POLISCOPE

The public record

WINTERSPRINGS (SEMINOLE COUNTY) · LOCALDecisions and attributed speech publishedPartial coverage

Event, Tuscawilla Lighting & Beautification District Advisory Committee

Wednesday, November 18, 2026 · Government meeting record

The 30-second read

Recorded outcome

The advisory committee reviewed design, maintenance, and material proposals for upgrading the north and south community fountains, focusing on pumps, membranes, and lighting.

The Tuscawilla Lighting & Beautification District Advisory Committee reviewed design, maintenance, and material guidelines for refurbishing community fountains and landscaping. The presentation outlines proposals for structural repairs, pump and piping modernization, LED lighting, and membrane options.

Why it matters

Residents in the district will see aesthetic updates to community entrances and changes to fountain maintenance standards that impact operational costs and longevity.

What happens next

No later meeting or follow-up date is stated in the reviewed record.

An official outcome record and a transcript or captions are published for this meeting.

Captured actions

41

Recorded outcomes

1

Source artifacts

4

What changed

Other key decisions

1 captured item has a publicly linked outcome.

Search all 41 meeting actions

Money

Transcript and record text

Closed captionsWhat was said at the meeting, transcribed Nov 20, 2026. Speech is not a decision.
  • No speaker turns were supplied with this transcript.
  • This transcript has no source timestamps.
  • No speaker identities were supplied with this transcript.

This source published text without speaker turns, so speakers and timestamps are not shown.

