutes to speak regarding the business of the utility and have the option to participate in the meeting in person and/or telephonically for general public comment, provided that the board reserves the right to adjust the time if there is a large number of speakers. The public may also submit written comments regarding the business of the utility by emailing BWPBoard@burbankca.gov by noon on the regular meeting date. To speak during public comment, members of the public may speak for three minutes in person in the board room on the third floor of the BWP Ron E. Davis Administration Building – 164 West Magnolia Boulevard, Burbank, California, or by calling 818-238-3627. Members of the public who attend the meeting in person will speak first, and those who choose to call in will speak once those in-person attendees have completed. AGENDA 1. FLAG SALUTE 2. ROLL CALL 3. ORAL COMMUNICATIONS During this portion of the agenda, any person may address the board on any matter concerning the department’s business or any item on tonight’s agenda. 4. BOARD AND STAFF RESPONSE TO ORAL COMMUNICATIONS 5. GENERAL MANAGER REPORT The General Manager will provide updates on any notable events.

Burbank Water and Power Board – June 04, 2026 Agenda Page 2 6. CONSENT CALENDAR The board may pull any of the listed consent items for further discussion, which will take place at the end of the reports to the board. A. MINUTES The board may approve the minutes of the regular meeting on May 14, 2026. Recommendation Approve as submitted. END OF CONSENT CALENDAR 7. REPORTS TO THE BOARD A. APPROVE AND AWARD BID SCHEDULE NO. 1545 TO PACIFIC HYDROTECH CORPORATION FOR THE CONSTRUCTION OF THE NEW CHLORAMINE BOOSTING SYSTEMS FOR RESERVOIRS 1, 4, AND 5 Michelle Elorde, Principal Civil Engineer-BWP, will present the award for Bid Schedule No. 1545. Recommendation Staff requests that the Burbank Water and Power Board find this project exempt from the California Environmental Quality Act under 14 CCR §15301; approve and award the contract documents for Bid Schedule No. 1545 – Construction of the New Chloramine Boosting Systems for Reservoirs 1, 4, and 5 (Contract) to Pacific Hydrotech Corporation, in the amount of $7,538,100; and authorize the BWP General Managerto execute the Contract and any other ancillary documents, including amendments, in form and substance satisfactory to the City Attorney’s Office and up to an amount available within the City Council-approved Fiscal Year 2025-26 Budget. B. ENDORSEMENT OF THE 2025 URBAN WATER MANAGEMENT PLAN AND WATER SHORTAGE CONTINGENCY PLAN Asif Sheikh, Manager Water Engineering & Planning, will present the 2025 Urban Water Management Plan. Recommendation Staff requests that the Burbank Water and Power Board endorse the 2025 Urban Water Management Plan, which includes the Water Shortage Contingency Plan, for approval and adoption by the City Council. C. RECOMMEND THE INTRODUCTION AND APPROVAL OF AN ORDINANCE AMENDING THE BURBANK MUNICIPAL CODE TO UPDATE THE SUSTAINABLE WATER USE ORDINANCE Drew Johnstone, Sustainability Officer, will present an ordinance to amend the Burbank Municipal Code to update the Sustainable Water Use Ordinance.

Burbank Water and Power Board – June 04, 2026 Agenda Page 3 Recommendation Staff requests that the Burbank Water and Power Board recommend that the Burbank City Council adopt an Ordinance amending and restating Title 8, Article 3 of the Burbank Municipal Code (BMC). D. BURBANK WATER AND POWER’S OPERATIONS AND FINANCIAL REPORTS Joe Lillio, Chief Financial Officer, will present Burbank Water and Power’s quarterly operating results and financial report for the period of January to March 2026 (Quarter 3 of Fiscal Year 2025-26). Recommendation This is an information item only. No action is required. 8. INFORMATION FROM STAFF A. LEGISLATIVE UPDATE – None. B. CUSTOMER SERVICE UPDATE – None. C. WATER DIVISION UPDATE – None. D. POWER SUPPLY UPDATE – None. E. SUSTAINABILITY UPDATE – None. F. ELECTRIC SERVICES UPDATE – Riad Sleiman G. COMMUNICATIONS & OUTREACH – Marisa DiDomenico 9. COMMENTS AND REQUESTS FROM BOARD MEMBERS 10. ADJOURNMENT The next regular board meeting is scheduled for Thursday, August 06, 2026.

Burbank Water and Power Board – May 14, 2026 Meeting Minutes 1 BURBANK WATER AND POWER BOARD MINUTES OF MEETING MAY 14, 2026 Mr. Cherry called the meeting of the Burbank Water and Power Board to order at 5:00 p.m. in the third-floor board room of the BWP Ron E. Davis Administration Building, 164 West Magnolia Boulevard, Burbank, California. Mr. Cherry called for the Pledge of Allegiance to the Flag. ROLL CALL BOARD PRESENT: Mr. Altman; Mr. Cherry; Mr. Eskandar; Mr. LeMasters; Mr. Luddy; Mr. Smith BOARD ABSENT: None. STAFF PRESENT: Ms. Samra, General Manager-BWP; Mr. Riad, Chief Assistant General Manager-BWP; Mr. Messineo, Assistant General Manager-Power Supply; Mr. Wilson, Assistant General Manager-Water Systems; Mr. Lillio, Chief Financial Officer; Mr. Wilson, Assistant General Manager-Operational Technology; Mr. Aquino, Assistant General Manager-Customer Service Operations; Mr. Johnstone, Sustainability Officer; Mr. Chwang, Senior Assistant City Attorney; Ms. Hourany, Senior Administrative Analyst; Ms. Covarrubias, Administrative Analyst II; Mr. Canyon, Marketing Manager; Ms. Weger, Principal Power Resources Planner; Matthew Culajay, Power Resources Planning Associate II; Ms. Flores, Senior Administrative Analyst; ORAL COMMUNICATIONS None. BOARD AND STAFF RESPONSE TO ORAL COMMUNICATIONS None. GENERAL MANAGER REPORT Ms. Samra began the General Manager’s report by announcing that, following an extensive recruitment process, Mr. Kyle Wilson has been selected for the Assistant General Manager of Operational Technology position. She noted that Mr. Wilson has been with BWP for over seven years and has most recently been serving out of class as the Acting Assistant General Manager for Operational Technology. Prior to joining BWP, Mr. Wilson worked for the City’s IT Department. Ms. Samra invited everyone to join her in congratulating Mr. Wilson on his well‑deserved promotion. Ms. Samra continued her report by highlighting BWP’s recent ribbon‑cutting ceremony on Friday, May 1st, for the Regional Intermodal Transportation Center Solar + Storage project at the Hollywood Burbank Airport. She emphasized that this project marks a major milestone in BWP’s 6A. UNAPPROVED

Burbank Water and Power Board – May 14, 2026 Meeting Minutes 2 commitment to achieving 100% zero‑carbon energy by 2040. The system includes a 2MW solar installation paired with a battery energy storage system and utilizes more than 4,260 American‑made solar panels across the rooftop of the RITC. Ms. Samra noted that the system can generate enough clean energy to power approximately 585 homes annually. She extended a special thank‑you to Jason Maruca for organizing the event, as well as to Riad Sleiman and Project Manager Michael Wang for their dedicated efforts in bringing the project to completion. Ms. Samra informed the Board that there had been recent discussion regarding BWP apparel and that staff is currently working with the City Attorney’s Office on the matter. She also reported that there is currently a vacancy on the BWP Board following the resignation of Member Kashani. Ms. Samra shared that BWP will be working on the application for the Reliable Public Power Provider (RP3) designation with the American Public Power Association. BWP is a Diamond recipient, representing the top tier of reliability. BWP has been a Diamond recipient for 15 years total, is awarded every 3 years, and hopes to continue receiving this award in commitment to excellence in service and reliability Lastly, she thanked Vice‑Mayor Smith for attending the recent City Council meeting and expressed her appreciation to the entire Board for their thorough review and approval of the