POLISCOPE

The public record

BURBANK (LOS ANGELES COUNTY)Agenda postedPartial coverage

BWP Board Meeting

Government meeting record

The 30-second read

Upcoming meeting

BWP Board Meeting

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The meeting is scheduled for the date in the official agenda. The agenda does not prove an outcome.

The published record is what is proposed for this meeting. No outcome has been recorded, so nothing on this page is a decision.

Record text

No transcript is held for this meeting. Recording: Watch video

Showing the first 60,000 of 81,065 characters. The full document is at the source.

CITY OF BURBANK BURBANK WATER AND POWER BOARD APRIL 02, 2026 A regular meeting of the Burbank Water and Power (BWP) Board will be held on April 02, 2026, at 5:00 p.m. in the board room on the third floor of the BWP Ron E. Davis Administration Building – 164 West Magnolia Boulevard, Burbank, California. This facility is disabled accessible. Auxiliary aids and services are available for individuals with speech, hearing, or visual impairments (48-hour notice is required). To make arrangements, please contact Armando Casillas via email at ACasillas@burbankca.gov or by phone at (818) 238-3550. Interpretation Requests: If you would like to participate in public comments and require an interpreter, please telephone the City Clerk’s Office at (818) 238-5851 at least 48 hours before the meeting. Si desea participar en los comentarios públicos y necesita un intérprete, por favor llame a la Oficina de la Secretaría Municipal al (818) 238-5851 al menos 48 horas antes de la reunión. Եթե ցանկանում եք մասնակցել հանրային մեկնաբանություններին և թարգմանիչ եք պահանջում, խնդրում ենք զանգահարել քաղաքապետարանի գրասենյակ՝ (818) 238-5851 հեռախոսահամարով հանդիպումից 48 ժամ առաջ Each member of the public will have a total of three minutes to speak regarding the business of the utility and have the option to participate in the meeting in person and/or telephonically for general public comment, provided that the board reserves the right to adjust the time if there is a large number of speakers. The public may also submit written comments regarding the business of the utility by emailing BWPBoard@burbankca.gov by noon on the regular meeting date. To speak during public comment, members of the public may speak for three minutes in person in the board room on the third floor of the BWP Ron E. Davis Administration Building – 164 West Magnolia Boulevard, Burbank, California, or by calling 818-238-3627. Members of the public who attend the meeting in person will speak first, and those who choose to call in will speak once those in-person attendees have completed. AGENDA 1. FLAG SALUTE 2. ROLL CALL 3. ORAL COMMUNICATIONS During this portion of the agenda, any person may address the board on any matter concerning the department’s business or any item on tonight’s agenda. 4. BOARD AND STAFF RESPONSE TO ORAL COMMUNICATIONS 5. GENERAL MANAGER REPORT The General Manager will provide updates on any notable events.

Burbank Water and Power Board – April 02, 2026 Agenda Page 2 6. CONSENT CALENDAR The board may pull any of the listed consent items for further discussion, which will take place at the end of the reports to the board. A. MINUTES The board may approve the minutes of the regular meeting on March 05, 2026. Recommendation Approve as submitted. END OF CONSENT CALENDAR 7. REPORTS TO THE BOARD A. APPROVAL TO AWARD BID SCHEDULE NO. 1541 TO PAVECO CONSTRUCTION, INC. TO PERFORM ASPHALTIC CONCRETE AND PORTLAND CEMENT CONCRETE REPAIRS FOR WATER, ELECTRIC, AND FIBER OPTIC SERVICES FOR BURBANK WATER AND POWER Arturo Sanchez, Civil Engineering Assistant, will present Bid Schedule No. 1541 for asphaltic concrete and concrete repairs for water, electric, and fiber optic services for Burbank Water and Power. Recommendation Staff requests that the Burbank Water and Power Board approve the award of Bid Schedule No. 1541 to Paveco Construction, Inc. to perform asphaltic concrete and Portland Cement Concrete Repairs for water, electric, and fiber optic services for Burbank Water and Power. B. PROPOSED UPDATE TO BURBANK WATER AND POWER’S FISCAL YEAR 2026-27 BUDGET Joe Lillio, Chief Financial Officer, will present the revisions made to the Burbank Water and Power’s proposed updated Fiscal Year 2026-27 budget. Recommendation Staff requests that the Burbank Water and Power Board recommend approval of the utility’s proposed Fiscal Year 2026-27 budget as presented at the April 2, 2026 Burbank Water and Power Board meeting to the Burbank City Council for the Electric Fund, Water Fund, MPP Operating Fund, Tieton Operating Fund, Street Lighting Fund, and Communication Fund. C. RECOMMEND THE INTRODUCTION AND APPROVAL OF AN ORDINANCE AMENDING THE BURBANK MUNICIPAL CODE TO UPDATE THE SUSTAINABLE WATER USE ORDINANCE Drew Johnstone, Sustainability Officer, will present an ordinance to amend the Burbank Municipal Code to update the Sustainable Water Use Ordinance.