15 and, uh, we'll start the meeting. Uh. Welcome everybody. Today is uh, wednesday, NOVEMBER 18th and we will begin with uh, roll call please me chairperson terry bevan I'm here vice chairperson rick cisco here. Committee member cynthia mckee here, committee member andrew preston here. And then we also have um MR. Dennis jones was reappointed but he is just not here tonight. I want to like guess yeah awesome. Okay. We'll move into a moment of silence followed by the pledge of allegiance. I pledge allegiance to the flag of the united states of america and to the republic for which it stands one nation under GOD ,indivisible with liberty and justice for all. Okay, we'll open it up for public input. Any public input? For the beginning of the meeting. We'll open it again later on. Okay. Not seeing any I'll close public input okay. We'll go to consent agenda item number 300 approval of the minutes from wednesday uh, AUGUST the 19th. Uh, that would be our last meeting. The city included those in to in your package. Hopefully everybody's had a chance to glance through them and if we can have a, uh we're good. We can have a motion to approve those. A motion to approve the minutes from the last meeting. The second. Oh, I'll just do a quick roll call. Can, uh, chairperson bono by vice chairperson disco. Uh, committee member mckee. Uh, all right. >> thank you, mayor preston I. Okay and it's have been approved. We'll move on to the regular agenda item number 500 a review of our quarterly, uh, fiscal expenditures, uh, year to date. Were also included in your package. Yes. Good evening, holly queen, finance director. Uh, so included in the packet was the detailed transactions for the entire fiscal year. Um, the only thing to note was we did make the correction to the street light amount. So those amounts were changed from the last meeting. Um, but other than that there was not any large items to note . I'm here if there's any specific questions on any items. >> that. The. Board members might have. I only had one question on on. The um. On the expenditures for this this is year to date but that happened within since we last met would have been the um uh, new wave. Concrete auto water level for the south fountain for a little over $2,000. Um, not sure what that is or but it does. Yes. >> uh, good evening, brian dunnigan, director of administrative services and operations so that um that particular implement on the south fountain um, is the water sensor that um controls the water level and tells the fountain when to fill. So unfortunately it did go bad. Um and we did have to replace that without that um, what you'll see is um, the fountain will lose water due to evaporation and we'll have to go out and uh, fill it manually which obviously, um, you know, it requires staff time so just a control feature for the water, um, level within the fountain. Okay. >> thank you. Any other questions? I don't really I don't do. >> a. Question per se on the actual items but just a general question with like kind of the entirety of this. I mean, it looks like everything that we had budgeted came in under budget for the fiscal year. I'll go over that once I get it. Okay. >> and what did you like what could have happened next with uh the leftovers or over the. >> next. Year. >> uh, whenever you have a second can you switch it? You wonder the same thing. So no more questions on specific level or specific detail items, correct? Uh, correct. Okay. All right, so I didn't uh, pull together I didn't have it wasn't able to get it done in time to get it on the agenda. But I'll provide a copy of this. So this is a pro forma for um basically where we're looking at coming in for year end. Um, all of your expenses should be there. There might be a small invoice that could potentially come in, uh, before end of year but for the most part this should be it. So um, what you'll see here is this large correction that we made. This was the correction. >> the budget amendment. To correct those streetlights from years past. Um, so that uh, you brought in at $966,000 in revenue versus the original budget. Of 673. 930, which the biggest variance was that uh, transfer into correct those streetlights. You also brought an additional $13,500 in interest income versus what the original budget was. So those are all good things down here are expenses. Um, so what we're looking at is uh, this is your streetlights, which we did know that that was going to come in under budget because we've now corrected that going forward on the actual so that's under budget by $90,000. And then the other large item that came in under budget is your and for grounds and brian is going to talk more of this when he talks about projects. Uh but the bulk of this was we had $75,000 earmarked for upgrades. We spent 42,000 for the one entrance. Um, and we still were not able to get some of the plant material in from the freeze uh, replacement. Um, but what that brings us down to is right now we're looking at putting around half $1 million to fund balance. That's right now approximately $532,000 that will be going to fund balance. Um, so right now the I did not. Do you have the 2027 budget you . No just the summary I do here okay so you'll see so right now that 2027 budget is what it was adopted at. But basically what this $500,000 is doing is it's going to fund balance so we can start building that fund balance for those projects in the future. And if we do time those correctly we could appropriate from this fund balance basically. Any questions I will yes. Could is the it's going to be clear so we have for 2027 we'll have a $75,000 budget plus the $532,000 fund balance that we would be able to tap into if we wanted to do anything. Potentially yeah, we would do if we wanted to tap into that $500,000 in 2027 we just do a budget amendment to appropriate from fund balance. Any other questions? It's kind of. I guess related to the surplus in the funding but maybe also leading into the status of projects but for. The streetlights for instance, are there additional streetlights that have not been addressed that we could go back and re um uh either upgrade or replace based on these additional funds surplus. Uh, that's kind of a bigger conversation. So the street lights uh, tbd has a certain set of streetlights that are within the assessment district. There could be potential ones I don't know off top of my head. Um, I know that, um, some people have come in the past and talked about, you know, why are my street lights not upgraded? We'd have to do some legal digging to make sure that they're within the assessment boundary. Um, so if that is something that the, uh, committee would want to do, just know that typically those contracts last for a minimum of ten years would do so it's a it's a lease and it's essentially the assessment district is paying the upcharge on those additional um features outside of your standard uh. Base cost. Gotcha. I wasn't sure we're limited in the amount of lights that were addressed based on the amount of funding available and now that we have more funding available, we can scope that out to address additional areas potentially. The only thing I could see that would make it a little complex is the ten year. So we we restarted the ten year I think it was about four years ago. So we're we've only got six years to go on that. So then we would have another set of lights that could potentially have kind of a off kilter contract timing. But if that is something that the committee wanted us to look into, we could do the research on that and determine what street lights are within the boundary that that. Could potentially do that. >> what street. Lights would these be? I'm just curious if. Uh these like if you live in a cul de sac and we're talking about that particular light. Yeah but that. >> was more city than it was. So initially our holly and I's understanding going back historically when the uh the assessment district was established it was there was a certain amount of upgrades that were done on main um collector roads throughout the community. So you'll see those down MR. Willow uh uh tuscarora winter springs boulevard um possibly shetland dyson but as you um continue to go within the community some of the other streets um in the in the neighborhoods outside of the you know, the private homes um still have like what you say is a traditional pole and gooseneck. Um so those were not included um, from what we've been able to see for the initial upgrade that happened back when the um assessment district was established um in the late 90s I believe. Um and then so since that time um, you know, there's been the ten year lease renewal that's continued for those lights that were initially upgraded um, in the late 90s. But the other lights throughout the community on some of the other streets were never part of the original upgrade for the assessment district as a whole, if that makes sense. Yeah. >> I've always uh, questioned that myself and I thought the answer I had gotten back one other time was that was that the city lights not. District lights. But I think it's worth a lot to be. Honest with you. Yeah. So so technically they're all city lights. Yeah. Your district just pays for the up fitted portion of it. So there's like a standard pole that the city handles for all public streets and right of ways. Right. And so the assessment only pays for that additional cost over that base rate. So technically even all the fancy poles are city poles. You just have a different standard of pole in your assessment correct? Correct I. Think it's worth looking at those. Um outlier lights in. >> those uh communities actually. Is that something. i mean they're. Old, they're ugly. I mean. Uh, they should be updated. If I'm thinking of the right right area within the district. Yes. >> so what we can do um, we do have, uh, some contacts with duke energy. Um, very, um very good group to work with over there. They have a comprehensive inventory of all the lights. Um, you know, not just the top lights but all the lights within the city. So we could certainly, um, set up some meetings with them and get a lay of the land, if you will, of you know what's out in the community. Um, that's not upgraded and then talk through some potential options of what it would look like to um, transition some of the poles, um, that are not on those uh, main roads throughout the community and uh, bring that information back to you at a future meeting. Um. >> and yeah, the. The cost yeah, yeah, the cost savings. Would be driven by the quantities based on their um their their data that. They are. >> and what. That would entail like removing the old and putting them correct. Correct, correct. So that would be like the one time charge and then the ongoing maintenance cost. Yes. >> I would anticipate there could be you know, potential one time you know capital construction costs on an ongoing lease. Um but again we'll talk through um you know, that scenario with our our friends over at duke energy and um, report back to. >> you okay. Yeah. >> sounds great. Good. >> yeah. Sounds good. Okay. Good news an update. Any additional questions on any other. Questions or just on that thought thread there are are there any other line items here where it would be we're scoping out additional areas to improve or upgrade based on. Um the funding surplus. Um yes. That is going to be something that we talk about um with the agenda item that we have um 501 um we'll start talking about the fountains. Um and you know, I want the board to have an understanding of what that um, is going to look like and try to apprize you on what those options are for that main entrance at winter springs boulevard. So that will be part of the conversation for 501 when you guys are ready to move on to that item. Okay. >> any other questions for my colleagues. >> anything else or because I'm good we're good. >> okay we'll move on to 501. Thank you. >> uh good evening again. um, just to get my notes here. Um, so I wanted to prepare an agenda item, um, specific for the conversation on the refurbishment of the north fountains going, um, you know, looking back at the meeting minutes and the direction that this board gave at their last meeting. Um, so we're looking for formal direction to move forward with those enhancements of the, uh, rehab at the north fountain. Um, and the reason, you know, we wanted to have this conversation with you all is there are going to be some expenses that are going to have to be incurred just to get a bid out on the street. So just for some context, back in 2024, um, we had uh the district spent about $10,750 on engineering work for the south mountain um, which was necessary in order to get a bid out on the street for the construction of the south fountain that had, um, the basin collapse as well as the flooding of the vault. Um additionally beyond the uh, engineering we did take uh required geotechnical borings be taken during that time in order to engineer specifically the um construction details for the vault um infrastructure which was moved from underground to above ground at the south fountain. Um, when we did those uh geotechnical borings there was an expense for that and we did do borings on both the north and south side of winter springs boulevard where the fountains were. Um, you know, ultimately the engineer of record is going to have to, uh, look at the borings that were taken in 2024 for the north mountain and, um ,feel comfortable that they're still valid, um, in order to put an engineering scope together so there could potentially be additional cost with borings if if those samples that were taken back two years ago, um, you know, need to be repealed, um, you know, reconstruction cost for the pump vault and the uh, pump installation installation uh filtration system um, back in 2024 was $117,000. Um and then the concrete basin which had collapsed um due to that catastrophic failure concrete work and plumbing um, associated with that was $157,000 back in 2024. Um, the good news with that previous work is if you recall, the assessment district actually received approximately $233,000 in reimbursements from insurance proceeds to cover that catastrophic failure of the south fountain which um, covered reconstruction of the basin the associated pre plumbing um and vault uh pump repairs um and the ultimate you know re um reestablishment of the pump infrastructure above ground so there are some additional enhancement opportunities in that area not related to reconstructing the north fountain. So you have um a very healthy uh, landscape area on both the north and south sides with the wing walls. Um we've got some initial estimates on um not um you know, for re landscaping um we're looking at approximately 40 to $45,000 for re landscaping both sides north and south. And then there's also been previous conversation with whites as well um not only landscape lighting but also um fountain lighting. So the landscape lighting again we have a rough estimate of about 20 to $25,000. So with those um considerations in mind we're kind of looking for some direction from the board on you know what your approach um your priority is in that area. We know that main entrance um it has scored high on the project ranking list but there's different elements to the to the work that can be done out there. Um, but understand you know, in order to get, um, a bid out on the street for the um, fountain reconstruction there are going to be some some cost involved, particularly with engineering. So with that I'll turn it over to you all to for discussion and answer any questions you might have. I um put together a small little powerpoint. Deck uh, related to the fountains. And these were just. Some ideas that I think we if as we're looking at the north fountain that we should take into consideration as we move forward with renovating and we would want both these fountains to operate I think similarly in scope right. Have the same guts underneath and they'll have vaults and heights and and any other enhancements that are needing maybe lighting, maybe have to drain both pools to go get new lighting in there to make sure that it's consistent with better tech, newer technology. Right. Um so anyway I took. A I took a look at some of the things out there that that we really should do and it kind of complements what you said, brian, because I think the geo study needs to be done. We have to go figure out what's underneath the ground to make sure if we start messing around with something we're not going to have a failure under there. There could be a pocket or something like that that we have no idea what's there. So we I do understand that. I mean we kind of have to understand that there are costs involved in in the renovation um, you know, review of the mechanical systems underneath there is the water circulation flowing correctly, you know, as it circulates in there is. The you know, do we have high quality pumps? Are they variable speed pumps? You know, that saves us electricity costs in the long run. Um uh accessibility for maintenance and repairs, you know, can we get to can the guys who have to do something get to the area quickly and efficiently uh, to the box to go fix something? And I don't want our community to see that box from the road. You know, we'll talk about landscaping as another item but just kind of just the mechanics automation, you know, timers, sensors, uh, you know, if if that pond is going to approach flood levels something is beeping loudly on somebody's phone that they can go out there and troubleshoot that area um drainage you know if the if that pond overflows is there a way to get some of that water, you know, to the road and down to the city's sewer system? I don't know if we have that today. Um. I think those are. >> some of the things we should look at the pipes, you know, the age of the pvc underneath there does that need to be replaced? And then I think we need a maintenance plan. Uh, you know, both short term what do we need to do every month to these ponds uh, and long term, you know, should we have annual inspections of both the, uh, pipe system and the electrical systems to make. >> sure that. Things are flowing the right way? Um, those were some of the key items in the design stage as I was looking through here. I also. Kind of researched a little bit about um, you know, I looked at structure and integrity of the pond itself. I think if we're going to do a study and we're going to spend the money both of them need to be looked at at the same time even though the other one was just redone I think it it. Could crack you. >> could. Get cracks over. time right. So I think both would need to be looked at so I had structural integrity. Um page uh four I think if you want to flip that presentation I had pumps and piping. I had the filtration and water quality systems in there and some just examples of things that we should probably think about as we. Contract. >> you know, an expert in fountains, uh, to come out and take a look at it. I also think we should get 2 or 3 estimates as well. Um. >> the material of the ceilings and finishes within the ponds. Um, you know, I went out to the internet and I picked up page seven here which talks about membrane types which is like out of my league. But there. >> are different types of membranes and I don't even know what we have in there today to talk about is that how does that right rank on a scale of 1 to 5 of the different types of membranes out there? So I don't know I think it's something that we should consider. Uh options and I know there's cost associated with each of those options but. >> they should. >> be presented to the board. So then. The board can say okay, we're willing to spend an extra thousand or 2000 to get the better quality membrane on there. Um, I also did some research on the colors of the ponds. and which colors look better. You could see in the opening page of the presentation. The darker colors although they are a little bit more of a maintenance actually are. More they rank higher on the door ability list to be honest with you it produces more of a natural look of what tuscaloosa is. We had them at one time we went to the light blue white background which is the highest maintenance interior base in color you could possibly put in a an a fountain. Um you can see the algae growing in know you know, white pine you can't see it in a uh, darker color. Uh um. It's something to consider. I I'm on the board. Uh, you know, I'm on the go back to the way tuscola was back when we built those darn things and they were the darker colors and I think one of our community members talked about the reasoning why they were that way originally to kind of co exist with the ponds and streams within tuscaloosa. They kind of gave it that. Community look. So something that we should at least consider cost wise price wise and then we can kind of decide on that. So I broke it down into kind of like looking at the infrastructure. Uh the. >> of what we have today where we should go more automation for sure and if you know and assess what's there I don't know the quality of what's there as we move forward. then I broke it into a lighting system. I think the lighting. >> out there today is I don't it's not that great to be honest with you. It's kind of dark. It's kind of it doesn't highlight. Um it doesn't look like to score right now to score really did a great job on that. Um the availability to control those lights for colors for holidays. Uh, I think that's important. Um. >> just some of the things I threw out there is the you know ,is the wiring up to par. You know, I think that all kind of needs to be looked. At if we're going to take a look at reconstructing these things and refurbishing them. Um. >> we probably won't be doing this again for another 10 to 20 years. 