budget. Ms. Samra responded to board member questions. DISCUSS BOARD MEMBER INTEREST FOR FUTURE BOARD CHAIR AND VICE CHAIR NOMINATION Ms. Samra provided an update on the Board Chair and Vice Chair nomination process. She reminded the Board that, following the nominations at the August 2025 BWP Board Meeting, Chair Cherry had requested that staff draft criteria to guide future nominations for these roles. After internal discussions, staff determined that establishing formal criteria would not align with the process used by the City Council in selecting its Mayor and Vice Mayor, nor with the practices of other City boards, commissions, or committees in selecting their Chairs or Vice Chairs. However, Ms. Samra noted that if the BWP Board still feels a more defined process is needed, staff is recommending that any board member interested in serving as Chair or Vice Chair indicate their interest during the June BWP Board Meeting under the “Comments and Requests from Board Members” agenda item. This would allow board members to be aware of who is interested prior to the August BWP Board Meeting, when nominations and selections occur. CONSENT CALENDAR MINUTES It was moved by Mr. LeMasters, seconded by Mr. Eskandar, and carried 6 – 0 to approve the meeting minutes of the regular meeting of April 02, 2026. END OF CONSENT CALENDAR

Burbank Water and Power Board – May 14, 2026 Meeting Minutes 3 REPORTS TO THE BOARD UPDATE TO BURBANK WATER AND POWER’S RULES AND REGULATIONS GOVERNING UTILITY SERVICES Mr. Lillio, Chief Financial Officer, presented the updates to Burbank Water and Power’s Rules and Regulations Governing Utility Services. Mr. Lillio, Mr. Chwang, Ms. Samra, and Mr. Riad responded to board member questions. It was moved by Mr. Eskandar, seconded by Mr. Altman, and carried 6 – 0, to recommend the Burbank Water and Power Rules and Regulations Governing Utility Services for approval by the Burbank City Council. RECOMMEND TO CITY COUNCIL THE ADOPTION OF A RESOLUTION APPROVING THE UPDATES TO THE RENEWABLE ENERGY RESOURCE PROCUREMENT PLAN AND ENFORCEMENT PROGRAM (VERSION 4) AND INCORPORATING OPTIONAL COMPLIANCE MEASURES AVAILABLE UNDER CALIFORNIA’S RENEWABLE PORTFOLIO STANDARDS PROGRAM Ms. Weger, Principal Power Resources Planner, presented the updates to the Renewable Energy Resource (RPS) Procurement Plan and Enforcement Program (Version 4). Ms. Samra and Mr. Chwang responded to board member questions. It was moved by Mr. Eskandar, seconded by Mr. Luddy, and carried 6 – 0, to recommend to the Burbank City Council the adoption of a resolution approving Version 4 of Burbank Water and Power’s Renewable Energy Resource Procurement Plan and Enforcement Program, which updates compliance planning through 2030, incorporates a cost-limitation framework, and clarifies Optional Compliance Measures available to Council under California Energy Commission (CEC) regulations and avoid severe penalties that could be assessed by the CEC if Renewable Portfolio Standards compliance obligations are not met. INFORMATION FROM STAFF LEGISLATIVE UPDATE Ms. Samra provided the Board with an update on federal and state legislative activities and highlighted key bills and regulatory matters that BWP is actively monitoring. WATER DIVISION UPDATE Mr. Wilson updated the Board on several ongoing Water Division initiatives, including the Water Transmission Valve Replacement Project and the recently approved rate increase by the Metropolitan Water District. He shared that staff toured the Las Virgenes Municipal Water District’s Advanced Water Purification Demonstration Facility with Mayor Takahashi and Council Member Anthony, and has received the 10% design-build package for a similar facility proposed at Robert Gross Park. He also reported that BWP received the draft Joint Powers Authority agreement with Las Virgenes and five partnering agencies related to the regional desalination project. In addition, Mr. Wilson invited Board Members to attend the ACWA Region 8 “The Future Is Flowing: AI & Innovation in Water Management” event and provided an update on the golden mussel issue.

Burbank Water and Power Board – May 14, 2026 Meeting Minutes 4 Mr. Wilson and Ms. Samra responded to board member questions. ELECTRIC SERVICES UPDATE Mr. Sleiman reported that BWP is in the final stages of securing a $3.5 million FEMA grant through CalOES to reconductor wires on the hillside and replace existing poles with fire-hardened infrastructure to enhance system resilience. Mr. Sleiman responded to board member questions. COMMUNICATIONS & OUTREACH UPDATE Mr. Canyon presented an update on BWP’s social media and email outreach performance, summarizing recent metrics, trends, and key findings. Mr. Canyon and Ms. Samra responded to board member questions. COMMENTS AND REQUESTS FROM BOARD MEMBERS Mr. Smith shared that he recently attended a continuity of operations meeting and recommended that each Board Member schedule time with staff for a similar review. He offered kudos for the RITC event and suggested exploring whether a display could be added to show the real‑time power generation from the solar panels. Mr. Smith also reported on the dedicated budget Council Meeting and requested that the budget be provided to the BWP Board in the same format presented to Council. Mr. Cherry requested an update on the hillside outage in April that originated from the substation. Ms. Samra and Mr. Sleiman responded, noting that a report on the root cause will be provided to the Board. Mr. Luddy and Mr. Altman requested social media public safety outage messaging similar to what other utilities provide. Ms. Samra responded that BWP could issue op‑eds similar to those released last year. ADJOURNMENT The regular meeting was adjourned at 6:45 p.m. The next regular board meeting is scheduled for June 04, 2026, and will be held in the third-floor board room at Burbank Water and Power Ron E. Davis Administration Building. Armando Casillas Mandip Kaur Samra Acting Administrative Officer-BWP General Manager-BWP Recording Secretary Secretary to the Board Tim Cherry, BWP Board Chair

1 STAFF REPORT DATE: June 4, 2026 TO: Burbank Water and Power Board FROM: Mandip Samra, General Manager, Burbank Water and Power VIA: Richard Wilson, Assistant General Manager, Water Systems BY: Asif Sheikh, Manager Water Engineering & Planning Michelle Elorde, Principal Civil Engineer-BWP SUBJECT: Approve and Award Bid Schedule No. 1545 to Pacific Hydrotech Corporation for the Construction of the New Chloramine Boosting Systems for Reservoirs 1, 4, and 5 RECOMMENDATION Staff requests that the Burbank Water and Power (BWP) Board (Board) find this project exempt from the California Environmental Quality Act (CEQA) under 14 CCR § 15301; approve and award the contract documents for Bid Schedule No. 1545 – Construction of the New Chloramine Boosting Systems for Reservoirs 1, 4, and 5 (Contract) to Pacific Hydrotech Corporation, in the amount of $7,538,100; and authorize the BWP General Manager to execute the Contract and any other ancillary documents, including amendments, in form and substance satisfactory to the City Attorney’s Office and up to an amount available within the City Council (Council)-approved Fiscal Year (FY) 2025-26 Budget. BACKGROUND Reservoirs 1, 4, and 5 make up over 80% of the City of Burbank’s (City) total water storage capacity, playing a critical role in system storage, operational flexibility, and reliability. Maintaining sufficient disinfectant levels in these reservoirs is required to meet State and Federal regulations and ensures that the water is safe to drink by inactivating harmful microorganisms and preventing microbial growth within the distribution system. Maintaining a stable disinfectant residual throughout the system is essential to protecting public health and ensuring regulatory compliance. WATER AND POWER Michelle Elorde 7A.