Burbank Water and Power Board – April 02, 2026 Agenda Page 3 Recommendation Staff requests that the Burbank Water and Power Board recommend that the Burbank City Council adopt an Ordinance amending and restating Title 8, Article 3 of the Burbank Municipal Code (BMC). 8. INFORMATION FROM STAFF A. LEGISLATIVE UPDATE – none. B. CUSTOMER SERVICE UPDATE – none. C. WATER DIVISION UPDATE – none. D. POWER SUPPLY UPDATE – none. E. SUSTAINABILITY UPDATE – none. F. ELECTRIC SERVICES UPDATE – none. G. COMMUNICATIONS & OUTREACH – none. 9. COMMENTS AND REQUESTS FROM BOARD MEMBERS 10. ADJOURNMENT The next regular board meeting is scheduled for Thursday, May 07, 2026.

Burbank Water and Power Board – March 05, 2026 Meeting Minutes 1 BURBANK WATER AND POWER BOARD MINUTES OF MEETING MARCH 05, 2026 Mr. Cherry called the meeting of the Burbank Water and Power Board to order at 5:00 p.m. in the third-floor board room of the BWP Ron E. Davis Administration Building, 164 West Magnolia Boulevard, Burbank, California. Mr. Cherry called for the Pledge of Allegiance to the Flag. ROLL CALL BOARD PRESENT: Mr. Altman; Mr. Cherry; Mr. Eskandar; Ms. Kashani; Mr. LeMasters; Mr. Luddy; Mr. Smith BOARD ABSENT: None. STAFF PRESENT: Ms. Samra, General Manager-BWP; Mr. Messineo, Assistant General Manager-Power Supply; Mr. Sleiman, Chief Assistant General Manager- BWP; Mr. Wilson, Assistant General Manager-Water Systems; Mr. Lillio, Chief Financial Officer; Mr. Wilson, Acting Assistant General Manager- Operational Technology; Mr. Serafini, Acting Assistant General Manager- Customer Service Operations; Mr. Johnstone, Sustainability Officer; Mr. Casillas, Acting Administrative Officer-BWP; Ms. Hourany, Senior Administrative Analyst; Mr. Chwang, Senior Assistant City Attorney; Ms. Luz, Senior Secretary; Mr. Spence, Manager Technology; Mr. Siani, Senior Administrative Analyst; Mr. Canyon; Marketing Manager; Ms. Sheth, Financial Account Manager-BWP; Ms. Kalomian, Financial Planning & Risk Manager ORAL COMMUNICATIONS None. BOARD AND STAFF RESPONSE TO ORAL COMMUNICATIONS None. GENERAL MANAGER REPORT Ms. Samra began the General Manager’s report by welcoming the newest Board Member, Ms. Kashani, who was recently appointed by the City Council on Tuesday, February 24 th. Ms. Samra then informed the Board that Representative Friedman had earmarked $1 million for the Reservoir project. Ms. Samra also noted that the monthly operations and financial report were not included on this month’s agenda, explaining that BWP will discuss the transition to quarterly updates to the Board. 6A. UNAPPROVED