15 years? Um. >> I just think we need to really do a deep dive in. >> there. And then the landscaping how do we incorporate. Um, the. Native florida type landscaping plans with what we have in there today? Maybe something in there. Today's not working. Those fountains give out sprays . Maybe we got plants in there that just don't like to be wet all the time. Um getting sprayed. I also heard there's sensors for. uh as the fountains go up if the wind comes blowing in they can actually like lower the quality of the height of the water or actually turn it off if it's so windy that it's going to blow that water uh, elsewhere. So that's some of the three kind of three buckets is how I was thinking of it. You know, the infrastructure of the ponds, the lighting ability and the um landscaping. So I ultimately can. Take over my thoughts anyway. And I. >> thank you for putting that together. And and you know, my initial thought is we have to really understand the entire scope. Of the. >> part of the fountains, which is really hard to do without having more of that information. Right. Can we use the original engineering assessment? I mean it is two plus years old now at this point right? Can we still use those boring. These are all just information that we just have no real recollection of or kind of any insight to and then ultimately what do we still have to fix and what do those what is that kind of budget talk I think like the the lighting in landscaping is always kind of secondary to the actual. Fountain functioning and being the way that we want to do it because what you want to do is just undo some of the things that we've done to get access or if we want to change those maintenance access, we have to put it somewhere where we just put plants and we're now you know, redoing some of that. So I think we have to get information on what the fountain really requires before we're going to be able to opine on what to kind of do next. Yeah. >> I think um from my perspective that's a very sound approach. Um, because there are a lot of moving pieces to these fountains um, and a lot of uh variance in design, um considerations that the board certainly should consider um, technology upgrades and things that can help achieve efficiencies. Um, so there are a couple companies that are coming to mind that I think um are capable of taking a look at um, what you all are asking for and providing um, an evaluation of that infrastructure and um, what I would um anticipate is um I think later in the agenda uh, you all are going to discuss your meeting dates for next year. Um, I I almost think that the fountain conversation is probably going to require a standalone meeting where we can bring, um, these companies in to present you their findings, um, their professional recommendations on what, um, should go into a reconstruction scope and then you can ask them questions. Um, I'm the city staff and and can also be a part of that conversation. Um, so you can be comfortable with the recommendations that these outside contractors are going to make because you're probably going to get some different opinions, which is good. Um and I think that's what you're looking for. Um, so um that's just kind of my thoughts on it looking at this from the staff's perspective. When you uh you had mentioned that we had some estimates for the uh the landscaping and the lighting for 40 to 45, 20 to 25 that gives us the 60 to 70 range. Correct. We have a $75,000 budget for next year. So to me it's like if we end up doing the fountains we have that budget allocated there's going to be added cost of fixing the fountain right. So I would imagine we're going to be using that $532,000 carry forward fund balance correct for that stuff. So really kind of understanding how much of that we have to use is it going to get approved what would likely dictate you know how how right the project . Yeah so again I think um yeah you know we can we can prioritize doing a deep dive on those considerations for the fountains and bring back further information for consideration um, to the board at a special meeting. Um and then with that information I think, you know, hopefully the board is in a position to make an informed decision on next steps and then to uh board members discuss point. You know, at that point you can maybe take a closer look at potential landscaping or landscape light upgrades once you have a better idea of where a fountain reconstruction scope is going to come in at um and go from there. I think we just need to be careful if we need to go into those ponds that's kind of coordinated with the guys doing the. Pond reconstruction right? You know. ? >> yeah, I'm saying if they're going to put new lights in the ponds right? Yeah. >> those guys that are going. >> to. Can work together. Yeah. >> and there's probably some cost savings there as well by bundling all of these different um functions together under one one contract. Right right. And we'll bring back a like a painting landscaping design for us. Correct? >> yeah. Similar to what we did for tuscarora. Yeah once once you all are are comfortable um, getting to that point, uh, you know, if you feel like that's those are, uh ,enhancements that you want to pursue, we can engage in a very similar process that we did with tuscarora, um, where the contractors submitted, you know, their own unique design within the guardrails that the board um, determines, um, for the plant material and, you know, kind of give them the palette to work with and, you know, ask for pricing along with that. As well as the lighting. Right? Correct. Those two versions we saw we're very different. >> yes. And the only other thing I would recommend um again it's up to the board but um and I'm kind of volunteer someone for something that um they MAY not be able to do but chairperson bevan obviously um, has done a lot of work um, in doing some of this research so you all as a board can only meet um and discuss this together as a group? Um, but you do have the ability if you wanted to designate um, you know, chairperson of onoe as a liaison to also assist in meeting with these contractors if she's available. Obviously. Um, that is something you can do and that way you have one of your representatives there, um ,with city staff as we're going through these conversations and kind of like a um a liaison on behalf of the board that is something that you all could do. Um and she could help be engaged in those conversations. Um, as we talked to these, um, fountain consultants if she's willing to do that, I kind of put her on the spot. I'm willing to learn. That's really useful. That would be great. More information we have. >> but yeah, the more for me and as soon as I know I can communicate that out right? yeah. >> and it just helps us have a regular um, line of communication with one of your members and they're they're kind of working along with staff as we work through this process and uh, make sure that ,you know, you all as a board are getting um, you know, the considerations that you want and it's not just city staff out there. Um, you know, based off of the conversation from tonight, we've done that with other boards where they can designate a liaison to work with staff. Yeah. >> appreciate the opportunity for a collaborative, uh, kind of problem solving, um, effort to get after this. And appreciate your efforts to highlight the number of complex variables that go into the actual solution that's going to meet our long term needs because it. >> is. Um, a lot of things to consider. And so having the total picture on where we're at today, um, where those risk areas might be the need improvement and how we can do a no kidding like comprehensive correct integrated solution. Yeah. Solution toward that is going to be foundation for long term success. So yeah. It's the absolutely it's good. Yeah it sounds really good. So with that um is there anything you do you all have any other questions on um 501 as it pertains to the fountains or the main entrance at winter springs boulevard, I do have um another update for you all that's not on the agenda as a standalone item. Um, if you're inclined to move on from 501. I don't have anything further um, from. Anybody else with say anything good here? Uh, if everyone's closing. Um. >> we'll. Move on to. >> the next item. Um, clerk do we need a motion? We need a motion? Yeah, I was going to ask. From them. I feel like we have consensus. I feel like I have clear direction. Um, you know, we have a designated liaison from the board that's going to work with staff and going through this process. And then I think we understand that there's a high potential for a special meeting in the future. Yep. >> and that'll be reflected in the minutes. Um um and with that I'm uh kind of a add on we'll call this 501 a um an update on the frost damaged replacement that we previously discussed at your last meeting. So, um, you all approve to move forward with replacing the, um ,the material landscape material throughout the district that was damaged in the freeze in JANUARY of 2026? Um, we we want to let you know that that has not been forgotten about. so one of the challenges that we ran into um, we had a uh, florida native plant uh, selection, um, from one of our wholesale suppliers that we were targeting and unfortunately that particular plant material which we've used extensively um, uh also one for 34 and in some of the city parks it's just not available in the quantity, um, that we're going to need for the um the district. So there are a couple other options that we wanted to discuss or I wanted to discuss with you this evening. So, um, you know, you all have previously given us some general direction that you want to target florida native, uh, plant species. Um, so we looked at, um, you know, quantity is is is the big um challenge with some of this is just the amount of plants that we're going to need to get um and sticking with that. So we've looked at uh simpson stopper um which is um again also looking at cold tolerance cold tolerance down to about 25 degrees um and then flowers typically um between APRIL and MAY um as well as um uh walters viburnum um schiller delight um that also is uh much more cold tolerant down to about ten degrees um typically blooms in um late winter and early spring. We do have confirmation that those um materials are available in the quantities that we would need them um to um, do the swap out um, a couple other options that would not be considered florida native however they are florida friendly. Um would be um the amelia plants and also uh bottle brush. Um, so I don't know if the board um is inclined to give any specific direction on um plant material or if you want to leave it up to staff to try and um, you know, put together the options out there but that is um you know, something that we were looking for some feedback this evening on. I made the quote. I knew it was going to go to rick. Um I just wanted. >> to understand it with the simpson stoppers and about the viburnum or those the plants that weren't available? No, those are the ones that are available and the ones that the variegated pits. So we did a bunch of uh variegated pits um out on 434 as well as um in the city parks. Um, you know, that was really picked for a couple reasons. One is there is some color variation in those so they they still have some of the same um visual characteristics of the nets that we lost um, in large quantities um due to the freeze but also they're extremely cold hardy and florida native so it checked a lot of boxes for us um, when we put those into other areas of the city but unfortunately the supplier um where we were getting those they just don't have that quantity available. Um, you know, for what tlb needs. So we. Try to go in all all in on one variety or I think there's a recommendation. >> you don't have to um there there's certainly the option to uh to to have a combination of some of these different options . Yeah I still recall like where they were at kind of in the design I have to go back at the design and I absolutely can kind of recommend some placement so maybe you have it there. No I don't think I do. We have I. Think we have the old ones at nine. And this is. Just replacing the frosted items right correct. It's still going to go back down the yes. Yeah this is just. What we have. Yeah this is really replacing the um the frost damage material that was reviewed at the last meeting and again we're we don't want um one of the learned lessons from this past winter is not just within tlb but as we're replacing things we want to make sure that we're going back with things that, um, can hold up better to these hard freezes. Should we have one again in the future? How about some of this rain? Yeah yeah you. >> know tolerant to. Where you. Uh no. >> I don't think they shared pictures rick of where all that was I think I. >> know the original 400. Um, I just off the top of my head. i'm certainly happy to pine. I just want to just kind of see kind of where they're at and and mixed in. Is that something that we can just follow? Yeah those so a lot a majority of what was presented at the last meeting we went through some photographs slides um a lot of material was lost on winter springs boulevard in the medians uh the length of the corridor throughout um the entire um length of winter springs boulevard. And then there was some uh areas where the monument features were even some of the smaller ones where we had um some dieback due to the freeze. So it's it's really more of a plug in um plug in approach of replacing um the the uh plant material that was damaged um with the freeze. So there wasn't a design per se like what you all saw for tuscarora because that was like a full renovation, um, you know, complete landscape reconstruction enhancement. This is more of just kind of a plug in approach of uh, the material that was damaged um, earlier this year. With the intent to still go back and do correct reviews of . >> each of. Those islands I. Understood okay, well we. >> will. Incorporate what we put in there right? The layout we have right because we have a lot of green area correct something right? Yeah. >> so um I know rick I know you've got. This one is if we have just kind of um uh just some guidelines. Yeah. We need plants that are going to be 3 to 5ft tall like you know what that really looks like we have you know, ten foot spans like how big is the area that we're putting in so that we kind of know. Yeah so there's obviously dwarf varieties of some of these selections that I um shared with you tonight. So that is a consideration in particular I wonder springs boulevard as you get into sightline issues with um where some of the breaks are in the medians for people that are turning in and out of their particular neighborhood. >> so I wasn't sure if the younger like an entrances or if these in medians. Now these are a lot of these I would say the majority of this work is medians or the monument features that are in the right of way. Um so we certainly um you know with consider height uh mature height of this material. Um I think it is uh it's a question for the board. Is there still a strong desire to primarily target florida native um species? Um, because it does limit you florida friendly? Uh. Well, I guess it doesn't always have to be like do we have an option to use grasses as well? Right. We can use like a hatchet grass. Yeah grass newly grasses right . Not strictly a shrub either so it could be. >> some. Okay to add some. Native grasses. >> there too right. Yeah it doesn't have to be kind of all of one thing. We just replace a stroke for a. Shrub with. >> sure kind. >> of soften it with some for. Us I think we can um yeah that's certainly an option. Um we can look at areas that um we can work in some of those like mealy grasses and other native grasses um and then also incorporate some of these shrubs as well um, and go from there. Uh yeah I'll let me I'll put some is it okay if I just follow up with uh maybe. You should be an email? Yeah. >> just make sure. Yeah. >> I'm I'm happy to um sure I I just want to I just really yeah. We can. Follow up in the next couple weeks, uh. Recommending the right plant for the right spot. Yeah. >> um, nature's care is ready to go. Um, they're on the labor. Um, they're they're going to do the install. Um, but part of this approach just to control costs was that the city was going to procure the materials. Um, so we're still comfortable with that approach. But rick, I'm more than happy to to meet with you, um, here, you know, in the next, you know, a couple of weeks. Yeah. You're available in. >> the same. Yeah. >> and then we can take a drive and. I can kind of show you the areas and. Yeah, that'd be great. >> I just keep in mind we are going to revisit each one of these islands. With more enhancements to. >> look at down the road. Yeah yeah. That's really. >> good feedback and I'm glad that you know you all have some very passionate people on the board that are willing to put in some time and rick rick well um you'll take a drive in my truck and take a look at some of these areas and pick your brain and you know, see what what you think would look good out there. >> happy to. That is it for the items that I had I believe looking at 502 the clerk's office had prepared an item looking at the meeting schedule for calendar year 2027. Before we. >> go there to. 502 um, can we. >> just uh, talk about that? I saw the. Holiday decorations are up. Yes, but not all of our monuments have a holiday decoration, correct? Correct. >> not yet. So there were a couple wreaths that didn't make it last year back into inventory. Um, so we are going to replace those. I also, um, took the liberty to there was a couple wreaths that I noticed some of the ornaments had been damaged or faded. So we are going to spend a little bit of money out of your operating to um uh replace some of the ornaments on the existing roofs and I believe there are two wreaths that MAY have been taken last year before we were able to get them back into storage. So we're replacing those as well. Um, but the goal is to have all of the holiday decorations up um prior to thanksgiving. So we are working on that with the staff. And that would be to score as well because I didn't see any wreaths on there correct. Yes that is something yeah we I I spoke with um staff earlier this week and that was one of the areas I had noticed as well and they had mentioned that there were a couple areas um that were still um yet to be completed. So we're again we're pushing for that goal to have that done before we leave for the thanksgiving holiday. Um next week. >> yeah, I think. >> I sought to score and uh vista will actually as well yes . It's one monument in vista. Well and when you come in so tucked into the trees over there. It kind of it's kind of I know which one you're talking about. Yeah yeah. and then there's the one over here on this side. >> yeah as well but. I did see them um. So that was good. And brian I. Also noticed that one of the islands down by me has a um it looks like it was a tree and it looked like it was here. It was cut and then now it looks like it's a tree with a nice big nice trunk with. No top on. See. Um, is that slated for removal. Or it will be I can you just send me an email of the location and. I will take a look in? Okay. Um, somewhere down. That way. >> yeah, we will definitely take a look at that. Um. >> I mean, he really looks pretty sad. It looks like it's alive, but it's. Yeah. >> it's just seen. Better days. And he just has a trunk. Yeah. >> I will, uh, take a look at that and. >> see if we. Yeah. Okay. Anything else for, um. Brian? >> no, no. You're good. Okay, let's move on. >> if I were to. Okay, so. Really this item is just to remind you as such, um, show you. your dates. >> for. Next year, tentative dates for next year and to make sure. Everybody is good with that. And then I know we had talked. About potentially looking at. >> a special meeting. >> I didn't know. >> if you wanted to talk. About that now or maybe wait until the. >> first of next year, um to look at that. Availability for you guys. But that's really what this is for. >> we just like to make sure that. >> you're updated for your next year. Calendar year and that if there's. >> any conflicts that we can talk about them now if you like. I don't have any issues with the standard schedule. I would say it's I would wait to do the special meeting until we have all of the information then kind of just scheduling in advance and not having the time to get the appropriate information. I think it's just. Yeah, you know we need and then we can can be through a special meeting. With them. >> yeah the same. >> so certainly if uh, you know, the date of a special meeting happens to coincide with a regular meeting, you know, we can, uh, you know, have that conversation during a regular meeting. But if it's going to be in between meetings and we feel like we've got enough information to bring back to you all, then you know we would do a special meeting but we wouldn't want to be a burden on on you all so. We can I'm good with that again then. Any any questions on the. So anything that. >> would be the same. Then it's. Very good. Yeah that. >> works and brian when you're ready. You know you can just email. You know and let us know we all want to meet when you have. Information to share. If it doesn't fall within. The meeting time. Okay anything else on uh if. I go to okay. If not we can. Open it up for public input. We have any public input. No public. Okay. Anything else from the board? No. Me welcome. Yeah. Well welcome. Andrew to our to our team. Um, so glad to have you. Yes, it'll be great. Uh, with that we can, uh. Adjourn the meeting. Meeting?

