1% Local Sales Tax Committee

Tuesday, January 13, 2026 · Government meeting record

The 30-second read

Record incomplete

The 1% Local Sales Tax Committee met to review project rankings and discuss a final batch of potential capital improvement projects for the city. The agenda included updates on ongoing infrastructure projects and the introduction of new water utility and park improvement proposals.

Why it matters

This committee determines which local infrastructure projects, including water utility upgrades and park improvements, receive funding from the 1% local sales tax extension.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Record text

No recording or transcript is held for this meeting.

Showing the first 60,000 of 72,452 characters. The full document is at the source.

Cindy Marsh-tichy, Committee Member Jack Howard, Committee Member Lisa M Gillen, Committee Member Joyce Tilden, Committee Member Robyn Bouchard, Committee Member Bob Gaydos, Committee Member Patti Allen, Committee Member Mike Fox, Committee Member Rose Hergenhan-Askew, Committee Member Isaac James, Committee Member Craig Holt, Committee Member Donna Peterman, Committee Member Sherry Danko, Committee Member Bill Courtney, Committee Member Graciela Nurse-Carthy, Committee Member Gene Murtha, Committee Member Ken Krause, Committee Member 1. CALL TO ORDER 2. PUBLIC COMMENT 3. APPROVAL OF MINUTES 4. GENERAL BUSINESS 1% LOCAL SALES TAX COMMITTEE AGENDA 120 LAISHLEY COURT, PUNTA GORDA, FL 33950 JANUARY 13, 2026,10:00 AM Roll Call Announcements Next Meeting - February 10, 2026 Anyone wishing to address the 1% Local Sales Tax Committee on any subject may do so at the appropriate time during the meeting. Those who choose to speak must state their name for the record. Each person will be allowed to speak up to a maximum of three minutes. December 9, 2025, Meeting Minutes 1

4.a. Rating of Projects 31- 41 Presented in December 4.b. List of All Project Rankings to Date 4.c. Final Batch of 1% Sales Tax Projects for Consideration 5. STAFF COMMENTS 6. ADJOURNMENT If any person decides to appeal any matter considered at this meeting, he or she may need a record of the proceedings, and for such purpose he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. In accordance with the Americans with Disabilities Act and Florida Statute 286.26, the location of this public hearing is accessible to persons with disabilities. If you are a person with disability who needs any accommodation in order to participate in this proceeding, you are entitled, at no cost to you, to the provision of certain assistance. Interpreters for the hearing impaired (TTY 941-575-5013) or non-English speaking citizens, and any other special accommodations can be requested by contacting the Human Resources Manager/Non-Discrimination Coordinator whose address is 326 W. Marion Avenue, Punta Gorda, FL 33950, whose telephone number is (941) 575-3371, and whose email address is humres@cityofpuntagordafl.com, at least two (2) calendars days prior to the meeting. 2

Title: December 9, 2025, Meeting Minutes Funds: Not applicable. Recommended Action: Approval of the minutes. Summary: The December 9, 2025, 1% Local Sales Tax Committee meeting minutes are available for review and approval. Department/Division: City Clerk 1% LOCAL SALES TAX COMMITTEE CITY OF PUNTA GORDA 01/13/2026 APPROVAL OF MINUTES EXHIBITS: 1. December 9, 2025, Minutes 3

CITY OF PUNTA GORDA, FLORIDA LOCAL SALES TAX COMMITTEE MEETING MINUTES DECEMBER 9, 2025, 9:00 A.M. 120 LAISHLEY COURT PUNTA GORDA, FL 33950 MEMBERS PRESENT: Patti Allen, Bill Courtney, Sherry Danko, Mike Fox, Bob Gaydos, Rose Hergenhan-Askew, Cindy Marsh-Tichy, Gene Murtha, Donna Peterman, Joyce Tilden MEMBERS ABSENT: Robyn Bouchard, Lisa Gillen, Craig Holt, Jack Howard, Isaac James, Ken Krause, Graciela Nurse-Carthy CITY STAFF PRESENT: Carl Benge, Boyd Lawrence, Kristin Simeone 1) CALL TO ORDER Boyd Lawrence, Planning Director, called the meeting to order at 10:02 a.m. PUBLIC COMMENT There were no comments. 2) APPROVAL OF MINUTES 2.a October 14, 2025, Minutes Exhibits: Cover Page October 14, 2025, Minutes Committee Member Peterman MOVED approval of the minutes, SECONDED by Committee Member Marsh-Tichy. MOTION UNANIMOUSLY CARRIED. 3) GENERAL BUSINESS 3.a Project Ratings Recap Projects 1 - 20 Exhibits: Cover Page Project Scoring First CIP Batch.pdf Project Scoring Second CIP Batch.pdf Boyd Lawrence presented the results of scoring for the first twenty projects proposed for the sales tax program extension, as delineated in the agenda material. 3.b Rating of Projects 21 - 30 Presented at October Meeting Exhibits: Cover Page 21. Sidewalk Improvement Phase I 22. Unimproved Alleyway 4