Burbank Water and Power Board – March 05, 2026 Meeting Minutes 2 Ms. Samra further updated the Board on a recent water main break near Whitnall Highway and Clark Avenue, noting that crews were dispatched around 2:30 a.m. and restored service to customers by the afternoon. She commended the water maintenance and construction teams for their quick response and dedication. Lastly, Ms. Samra reminded the Board and the public that customers needing after-hours assistance should call BWP’s after-hours phone number, 818-238-3778, and clarified that there had been a recent mix-up in which the main customer service line was mistakenly advertised as the after-hours number. CONSENT CALENDAR MINUTES It was moved by Mr. Eskandar, seconded by Mr. LeMasters, and carried 7 – 0 to approve the meeting minutes of the regular meeting of February 05, 2026. END OF CONSENT CALENDAR PRESENTATION OVERVIEW OF BURBANK WATER AND POWER’S CUSTOMER SERVICE OPERATIONS Mr. Serafini, Acting Assistant General Manager-Customer Service Operations, presented an overview of Burbank Water and Power’s Customer Service Operations. Mr. Serafini, Ms. Samra, Mr. Spence, Mr. K. Wilson, Mr. Sleiman, and Mr. R. Wilson responded to board member questions. REPORTS TO THE BOARD APPROVAL OF A PROFESSIONAL SERVICES AGREEMENT BETWEEN BURBANK WATER AND POWER AND TMG UTILITY ADVISORY SERVICES, INC. DBA TMG CONSULTING, INC. Mr. Wilson, Acting Assistant General Manager-Operational Technology, presented the Professional Services Agreement with TMG Utility Advisory Services, Inc., DBA TMG Consulting, Inc. Mr. K. Wilson, Ms. Samra, Mr. Spence, and Mr. Chwang responded to board member questions. It was moved by Mr. Eskandar, seconded by Mr. Luddy, and carried 6 – 1, with Mr. Smith voting no, to approve the Professional Services Agreement between BWP and TMG Utility Advisory Services, Inc., DBA TMG Consulting, Inc., in the amount of $1,068,000. RECOMMENDATION FOR CITY COUNCIL ADOPTION OF AN ORDINANCE AMENDING AND RESTATING ARTICLE 3 OF TITLE 8 OF THE BURBANK MUNICIPAL CODE, RELATING TO THE SUSTAINABLE WATER USE PRACTICES, AND FINDING OF A CEQA EXEMPTION (14 CCR 15301, 15305, 15308) This item was pulled from the agenda and will be rescheduled for a future meeting.

Burbank Water and Power Board – March 05, 2026 Meeting Minutes 3 UPDATE TO YEAR TWO OF THE FISCAL YEAR 2025-26 & 2026-27 BUDGETS Mr. Lillio and Ms. Samra presented BWP’s proposed updated Fiscal Year 2026-27 budget. Mr. Lillio, Ms. Samra, Ms. Sheth, and Mr. K. Wilson responded to board member questions. It was agreed upon by the board and staff that voting would not take place during the March 05, 2026 BWP Board meeting and would be rescheduled for the April 02, 2026 BWP Board meeting. INFORMATION FROM STAFF None. COMMENTS AND REQUESTS FROM BOARD MEMBERS None. ADJOURNMENT The regular meeting was adjourned at 7:45 p.m. The next regular board meeting is scheduled for April 02, 2026, and will be held in the third-floor board room at Burbank Water and Power Ron E. Davis Administration Building. Armando Casillas Mandip Kaur Samra Acting Administrative Officer-BWP General Manager-BWP Recording Secretary Secretary to the Board Tim Cherry, BWP Board Chair

1 STAFF REPORT DATE: April 2, 2026 TO: Burbank Water and Power Board FROM: Mandip Kaur Samra, General Manager, Burbank Water and Power VIA: Richard Wilson, Assistant General Manager, Water Systems BY: Asif Sheikh, Manager Water Engineering & Planning SUBJECT: Approve and Award Bid Schedule No. 1541 to Paveco Construction, Inc. to Perform Asphaltic Concrete and Portland Cement Concrete Repairs for Water, Electric, and Fiber Optic Services for Burbank Water and Power RECOMMENDATION Staff requests that the Burbank Water and Power (BWP) Board (Board): 1. Find this project exempt from CEQA (California Environmental Quality Act) under 14 CCR § 15301; 2. Approve and authorize the BWP General Manager to execute the contract documents for Bid Schedule No. 1541 – Perform Asphaltic Concrete and Portland Cement Concrete Repairs for Water, Electric, and Fiber Optic Services for Burbank Water and Power to Paveco Construction, Inc., in the amount of $3,300,000.00; and 3. Authorize the BWP General Manager to execute any other ancillary documents, including amendments, in form and substance satisfactory to the City Attorney’s Office and up to an amount available within the council-approved fiscal year budget. BACKGROUND BWP installs and maintains the City of Burbank’s (City) water, electric, and fiber optic infrastructure within the public right-of-way, which often requires excavating City streets. BWP relies on a qualified paving contractor to restore pavement affected by these activities because the specialized equipment and expertise required for this work exceed our capabilities. WATER AND POWER 7A.