Tuscawilla Lighting and Beautification District Discussion on Fountain Refurbishment Project November 18, 2026 2026 Presentation prepared by Chairperson dated 11/ 18/ 2026

Key Design Considerations for Fountain Restoration Fountain Diagnosis of the current situation Obtain 2 or 3 fountain diagnosis of the current situation and recommend enhancements to the TLBD - both fountains need to be identical in functionality and reliability/ compatibility Review the of mechanical system and location Efficient water circulation ( ensures flow, prevents stagnation and maintains water clarity) Consider high quality pumps, filtration systems, proper sized piping, automated control Update to Variable speed pumps- and size for desired water effects Accessibility for maintenance and repairs Automated timers and sensors Basin color change to Medium Slate or Charcoal Gray ( North and South) Drainage and soil conditions Water Recycling and reuse Review of pipes – PVC for any aging and replacement Maintenance and long- term operation- Clear maintenance schedules to include annual inspections with recommendations 2

Key Design Considerations for Fountain Restoration LED Lighting System Obtain 2 or 3 proposals for Enhance lighting at North and South Incorporate updated Landscaping into Lighting design Remote control access – color changing abilities State of the art lighting and wiring Highlighting entryways, water movement, landscaping Maintenance requirements – annual inspection and adjustments Landscaping Update Obtain 2 or 3 proposals for Enhanced Landscaping Seeking color, seasonal updates, water spray tolerable, native to Florida. Incorporate existing and enhance entrance visually, hide any visual equipment from public but ensure accessibility for maintenance Any Special Maintenance requirements 3

Refurbishing a commercial fountain requires balancing durable materials, reliable hydraulics, water treatment, and ongoing maintenance Processes andUpdatesConsiderMaterial Drain the basin completely and inspect the shell for hairline fractures, settling, or hollow spots. Replace failing waterproof membranes and re-caulk expansion joints with commercial-grade sealants. Consider membrane options as recommended (pg6 for re) Full Inspection of the existing basins for cracks, loose tile, or failing waterproof membranes, and verify structural stability Structural Integrity & Materials Check seals, bearings, impellers, and strainers during refurbishments. Consider variable-speed pumps, water recycling/ reuse, and automated timers or sensors to lower operating costs. Pump Modernization: Swap outdated single-speed pumps for high-efficiency, variable-frequency drive (VFD) pumps. This cuts electricity costs and lets you adjust spray heights for windy days Underground Piping: Pressure-test existing supply and return lines before pouring new finishes. Replacing brittle PVC or corroded metal pipes now prevents costly demolition later. Include proper waterproofing, overflow management, and drainage for rain or splash-out Size pumps, piping and nozzles based on desired water effects, flow rates, elevations, and pipe runs. Variable-speed pumps and water recirculation help lower operating costs. Pumps & Piping Use automatic fill valves to keep water levels steady (preventing pump or light overheating) alongside proper drainage and overflow management for heavy rain. Debris Management: Outdoor community fountains collect leaves, trash, and windblown dirt. Upgrade intake strainers, add surface skimmers, and install commercial sand or cartridge filtration to keep nozzles from clogging. Water Level Controls: Replace unreliable mechanical float valves with electronic auto-fill sensors and verify that overflow drains handle heavy storm runoff without flooding surrounding walkways. Automated Sanitation: Large outdoor basins exposed to sunlight grow algae rapidly. Install automated chemical controllers (chlorine/ bromine and pH feeders) or UV/ozone systems to keep water clear and safe. Spray & Aerosol Safety: If the fountain creates fine mist or allows people near the water, maintain strict sanitation standards to prevent bacterial growth like Legionella. Wind & Splash Control: Add an anemometer (wind sensor) that automatically lowers or shuts off high spray jets during strong gusts to prevent water loss and slippery sidewalks Include screens, skimmers, and filtration systems to trap debris, maintain clarity, and control algae. Plan chemical dosing/ metering where needed. Filtration & Water Quality 4

Processes andUpdatesConsiderMaterial Sealants & Finishes: Clean mineral buildup and apply material-compatible sealers or protective coatings where appropriate based on membrane type. Consider Basin colors and membrane options (pgs. 5 & 6) Review any corrosion or build up around the fountains. Selection of corrosion- and weather-resistant materials suited to the environment— such as stainless steel, reinforced concrete, stone, glass, or acrylic. Durable Materials Service Access: Ensure pumps, valves, filters, strainers, and junction boxes remain accessible for routine cleaning, winterization/ seasonal care, and repairs after construction finishes. Set up a regular schedule for debris removal, water testing, nozzle/ strainer cleaning, and annual mechanical/ electrical inspection Large outdoor basins exposed to sunlight grow algae rapidly. Install automated chemical controllers (chlorine/ bromine and pH feeders) or UV/ozone systems to keep water clear and safe. Annually inspect for mineral buildup and apply material-compatible sealers or protective coatings where appropriate. Budget for annual inspections from certified inspectors electrical, pipes and ground. Service Plan: Set up a regular schedule for debris removal, water testing, nozzle/ strainer cleaning, and annual mechanical/ electrical/ ground inspections. Match the Basin Finish to Your Maintenance Schedule- Budget accordingly. Ongoing Maintenanc e Use waterproof (e.g., IP68-rated) underwater or accent lighting and reliable electrical/ control wiring without creating harsh glare. Consider led color lighting with remote controls (Apps, etc.) Dark interiors absorb light, meaning underwater LED fixtures will illuminate the moving water plumes and bubbles rather than the concrete floor. Light interiors reflect light everywhere, brightening the entire basin. Select waterproof fixtures designed for submerged or wet conditions to highlight water movement and improve nighttime visibility without excessive glare. Select waterproof fixtures designed for submerged or wet conditions to highlight water movement and improve nighttime visibility without excessive glare Enhancing current lighting Lighting Seeking color, seasonal updates, water spray tolerable, native to Florida. Landscaping to make a statement at entrance, brick walls to be cleaned and maintenance if needed, clean signage, and paint the railings. Updating landscaping to incorporate existing and newelementsLandscaping 5

Top Interior Basin Colors & Trade-Offs BestForMaintenance &AlgaeRealityVisualEffect onWaterBasinColor Architectural basins, reflecting pools, and fountains with dramatic spray jets or night lighting. Hides submerged pipes, debris, and minor staining best, but absorbs solar heat, which can speed up algae growth in hot climates if circulation lags. Creates a mirror-like reflection of the sky and trees; makes white water jets and LED lighting pop dramatically at night. Charcoal Gray or Black Community entrances, parks, and high-visibility areas with hard water or surrounding trees. Best all-around camouflage. Hides both dark organic debris leaves/ dirt) and white mineral/ calcium scale better than pure black or white. Produces a natural, deep river- stone appearance without looking overly stark or industrial. Medium Slate Gray or Taupe Traditional plazas, resort-style communities, and bright, sunny locations. Hides debris moderately well, though mineral deposits along the waterline will still show as white crust. Gives water a rich, classic aquatic tone without looking like a backyard swimming pool. Deep Cobalt or Navy Blue Interactive splash pads (where visibility of depth/ footing is a safety priority) or indoor features. Highest maintenance. Every fallen leaf, speck of dirt, and patch of algae stands out immediately; white scale is less visible, and organic staining shows fast. Creates a bright, tropical sparkle and shows off the shape of the basin floor clearly. Light Blue or White Future Enhancement Today For an outdoor community fountain, charcoal gray or black is the most popular commercial choice for the basin interior, while medium- gray or earth- toned stone works best for visible outer walls and tiers. The right color depends on how you want the water to behave visually, how much direct sun the basin gets, and how often maintenance crews can clean it. 6

Top Membrane Options by Finish & Use Case KeyLimitationsKeyAdvantagesBestForMembraneType Requires specialized spray rigs and certified installers; needs a UV-stable topcoat if exposed to direct sun Seamless, extreme crack- bridging, cures in seconds, high chemical/ chlorine resistance Exposed concrete basins, complex curves, and fast turnarounds Pure Polyurea ( e.g., ArmorThane, Sikalastic) Higher material and labor cost; requires careful surface prep Monolithic bond directly to concrete, self- flashes around drains/ nozzles, zero seams Fountains finished with tile, stone pavers, or masonry cladding Fleece- Reinforced Liquid Resin e.g., Kemperol 2K- PUR, Triflex) Strong odor during application; strict solvent/ cleaner requirements Cures in under an hour, handles foot traffic, superior chlorine resistance Interactive fountains, splash pads, or basins over occupied structures PUMA / PMMA Traffic Coatings e.g., Tremco Vulkem EWS) Less flexible than polyurea; struggles if the basin has active structural movement Easy trowel/ roller application, handles negative hydrostatic pressure, tile sets directly on top Direct- bond tile installations on structurally sound concrete Polymer- Modified Cementitious e.g., Laticrete Hydro Ban, Miracote) Difficult to seal around numerous jets/ lights; unsightly folds in formal architectural basins Very flexible, 30 - 50 year lifespan, handles ground shifting well Naturalistic rock/ boulder water features or budget- conscious basins 45–60 Mil EPDM Rubber Liner e.g., Aquascape, Polygomma) For refurbishing a large outdoor commercial fountain, spray-applied polyurea and fleece- reinforced liquid resin membranes ( such as polyurethane or PMMA) are the industry top choices. Because existing basins often have hairline cracks, complex pipe penetrations, and aged concrete, seamless liquid- applied systems eliminate the seams where traditional liners fail. The ideal membrane depends on your fountain' s finish and whether the membrane will sit exposed to sunlight or buried beneath tile and stone. 7