2 Prior to 1996, Burbank’s water demand averaged approximately 24 million gallons per day (MGD). At that time, both local groundwater and imported Metropolitan Water District of Southern California (MWD) supplies were treated with free chlorine, which remains relatively stable for a long time in storage. Following 1996, several significant system changes occurred. When the Burbank Operable Unit (BOU) treatment facility was constructed, more groundwater was used, and MWD began using chloramines (a combination of chlorine and ammonia) instead of chlorine. BWP switched to chloramines so that we could blend our treated water from the BOU with MWD’s water. With the full build-out of our recycled water system and lower water use through conservation, our current daily demand averages approximately 12 MGD and is as high as 18 MGD during the summer. However, reservoir storage volumes and system configuration have remained largely unchanged. The combination of reduced demand, unchanged storage volumes, and the fact that chloramines don’t last as long as chlorine has made maintaining water quality in the storage and distribution system increasingly more complicated and requires our operators to frequently monitor and tend these reservoirs. In 2020, BWP retained Water Quality & Treatment Solutions, a firm specializing in drinking water quality and treatment systems, to evaluate these conditions. Based on that evaluation, they recommended the installation of chloramine boosting systems that automatically maintain consistent disinfectant levels. BWP subsequently retained Lee & Ro, Inc. to design chloramine boosting systems for Reservoirs 1, 4, and 5. This project includes the installation of on-site sodium hypochlorite generation systems, chemical storage tanks, metering pumps, analyzers, mixers, sample recovery systems, control panels, and related mechanical, electrical, and instrumentation improvements to allow controlled chloramine boosting at each site. DISCUSSION Current operations maintain disinfectant residuals within regulatory requirements, and BWP continues to deliver safe and compliant drinking water to customers. However, maintaining disinfectant residuals in reservoirs where longer water age reduces the available disinfectant requires a lot of attention by our operators. They rely on deep reservoir drawdowns and frequent manual adjustments to remove and replace water and maintain adequate disinfection residuals, all while maintaining adequate levels of storage to meet demand and fire flow needs. While effective, this approach reduces operational flexibility, increases system complexity, and is an inefficient use of staff at a time when increasing regulations require their attention on other matters. The chloramine boosting systems will simplify our operation by providing automated residual control that requires less operator intervention, improve operational efficiency and increase reliability by making more effective use of available storage capacity,

3 particularly in other reservoirs located in higher elevations, and by enabling longer retention times without compromising water quality. Evaluation of Bidders BWP conducted a competitive bidding process for this project, with five bids received on the bid opening date of February 18, 2026: Bids Received Pacific Hydrotech Corporation $7,538,100.00 Metro Builders & Engineers Group, Ltd $7,997,991.00 GSE Construction Co Inc $9,045,545.00 MMC, Inc. Non-Responsive R2BUILD Non-Responsive Lee & Ro’s construction estimate during design was approximately $5.3 million, with a final engineer’s estimate of about $5.41 million including contingencies. The current approved project budget is $9.8 million, which includes allowances for construction management and inspection services, engineering support, and contingency. The lowest responsive and responsible bid is approximately 42% above the engineer’s estimate, as further explained below. Staff reviewed several options: 1. Asked Pacific Hydrotech Corporation to reduce their cost. They reviewed their bid and coordinated with their subcontractors; however, pricing remained firm due to material costs, fuel pricing, and broader economic uncertainty affecting procurement and delivery. 2. Evaluated the option of phasing the project by constructing chloramine boosting systems at Reservoirs 1 and 4 first, with Reservoir 5 deferred. While feasible, this approach would require additional design effort to separate construction documents, introduce inefficiencies in mobilization and sequencing, and delay implementation of the full system. Deferring a portion of the work would also extend reliance on current operational practices and is expected to increase overall project cost over time. 3. Delay award of the project to rebid later. This is not expected to result in more favorable pricing given current market conditions and would prolong existing operational challenges. Proceeding with construction now allows BWP to implement a long-term solution, stabilize operations, and avoid further exposure to market escalation.

4 4. Build a pipeline directly from the Valley Pumping Plant to the reservoirs to address water age and promote turnover. This is costly and impractical, and lacks adequate control systems to regulate disinfection residual. 5. Inject chloramine directly into the reservoirs from a mobile portable container. A truck-mounted tank and pump system could be used in small reservoirs; however, this approach is not practical and would be ineffective for Reservoirs 1, 4 and 5. 6. Approve the contract with Pacific Hydrotech Corporation. They are the lowest responsive and responsible bidder and are well-qualified to perform the work. Staff conducted a detailed review of the bid results with Lee & Ro to evaluate the variance from the engineer’s estimate. Based on this review, the bid pricing is consistent with current market conditions. Recent comparable infrastructure projects are experiencing similar cost escalation driven by elevated material pricing, ongoing labor constraints, and a highly competitive construction market. The spread between the three responsive bids further supports the fact that the pricing received is reflective of the current market rather than an outlier. Staff recommends option 6. Approval of this Contract will implement a reliable, long-term solution for maintaining disinfectant residuals, reduce operational burden, and support continued compliance with applicable regulatory requirements. The City Attorney’s Office has reviewed and approved the contract documents, which are now presented for Board consideration. ENVIRONMENTAL REVIEW Staff recommends that the BWP Board find the project categorically exempt from CEQA pursuant to 14 CCR § 15301 (Existing Facilities) because the work related to the construction and installation of chloramine boosting systems at Reservoirs 1, 4, and 5 involves minor improvements to existing public utility facilit

Showing the first 24,000 of 30,218 characters. The full document is at the source.