2 BWP’s paving contract supports restoration efforts associated with water system improvements, including planned transmission and distribution main replacements, valve replacements, new service installations, and emergency repairs from water main breaks. The contract also covers pavement repairs following underground electric and fiber optic construction throughout the year. The paving contract reflects pre-negotiated unit prices with the contractor based on the type and quantity of items constructed during each project. This unit pricing structure helps control costs by establishing rates upfront and maintaining them throughout the contract year. If the contract is renewed, prices will be adjusted based on the Consumer Price Index (CPI) for labor and the Producer Price Index (PPI) for petroleum-based materials to reflect market conditions. The current paving contract has exhausted all renewal options and will expire on May 10, 2026. To avoid any disruption in pavement restoration services, BWP must establish a new paving contract prior to the expiration date. Under Burbank Municipal Code (BMC) section 2-1-418.C.5, the Board is authorized to approve contracts for goods, services, and public work construction projects if the costs are funded through BWP’s annual budget. DISCUSSION BWP has completed the competitive bid process for pavement repair services associated with maintenance of underground utilities. The scope of work encompasses all labor, materials, equipment, services, and traffic control necessary to perform asphalt pavement repairs as requested. Typical tasks include asphalt removal, surface preparation, placement and compaction of new asphalt, base repairs, and striping. Prior to selecting a qualified contractor, the following were important considerations for this contract: • Timely pavement restoration minimizes disruptions to traffic, businesses, and residents during construction and emergency repairs. • Specialized expertise is required for proper asphalt and concrete installation. • Pre-negotiated unit pricing ensures predictable costs, accurate budgeting, and avoids premium charges for emergency work. • Compliance with local, state, and federal regulations is essential for construction in the public right-of-way. • On-call contractor availability provides flexibility for planned and emergency work, ensuring continuity of service. Following the solicitation, only one qualified bidder submitted a proposal. The lowest responsive bidder previously held BWP’s paving contract and has successfully performed

3 similar work for BWP. This prior experience ensures familiarity with BWP’s workflow and requirements, which is expected to facilitate a smooth transition and continuity of service. Although BWP has prior experience with this contractor, staff conducted a line-item cost review to ensure the submitted line-item prices were fair. The proposed line-item costs were compared to those in the previous paving contract under BS 1480 and were used to price five sample projects to compare costs. The analysis showed that the average price decreased by approximately 2.5% and remained below the regional CPI increase of 3.18% from January 2025 to January 2026. This pricing comparison indicates that the proposed paving contract represents a cost-effective option for BWP. The agreement provides for an initial one-year term, with four optional one-year extensions. Annual price adjustments will be limited to adjustments based on the Consumer Price Index (CPI) for labor and the Producer Price Index (PPI) for petroleum- based materials. ENVIRONMENTAL REVIEW Work related to the operation, repair, maintenance, or minor alterations of existing public facilities are categorically exempt from the California Environmental Quality Act (CEQA) (14 CCR § 15301). The work subject to this amendment will restore streets back to their original condition, without expanding any existing use or adding any additional lanes. In addition, if work is implemented for Complete Streets projects, a separate CEQA analysis will be determined under the Compete Streets project. Staff recommends that the Board find this agenda item categorically exempt from CEQA for the reasons stated above. FISCAL IMPACT The annual expenditure of work under Bid Schedule No. 1541 is estimated not to exceed $3,300,000 per year. The cost of paving will be funded through capital projects which already have an approved budget, aid-in-construction projects, and/or previously budgeted and approved maintenance activities. CONCLUSION Approval of Bid Schedule No. 1541 is essential to ensure uninterrupted pavement restoration services for BWP’s water, electric, and fiber optic projects. The selected contractor has a proven track record with BWP, providing familiarity with established workflows and regulatory requirements, which will support a smooth transition and consistent service delivery. By approving this contract, the Board will enable BWP to maintain compliance with local, state, and federal regulations, minimize disruptions, and continue timely restoration of City streets impacted by utility construction and maintenance activities. ATTACHMENT Attachment 1 – Bid Schedule No. 1541 Bids and Tabulations