TUSCAWILLA LIGHTING & BEAUTIFICATION DISTRICT ADVISORY COMMITTEE REGULAR MEETING AGENDA WEDNESDAY, NOVEMBER 18, 2026 - 5:15 PM CITY HALL - COMMISSION CHAMBERS 1126 EAST STATE ROAD 434, WINTER SPRINGS, FLORIDA

CALL TO ORDER Roll Call Invocation Pledge of Allegiance Agenda Changes AWARDS AND PRESENTATIONS INFORMATIONAL AGENDA PUBLIC INPUT Anyone who wishes to speak during Public Input on any Agenda Item or subject matter will need to fill out a “Public Input” form. Individuals will limit their comments to three (3) minutes, and representatives of groups or homeowners' associations shall limit their comments to five (5) minutes, unless otherwise determined by the City Commission. CONSENT AGENDA 300. Approval of the Minutes: Wednesday, August 19, 2026 Tuscawilla Lighting and Beautification District Advisory Committee Regular Meeting 2026 08 19 TLBD Regular Meeting Minutes.pdf PUBLIC HEARINGS AGENDA Pursuant to F.S. § 286.0115, if the mayor or any city commissioner receives and/or sends ex parte communications regarding any application filed with the city, the mayor or any city commissioner must publicly disclose such communications before or during the hearing at which a vote is taken on the quasi-judicial matter, so that persons who have opinions contrary to those expressed in the ex parte communications are given a reasonable opportunity to refute or respond to the communications. REGULAR AGENDA 500. Quarterly Fiscal Year to Date Expenditure Details TLBD 09.30.2026.pdf 501. Discussion on North Fountain Refurbishment Scope 502. Review of the Meeting Schedule for Calendar Year 2027 REPORTS PUBLIC INPUT Anyone who wishes to speak during Public Input on any Agenda Item or subject matter will need to fill out a “Public Input” form. Individuals will limit their comments to three (3) minutes, and representatives of groups or homeowners' associations shall limit their comments to five (5) minutes, unless otherwise determined by the City Commission.

ADJOURNMENT PUBLIC NOTICE This is a Public Meeting, and the public is invited to attend and this Agenda is subject to change. Please be advised that one (1) or more Members of any of the City's Advisory Boards and Committees may be in attendance at this Meeting, and may participate in discussions. Persons with disabilities needing assistance to participate in any of these proceedings should contact the City of Winter Springs at (407) 327-1800 "at least 48 hours prior to meeting, a written request by a physically handicapped person to attend the meeting, directed to the chairperson or director of such board, commission, agency, or authority" - per Section 286.26 Florida Statutes. "If a person decides to appeal any decision made by the board, agency, or commission with respect to any matter considered at such meeting or hearing, he or she will need a record of the proceedings, and that, for such purpose, he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based" - per Section 286.0105 Florida Statutes.

TUSCAWILLA LIGHTING & BEAUTIFICATION DISTRICT ADVISORY COMMITTEE REGULAR MEETING AGENDA WEDNESDAY, NOVEMBER 18, 2026 - 5:15 PM CITY HALL - COMMISSION CHAMBERS 1126 EAST STATE ROAD 434, WINTER SPRINGS, FLORIDA 1

CALL TO ORDER Roll Call Invocation Pledge of Allegiance Agenda Changes AWARDS AND PRESENTATIONS INFORMATIONAL AGENDA PUBLIC INPUT Anyone who wishes to speak during Public Input on any Agenda Item or subject matter will need to fill out a “Public Input” form. Individuals will limit their comments to three (3) minutes, and representatives of groups or homeowners' associations shall limit their comments to five (5) minutes, unless otherwise determined by the City Commission. CONSENT AGENDA 300. Approval of the Minutes: Wednesday, August 19, 2026 Tuscawilla Lighting and Beautification District Advisory Committee Regular Meeting 2026 08 19 TLBD Regular Meeting Minutes.pdf PUBLIC HEARINGS AGENDA Pursuant to F.S. § 286.0115, if the mayor or any city commissioner receives and/or sends ex parte communications regarding any application filed with the city, the mayor or any city commissioner must publicly disclose such communications before or during the hearing at which a vote is taken on the quasi-judicial matter, so that persons who have opinions contrary to those expressed in the ex parte communications are given a reasonable opportunity to refute or respond to the communications. REGULAR AGENDA 500. Quarterly Fiscal Year to Date Expenditure Details TLBD 09.30.2026.pdf 501. Discussion on North Fountain Refurbishment Scope 502. Review of the Meeting Schedule for Calendar Year 2027 REPORTS PUBLIC INPUT Anyone who wishes to speak during Public Input on any Agenda Item or subject matter will need to fill out a “Public Input” form. Individuals will limit their comments to three (3) minutes, and representatives of groups or homeowners' associations shall limit their comments to five (5) minutes, unless otherwise determined by the City Commission. 2

ADJOURNMENT PUBLIC NOTICE This is a Public Meeting, and the public is invited to attend and this Agenda is subject to change. Please be advised that one (1) or more Members of any of the City's Advisory Boards and Committees may be in attendance at this Meeting, and may participate in discussions. Persons with disabilities needing assistance to participate in any of these proceedings should contact the City of Winter Springs at (407) 327-1800 "at least 48 hours prior to meeting, a written request by a physically handicapped person to attend the meeting, directed to the chairperson or director of such board, commission, agency, or authority" - per Section 286.26 Florida Statutes. "If a person decides to appeal any decision made by the board, agency, or commission with respect to any matter considered at such meeting or hearing, he or she will need a record of the proceedings, and that, for such purpose, he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based" - per Section 286.0105 Florida Statutes. 3

CONSENT AGENDA ITEM 300 TUSCAWILLA LIGHTING & BEAUTIFICATION DISTRICT ADVISORY COMMITTEE AGENDA | NOVEMBER 18, 2026 REGULAR MEETING TITLE Approval of the Minutes: Wednesday, August 19, 2026 Tuscawilla Lighting and Beautification District Advisory Committee Regular Meeting SUMMARY FUNDING SOURCE RECOMMENDATION Staff recommends the Committee review and approve the Wednesday, August 19, 2026 Tuscawilla Lighting and Beautification District Advisory Committee Regular Meeting minutes. 4

TUSCAWILLA LIGHTING AND BEAUTIFICATION DISTRICT ADVISORY COMMITTEE REGULAR MEETING MINUTES AUGUST 19, 2026 CITY HALL – COMMISSION CHAMBERS CITY OF WINTER SPRINGS, FLORIDA CALL TO ORDER Chairperson Terri Bivona called the Wednesday, August 19, 2026 Regular Meeting of the Tuscawilla Lighting and Beautification District Advisory Committee to order at 5:15 p.m. in the Commission Chambers of the Municipal Building (City Hall, 1126 East State Road 434, Winter Springs, Florida 32708). Roll Call: Chairperson Terri Bivona, present Committee Member Cynthia “Cyndy” Miericke, present Committee Member Rick Ziska, absent Deputy City Clerk Tristin Tarrant, present City Clerk Erin O’Donnell, present Also present: Mr. Brian Dunigan, Director, Administrative Services and Operations Department Mr. Kevin Maddox, Landscape Manager, Urban Beautification Ms. Holly Queen, Director, Finance Department A moment of silence was observed followed by the Pledge of Allegiance. Director Dunigan requested the addition of two add-on items. A discussion on landscape enhancements and frost damage remediation for medians which will be noted as item 502 and a budget confirmation item from Finance Director Queen which will be noted as item 503. The Committee adopted the agenda with those changes. REGULAR AGENDA – PART I 500. Election for Vice-Chairperson of the Tuscawilla Lighting and Beautification District Advisory Committee for the remainder of Calendar Year 2026. Chairperson Bivona opened the nominations for Vice-Chairperson. CHAIRPERSON BIVONA NOMINATED BOARD MEMBER RICK ZISKA. SECONDED BY COMMITTEE MEMBER MIERICKE. NOMINATION WAS ACCEPTED. NO OTHER NOMINATIONS WERE GIVEN. NO OBJECTION TO THE NOMINATION WAS GIVEN. RICK ZISKA WAS ELECTED AS VICE-CHAIRPERSON FOR THE REMAINDER OF CALENDAR YEAR 2026 AWARDS AND PRESENTATIONS 100. Not Used INFORMATIONAL AGENDA 200. Not Used 5

CITY OF WINTER SPRINGS, FLORIDA TUSCAWILLA LIGHTING AND BEAUTIFICATION DISTRICT ADVISORY COMMITTEE REGULAR MEETING MINUTES – AUGUST 19, 2026 PAGE 2 of 4 PUBLIC INPUT Chairperson Bivona opened Public Input Kurt Miericke, Winter Springs Resident, President of the Tuscawilla HOA, addressed the Committee and expressed that he was please with the committee. Mr. Miericke Complimented the work done on Tuscora. Mr. Miericke relayed the next Commission meeting the discussion of the assessment increase is taking place and expressed support for the increase. He additionally urged the members to be present at the meeting. Chairperson Bivona closed Public Input CONSENT AGENDA 300. Approval of the Minutes: Wednesday, May 20, 2026 Tuscawilla Lighting and Beautification District Advisory Committee Regular Meeting MOTION TO APPROVE [THE MINUTES FROM MAY 20, 2026]. MOTION BY VICE-CHAIRPERSON ZISKA. SECONDED BY COMMITTEE MEMBER MIERICKE. DISCUSSION. VOTE: BIVONA (AYE); ZISKA (AYE); MIERICKE (AYE) MOTION CARRIED 3-0. PUBLIC HEARINGS AGENDA 400. Not Used REGULAR AGENDA – PART II 501. Quarterly Fiscal Year to Date Expenditure Details Finance Director Holly Queen presented the detailed transaction report for the period October 1, 2025 through July 31, 2026. Overall expenditures were found to be in line with budget, with several accounts carrying remaining balances. The Committee was advised that unspent funds roll into fund balance at fiscal year-end on September 30, and that open purchase orders may be reappropriated via budget amendment into the following fiscal year. Discussion continued on two fountain-related repair items and Landscape Manager Kevin Maddox confirmed that the south fountain motor replacement was covered under the manufacturer's warranty, with only labor costs being incurred by the district. A second repair at the same fountain, reflected in July, involved the waterfall side rather than another full motor replacement. Landscape Manager Maddox explained that the failed component was part of the pump assembly rather than the motor itself, and staff was able to reuse most of the existing pump components. The Committee concluded that the expenditure report appeared to be in order and no further concerns were raised under this item. 502. ADD-ON Discussion on Median Enhancements and Frost Damage Materials Operations Director Dunigan presented photographic documentation of frost damage sustained throughout the assessment district during the January 2026 freeze. The damage was extensive, affecting plant material at approximately 20 locations including medians, monument features, and fountain areas. Staff presented two options for the Committee's consideration. The first option is processing with the previously planned landscape renovation on Medians 1, 2, 3, and 4, replacing severely aged, diseased, and frost-damaged material with cold-hardy, Florida- native or Florida-friendly species, with materials estimated not to exceed $20,000 and contracted labor not to exceed $25,000. The second option is to address the frost-damaged plant material district-wide across all affected 6