oMe Amng to rDer tHe uNeth ,@2p2v .@uh ,@lAr etiNgf turbAnk 5ed trtoArd f EDatn .@ AcKed traDitnAl AtreDed rritoryf t mAsh CHaNa ernAnDiNoat,@aNd tatn wch we a arng,@eDatiNg,@aNdiNg uh,@s AtAnDor t eDfeGiAe .@gHt aDy to BeGin dGe an to lAgf t UNited 3tAs f ca And to tHeuBcor wcHt stan ,@oNe Natn nDerod , iNe withiBer And steor a .@THaNk .@I wAe to HeAr ite HnGsut with thAt uh,@ .@gArd,@cAn ea taKe t rll At th tiMe ?@mBer on , pren .@mBer gAaNiAn erkAnt.@ PriDeNt sBerg ,@PriDeNt rAmMcAr,@I Amnt.@ ha qm ,@uh,@rtiNgn eDon ,@tHers Notng rortutn don 6 ,@aDstnts to t AnDa. Are t a AtMen to tHe AnDa ?@DR.@MAiAs hAnk u ,@uh,@MADAM 0nt.@uh, 're ng .@1sd And3 . ,@ And n tir oNnt 1sd And3 .@um,@I He aDon AtMeNt,@uh,@th tHeoNnt f MyaGs,@I diKe to Add An AdDitnAl gNitn,@uh,@uNr preNtAoNs And roGoNs . L riGht,@tHaNk 5m ,@aNy iteMsoruture And ?@um, DR.@rg h,@I wlDe, tHsort f a reMiNrf wAntiNg to Get a rort Bkn rry,@mt iNng My s Here .@um n on s .@st a eNfh w rng tm And whAt t prot And rActor tm d Be Gat .@Ot 5m ,@I ha ,@I Kw we He ,@uh,@a Acte ,@uh,@iNrNt to rMit or w rk n urmAurbAnk .@um ,@d ors to ,@um ,@a rMitork ,@uh,@in cHiNia.@Itd a eGy rMit ,@um,@r to Aow tHe GrAnDcHdren f riDen AtteNdch n urbAnk . Um ,@d iKeors to tHat riGht ,@ AtHer AnDa?@ 5m ,@l riGht tHen wl Me to Mym . L riGht .@ ,@um,@it s uNe , uh,@iNdcHlt ek .@wHh t Gat.@um,@t An urnDf eAr ,@t mt s h ors to rog w h Bnery m iNcreDib tseAr .@um,@aNd itdbAyoMe As No to Mtfitng in ts rm thAt wld iKeors to rog ctor ar iAs toNiGht .@um aNdor h AmAng work ts lAsteAr Asur nterim nteNnt,@I Kw Hs stl Got Ae f w ft AnDotsf work to Do ,@um t waNd to MaKe ure thAt ated thAtpa ,@um,@ gNe Him .@ANd ,@u Kw it Bn AlMt xAct AeAr e He eDp ,@um,@ t ate .@aNd,@um ,@e Had a ot tiMe toGetr And t ,@I Aate t w thAt u Heed .@th Dtrt tHnteg And KiNdNs . ANd Alws withntsirst . Um .@LAst wk ,@uh,@ng rBaNkiGh GrAatn,@I Had tHe ure f HaNnGut ,@um t reAy DmAs,@th're st t tnGs thAt Hd om,@um,@t Had t , tHeuref DnGf Dng r ,@um,@oNiDer ma And m,@u Kw,@it , it Alws s Alwsh a ea to Him with KiDs , um,@cAe ts Alws lAiNg .@ur HeArt or .@um ,@aNd thAt thAs w ur workoMm .@aNd tHat w,@wHat Ds . Um ,@aNd t BoArd waNd to gNe thAt ,@aNd Kw a Metr And tApHornarlAr .@um o t a e f g .@um, oNef tms t id gh Bk,@THe at Brid ,@um,@tHe dGe Metr sHld Not Be a urpre to aNyBoDy w rea t u3d Brid rh iAy t lAst .@t we,@u Kw, u reAy He Bn a BdGe , um,@ttiNgs thrgh ts lAsteAr And MaKiNgure thAt a MaDety to t otriDe .@um,@tHuGh, tHuGh Aotf ,@ f win aNd y waters AnDm og m aNd an oNe to reAy rk ts Metrf waNt to ,@t 'm ,@m Not Gng ,@um,@ Ang with thAt ,@um, I ,@I waNd to Ge tHiNg,@aNd wl Ao I Hen't reAd ts Bk ,@um, t s iDcuGh,@ ltiKet we .@um ,@aNd m Ao tiNg,@I HeAr thAt t Dad Bk f m oNs HiNg a Hard ,@ waNd to MaKeure tHat we were Dng ,@iNg riGht t Dad Bk .@ liKe it bAye .@um,@I Don't tHiNk Hs BnaNd.@um ,@I exct a l Bk rort By tHenDf tuMr .@um h , o s thAt Betr?@oh,@its tter .@ thAt whAt h Bn iNg tt er etin ?@um And tn ,@um,@ st Ao waNd oMetng to um BgHnp re 3o wl oNe tohk a brid .@rNsut w tty lAnDcKeDn ng ,@um, df My orite briDs ,@um,@ ,@u Kw thAt wl tnKf th eAr And Af thAt ha eArNed And ered . Um ,@I Kw thAt t wl Be ,@uh, s with,@w,@tHat w pAiNl .@um,@t ,@I He thAt um wl reMeMrt with growth .@aNd reMeMr thAt,@tHat t Aate tHiNg Gen to ts Dtrt. Um And wek orwArd to ntiNng ton t otriDef ts BdGe .@um , it Bnt Aure rKiNg with 3o thAnk um,@ My aGs He aNytng to Add ?@ .@ANyw,@I ed a Hug .@t,@t reAd it Don't Ndt.@ .@oh gHt.@l riGht,@ wl Me on to ma ormAon preNtAon nits And nDgram .@oh ,@I tuGht oh h ,@ HeoMetng to aDd to thAt?@oh ,@ah, oh ,@ea Hd.@ He He AdDitnAl roGon rr .@ma,@aNd He Ders it .@ aNo aNgn.@I m hAoMe thn .@I nd ts ote,@aNdts ,@wHeNe on r teAml d And priAdor tiror. Th a MoreiKy to Mt aNd d AtAoNs . PArt t 3o tk t Hm wHen t Dtrt Had Bn Hit th a DtAng Bw And a urefr eAps tHe re HaDm ern ts Dtrt .@um , BaNd toGetr ed to uor GdAe,@wHh priDed with a And a cAlm toNe .@aNdt w GeNe iDan .@bByd,@ Get to tiDe,@aNd t wAnted to thAnKery Mh rrrt n a ratr rBeNt tiMeors .@THaNk u s n t waNd thAt,@uh ,@tHe om eDed .@in Big ws And sMl ws ,@aNdiNe d ,@I aw sAy wn t w o Hard And Iaw wn t w y ,@ah,@t were o steAor a fs,@aNd o d to He tten to work with n ts cApa ,@um ,@aNd As KiNd f aDyed,@I tnk r stea,@wHetr thAt w , um,@eAr Not ,@u MaDe t eMiKet w .@eryBoDy deAnn .@u were t ck thAt rteDs DuriNg th Hard tiMe And tt Gs tHtiNg thAt we a nd GrAl.@THaNk . Ab hAnk .@oh , ctorga .@THaNk 5m , eAnGf Met .@aNd tHaNkor BlDiNg ts stng BdGe thAt o MaNy rAoNs wl,@ .@I tHaNk And Kw .@aNd As aGd,@uh ,@ng th Dlt tiMe,@aNd we ld thAt BdGe toGetr,@. THaNk And 'Mery priAftHiNg . DoNe .@l riGht .@THaNk u ,@ctor riGht , w ,@r ormAon preNtAoNnits And nd gram oNltiNg with Dtrt aDcAs,@a Dnf UrbAn utur .@o Ab,@tHaNk ,@MADAM PriDeNt,@ard Mem,@stf aNdom.