4 Attachment 2 – Bid Schedule No. 1541 Cost Allocations Attachment 3 – Paveco Construction’s submittal for Bid Schedule No. 1541

C I T Y O F B U R B A N K MEMORANDUM DATE: February 27, 2026 TO: Mandip Samra, Burbank Water and Power General Manager Via Arturo Sanchez, Civil Engineering Assistant – BWP FROM: Michael DeGrey, Buyer II SUBJECT: Bid Schedule No. 1541 – PERFORM ASPHALTIC CONCRETE AND PORTLAND CEMENT CONCRETE REPAIRS, AND FIBER OPTIC SERVICES FOR BURBANK WATER AND POWER Attached are the subject bid and tabulation. After your review of the bid, please return the bid with the bid evaluation/recommendation. Please check to see if a requisition has been sent to Purchasing and if not, please input your requisition at the same time you return this paperwork. MD:md Attachments ATTACHMENT 1 A1-1

Bid Schedule No. 1541 PERFORM ASPHALTIC CONCRETE AND PORTLAND CEMENT CONCRETE REPAIRS, AND FIBER OPTIC SERVICES FOR BURBANK WATER AND POWER BIDDER TOTAL SUM BID BID DEPOSIT Paveco Construction, Inc. Only bidder, rate sheet attached to Bidder’s Proposal 10% Bid Schedule No. 1541 advertised in the Los Angeles Times on January 7, 2026 & January 14, 2026. Thirty-one (31) copies of the bid were downloaded, of which Sixteen (16) identified themselves as Prime Contractors and One (1) were received at the bid opening. Four (4) Bidder’s attended the mandatory pre-bid conference. There were no responses from: 1st California Construction, Inc. All American Asphalt Allied Solutions AVA Builders, Inc C. A. Rasmussen, In. DASH Construction Co. Inc. Hampton Tedder Electric Company Imperium, Inc. Kern County Builders Exchange PALP Inc PaveWest, Inc RC Becker & Son, Inc The Nazerian Group Toro Enterprises ATTACHMENT 1 A1-2

Bid Item Number QUANTITY PER LOCATION UNIT UNIT PRICE 1 AC Paving Installation 20 SF Minimum EA $650.00 21 through 400 SF $18.00 5” and less 401 through 1,000 SF $12.75 1,001 through 2,500 SF $10.00 2,501 and greater SF $9.00 20 SF Minimum EA $715.00 21 through 400 SF $20.00 6” 401 through 1,000 SF $14.75 1,001 through 2,500 SF $12.00 2,501 and greater SF $10.25 20 SF Minimum EA $775.00 21 through 400 SF $24.00 8” 401 through 1,000 SF $18.75 1,001 through 2,500 SF $16.00 2,501 and greater SF $14.25 20 SF Minimum EA $835.00 21 through 400 SF $27.50 10” 401 through 1,000 SF $22.25 1,001 through 2,500 SF $19.50 2,501 and greater SF $17.75 20 SF Minimum EA $2.00 Every inch 21 through 400 SF $2.00 Over 401 through 1,000 SF $2.00 10” 1,001 through 2,500 SF $2.00 2,501 and greater SF $2.00 2 Standard AC Overlay 50 SF Minimum EA $875.00 51 through 500 SF $13.00 501 through 2,500 SF $8.75 2,501 through 5,000 SF $6.50 5,001 and greater SF $4.35 3 Rubberized AC Overlay 200 SF Minimum EA $1,750.00 201 through 2,500 SF $10.00 2,501 through 7,500 SF $6.75 7,501 and greater SF $4.35 4 Full Depth Asphalt 6" and less 1,000 SF Minimum EA $3,250.00 Pavement Removal 1,001 through 2,500 SF $2.50 2,501 and greater SF $1.75 PERFORM ASPHALTIC CONCRETE AND PORTLAND CEMENT CONCRETE REPAIRS, AND FIBER OPTIC SERVICES FOR BURBANK WATER AND POWER Bid Tabulation BS 1541 Item Description BID ITEM 4: FULL-SEPTH ASPHALT PAVEMENT REMOVAL, INCLUDING DISPOSAL OF EXISTING ASPHALT AND GRADING AND COMPACTION OF SUBGRADE (AC) BID ITEM 2: 2” STANDARD ASPHALT OVERLAY OVER EXISTING AC OR PCC, INCLUDING COLD PLAINING (AC) BID ITEM 3: 2” RUBBERIZED ASPHALT OVERLAY OVER EXISTING AC OR PCC, INCLUDING COLD PLANING (AC) BID ITEM 1: ASPHALTIC CONCRETE PAVING INSTALLATION, INCLUDING REMOVAL AND DISPOSAL OF COLD MIX OR PERMANENT ASPHALTIC CONCRETE (AC) ATTACHMENT 2 A2-1