23. Baynard Vasco Sidewalks FY 2026 24. Harborwalk East Phase II FY 2026 25. Bicycle Capital Improvement Program FY 2026 26. Harborwalk US 41 NB Bridge Underpass Improvements FY 2026 27. Complete St - Virginia Ave - Harvey to US 41 FY 2026 28. Maud St Angled Parking FY 2026 29. Royal Poinciana FY 2026 30. Tropicana and Marion Sidewalk Enhancement FY 2026 Scoring Sheet - Condensed Boyd Lawrence led Board members through scoring of projects 21 through 30. Discussion ensued regarding the following: 21) Sidewalk Improvement Phase I The project accounted for construction of new sidewalks and replacement of existing sidewalks throughout the City. Members were not in favor of completing maintenance using sales tax funds. 22) Unimproved Alleyway The project would impact a small number of houses which had been constructed on an unimproved alleyway; the project would not benefit a large portion of the City's residents. 23) Baynard/Vasco Sidewalk Improvements The project was not a joint project with other entities. 24) Harborwalk East Phase II Public Works did not wish to disturb the mangroves in the project area. 25) Bicycle Capital Improvement Program There were no funds currently designated for the proposed program, which had resulted from community feedback. 26) Harborwalk US 41 Northbound Bridge Underpass Improvements No discussion. 27) Complete Street - Virginia Avenue-Harvey Street to US 41 This was a joint project in that the City would need to coordinate with the State; however, the potential for State funding had not yet been investigated. 28) Maud Street Angled Parking The project would provide additional parking for visitors to popular locations, including the Visual Arts Center, Fishermen's Village, and the Military Heritage Museum. 29) Complete Street - Royal Poinciana Improvements The project was significant to residents of Burnt Store Meadows. Traffic calming measures would be included. 30) Tropicana and Marion Sidewalk Enhancement The project would benefit safety for pedestrians and cyclists in the area. The annual maintenance costs were related to lighting. Consensus of the Committee was to defer the following projects: Sidewalk Improvement Phase I; Unimproved Alleyway; Harborwalk East Phase II. Boyd Lawrence indicated project rankings could be reevaluated at the January 13, 2026, committee meeting. Discussion then ensued regarding funding of projects from the 2020 1% local sales tax extension. 3.c Introduction of Final 1% Sales Tax Potential Projects Exhibits: 5