@uh ,@ pria tor to Bore tod And tk aite Bit AnDnt w a withtrt at Grp And t ers thAt we priDe to a cHl Dtr Hp itate And , uh,@tHe ,@tHe oNf r nDgram.@ ,@uh,@ Do ha a ,@antatn thAs n tcrn Now ,@uh, st As a qck ntctn, NaMe slAniNg .@m t exute ntor stct Aat .@I He with Men t eNaNan ,@wHs ur or gram MaNaGer ,@uh, tHatsers to stcts reAy Heren t utrn ora a As we orwArd.@ h reAy dAy whAt w tng Aut ,@ ws And ,@aNd whAt wHat a we And whAt MaKs ereNt .@uh ,@it w ,@uh, a Dn f rBan s,@aoMpa thAt w creAd n2 AnDd a t f hiNan hrt aNd ,@aNd AyorcHl stcts .@uh ,@ord with tHe a thAt wean Do a tterob ,@tHat Dtr Nd DeDateDrt froMnDiDua thAt He pren tsn ts iNst .@r ntire oMpAs tHiNg But At cHl stct ,@tHenDiDua thAt ha word Diryn proGra At,@at t t stct And He Bn ntiNg BoNd proGra or MaNy cHl stcts AuNd tta .@uh, l f urnDiDua He a vAst ere worng ct with cHl Dtr . Uh ,@ reAy b troNy tHat we a An nDeNnt aryf t,@ t stct.@ a Not Hereor tHeoNltan ,@r t,@r tHe Acts,@r eNers ,@r toNtr, r t,@r a t rt stf .@ Aiter Here to An xteNon f r stct And rntr stct Aaty And AnDn tHe Bt w e to ure tHat t Dla thAt ur mMuNity h ntsted with s are Bng d Aaty And eNy MiNg orwArd, cAe we AnDiDua thAt hAatn AeAt And ord ts work,@ reAy ta thAt to HeArt .@ reAy uNtAnd thAt t t t At HaNd ,@aNd t iDen thAturom hAslAdns to Be Ae to e t tax DlAn a w tHat ActuAy s tir s,@in a MeAnGl w . Uh ,@ He Dirt hAnDoNrt thAt we priDe ,@uh,@ work th rstiNg ta to mAure thAt w An exnf thAt.@ work y with r nteNnt ,@ur b fa h,@ctors to en thAt h w we rAh t work thAt th're Alrea Dng And en thAt thAt works Bng ,@uh hn a,@in An eNt And MaNr . Uh,@'re Bd By a troNg h Acrs t ta,@ tHe thAt we He tod AnDt t thAt we hAn 3tHern ora, t a t tha Be rKiNgnrgram.@ we ha Acts,@ He ,@uh, uh,@nteNnts .@ He otrnDiDua thAt were ynur nDtry thAt cAn Hp eraGe t work thAt Do to ure thAt thAt pr a Med Med rward .@ He a ot f exng rat with a urta reGatory aGen,@th ,@tHat we a kNow AnDe to tk Aut , t ,@uh,@f 0uBc oNstctn,@pArtnt ox 3uBstan oNtr And lf t tHer et thAt extn ttAs,@e And ot.@ we reAy Bng a gtroNg BeNcHfe to tHe ,@ t,@uh to tgram Hp itateh whAt Dng .@uh,@ a MeNufgram rt ,@erytng m prtroNrt And aNng ,@uh,@rKiNg th t Dtrt ,@tHe BoArd , ureriNnDeNt toure tHat torits thAtst aNd torits thAt mMuNity a BuGht rwardn a MeAnGl And cte w.@uh,@tHat tak a f aNng,@a ot f oNs As we BeGin tok atorits .@ o uty Kw,@ Ner He eNgh Mon to Do tHiNg tHat we Kw we Nd.@ Now we ha to MaKeure thAt t work tHat we Do s t Bt vAe torom As orwArd AnDo we work y toure thAt wean briNg thAt to .@ work n prureMeNt AnDoNtr ,@uh, Apt At worng thrgh tHear Dnt Dery tHoDs ,@uh,@ Apt At rKiNg thrgh Af t,@tHe tHe ws to ure thAt ar thAt He std to Asar Ast an ib Go to Get t f thAt ,@wHetr thAt Mea rKiNg thrgh iGbAck aGeMen r s3 Agrnts or a t Dnt h cHan thAt we He At ur to Be Ae to to t t Mtutf ar .@uh ,@ He Dig He Actsn ta tHatan Hp work withr arcHit.@'re Not Here to er Act,@t 're DiNity Here to He a dhr r to en thAt 're Getng whAt utm r arcHitrAl tea AnDr gn tea.@uh ,@erytng from ctn to h proGrAm MaNaGers And ct mAna thAt Autn t duriNg thAt Af t am Mem thAt we BnGnto tHegram a Bng in BnGiNg r cts rwardn t w thAt exct n r om excts .@ Ao work tHr teAm or rorng, eut Actits,@rKiNg y with r iteNs BoNd ergHtoMtts toure tHat r oMs Awa . ONe f t tnGs thAt e ard thrgh My arrs tHat h trApAys k to wHat we Do ,@gHt ?@MAnGure tHat we Bng t om oNg withs As artNers , eNng thAt we rortn a traNareNt w toure thAt tHe om KxAct wHere tir Dla a Bng eNt.@ANd ,@aNd we work ure thAt we aDequa rorng o t mMuNity KxAct whAs iNgn,@ty to t BoArd t Ao to t om At lArGe to ure thAt thAt we ha artNers As we Me rward thrgh ts aNd AgAin we He,@ He lKs thAt He DoNe ts work r MaNy ,@ma eAn cHl stcts thAt,@tHat Bng thAt rward .@r gram wld Be ,@uh,@t to Agn with tHe ,@tHe urbAnk Goa And with tHe gram ,@'re Not Here to tAr t BoNd .@'re Here ActuAy work with ur ta toure thAt w cte As we Me t BoNd rward,@ w At ur stng And,@aNd t n to en thAt we Agn th t work thAt Alrea ha Gng n.@uh ,@u Alrea ha ,@ah,@fa,@lKs. U He a its Dirr . Uh ,@lartNer with ,@th th tnDiDua to en thAt w worng y with whAt h Alrea eNlAnNed.@uh ,@nDerstaNd u Alrea He a MrlAn, aNd o w Alrea Bn oKiNg At thAt.@e Alrea eNcAng urn MrlAn,@uh,@t Now it ,@it reqss to taKe thAt in Actn.@ Nd tout tHer a tla ,@tHe ng-termla ,@in oMe areeAn t MaKiNg to briNg t ctsorwArd, aNd we Agn with t Goa tHat Adn thAt mAsterlAn .@t Mrla areiNg DuMen .@aNd we l,@ nDerstaNd thAt prer tiMe As tHiNiKe reGatoryhAng hAeNr ,@or NewgraMs At tHeta .@'re Alws eNgAng with t Dtrt to en thAt torits thAt 're wornGn a n iGnMeNt with whAt t stct And whAt t rreNt n a or t Dtrt As we Me rward .@AGn .@it Aut traNaren ,@aBttretcHiNg ars.@It Aut Bng cte And nt As we orwArd with ts,@th tHegraMs .@uh,@xt Bng Be b troNy rurirm w nDed with nAiAl Aors .@THat whAt UrbAn uture tArted Dng.@ ha a troNgore Bf n r oMpa Aut iNan on And uriNg tHat thAt we a As BiGf a wAhDoGfr Dla As are to ure thAttHiNg tHat w Dng s Bng DoNe in a w thAt Gets t Mtut t.