Every inch 1,000 SF Minimum EA $525.00 Over 6" 1,001 through 2,500 SF $0.35 2,501 and greater SF $0.35 5 Sawcutting 1" - 5" AC 1 through 20 LF $4.50 21 through 100 LF $4.00 101 through 500 LF $3.25 501 and greater LF $2.65 6" - 9" AC 1 through 20 LF $6.00 21 through 100 LF $4.50 101 through 500 LF $4.00 501 and greater LF $3.00 1" - 5" PCC 1 through 20 LF $7.00 21 through 100 LF $5.25 101 through 500 LF $4.00 501 and greater LF $3.00 6" - 9" PCC 1 through 20 LF $8.00 21 through 100 LF $7.50 101 through 500 LF $6.00 501 and greater LF $5.50 6 Concrete Paving 10 through 100 SF $40.00 6” – 8” 101 through 175 SF $25.00 176 and greater SF $22.00 10 through 100 SF $45.00 9” – 12” 101 through 175 SF $29.00 176 and greater SF $25.00 Additional per 10 through 100 SF $2.50 Inch Over 101 through 175 SF $2.50 12” 176 and greater SF $2.50 7 PCC Base 10 through 100 SF $40.00 6” – 8” 101 through 175 SF $25.00 176 and greater SF $22.00 10 through 100 SF $45.00 9” – 12” 101 through 175 SF $29.00 176 and greater SF $25.00 Additional per 10 through 100 SF $2.50 Inch Over 101 through 175 SF $2.50 12” 176 and greater SF $2.50 8 PCC Curb Removal and 10 LF Minimum EA $850.00 Installation 11 through 50 LF $65.00 51 and greater LF $45.00 9 PCC Gutter Removal and 10 LF Minimum EA $850.00 Installation 11 through 50 LF $65.00 BID ITEM 6: CONCRETE PAVING, INCLUDING REMOVAL AND DIPSOAL OF COLD MIX OR PERMANENT CONCRETE PAVING (PC) BID ITEM 7: PCC BASE, INCLUDING REMOVAL AND DISPOSAL OF COLD MIX OR PERMANENT PCC BASE (PC) BID ITEM 8: PCC CURB (6’ – 8” CURB FACE; INCLUDING REMOVAL AND DISPOSAL OF COLD MIX OR EXISTING CURB (PC) BID ITEM 9: PCC GUTTER (UP TO 18” WIDTH; INCLUDING REMOVAL AND DISPOSAL OF COLD MIX OR EXISTING GUTTER) (PC) BID ITEM 5: SAWCUTTING OR TRIMMING OF CUTS WHEN SPECIFIED BY THE ENGINEER (CPI) ATTACHMENT 2 A2-2