CITY OF WINTER SPRINGS, FLORIDA TUSCAWILLA LIGHTING AND BEAUTIFICATION DISTRICT ADVISORY COMMITTEE REGULAR MEETING MINUTES – AUGUST 19, 2026 PAGE 3 of 4 medians and monument features, with city staff purchasing materials from wholesalers not to exceed $15,000 and contracted labor not to exceed $25,000. The Committee reached consensus and agreed that addressing all frost damage district-wide, the second option, was preferable to a partial renovation of only four medians, as it would improve conditions across more locations visible to residents. It was also noted that replacement material would prioritize cold-hardy and mixed species to avoid over-reliance on any single plant and to reduce future freeze vulnerability. Landscape Manager Maddox noted that a plan was already underway to screen the south fountain's above-ground pump infrastructure with 15-gallon Podocarpus as a cold-hardy alternative. MOTION TO REPLACE THE FROST DAMANGE [OPTION TWO]. MOTION BY VICE-CHAIRPERSON ZISKA. SECONDED BY CHAIRPERSON BIVONA. DISCUSSION. VOTE: BIVONA (AYE); ZISKA (AYE); MIERICKE (AYE) MOTION CARRIED 3-0. 503. ADD-ON Confirmation of 2027 Budget Items Finance Director Queen presented an update to the FY 2027 budget model previously approved by the Committee in May 2026. A billing correction related to streetlight expenses was identified, resulting in a credit of approximately $90,000. Finance Director Queen sought confirmation that the Committee wished to maintain the previously approved $193 per parcel assessment rate and asked for direction on how to allocate the streetlight savings. The Committee agreed that the savings should not be redirected to additional projects at this time, given the desire to preserve funds for the North Fountain Rehabilitation, which remains the district's highest-priority capital project. Members expressed concern that committing additional funds before receiving bids on the fountain could delay or compromise that project if costs exceed initial estimates. Director Dunigan and Landscape Manager Maddox noted that staff intends to combine the fountain rehabilitation scope with the Winter Springs Boulevard entrance lighting project, given their proximity, and will bring a formal project scope to the next meeting for the Committee's review prior to soliciting bids. The Committee confirmed its direction to maintain the assessment rate for FY 2027 and to appropriate the streetlight savings to fund balance for future capital projects, prioritizing the fountain rehabilitation. REPORTS Chairperson Bivona inquired about the status of the main entrance lighting and other median projects, identified as remaining priority projects for the fiscal year. Landscape Manager Maddox confirmed these items are on the work plan and that quotes will be solicited from vendors based on a staff-prepared scope. Director Dunigan indicated that a similar process for the Tuscora project would be followed, with the goal of presenting proposals at the August 19, 2026 meeting and completing work before the end of September. PUBLIC INPUT Chairperson Bivona opened Public Input Kurt Miericke, Winter Springs Resident, suggested and confirmed the Committee showed support and motioned for the increase of the assessment fee. Chairperson Bivona closed Public Input 7

CITY OF WINTER SPRINGS, FLORIDA TUSCAWILLA LIGHTING AND BEAUTIFICATION DISTRICT ADVISORY COMMITTEE REGULAR MEETING MINUTES – AUGUST 19, 2026 PAGE 4 of 4 Director Dunigan introduced the new City Clerk, Erin O'Donnell, and acknowledged the contributions of Deputy City Clerk Tarrant, who served in an interim capacity over the summer. ADJOURNMENT Chairperson Bivona adjourned the Regular Meeting of the Tuscawilla Lighting and Beautification District Advisory Committee at 6:01 p.m. RESPECTFULLY SUBMITTED: _____________________________________ TRISTIN TARRANT DEPUTY CITY CLERK NOTE: These Minutes were approved at the _________, 2026 Tuscawilla Lighting and Beautification District Advisory Committee Regular Meeting. 8

REGULAR AGENDA ITEM 500 TUSCAWILLA LIGHTING & BEAUTIFICATION DISTRICT ADVISORY COMMITTEE AGENDA | NOVEMBER 18, 2026 REGULAR MEETING TITLE Quarterly Fiscal Year to Date Expenditure Details SUMMARY FUNDING SOURCE RECOMMENDATION 9

TLBD Maintenance Fund Quarterly Meeting - November 18, 2026 Select Expense Accounts 10/1/2025 - 09/30/2026 Date Amount Description Budget $21,496 10.21.25 $620 Oct Fountain Maint. 10.29.25 $620 Oct Fountain Maint. 11.04.25 $1,240 Nov Fountain Maint. 12.09.25 $1,240 Dec Fountain Maint. 01.09.26 $1,240 Jan Fountain Maint. 02.09.26 $1,240 Feb Fountain Maint. 03.03.26 $1,240 Mar Fountain Maint. 04.10.26 $1,240 Apr Fountain Maint. 04.10.26 $627 South Fountain Motor 05.05.26 $1,240 May Fountain Maint. 06.08.26 $1,240 Jun Fountain Maint. 07.02.26 $1,240 Jul Fountain Maint. 07.14.26 $500 South Fountain Waterfall Motor 08.03.26 $1,240 Aug Fountain Maint. 09.08.26 $1,240 Sep Fountain Maint. 09.15.26 $112 North Fountain - new lid & basket 09.30.26 $2,183 Auto Water Leveler South Fountain YTD Expense Total $18,302 Encumbered $0 End Balance $3,194 Budget $254,738 11.04.25 $7,722 October Landscaping 11.04.25 $7,722 November Landscaping 12.09.25 $7,722 December Landscaping 01.06.26 $2,758 Install Carissa Holly in Median 01.09.26 $7,722 January Landscaping 01.13.26 $1,855 Annual Flowers 02.09.26 $7,722 February Landscaping 03.10.26 $7,722 March Landscaping 07.07.26 $7,722 April Landscaping 04.07.26 $949 Insecticide Application 05.05.26 $7,722 May Landscaping 06.02.26 $7,722 June Landscaping 07.02.26 $7,722 July Landscaping 08.11.26 $7,722 Aug Landscaping Nature's Care Account/Vendor Fountains Nuwave Concrete Grounds 10

09.08.26 $7,722 Sep Landscaping 09.15.26 $3,426 Fungicide & Pesticide Treatments 09.22.26 $2,170 Flower Rotation Siteone 10.08.25 $40 irrigation supplies for repair 10.21.25 $79 irrigation supplies for repair 10.29.25 $214 irrigation supplies for repair 11.04.25 $232 irrigation supplies for repair 12.09.25 $279 irrigation supplies for repair 12.16.25 $1,139 irrigation supplies for repair 12.24.25 $36 irrigation supplies for repair 01.26.26 $170 irrigation supplies for repair 03.17.26 $71 irrigation supplies for repair 04.07.26 $128 irrigation supplies for repair 04.15.26 $48 irrigation supplies for repair 06.08.26 $61 irrigation supplies for repair 07.14.26 $22 irrigation supplies for repair 08.11.26 $145 irrigation supplies for repair 08.19.26 $219 irrigation supplies for repair 09.22.26 $107 irrigation supplies for repair BrightArbor 08.03.26 $43,867 Tuscora Monument Enhancement & irrigation repair J&D Transfer Station 04.06.26 $400 Waste Disposal (deep freeze damage) YTD Expense Total $151,082 Encumbered $0 End Balance $103,656 Budget $500 M&M Flags 08.19.26 $492 Flags YTD Expense Total $492 Encumbered $0 End Balance $8 Budget $5,500 NBS 01.26.26 $1,375 1st QTR Special Assessment Services 04.10.26 $1,375 2nd QTR Special Assessment Services 07.07.26 $1,375 3rd QTR Special Assessment Services 09.30.26 $1,375 4th QTR Special Assessment Services YTD Expense Total $5,500 Encumbered $0 End Balance $0 Signs/Walls Contract Admin 11

Budget $74,340 $19,447 reverse manual accrual 11.14.25 $34 October 12.12.25 $38 November 01.13.26 $37 December 02.13.26 $35 January 03.13.26 $34 February 04.10.26 $34 March 05.14.26 $34 April 06.15.26 $34 May 07.20.26 $34 June 08.14.26 $34 July 09.11.26 $34 August 09.30.26 $34 September City of Winter Springs (irrigation) 10.14.25 $674 Vistawilla / Tuscora /WSB / Tuskawilla 10.21.25 $1,192 Seneca / Shetland / WSB / Dyson 11.12.25 $740 Vistawilla / Tuscora /WSB / Tuskawilla 11.18.25 $2,252 Seneca / Shetland / WSB / Dyson 12.09.25 $818 Vistawilla / Tuscora /WSB / Tuskawilla 12.16.25 $2,147 Seneca / Shetland / WSB / Dyson 01.13.26 $1,532 Vistawilla / Tuscora /WSB / Tuskawilla 01.20.26 $1,697 Seneca / Shetland / WSB / Dyson 02.10.26 $1,704 Vistawilla / Tuscora /WSB / Tuskawilla 02.17.26 $1,323 Seneca / Shetland / WSB / Dyson 03.10.26 $2,117 Vistawilla / Tuscora /WSB / Tuskawilla 03.17.26 $1,174 Seneca / Shetland / WSB / Dyson 04.14.26 $2,753 Vistawilla / Tuscora /WSB / Tuskawilla 04.21.26 $1,026 Seneca / Shetland / WSB / Dyson 05.12.26 $2,664 Vistawilla / Tuscora /WSB / Tuskawilla 05.19.26 $1,261 Seneca / Shetland / WSB / Dyson 06.09.26 $2,471 Vistawilla / Tuscora /WSB / Tuskawilla 06.16.26 $644 Seneca / Shetland / WSB / Dyson 07.14.26 $3,211 Vistawilla / Tuscora /WSB / Tuskawilla 07.21.26 $1,223 Seneca / Shetland / WSB / Dyson 08.11.26 $3,083 Vistawilla / Tuscora /WSB / Tuskawilla 08.18.26 $1,430 Seneca / Shetland / WSB / Dyson 09.08.26 $7,711 Vistawilla / Tuscora /WSB / Tuskawilla 09.15.26 $1,333 Seneca / Shetland / WSB / Dyson Duke Energy 10.27.25 $953 Low voltage entrance lighting-Sept 11.17.25 $32 Low voltage entrance lighting-October 11.18.25 $234 Low voltage entrance lighting-October 11.24.25 $1,459 Low voltage entrance lighting-October Seminole County (irrigation) Utilities 12