Cover Page 31. Historic District Street Lights_FY26 32. Gilchrist Park - Harborwalk Improvements (Seating and Shade) 33. Historic District Interpretation Markers_FY26 34. Harborwalk - Laishley Park Marriage Point_FY26 35. Harborwalk - Veterans Park Shade Structure(s)_FY26 36. Trabue Park Improvements_FY26 37. South Punta Gorda Park (Old Firestation II)_FY26 38. Harborwalk West - Area 3_FY26 39. Living Shoreline Extension Trabue Park and Shreve Park 40. Waterfront Sports Activity Center_FY26 41. Complete St - Airport Rd Improvements_FY26.pdf Boyd Lawrence presented the following projects and reviewed the capital improvements program sheet (included in the agenda material) for each: 31) Historic District Street Lights Discussion ensued regarding the scope of the project, with Boyd Lawrence clarifying the project would address areas where lighting was missing. 32) Gilchrist Park - Harborwalk Improvements (Seating and Shade) Discussion ensued regarding the likelihood of approving projects that were low priority as well as how projects were prioritized. 33) Historic District Interpretation Markers Team Punta Gorda was suggested as a partner for this project. 34) Harborwalk - Laishley Park Marriage Point Discussion ensued regarding the high cost of this project, which was a low priority, as well as the condition of the current gazebo. 35) Harborwalk - Veterans Park Shade Structures No discussion. 36) Trabue Park Improvements Discussion ensued regarding the location of the park. 37) South Punta Gorda Park (Old Fire Station II) Discussion ensued regarding the potential to install a kayak launch in the south of the City. 38) Harborwalk West - Area 3 Discussion ensued regarding the pedestrian bridges included within the project area and the need for more parking in the area. 39) Living Shoreline Extension Trabue Park and Shreve Park Discussion ensued regarding who would complete the project as well as its ability to enhance the area's aesthetic and environment, with desire expressed to maintain visibility of the harbor as part of the design. Concern was also expressed regarding the project's potential impact on the ability for mooring balls to be placed nearby, with acknowledgement that the project could help mitigate storm impacts. 40) Waterfront Sports Activity Center No discussion. 41) Complete Street - Airport Road Improvements Discussion ensued regarding addressing sidewalks through a comprehensive fund that would allow for sidewalk projects to be funded, with Kristin Simeone noting a similar fund had been established for Americans with Disability Act projects. 6

STAFF COMMENTS Boyd Lawrence noted utilities projects would be presented at the January 13, 2026, committee meeting. ADJOURNMENT The meeting adjourned at 11:14 a.m. 7

Title: Rating of Projects 31- 41 Presented in December Funds: Recommended Action: For Review and Discussion Summary: 31. Historic District Street Lights 32. Gilchrist Park - Harborwalk Improvements - Seating and Shade 33. Historic District Interpretation Markers 34. Harborwalk - Laishley Park Marriage Point 35. Harborwalk - Veterans Park Shade Structure(s) 36. Trabue Park Improvements 37. South Punta Gorda Park (Old Fire Station II) 38. Harborwalk West - Area 3 39. Living Shoreline Extension Trabue Park and Shreve Park 40. Waterfront Sports Activity Center 41. Airport Road Improvements (from meeting #1) Department/Division: Urban Design 1% LOCAL SALES TAX COMMITTEE CITY OF PUNTA GORDA 01/13/2026 GENERAL BUSINESS EXHIBITS: 1. 31. Historic District Street Lights 2. 32. Gilchrist Park - Harborwalk Improvements - Seating and Shade 3. 33. Historic District Interpretation Markers 4. 34. Harborwalk - Laishley Park Marriage Point 5. 35. Harborwalk - Veterans Park Shade Structure(s) 6. 36. Trabue Park Improvements 7. 37. South Punta Gorda Park (Old Firestation II) 8. 38. Harborwalk West - Area 3 9. 39. Living Shoreline Extension Trabue Park and Shreve Park 10. 40. Waterfront Sports Activity Center 11. 2. Complete Street - Airport Road Improvements 8

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Planning $63,840 $0 $0 $0 $0 $0 $0 Design $159,600 $0 $0 $0 $0 $0 $0 Construction $460,000 $0 $0 $0 $0 $0 $0 Total $683,440 $0 $0 $0 $0 $0 $0 This 2-year project consists of an engineering study to identify the missing decorative lighting connections in the Historic District, followed by engineering and construction documents and installation. Total Anticipated Cost $683,440: Engineering Study - $63,840 Design & Permitting - $159,600 Construction - $400,000 Contingency - $60,000 Funding: $683,440 UNFUNDED To enhance the safety, security, and aesthetic appeal of the Historic District. This project will also maintain the character of Historic Punta Gorda in keeping with the branding activities of the City. Maintenance & Electric $1,500 annually Planning Boyd Lawrence Historic District Street Lights TBD Financial Information TBD Project Costs Maintain and enhance the City’s infrastructure to ensure efficient and effective service delivery and quality aesthetic appeal. Description/ Justification: Provide consistent aesthetic streetscape character throughout the historic downtown while enhancing safety for all residents and tourists. 0% Infrastructure Sustainability CIP Sheet 9