51 and greater LF $45.00 10 PCC Curb and Gutter Removal and 10 LF Minimum EA $1,500.00 Installation 11 through 50 LF $115.00 51 and greater LF $95.00 11 PCC Sidewalk Removal and 25 SF Minimum EA $1,200.00 Installation 26 through 100 SF $35.00 101 through 200 SF $22.00 201 and greater SF $19.50 12 Pedestrian Ramp Removal and Inst. EA $6,500.00 13 Miscellaneous Base 10 CY Minimum EA $600.00 11 through 50 CY $50.00 51 and greater CY $45.00 14 Thermoplastic Striping Single Stripe 20 LF Minimum EA $875.00 21 through 100 LF $18.00 101 and greater LF $10.00 Double Stripe 20 LF Minimum EA $975.00 21 through 100 LF $20.00 101 and greater LF $12.00 15 Thermoplastic Accessories “Stop” Word EA $550.00 Arrow EA $550.00 16 Traffic Loops 2 or less EA $2,250.00 3 through 6 EA $1,350.00 7 and greater EA $900.00 17 Soils Testing Standard Proctor EA $500.00 Field Density Test (2) Tests $475.00 18 Steel Plates 1 through 4 /Plate/Job $275.00 5 and greater /Plate/Job $150.00 19 Steel Tie Bars EA $20.00 20 Traffic Control Flagman Hour $140.00 Arrow Board Hour $40.00 Baldwin Park 515002 7/31/2027 1000012272 License No. License Expiration PWC Registration BID ITEM 18: TEMPORARY STEEL TRAFFIC PLATES (ASSUME 4 DAYS OF PLATE RENTALS PER JOB) (CPI) BID ITEM 19: STEEL TIE BARS, PER CITY OF BURBANK STANDARDS (CPI) BID ITEM 20: TRAFFIC CONTROL (CPI) Location (City) BID ITEM 12: PCC PEDESTRIAN RAMP, COMPLETE PER CALTRANS STANDARD PLAN A88A, CASE A, DETAIL B, INCLUDING REMOVAL AND DISPOSAL OF COLD MIX OR CONCRETE AND INSTALLATION OF TRUNCATED DOMES (PC) BID ITEM 13: MISCELLANEOUS BASE, INCLUDING SUPPLY, INSTALLATION, AND COMPACTION (MB) BID ITEM 14: THERMOPLASTIC STRIPING (WHITE OR YELLOW) (PP) BID ITEM 15: THERMOPLASTIC ACCESSORIES (PP) BID ITEM 16: TRAFFIC LOOPS (CPI) BID ITEM 17: SOILS TESTING (CPI) BID ITEM 10: PCC CURB AND INTEGRAL GUTTER INCLUDING REMOVAL AND DISPOSAL OF COLD MIX OR EXISTING CURB AND GUTTER (PC) BID ITEM 11: PCC SIDEWALK (3’ – 5” THICH, INCLUDING REMOVAL AND DISPOSAL OF COLD MIX OR EXISTING SIDEWALK) (PC) ATTACHMENT 2 A2-3

10% Yes Yes Yes Yes Greg Fleming 626-337-5589 paveco@pavecoinc.com Non-collusion Declaration Will extend contract? Contact Bid Bond Acknowledgement of Addenda 1 IIPP Certification ATTACHMENT 2 A2-4

ATTACHMENT 3 A3-1

ATTACHMENT 3 A3-2

ATTACHMENT 3 A3-3

ATTACHMENT 3 A3-4

ATTACHMENT 3 A3-5

ATTACHMENT 3 A3-6

ATTACHMENT 3 A3-7

ATTACHMENT 3 A3-8

ATTACHMENT 3 A3-9

ATTACHMENT 3 A3-10

ATTACHMENT 3 A3-11

ATTACHMENT 3 A3-12

ATTACHMENT 3 A3-13

ATTACHMENT 3 A3-14

ATTACHMENT 3 A3-15

ATTACHMENT 3 A3-16

ATTACHMENT 3 A3-17

ATTACHMENT 3 A3-18

ATTACHMENT 3 A3-19

ATTACHMENT 3 A3-20

ATTACHMENT 3 A3-21

ATTACHMENT 3 A3-22

ATTACHMENT 3 A3-23

ATTACHMENT 3 A3-24

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Recording and media

Coverage and corrections

Records considered

  • BWP Board Meeting

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: 52293d68488b7c638cb69e797e53dcc5. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record