@ we reAy waNt to ma ure thAt we ,@uh,@uh, orna with whAt Dng AnDure thAt eryf t DlAs iNg Blt ,@t r Bng eNtorct .@THetHer t otr Big ,@uh,@ to whAt we es thAt w An exnfr teAm .@PArt f wHat we Do Ao s we Hp dityfr teAm . THs Not Anoror to taKer.@ waNt to d rity.@ waNt to d t thAt a witn ur teAm And As Bng New am Mem n.@ waNt to priDe t KiNdf rt And trng thAt t Nd ure thAt tynDerstaNd f t ,@tHe Nua f t stategram.@It a ery xgram And MaKiNgure tHat thAt we Hp Bld thAt cApa As we GoorwArd .@ANd ,@uh,@ Hp itate aNd Aerate d,@gHt ?Nd Aotf tiMn ur iNst,@ s Mon ,@aNdf 're Not Bng n we MaKe t cAl oNs,@f wch a t y to MaKe ,@t As ard Nd thAtormAon . U Nd thAt thAt tAs to Be Ae to MaKe tHe d.@THat urob itate thAt ,@ ure tHat wenDerstaNd a f t aNs f whAs HnGo an MaKe tm t Bt oNe .@in a tiMy mAnNer to Be Ae to Me t tHectsorwArd .@uh 3o aGn,@ td Aot Aut stng Dla ,@ eNnGorits,@mAng thAttHiNg thAt w iNgsn AgNnt with whAt tHe Dtrt wan .@uh,@mAng thAt we Agn with r ergHtoMtt And priDiNg whAt DuMen And aNd,@aNd ror And nDiNg eNng Det thAt t mMite n to Do tirob uh,@ reAy waNt to MaKeure tHat we ,@uh,@rk with tHe Dtrt to hActs we GoorwArd ,@ we He wHe tea fcHeDiNg tea tHat wl work n h How t pr a MeDorwArd And in whAtrDer t Med rward toure thAt we w ab tond Dla cty .@ONef tore snur oMpa shn a ixed Mod .@wHh s Dnt thAn Aotf proGrAm MaNaGeMeNt ,@uh, .@ work n a d.@WHen we Ge a mBer thAt thAt thAt wl cHar,@tHat An NuMr uh ,@cAs Dr NiGht ,@aNy f t Dr NiGht,@aNd 're Here to Hprt r am .@ Don't Bn ck And DiMiNg Dtr. O MaNy,@ MaNy tim ,@u MAY He ered oNtrt aMeNdMen thAt Hn r As More ,@ n Be AdDed to cts with vAs Dnt rea And rAon BeHiNd thAt Aut wHy ts xteNon n,@u Not thAt with Dtrt aDcAs g .@ work y withr teAm tooMe with with a t Mod And Hd By thAt t Mod ng orwArd.@THs An in NuMr ,@ a thAt we s ,@ iNorateDnto thAtt , aNd we,@ b troNy tHath thAts a l f tertAin w u Kw,@u Kw whAt tnGs are GoNna t MiNgorwArd aNd Kw thAt're Not iNg to AhAng BoNd tHat .@uh 3o MiNgorwArd, st KiNdf Aite Bit Aut ,@ urnt He0 ntsp And Down t ta . Het Aite Bitr BoNnoNstctn thAt tHat w MaNaGiNg .@uh ,@e mBiNeDnur teAm.@ He er 5pea f ere rKiNgn ,@in cHl tron And,@aNd l th ortf Dtrt aDca Gst a tt Bitr eAld .@uh uh,@st a KiNdf a qck exaNatn to thAt.@UrbAn s h Bn AuNdin , e2 .@t we roGd tHat t w a g nur iNst thAt we,@ Had An rtuNity Here thAt reAy eDs to Bed.@ Had stcts thAt weretruGiNg th tiNg to iNd Aate lf oNltiNg thAt nDerstaNd tgram aNd nDerstaNd cHl tron,@uh,@aNd we stdp to t to l thAt iDn a w thAt we b Dtr a ng r .@ANdo thAt wt arsld .@It Bn HiGy with 0en aDy Ded AnDt , st thAt AuNtf tiMe And aNdh an HoNy ten He Bnery sAd withur with ur thAt we .@th toMe Heren utrn ora thAt were rreNy worng with.@'re , HeoNtr And,@aNd rKiNg with eDon h ,@OxnArd 5oNiGh 3cHl stct,@PAs 6ers a ,@aNdersa eAch 3cHltrt w 're HiNg to MaNaGe tir , tHr BoNd graMs with ur st tsst ur a e tHat w worng with .@uh , nGn Aite Bit Aut wHo we a ,@uh,@,@an ng,@m te priDeNt,@t t reNy , st Aite Bitr AeAr aGo ,@uh,@d Aar cAerncHl Dtr .@I , uh,@ word riGht Here in NgHnGcHl Dtrt. I w nDe 5ed trtor Aut ars.@I w tir aDstrAr f its And ort ,@uh,@mAnAng tir At tHat tiMe w 0 Mon BoNd wHh we were ln n rAng thAtp to 0 n Bore t,@t wAs Algram .@From tHere ,@I ,@uh,@nt to oNg h 5ed 3cHltrt wAs MaNaGiNg tir 5 Bon proGrAm,@th As tir exute ,@uh,@ctor fa And tn ltiMaty tHe tAnt eriNnDeNtf fa AnDrAoNs , iNg to MaNaGe tir AlMt $u BoNgram .@ thAt I wn a ma Dtrt Here in 3tHern ora Kwn As 5ed ,@uh,@wHere w tHereor ,@uh,@aBt5 ea rKiNg thrgh tir fAgram As ,@ wl . Uh ,@DAnAn ,@wHs Here th Me toNiGht ,@hAs More thAn 2uea fere .@SHs , uh,@nt n oNg eAch UNd 3cHltrt w , uh,@ rited Her to Bng r to thAtgram .@uh ,@ tHat,@sHe w with iNe UNd And AgAin worng y with h withgraMs . SHs ery Apt At t aNng And DntiDe t h And And workery y withur Dig And arcHit to Be Ae to Bng tHe tnGsorwArd.@ He otrnDiDua thAt He st a Ht fere rKiNg Diryor cHl stcts .@r ,@r MaNy,@ma ars 5h ,@ thAs Aite aBts ,@uh,@ t t a qst ,@uh, mMen,@aNytng thAt,@tHat cAn h Aror aBt whAt we Do or As stct Aat g . ONm MyaGs 5h , ctorsBerg tnk My on MiGht Beorr HAsty .@t ld Ao wgh in.@ ,@ reNy td aBt HiriNg a BoNd MaNaGer, aNd we He ta nla And tHe MoNs oMiNg ut f BoNd nDs.@an tk a ite t Aut How t work thAt s Dnt thAn t work e w t BuGht n ,@ wl tArt with thAt we He BuGhtn , r Dirr f its cHcAy sits aNd o thAt,@tHat wld Be utiNe rtrd MnteNan nDed ,@rred MnteNan nDeDcts ,@um,@nd 0 cts we Had a l ,@um u Kw,@f tk r uNdcts aNd AgAin,@t thAt t dn't BeoMe ,@t ,@um,@tHe BoNd ct mAna we Hen ,@oNta w a Bt whAt l b on t GuNd.@th,@th a , th'reiNg t d to dAy oNstctn AnDcts , iNg t wkthrgHsn a lAr b.@um ,@th s h Moref a HiGh l fer ,@um,@tHat d Be a BothoNltate aNd tn we ld Ao reAch to MaKe ure w erng m t oMiAe ef MaNyf t Af tHe BoNd And m Asar As prureMeNt And tHers, t l et Hs terto ah ,@ab .