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Unfunded TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design Construction Equipment Contigency Total Estimated $63,840 $159,600 $460,000 $0 $0 $683,440 Actual $0 $0 $0 $0 $0 $0 Variance -100% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes Maintenance FEMA Funds Grant Funds Insurance Funds CIP Sheet 10

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design $76,600 $0 $0 $0 $0 $0 $0 Construction $368,000 $0 $0 $0 $0 $0 $0 Total $444,600 $0 $0 $0 $0 $0 $0 Financial Information TBD Project Costs Maintain and enhance the City’s infrastructure to ensure efficient and effective service delivery and quality aesthetic appeal. Description/ Justification: Enhance the usability of Harborwalk for key events and pedestrians by providing additional comfort to all participants via shade and seating. 0% Infrastructure Sustainability Planning Boyd Lawrence Gilchrist Park - Harborwalk Improvements (Seating and Shade) TBD The project consists of conceptual design and engineering plans – available options may include but are not limited to a pergola, shelter, shade structure, benches, seating wall, covered swing/bench, and landscaping/shade trees. Manufacturing and installation costs are estimated only pending design and schedule of value. Total Anticipated Cost $444,600: Design & Permitting - $76,600 Construction - $320,000 Contingency - $48,000 Funding: $444,600 UNFUNDED To enhance the usability and aesthetic appeal of Gilchrist Park and Harborwalk by providing additional comfort via additional seating and shade options. Maintenance $1,000 annually CIP Sheet 11

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Unfunded TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design Construction Equipment Contigency Total Estimated $0 $76,600 $368,000 $0 $0 $444,600 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Maintenance FEMA Funds Grant Funds Insurance Funds Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes CIP Sheet 12

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design $160,000 $0 $0 $0 $0 $0 $0 Construction $460,000 $0 $0 $0 $0 $0 $0 Total $620,000 $0 $0 $0 $0 $0 $0 Financial Information TBD Project Costs Support, promote & maintain the City’s historic character. Description/ Justification: Preserve an important asset that celebrates part of Punta Gorda's unique history, providing educational features throughout downtown Historic Punta Gorda. 0% Quality of Life Planning Boyd Lawrence Historic District Interpretation Markers TBD A 2-year project will identify the historical point(s) of interest and historical significance throughout the City's Historic District. Design and develop a historic interpretative marker (signage/wayfinding) plan that identifies the historical point of interest to create a unified message for Historic Punta Gorda while recognizing the unique aspects of the historic areas. Manufacture and installation of markers. Construction cost estimated only pending design and schedule of value. Total Anticipated Cost $620,000: Design & Permitting - $160,000 Construction - $400,000 Contingency - $60,000 Funding: $620,000 UNFUNDED To preserve and enhance the City's small town charm by celebrating the unique history of our community in alignment with the City's Harborside Hometown brand. Maintenance $1,500 annually CIP Sheet 13

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Unfunded TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design Construction Equipment Contigency Total Estimated $0 $160,000 $460,000 $0 $0 $620,000 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Maintenance FEMA Funds Grant Funds Insurance Funds Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes CIP Sheet 14

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design $191,521 $0 $0 $0 $0 $0 $0 Construction $807,575 $0 $0 $0 $0 $0 $0 Total $999,096 $0 $0 $0 $0 $0 $0 Financial Information TBD Project Costs Maintain and enhance the City’s infrastructure to ensure efficient and effective service delivery and quality aesthetic appeal. Description/ Justification: Increase and enhance the use of the area for residents and tourists alike. In addition provides improved accessibility for all users. 0% Infrastructure Sustainability Planning Boyd Lawrence Harborwalk – Laishley Park Marriage Point TBD This is a 1 to 2-year project. Design and Construct hardscape and landscape improvements including installation of new gazebo at Marriage Point in Laishley Park to address ADA issues outlined in the City's ADA Transition Plan. Construction (cost estimated only pending design and schedule of value): Total Anticipated Cost $999,095 Design & Permitting - $191,520 Construction - $702,240 Contingency - $105,335 Funding: $999,095 UNFUNDED Marriage Point has not received any improvements in over 18 years and is in need of an update and improvements. Maintenance $3,000 annually CIP Sheet 15