12.23.25 $267 Low voltage entrance lighting-November 12.29.25 $1,901 Low voltage entrance lighting-November 01.26.26 $276 Low voltage entrance lighting-December 01.29.26 $2,059 Low voltage entrance lighting-December 02.20.26 $267 Low voltage entrance lighting-January 02.23.26 $1,666 Low voltage entrance lighting-January 03.16.26 $263 Low voltage entrance lighting-February 03.23.26 $1,846 Low voltage entrance lighting-February 04.20.26 $265 Low voltage entrance lighting-March 04.24.26 $1,304 Low voltage entrance lighting-March 05.19.26 $263 Low voltage entrance lighting-April 05.26.26 $1,137 Low voltage entrance lighting-April 06.18.26 $229 Low voltage entrance lighting-May 06.23.26 $1,148 Low voltage entrance lighting-May 07.20.26 $229 Low voltage entrance lighting-June 07.22.26 $1,520 Low voltage entrance lighting-June 08.17.26 $264 Low voltage entrance lighting-July 08.24.26 $1,712 Low voltage entrance lighting-July 09.22.26 $1,888 Low voltage entrance lighting-Aug 09.30.26 $266 Low voltage entrance lighting-Sept YTD Expense Total $48,598 Encumbered $0 End Balance $25,742 Streetlights Budget $243,396 Duke Energy 10.27.25 $12,551 September Streetlights 11.24.25 $12,551 October Streetlights 12.29.25 $12,551 November Streetlights 01.20.26 $12,551 December Streetlights 02.23.26 $12,551 January Streetlights 03.24.26 $12,551 February Streetlights 04.24.26 $12,551 March Streetlights 05.26.26 $12,551 April Streetlights 06.23.26 $12,551 May Streetlights 07.27.26 $12,551 June Streetlights 08.24.26 $12,551 July Streetlights 09.28.26 $12,551 August Streetlights YTD Expense Total $150,607 Encumbered $0 End Balance $92,789 13

REGULAR AGENDA ITEM 501 TUSCAWILLA LIGHTING & BEAUTIFICATION DISTRICT ADVISORY COMMITTEE AGENDA | NOVEMBER 18, 2026 REGULAR MEETING TITLE Discussion on North Fountain Refurbishment Scope SUMMARY City staff is seeking direction from the committee on next steps for developing a formal scope for enhancements and refurbishments to main entrance at Tuskawilla Road and Winter Springs Blvd. Anticipated pre bid expenses include obtaining engineered drawings for the north fountain, this expense totaled $10,750 in 2024. Additionally, should the committee choose to move forward with the refurbishment of the north fountain the engineer of record will need to verify that the geotechnical borings obtained in 2024 can still be used for the redesign. Reconstruction of the new pump vault and replacement of existing pump and filtration infrastructure totaled $117,440 in 2024. Reconstruction of the concrete basin of the south fountain cost $157,068 in 2024. The TBLD assessment district received approximately $233,000 in reimbursements from insurance to cover the reconstruction of the basin, associated replumbing, and vault/pump repairs due to a catastrophic failure of the basin and vault infrastructure. Additional enhancement opportunities in this area include relandscaping of the monument features on both the north and south fountains and updating the landscape lighting in this location. FUNDING SOURCE RECOMMENDATION City staff is recommending the committee review the information presented by staff and provide further direction. 14

REGULAR AGENDA ITEM 502 TUSCAWILLA LIGHTING & BEAUTIFICATION DISTRICT ADVISORY COMMITTEE AGENDA | NOVEMBER 18, 2026 REGULAR MEETING TITLE Review of the Meeting Schedule for Calendar Year 2027 SUMMARY The tentative 2027 dates are as follows (all starting at 5:15 PM): February 17, 2027 May 19, 2027 August 18, 2027 November 17, 2027 The scheduling of Tuscawilla Lighting and Beautification Advisory Committee falls on every third Wednesday of February, May, August, and November. FUNDING SOURCE RECOMMENDATION Review and confirm the Tuscawilla Lighting and Beautification Advisory Committee calendar year 2027 tentative meeting dates. 15

Showing the first 24,000 of 43,940 characters. The full document is at the source.