@uh ,@wHat we t Dos whAs d tron MaNaGeMeNt.@r , rers a Not Bed n uh,@iNlDoNstctn mAnAnt .@ wn 're tHiNng Aut t thAt n oNstctn trAersn on cHlit And MaKe ure tHat hcts a MiNg rward .@THat Not whAt w tAlKiNg Aut Here.@'re tAlKiNg Autgram mAnAnt.@'re tng Aut ure thAtr gram ,@lf tcts thAt u He Aet pn a w tHat,@tHat ,@uh,@are Gng to Be cte AnDnt MiNg rward,@tHat w Ae to exute tctsn tiMe tHat w Ae toeraGe a tta MoNs thAt wean on tiMe .@tHat we work with y to Do tnGsiKe Hire tHe Actur tea thAt worng with to MaKe thAt t a tery st teAnur,@in urta lf ar Dnt ort uNct thAt Hn Be Ae to Bng t on And Hp ,@ Me t ,@uh, t ctsorwArd.@uh u Kw,@I ,@I ,@atr,@ur ergHtoMtt Mng lAst NiGht.@Id ts And sAid,@u Kw ,@st st,@aNd m tss Not in My Btntert,@t ,@uh, u Don't He to Hire a teAm Do ts work .@uan Do tHe ,@t to Do thAt , u He tout Aot f eMph nternAlta . D Nd to Hire a a f stf to Be Ae to to Me tHe ctsorwArd ,@uh, cAe t Aot f work iNeDn n,@in MiNg a prt thrgh Af vAs Dnt reGatory prs thAt a NsAn orr to MeorwArd.@ a kNow ,@gHt ?@PretiMe aNdtrgHorwArd,@t tHers Aotf Nua to How u,@u Me thrgh thAt tHt Bng gHtn,@in t x MoNth Ds And a t otr tnGs thAt a GnGn . Uh ,@mAng ure thAt t,@tHe , tHeoNtrng tea a t st teAeor tob uh ,@rKiNg with t BoArd And , aNd,@aNdr.@HAsty And t teAm tk Aut tnGs iKe Met,@wHat t st wf BnGiNg ts prtorwArd.@ANd t a tf ,@uh,@ereNs ut tHere Beten,@e HeArd a tHe tersea ea Bk aNd DiGn ,@d And DiGn t Bld And ,@u Kw scts AnDt,@u kNow ,@iNpKa And a t ereNt ter thAt Ad t.@uh ,@ Hp g u thrgh thAt As As u ,@ucHeDe And ,@aNd orga tctsn a wAy toeraGe AnDure thAt Getng t Bt . Lf t aNnd n Ds .@lAt y .@la w tax Dla wHen're Not Ae to Bng tHects to rnts aNd roMn An cte w .@uh ,@aNd we waNt MiNiMe thAt .@ waNt to iMiNate thAt fe And en thAt r cts a, are t t ority to Me tHeMorwArd .@r teAm,@cAe e Bn Dng tsor a ng tiMe,@at ery HiGhs. He a ot f rat t witn tnDtry to en thAtrcts Get tHe KiNd fntert thAt ,@tHat u Dernurom, aNd ts Gs a t w m iNon ers to othNrt to ,@ arcHitrAl tea ,@uh,@lf tHe Dnters thAt Nd to MaKeure thAt Getng h t Mt etite sa e r work .@uh ,@rKiNg y with r tea or h ort,@u Kw ,@mAng ure tHat ty nDerstaNd t ,@tHe vAs Dnt h NuAf tHe gram ,@t taKiNgr r tm ,@t t GiNg tm tHe a to ,@ tk thrgh tHiNo thAt we aNiGure t Bt w to Me prorwArd s reAy , whAt we Do .@uh He tHat Adt .@ n ha t qst,@t 'm iNg toea tm toGetr cAe tnk t ated.@uh ,@tHeirsts w wl we HeArm,@nd whAt Ds thAt aDen k ?@ANd toNds,@u kNow,@tArted worng with tHoMpa ,@y na .@um I waNt tot KiNd f Betr uNtAnd .@Il iKe t gHt Be oMe reDuNdAy t aNd How we KiNdf t to thAt orwArd .@CAn,@cAn eAk to t ,@tHers t, He iNg oNltiNg riGht w .@'ren whAts d a ha f p3c wn ar thAt term ,@wHen w nGor t iMeMen ,@tHatoNtrt y set touNtn s0th .@ wld taKe er thAtoroNf thAtor .@y Ana s thAs a Dnt uMetf wl ,@um, wHere ty Dp De Dpnto tHe Ant trs fur nDiNg And witn nternAl And .@ tHe taKen a Dp De And th're riBrAng Aur rts to MaKeure t t yoMiAnt But t iGd withurla As wl, aNd ty wld Be worng n uNctnnturtHer Not th,@ah .@I,@I ,@I wl iNt t thAt we work y withnAn , iNeren.@uh ,@y aNytss Aer tHat thAs reAy Aut thAt uHcAl AntaBityor ur BoNd.@uh ,@it ortAnt rog thAt ,@uh,@nd uNnGs MateriAy ereNt thAn GeNer uNd uNng.@st b t l f Detl thAts ired Not y or ur ergHt oMtt uNtAnDiNgf How wend y Acrscts ,@t Ao wHen we rortp to tta r t ntuAl iMeMeNm tta r tcts.@THe AntiNg st ma Dnt.@uh,@y aNytss AartNer thAs AntiNg tHat wor with stct And t Dtrs uNng t And t nty uNng t to Bng t rtsorwArDo thAt we an tter er thAt reqnt r trApAy to ur mMuNity .@THe tef ror aNd t te formAon tHat ty d s h reAy ss to Mt thAt GoAl. WHat we Dos we Do t exutn ,@gHt ?@'re t on thAt ActuAy Deter whAt wnDiNg And wHere wnDiNgtn And aNd whAt t roMnDatn to tHe BoArDor How t pr wld Be MiNg rward .@I tnk t a proBab Bothor,@ctor HAsty ,@t ,@um,@I Kwt uNiKe weNt to t SOt NiGht.@I wlDe HeAr t dBk thAt ty hAd ,@um,@aNd tn Ao ,@um, wHeNld wetor ts oMe Bk or a ote.@um,@ 'd BnGt,@,@I Go bAcKwArDs Here Aite Bit,@ d Bng AoNtrt .@I waNt n uNe 5thf ,@um,@I t Kwf w Bng t to 8th to t ,@t 'd Be ng At thAt Bore tHenDf tcHleAr .@um r tdBk ,@um,@ Did ha tsntatn And we d Ar,@ed Aotf oNs.@uh ,@I tnk t t ern HeArd wt whAt oMcAoNkiKe , um,@twn And tn t rit And And How thAs nNa k And,@aNd o thAs tHiNg w DiNityiNe And w workn thAt And mAure we He a reAl ar mMuNatnl.@um ,@aNd stng At toNtrt n rAl,@u Kw ,@ ts a ltaroNtrt riGht Now 'retArtiNgut with An an And w GoNna,@u kNow,@l Get to thAt AnNuAl aNd tn w Gom t. ,@um,@I,@It t dBk erl wtty Gd.@uh , oNetHer w oMiNgn At tHnt ,@wHat s r As And How Do,@wHat are GoNnAoriteirst aNd letlAnak to thAt aite Bit b tnk u Kw t Ar to thAt. Ah,@ah,@tHaNk.@uh ,@I reAy qck b,@I t tnk AdDed t q tHe qstn AutnGaGeMeNt aNd oMcAon.@uh,@ wl, ,@ wl ,@uh,@uh,@rk wArDs whAr t Dtrs ortAe with with mMuNat .@st t , tHat iKe At eAst a eKr m Biwy nt Diry with r stct teAm .