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Unfunded TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design Construction Equipment Contigency Total Estimated $0 $191,521 $807,575 $0 $0 $999,096 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Maintenance FEMA Funds Grant Funds Insurance Funds Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes CIP Sheet 16

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design $63,800 $0 $0 $0 $0 $0 $0 Construction $383,000 $0 $0 $0 $0 $0 $0 Total $446,800 $0 $0 $0 $0 $0 $0 Design, engineer, manufacture, and install shade structure(s) in Veterans Park open area by the gazebo. Estimate $446,800 Funding: $446,800 UNFUNDED Unknown Annual Maintenance Cost Planning Boyd Lawrence Veterans Park Shade Structure(s) TBD Financial Information TBD Project Costs Maintain and enhance the City’s infrastructure to ensure efficient and effective service delivery and quality aesthetic appeal. Description/ Justification: Enhance the usability of Veterans Park for key events by providing additional comfort to participants via shade. 0% Infrastructure Sustainability CIP Sheet 17

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Unfunded TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design Construction Equipment Contigency Total Estimated $0 $63,800 $383,000 $0 $0 $446,800 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes Maintenance FEMA Funds Grant Funds Insurance Funds CIP Sheet 18

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design $319,200 $0 $0 $0 $0 $0 $0 Construction $1,322,500 $0 $0 $0 $0 $0 $0 Total $1,641,700 $0 $0 $0 $0 $0 $0 Financial Information TBD Project Costs Maintain and enhance the City’s infrastructure to ensure efficient and effective service delivery and quality aesthetic appeal. Description/ Justification: Enhances the City residents’ quality of life by providing an additional park thereby increasing and improving the level of service. 0% Infrastructure Sustainability Planning Boyd Lawrence Trabue Park Improvements TBD This is a 2-year project. Development of conceptual design to best utilize the park property. Design Engineering & Permitting (includes design commission for public art or architectural gateway feature). Construct. Cost estimated only pending design and schedule of value. Total Anticipated Cost $1,641,700: Design & Permitting - $319,200 Construction - $ 1,150,000 Contingency - $172,500 Funding: $1,641,700 UNFUNDED Implementation of the City's Recreation & Open Space Element of the Comprehensive Plan to provide a recreational level of service for all users. Create a gateway feature at the eastern entry of the City, enhancing the appearance of the Medical District. Maintenance & Utilities $10,000 Annually CIP Sheet 19

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Unfunded TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design Construction Equipment Contigency Total Estimated $0 $319,200 $1,322,500 $0 $0 $1,641,700 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Maintenance FEMA Funds Grant Funds Insurance Funds Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes CIP Sheet 20

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/ Engineering $287,300 $0 $0 $0 $0 $0 $0 Construction $989,700 $0 $0 $0 $0 $0 $0 Total $1,277,000 $0 $0 $0 $0 $0 $0 This Park project is a 3-year project. Design preliminary concept plan for a park with amenities on a City- owned property located in South Punta Gorda adjacent to Fire Station II, Acline Rd. Design, Engineering & Permitting, and Construction (cost estimated pending design and schedule of value) Total Anticipated Cost $1,277,000: Design - $287,300* Construction - $ 862,000 Contingency / Permit - $127,700 Funding: $1,277,000 UNFUNDED *City Engineer could do engineering. Implementation of the City's Recreation & Open Space Element of the Comprehensive Plan to provide a recreational level of service for the South Punta Gorda Neighborhoods. Enhance the level of service of park facilities in compliance with the standards adopted in the City's Recreation and Open Space Element of the 2040 Comprehensive Plan. Maintenance, Utilities, Irrigation & Mowing $5,000 Annually Planning Boyd Lawrence South Punta Gorda Park (Old Firestation II) TBD Financial Information TBD Project Costs Maintain and enhance the City’s infrastructure to ensure efficient and effective service delivery and quality aesthetic appeal. Description/ Justification: The development of a park in this area will increase the level of service to accommodate population growth and maintain a level of service for the delivery of recreation and open space. 0% Infrastructure Sustainability CIP Sheet 21