15 and, uh, we'll start the meeting. Uh. Welcome everybody. Today is uh, wednesday, NOVEMBER 18th and we will begin with uh, roll call please me chairperson terry bevan I'm here vice chairperson rick cisco here. Committee member cynthia mckee here, committee member andrew preston here. And then we also have um MR. Dennis jones was reappointed but he is just not here tonight. I want to like guess yeah awesome. Okay. We'll move into a moment of silence followed by the pledge of allegiance. I pledge allegiance to the flag of the united states of america and to the republic for which it stands one nation under GOD ,indivisible with liberty and justice for all. Okay, we'll open it up for public input. Any public input? For the beginning of the meeting. We'll open it again later on. Okay. Not seeing any I'll close public input okay. We'll go to consent agenda item number 300 approval of the minutes from wednesday uh, AUGUST the 19th. Uh, that would be our last meeting. The city included those in to in your package. Hopefully everybody's had a chance to glance through them and if we can have a, uh we're good. We can have a motion to approve those. A motion to approve the minutes from the last meeting. The second. Oh, I'll just do a quick roll call. Can, uh, chairperson bono by vice chairperson disco. Uh, committee member mckee. Uh, all right. >> thank you, mayor preston I. Okay and it's have been approved. We'll move on to the regular agenda item number 500 a review of our quarterly, uh, fiscal expenditures, uh, year to date. Were also included in your package. Yes. Good evening, holly queen, finance director. Uh, so included in the packet was the detailed transactions for the entire fiscal year. Um, the only thing to note was we did make the correction to the street light amount. So those amounts were changed from the last meeting. Um, but other than that there was not any large items to note . I'm here if there's any specific questions on any items. >> that. The. Board members might have. I only had one question on on. The um. On the expenditures for this this is year to date but that happened within since we last met would have been the um uh, new wave. Concrete auto water level for the south fountain for a little over $2,000. Um, not sure what that is or but it does. Yes. >> uh, good evening, brian dunnigan, director of administrative services and operations so that um that particular implement on the south fountain um, is the water sensor that um controls the water level and tells the fountain when to fill. So unfortunately it did go bad. Um and we did have to replace that without that um, what you'll see is um, the fountain will lose water due to evaporation and we'll have to go out and uh, fill it manually which obviously, um, you know, it requires staff time so just a control feature for the water, um, level within the fountain. Okay. >> thank you. Any other questions? I don't really I don't do. >> a. Question per se on the actual items but just a general question with like kind of the entirety of this. I mean, it looks like everything that we had budgeted came in under budget for the fiscal year. I'll go over that once I get it. Okay. >> and what did you like what could have happened next with uh the leftovers or over the. >> next. Year. >> uh, whenever you have a second can you switch it? You wonder the same thing. So no more questions on specific level or specific detail items, correct? Uh, correct. Okay. All right, so I didn't uh, pull together I didn't have it wasn't able to get it done in time to get it on the agenda. But I'll provide a copy of this. So this is a pro forma for um basically where we're looking at coming in for year end. Um, all of your expenses should be there. There might be a small invoice that could potentially come in, uh, before end of year but for the most part this should be it. So um, what you'll see here is this large correction that we made. This was the correction. >> the budget amendment. To correct those streetlights from years past. Um, so that uh, you brought in at $966,000 in revenue versus the original budget. Of 673. 930, which the biggest variance was that uh, transfer into correct those streetlights. You also brought an additional $13,500 in interest income versus what the original budget was. So those are all good things down here are expenses. Um, so what we're looking at is uh, this is your streetlights, which we did know that that was going to come in under budget because we've now corrected that going forward on the actual so that's under budget by $90,000. And then the other large item that came in under budget is your and for grounds and brian is going to talk more of this when he talks about projects. Uh but the bulk of this was we had $75,000 earmarked for upgrades. We spent 42,000 for the one entrance. Um, and we still were not able to get some of the plant material in from the freeze uh, replacement. Um, but what that brings us down to is right now we're looking at putting around half $1 million to fund balance. That's right now approximately $532,000 that will be going to fund balance. Um, so right now the I did not. Do you have the 2027 budget you . No just the summary I do here okay so you'll see so right now that 2027 budget is what it was adopted at. But basically what this $500,000 is doing is it's going to fund balance so we can start building that fund balance for those projects in the future. And if we do time those correctly we could appropriate from this fund balance basically. Any questions I will yes. Could is the it's going to be clear so we have for 2027 we'll have a $75,000 budget plus the $532,000 fund balance that we would be able to tap into if we wanted to do anything. Potentially yeah, we would do if we wanted to tap into that $500,000 in 2027 we just do a budget amendment to appropriate from fund balance. Any other questions? It's kind of. I guess related to the surplus in the funding but maybe also leading into the status of projects but for. The streetlights for instance, are there additional streetlights that have not been addressed that we could go back and re um uh either upgrade or replace based on these additional funds surplus. Uh, that's kind of a bigger conversation. So the street lights uh, tbd has a certain set of streetlights that are within the assessment district. There could be potential ones I don't know off top of my head. Um, I know that, um, some people have come in the past and talked about, you know, why are my street lights not upgraded? We'd have to do some legal digging to make sure that they're within the assessment boundary. Um, so if that is something that the, uh, committee would want to do, just know that typically those contracts last for a minimum of ten years would do so it's a it's a lease and it's essentially the assessment district is paying the upcharge on those additional um features outside of your standard uh. Base cost. Gotcha. I wasn't sure we're limited in the amount of lights that were addressed based on the amount of funding available and now that we have more funding available, we can scope that out to address additional areas potentially. The only thing I could see that would make it a little complex is the ten year. So we we restarted the ten year I think it was about four years ago. So we're we've only got six years to go on that. So then we would have another set of lights that could potentially have kind of a off kilter contract timing. But if that is something that the committee wanted us to look into, we could do the research on that and determine what street lights are within the boundary that that. Could potentially do that. >> what street. Lights would these be? I'm just curious if. Uh these like if you live in a cul de sac and we're talking about that particular light. Yeah but that. >> was more city than it was. So initially our holly and I's understanding going back historically when the uh the assessment district was established it was there was a certain amount of upgrades that were done on main um collector roads throughout the community. So you'll see those down MR. Willow uh uh tuscarora winter springs boulevard um possibly shetland dyson but as you um continue to go within the community some of the other streets um in the in the neighborhoods outside of the you know, the private homes um still have like what you say is a traditional pole and gooseneck. Um so those were not included um, from what we've been able to see for the initial upgrade that happened back when the um assessment district was established um in the late 90s I believe. Um and then so since that time um, you know, there's been the ten year lease renewal that's continued for those lights that were initially upgraded um, in the late 90s. But the other lights throughout the community on some of the other streets were never part of the original upgrade for the assessment district as a whole, if that makes sense. Yeah. >> I've always uh, questioned that myself and I thought the answer I had gotten back one other time was that was that the city lights not. District lights. But I think it's worth a lot to be. Honest with you. Yeah. So so technically they're all city lights. Yeah. Your district just pays for the up fitted portion of it. So there's like a standard pole that the city handles for all public streets and right of ways. Right. And so the assessment only pays for that additional cost over that base rate. So technically even all the fancy poles are city poles. You just have a different standard of pole in your assessment correct? Correct I. Think it's worth looking at those. Um outlier lights in. >> those uh communities actually. Is that something. i mean they're. Old, they're ugly. I mean. Uh, they should be updated. If I'm thinking of the right right area within the district. Yes. >> so what we can do um, we do have, uh, some contacts with duke energy. Um, very, um very good group to work with over there. They have a comprehensive inventory of all the lights. Um, you know, not just the top lights but all the lights within the city. So we could certainly, um, set up some meetings with them and get a lay of the land, if you will, of you know what's out in the community. Um, that's not upgraded and then talk through some potential options of what it would look like to um, transition some of the poles, um, that are not on those uh, main roads throughout the community and uh, bring that information back to you at a future meeting. Um. >> and yeah, the. The cost yeah, yeah, the cost savings. Would be driven by the quantities based on their um their their data that. They are. >> and what. That would entail like removing the old and putting them correct. Correct, correct. So that would be like the one time charge and then the ongoing maintenance cost. Yes. >> I would anticipate there could be you know, potential one time you know capital construction costs on an ongoing lease. Um but again we'll talk through um you know, that scenario with our our friends over at duke energy and um, report back to. >> you okay. Yeah. >> sounds great. Good. >> yeah. Sounds good. Okay. Good news an update. Any additional questions on any other. Questions or just on that thought thread there are are there any other line items here where it would be we're scoping out additional areas to improve or upgrade based on. Um the funding surplus. Um yes. That is going to be something that we talk about um with the agenda item that we have um 501 um we'll start talking about the fountains. Um and you know, I want the board to have an understanding of what that um, is going to look like and try to apprize you on what those options are for that main entrance at winter springs boulevard. So that will be part of the conversation for 501 when you guys are ready to move on to that item. Okay. >> any other questions for my colleagues. >> anything else or because I'm good we're good. >> okay we'll move on to 501. Thank you. >> uh good evening again. um, just to get my notes here. Um, so I wanted to prepare an agenda item, um, specific for the conversation on the refurbishment of the north fountains going, um, you know, looking back at the meeting minutes and the direction that this board gave at their last meeting. Um, so we're looking for formal direction to move forward with those enhancements of the, uh, rehab at the north fountain. Um, and the reason, you know, we wanted to have this conversation with you all is there are going to be some expenses that are going to have to be incurred just to get a bid out on the street. So just for some context, back in 2024, um, we had uh the district spent about $10,750 on engineering work for the south mountain um, which was necessary in order to get a bid out on the street for the construction of the south fountain that had, um, the basin collapse as well as the flooding of the vault. Um additionally beyond the uh, engineering we did take uh required geotechnical borings be taken during that time in order to engineer specifically the um construction details for the vault um infrastructure which was moved from underground to above ground at the south fountain. Um, when we did those uh geotechnical borings there was an expense for that and we did do borings on both the north and south side of winter springs boulevard where the fountains were. Um, you know, ultimately the engineer of record is going to have to, uh, look at the borings that were taken in 2024 for the north mountain and, um ,feel comfortable that they're still valid, um, in order to put an engineering scope together so there could potentially be additional cost with borings if if those samples that were taken back two years ago, um, you know, need to be repealed, um, you know, reconstruction cost for the pump vault and the uh, pump installation installation uh filtration system um, back in 2024 was $117,000. Um and then the concrete basin which had collapsed um due to that catastrophic failure concrete work and plumbing um, associated with that was $157,000 back in 2024. Um, the good news with that previous work is if you recall, the assessment district actually received approximately $233,000 in reimbursements from insurance proceeds to cover that catastrophic failure of the south fountain which um, covered reconstruction of the basin the associated pre plumbing um and vault uh pump repairs um and the ultimate you know re um reestablishment of the pump infrastructure above ground so there are some additional enhancement opportunities in that area not related to reconstructing the north fountain. So you have um a very healthy uh, landscape area on both the north and south sides with the wing walls. Um we've got some initial estimates on um not um you know, for re landscaping um we're looking at approximately 40 to $45,000 for re landscaping both sides north and south. And then there's also been previous conversation with whites as well um not only landscape lighting but also um fountain lighting. So the landscape lighting again we have a rough estimate of about 20 to $25,000. So with those um considerations in mind we're kind of looking for some direction from the board on you know what your approach um your priority is in that area. We know that main entrance um it has scored high on the project ranking list but there's different elements to the to the work that can be done out there. Um, but understand you know, in order to get, um, a bid out on the street for the um, fountain reconstruction there are going to be some some cost involved, particularly with engineering. So with that I'll turn it over to you all to for discussion and answer any questions you might have. I um put together a small little powerpoint. Deck uh, related to the fountains. And these were just. Some ideas that I think we if as we're looking at the north fountain that we should take into consideration as we move forward with renovating and we would want both these fountains to operate I think similarly in scope right. Have the same guts underneath and they'll have vaults and heights and and any other enhancements that are needing maybe lighting, maybe have to drain both pools to go get new lighting in there to make sure that it's consistent with better tech, newer technology. Right. Um so anyway I took. A I took a look at some of the things out there that that we really should do and it kind of complements what you said, brian, because I think the geo study needs to be done. We have to go figure out what's underneath the ground to make sure if we start messing around with something we're not going to have a failure under there. There could be a pocket or something like that that we have no idea what's there. So we I do understand that. I mean we kind of have to understand that there are costs involved in in the renovation um, you know, review of the mechanical systems underneath there is the water circulation flowing correctly, you know, as it circulates in there is. The you know, do we have high quality pumps? Are they variable speed pumps? You know, that saves us electricity costs in the long run. Um uh accessibility for maintenance and repairs, you know, can we get to can the guys who have to do something get to the area quickly and efficiently uh, to the box to go fix something? And I don't want our community to see that box from the road. You know, we'll talk about landscaping as another item but just kind of just the mechanics automation, you know, timers, sensors, uh, you know, if if that pond is going to approach flood levels something is beeping loudly on somebody's phone that they can go out there and troubleshoot that area um drainage you know if the if that pond overflows is there a way to get some of that water, you know, to the road and down to the city's sewer system? I don't know if we have that today. Um. I think those are. >> some of the things we should look at the pipes, you know, the age of the pvc underneath there does that need to be replaced? And then I think we need a maintenance plan. Uh, you know, both short term what do we need to do every month to these ponds uh, and long term, you know, should we have annual inspections of both the, uh, pipe system and the electrical systems to make. >> sure that. Things are flowing the right way? Um, those were some of the key items in the design stage as I was looking through here. I also. Kind of researched a little bit about um, you know, I looked at structure and integrity of the pond itself. I think if we're going to do a study and we're going to spend the money both of them need to be looked at at the same time even though the other one was just redone I think it it. Could crack you. >> could. Get cracks over. time right. So I think both would need to be looked at so I had structural integrity. Um page uh four I think if you want to flip that presentation I had pumps and piping. I had the filtration and water quality systems in there and some just examples of things that we should probably think about as we. Contract. >> you know, an expert in fountains, uh, to come out and take a look at it. I also think we should get 2 or 3 estimates as well. Um. >> the material of the ceilings and finishes within the ponds. Um, you know, I went out to the internet and I picked up page seven here which talks about membrane types which is like out of my league. But there. >> are different types of membranes and I don't even know what we have in there today to talk about is that how does that right rank on a scale of 1 to 5 of the different types of membranes out there? So I don't know I think it's something that we should consider. Uh options and I know there's cost associated with each of those options but. >> they should. >> be presented to the board. So then. The board can say okay, we're willing to spend an extra thousand or 2000 to get the better quality membrane on there. Um, I also did some research on the colors of the ponds. and which colors look better. You could see in the opening page of the presentation. The darker colors although they are a little bit more of a maintenance actually are. More they rank higher on the door ability list to be honest with you it produces more of a natural look of what tuscaloosa is. We had them at one time we went to the light blue white background which is the highest maintenance interior base in color you could possibly put in a an a fountain. Um you can see the algae growing in know you know, white pine you can't see it in a uh, darker color. Uh um. It's something to consider. I I'm on the board. Uh, you know, I'm on the go back to the way tuscola was back when we built those darn things and they were the darker colors and I think one of our community members talked about the reasoning why they were that way originally to kind of co exist with the ponds and streams within tuscaloosa. They kind of gave it that. Community look. So something that we should at least consider cost wise price wise and then we can kind of decide on that. So I broke it down into kind of like looking at the infrastructure. Uh the. >> of what we have today where we should go more automation for sure and if you know and assess what's there I don't know the quality of what's there as we move forward. then I broke it into a lighting system. I think the lighting. >> out there today is I don't it's not that great to be honest with you. It's kind of dark. It's kind of it doesn't highlight. Um it doesn't look like to score right now to score really did a great job on that. Um the availability to control those lights for colors for holidays. Uh, I think that's important. Um. >> just some of the things I threw out there is the you know ,is the wiring up to par. You know, I think that all kind of needs to be looked. At if we're going to take a look at reconstructing these things and refurbishing them. Um. >> we probably won't be doing this again for another 10 to 20 years. 15 years? Um. >> I just think we need to really do a deep dive in. >> there. And then the landscaping how do we incorporate. Um, the. Native florida type landscaping plans with what we have in there today? Maybe something in there. Today's not working. Those fountains give out sprays . Maybe we got plants in there that just don't like to be wet all the time. Um getting sprayed. I also heard there's sensors for. uh as the fountains go up if the wind comes blowing in they can actually like lower the quality of the height of the water or actually turn it off if it's so windy that it's going to blow that water uh, elsewhere. So that's some of the three kind of three buckets is how I was thinking of it. You know, the infrastructure of the ponds, the lighting ability and the um landscaping. So I ultimately can. Take over my thoughts anyway. And I. >> thank you for putting that together. And and you know, my initial thought is we have to really understand the entire scope. Of the. >> part of the fountains, which is really hard to do without having more of that information. Right. Can we use the original engineering assessment? I mean it is two plus years old now at this point right? Can we still use those boring. These are all just information that we just have no real recollection of or kind of any insight to and then ultimately what do we still have to fix and what do those what is that kind of budget talk I think like the the lighting in landscaping is always kind of secondary to the actual. Fountain functioning and being the way that we want to do it because what you want to do is just undo some of the things that we've done to get access or if we want to change those maintenance access, we have to put it somewhere where we just put plants and we're now you know, redoing some of that. So I think we have to get information on what the fountain really requires before we're going to be able to opine on what to kind of do next. Yeah. >> I think um from my perspective tha

All meeting actions

Source coverage incomplete

41 meeting items captured. The published sources do not prove this is the complete docket.

Showing 12 of 41

Browse by category41 actions

Official record

Coverage and corrections

Records considered

  • Event, Tuscawilla Lighting & Beautification District Advisory Committee — Minutes
  • Event, Tuscawilla Lighting & Beautification District Advisory Committee
  • Tuscawilla Lighting & Beautification District Advisory Committee — Packet
  • Event, Tuscawilla Lighting & Beautification District Advisory Committee — Closed Captions

Not claimed by this page

  • A source-grounded next meeting date
  • The available transcript has no reliable timestamps.
  • Transcript coverage is partial.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.
  • Low-grade, ungraded, procedural, or superseded items remain in the complete agenda inventory rather than the meeting digest.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: 4b619898df477346e6350bd0f01494b9. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record