@ANd tn As eDed And As Apria ,@ oMe Bore ts BoArd And aNdnt tormAon tHat t BoArd n to He , wHetr thAt Mea oNtrt prsr t r ,@uh, mAyBe oNs aBt t BoNd .@uh ,@ Ao ,@uh are AvAab And w work th teAm to Add r ergHt oMtt ,@uh,@ He oMcAon iAsts tha Hp with uh with wtten And,@aNd priNdoMcAoNs thAt we cAnut utn ,@oNct dAs .@uh ,@l Go to,@ mMuNity MnGs,@gHt ?@wn hAs,@l,@l Do t nDf tnGs to Hpnt tHe,@tHe Gat work thAt thAt 're Dng HerenurbAnk And aNd ,@aNd How thAs MateriAy ctiNgurcHl eNnMen .@Dr .@ArkAan 3o oKiNg AtoMe f tir ntrActs thAs oMpAng to f t tHer Dtr ,@a sMr ,@uh,@gGer ,@t ,@uh, oNrn s ,@rxa,@um I w t wn t w er with l a And t proNtr b th weren't HiriNg cAy .@ tnk At At oNe nt,@u Kw,@in ter ut Kw,@cAe sAid worng with t om eDs.@I wld Beery iNsted to thAtf w oKiNg At Ao HiriNg wd ok ,@ k , cAe thAt woMetng thAt wAs BuGht p Mh arr BoNd e,@t ,@I Kw tHate DeAlt withmAer on,@aNd 'Mure ts h Bk to with mAer stcts.@um ,@I wlDiKe to e thAt we ,@'re tng aBtng At Nf t mMuNity ,@ Ao .@briNg nto iDeratn .@ng Ah,@ah,@I,@I ,@I wl tHat h Dtrt gArDfe h thAt sAoNrn,@gHt ?@THe a cAl tax Dla thAtr mMuNitysntstiNgns. Its ur riBity.@I e thAterytroNy on .@It ur on to h work y with r om to en thAt h ntrActors witn tir cApa He tor workn ur BoNdgraMsn tHrery aMe NgHrh . L work with t ard.@lw Dtrt ,@e,@e utut , uh,@uh,@ntrActor nGaGeMeNt w wel ntrActorsn to tk Aut tHe Gat work thAs Hng iNurbAnk And reAy tiNg to iNnte oNtr work with ,@uh,@th And,@aNd BiDsn ur pr,@uh,@tt Gs er thAn thAt t.@k at tnGsiKe MateriAl ers,@gHt ?@cAe ntrActors At rtnf t work ,@uh,@wHen work witharr ,@ rNatnr Mor rr ntrActs,@uh,@ work with ur r GeNeroNtro thAt tHit tor oNtr thAt m, mAyBe Don't He Aot f gn nurbAnk,@t mAyBe He Aew Dnt um rctaNsr cAen thAtan ActuAy ut And worknur oBs. Uh ,@ workery with tHat .@uh ,@,@ an work with u to GeNerate rorn whAt tHe whAt terntag oKiKe And whAt t Goa mAyBe He BnstaBsHed By tHe Dtrt .@ we Auty cAn,@cAn,@cAn Do t tnGs ure thAt As Mhf t rk As eta Here cAy nd 'm ure thAtr . HAstyaNw t mMuNity woror Agrnt tHat we iGd AnDm Af tHat 5m,@d He a on?@ Aad .@.@ka k oKiNg ,@I He qst.@ m Not ure wcHrDer wAnted Bt Did aNswerartf thAtn terf cAe Had oNoNtr um,@are weng ,@mAyBe ts or,@DR.@HAsty,@are we oKiNg At tHeroMpa tn in terf oMpAn iNg He,@t wl tl , um,@th tsnGtr tHs Byar towt stcture or whAt we Nd At th nt .@stoMpa we d BnGnor gram mAnAnt a Gng to Be gNaNy More thAn w GsoMiNgn ,@aNd tnk to thAt m At t sl.@I tord As .@a trAoNgram mAnAnt irm wld t exntiAy More w s briNng n An AnNuAlt thAt d MoNth Boreor otroNtr.@um,@aNd mBer tss Ao to ort a HyBd Ah, wHhs Gng to Bee cAe w Gng to He fur wn stiNg iNrn ta .@ t,@u kNow,@aNdo thAs w ,@um, I tnk tss e And m aNd s reAy Mon wl eNtor t .@GreAt, ah,@diKe to HeAr t n And taKe n ts uNtAnDiNg.@w,@wHo wld tHen rort to ?@ Mf aNd teriNnDeNt.@.@ANd tHen How Do we ck uNtAor tm?@u d Be Ae to Do thAt tHuGh reGar rorng tHatom p b ty wl Acte with Hng And orng t Borror And tHe 3fc ror As wl ,@wHh d Be More eNt And Mt Mh More,@uh,@tHorgh . ANdpDated k,@tHaNk gHt hAnk o Mh.@THaNk uo Mh.@I Aate t rtuNity tooMen And tk th tod .@THaNk THaNk .@l riGht,@l to y rorm t ard AnDta.@THeirst s .@rtsm ur aBor pArt.@l tArt with SArAh 3cHwArtzm urbAnk iAon .@ d eNiNg,@mMuNity Mem, mBersf toArd f EDatn AnDw u3d eMs.@ NaMes 3arah hwar ,@aNd 'm a urbAnk rf u3DareNt And t priDeNtf turbAnk iAon , preNng Ama0p ,@un,@ aNd h aNaGe pAtHoGnu3d .@I waNt to ta a MoMeNt to AcKed tHe Hard work And DeDatnf rca ,@ed ea ,@aDstra ,@aNd b5ta .@urer, mMitnt ,@aNdon ts eAr He MaDe a ng ereNn tf ur stuDen And tom .@I iNd tiMeor oMe -Derd rt,@aDntur, aNd tiMe withr aMy And frnDs .@m Gng to Be brd tod b My eAe iAen Alrea sHared MaNy f uroNsn tHe AnDa tod At t lAst Mng .@ut,@wHe nDerstaNd t Nd or oMe orgAzAoNf t Dtrt ,@aNd AdDitnAl proNta n oMe areAs w ur Dtrt h fAeNrt e ra Both mAnAnt And t BoArd And tHe BoArd to trApAnt sHarelAor Both How t oNs wl Be uNd And w ty wl Be Hd uNtAe .@ t ref a oNs ltiMaty to e b5 Mon.@w wl thAt Be uAd?@ANd whAt wl Be f t rea rt ta .@rtrMore ,@tHe nDiNgdor t oNsaNt Be Derd from tlAom .@ a l Awa,@ a NeGotiAng er t ntarycAl eDatngraMor t7 , 2pcHleAr And exct to NeGotiAr tHer iMrtaNtcAr And nt eDs NexteAr .@I bu3d Bt work wnt aBorat with ca And tHron.@,@ a exctiNg a HeAlter thAn preDd ta BuDt.@ Do t waNtu3d to Gon a eNnGpror to aNiNutm Af itstAlDers.@ANd or aNd ur aGs n sa , tHatuts Gen At t bArGng tab .@nAy,@I d Be reMsf Did Not kNowdGe And thAnk or tAng a tooNr t gAllAatf At toMef tit iNg roMnDed .@It Aea, in AteAst tef t atet trAiNers,@b5s tAng a oNdk At w th Apria BoNg AvAl .@m GlAd thAt u rdurdBkn tHn tt f aBoratn And tk AoNd ok At wtHer e on Gen BoNn tHe MaNaG

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • BWP Board Meeting — Minutes
  • BWP Board Meeting
  • BWP Board Meeting — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: 5c5928a6b4892bb0e17e4931a9eb361b. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record