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Unfunded TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design/ Engineering Construction Equipment Contigency Total Estimated $0 $287,300 $989,700 $0 $0 $1,277,000 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes Maintenance FEMA Funds Grant Funds Insurance Funds CIP Sheet 22

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/ Engineering $383,000 $0 $0 $0 $0 $0 $0 Construction $1,915,000 $0 $0 $0 $0 $0 $0 Total $2,298,000 $0 $0 $0 $0 $0 $0 Financial Information TBD Project Costs Complete the 18-mile pedestrian/bicycle pathway connecting all neighborhoods through collaboration with applicable granting agencies and City investment in pathways by June FY2028. Description/ Justification: Completing the Pathways will contribute to the City's urban mobility and help create a strong, viable community. 0% Infrastructure Sustainability Planning Boyd Lawrence Harborwalk West - Area 3 HWALK3 Design Harborwalk West along Retta Esplanade to Linear Park to include 2-foot bridges, decorative lighting, landscaping, and on-street parking. Public Works completed a small portion of the lighting in FY 2021. Planning Estimates Only Total Anticipated Cost $2,298,800: Design & Permitting - $383,000 Contingency - $319,000 Construction - $1,596,000 Funding: $2,298,800 UNFUNDED A critical link in Punta Gorda Pathways, Harborwalk runs along the waterfront and extends from Cooper Street to Fisherman's Village. A necessary project to provide access to various destination points and a safe route to commercial, retail, historical, and downtown areas. Electric, Irrigation & Mowing $11,000 Annually CIP Sheet 23

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Unfunded TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design/ Engineering Construction Equipment Contigency Total Estimated $0 $383,000 $1,915,000 $0 $0 $2,298,000 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Maintenance FEMA Funds Grant Funds Insurance Funds Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes CIP Sheet 24

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/ Engineering $1,000,000 $0 $0 $0 $0 $0 $0 Construction $2,500,000 $0 $0 $0 $0 $0 $0 Total $3,500,000 $0 $0 $0 $0 $0 $0 This is a multi-year project consisting of planning, design, engineering, and construction of a living shoreline along segments of the City’s Harborwalk. FY 2025: Grant application and Cost - $8,458 – General Fund FY 2026 – FY 2029: Project Execution - $3,500,000 Funding Sources: $0 – General Fund $TBD – NOAA BIL Grant - Applying April 2025 $TBD - City match In-Kind Alice, Pittman, And Shreve Parks Trabue Park Planning Boyd Lawrence Living Shoreline Harborwalk: Alice, Pittman, Shreve, and Trabue Parks TBD Financial Information TBD Project Costs Apply best management practices and systems in infrastructure maintenance. Description/ Justification: The project will help mitigate flooding risks, buffer the effects of storms, reduce further erosion and reflection/deflection from existing seawalls and improve the resilience of the 423-acre area. 0% Infrastructure Sustainability CIP Sheet 25

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Local - GF TBD $0 $0 $0 $0 $0 Federal - G TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design/ Engineering Construction Equipment Contigency Total Estimated $0 $1,000,000 $2,500,000 $0 $0 $3,500,000 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes Maintenance FEMA Funds Grant Funds Insurance Funds CIP Sheet 26

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: LOW Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2026 End Date: 09/30/2028 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/ Engineering $1,000,000 $0 $0 $0 $0 $0 $0 Construction $2,500,000 $0 $0 $0 $0 $0 $0 Total $3,500,000 $0 $0 $0 $0 $0 $0 Planning Boyd Lawrence Waterfront Sports Activity Center at Gilchrist Park TBD Financial Information TBD Project Costs Achieve status as a waterfront destination for land and water visitors through implementing selected recommendations in the 2019 PLAN Punta Gorda Citywide Master Plan over the next five years. Proposed project to include boat storage for non-motorized boats (sailboats, kayaks, canoes) and a launching facility. Maintenance $3,000 Annually Description/ Justification: Increase the level of service for existing park facilities and amenities to accommodate population growth and maintain the level of service for recreation and open space delivery. 0% Quality of Life CIP Sheet 27

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Local - GF TBD $0 $0 $0 $0 $0 Federal - G TBD $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Repair & Maint $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Planning Design/ Engineering Construction Equipment Contigency Total Estimated $0 $1,000,000 $2,500,000 $0 $0 $3,500,000 Actual $0 $0 $0 $0 $0 $0 Variance 0% -100% -100% 0% 0% -100% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Project Timeline and Status Notes Maintenance FEMA Funds Grant Funds Insurance Funds Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance CIP Sheet 28

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 Dept/Div: Dept Contact: Project Priority: HIGH Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2020 End Date: 09/30/2029 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/Engineering $171,000 $150,000 $0 $0 $21,000 $0 $0 Construction $2,117,500 $0 $0 $0 $79,000 $2,038,500 $0 Total $2,288,500 $150,000 $0 $0 $100,000 $2,038,500 $0 Financial Information 118-3007-541-6517/301-3005-541-6517 Project Costs Complete the 18-mile pedestrian/bicycle pathway connecting all neighborhoods through collaboration with applicable granting agencies and City investment in pathways by June FY2028. Description/ Justification: Improve resident connectivity to the Tamiami Trail [US 41] business corridor for daily needs and connect to the existing Punta Gorda Pathway segments on US 41 and Shreve Street. 0% Infrastructure Sustainability City Manager/ Planning Boyd Lawrence Complete Street – Airport Road Improvements AIRCOM Planning Estimates – Total Construction $2,288,500 FY 2021-2024: Design improvements on Airport Road from US 41 to Cooper Street, providing sidewalks, bicycle facilities, decorative street lights, and street trees. Design $171,000 completed. FY 2028-2029 - Construction Railroad Crossings - $500,000 All other Construction - $1,500,000 Permit - $10,000 Engineering Services- $7,500 Contingency - $100,000 Funding: $ 150,000 - 1% Sales Tax $ 250,000 - Mobility Impact fees $1,200,000 - Unfunded - 1% Sales Tax Tier II $ 688,500 - Unfunded: Possible add'l Mobility Impact fees. CIP Sheet 29

City of Punta Gorda, Florida Capital Improvement Program FY 2026 – FY 2030 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Local - ST $150,000 $150,000 $0 $0 TBD $0 $0 Local - FSIF $250,000 $0 $0 $0 $100,000 $150,000 $0 Unfunded TBD $0 $0 TBD $0 $0 $0 Total Funding $400,000 $150,000 $0 $0 $100,000 $150,000 $0 Maintenance $10,000 $0 $0 $0 $0 $5,000 $5,000 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Design/ Engineering Land Construction Equipment Contingency Total Estimated $171,000 $0 $2,117,500 $0 $0 $2,288,500 Actual $87,000 $0 $0 $0 $0 $87,000 Variance -49% 0% -100% 0% 0% -96% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Maintenance Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes CIP Sheet 30

Title: List of All Project Rankings to Date Funds: Recommended Action: For Review and Discussion Summary: Summary of all projects rated so far (Presented in August, September, October). Department/Division: Urban Design 1% LOCAL SALES TAX COMMITTEE CITY OF PUNTA GORDA 01/13/2026 GENERAL BUSINESS EXHIBITS: 1. Project Scoring 31

Score Sheet Set (# of Responses) 1 2 3 4 5 6 7 8 9 10 11 12 13 Average Project Sidewalk Improvement Phase I Unimproved Alleyway Harborwalk East Phase II_FY26 Downtown Flooding Phase III 13 12 14 14 13 9 10 13 12 13 13 11 14 12.38 Public Safety Building Expansion 13 11 13 9 10 9 11 9 10 9 12 10 10.50 New Replacement Fire Truck 13 11 9 9 9 11 13 10 10 13 11 12 10.92 Historic District Infrastructure 13 8 12 11 12 8 10 8 11 10 12 8 10.25 West Henry St Property Improvements 12 11 12 9 8 10 11 8 9 12 11 9 10.17 Harborwalk-US41SB Bridge Approach Lighting 11 9 10 8 11 9 10 9 9 11 11 8 9.67 Maud St Angled Parking_FY26 10 9 10 6 11 11 10 12 11 10.00 Royal Poinciana_FY26 12 10 9 7 9 9 7 12 11 9.56 Ponce de Leon Park Improvements 9 7 13 9 8 9 10 8 9 11 9 9 9.25 Complete Street - Shreve Street 9 9 9 8 9 9 9 8 9 6 10 8 8.58 Complete Street - Virginia Ave - US 41 to Nesbit 9 9 11 8 7 8 8 8 10 8 12 8 8.83 Traffic Signal - Burnt Store Rd & Home Depot 11 8 8 10 10 8 10 7 9 9 8 9 8.92 Channel and Basin Dredging at Boat Club Area 10 6 10 8 7 10 7 6 12 10 9 7 11 8.69 ADA Improvements - Citywide_FY26 7 7 11 8 7 10 8 9 9 12 10 8 7 8.69 West William Street Drainage Improvements 7 7 10 9 9 10 7 6 10 11 12 8 9 8.85 Glasgow Avenue Improvements 9 7 9 7 7 10 9 9 10 7 11 8 8 8.54 Gateway Alley 100 W Marion Ave at Herald Court 12 8 11 7 5 10 7 7 8 11 9 9 7 8.54 Sidewalk Connections W Marion - Bal Harbor 10 9 13 9 5 9 8 8 10 10 9 8 7 8.85 Baynard Vasco Sidewalks_FY26 10 7 7 7 7 8 9 11 10 8.44 Tropicana and Marion Sidewalk Enhancement 9 8 7 7 7 8 9 9 10 8.22 Complete St - Virginia Ave - Harvey to US 41_FY26 7 8 7 8 7 7 8 10 11 8.11 Harborwalk US 41 NB Bridge Underpass Improve 9 7 8 7 7 7 7 10 10 8.00 Accessible Pedestrian Signals (APS)_FY26 8 7 11 8 7 8 9 7 9 10 10 8 8 8.46 Sidewalk Connections Tripoli_FY26 8 8 8 9 6 8 8 7 10 9 9 9 7 8.15 Bicycle Capital Improvement Program_FY26 8 6 8 7 6 6 8 10 10 7.67 Pickleball Court Fencing Replacement 5 6 8 7 5 11 6 7 8 7 7 7 8 7.08 Presented August 12 Presented September 9 Presented October 14 Deferred Deferred Deferred Scoring All Projects to Date 32

Title: Final Batch of 1% Sales Tax Projects for Consideration Funds: Recommended Action: For Review and Discussion Summary: 41. Reverse Osmosis (RO) Water Treatment Plant Expansion 42. Socorro Water Main Replacement 43. Burnt Store Road Booster Station Pipe Riser Repairs and Pumps 44. Via Tripoli Water Main Replacement 45. Lift Station 30 Gravity Rehab 46. Airport Road Water Main Replacement 47. Lift Station 30 Rehab 48. Bal Harbor Water Main Replacement 49. Aqui Esta Water Main Replacement 50. Laishley Marina Improvements Department/Division: Urban Design 1% LOCAL SALES TAX COMMITTEE CITY OF PUNTA GORDA 01/13/2026 GENERAL BUSINESS EXHIBITS: 1. 41. Reverse Osmosis (RO) Water Treatment Plant Expansion 2. 42. Socorro Water Main Replacement 3. 43. Burnt Store Road Booster Station Pipe Riser Repairs and Pumps 4. 44. Via Tripoli Water Main Replacement 5. 45. Lift Station 30 Gravity Rehab 6. 46. Airport Road Water Main Replacement 7. 47. Lift Station 30 Rehab 8. 48. Bal Harbor Water Main Replacement 9. 49. Aqui Esta Drive Water Main Replacement 10. 50. Laishley Marina Improvements 11. Scoring Sheet - Condensed 33

City of Punta Gorda, Florida Capital Improvement Program FY 2025 – FY 2029 Dept/Div: Dept Contact: Project Priority: CRITICAL Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2025 End Date: 09/30/2026 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/Engineering $4,000,000 $4,000,000 $0 $0 $0 $0 $0 Land $0 Construction $52,000,000 $26,000,000 $26,000,000 $0 $0 $0 Equipment $0 Contigency $0 Total $56,000,000 $4,000,000 $26,000,000 $26,000,000 $0 $0 $0 Quality of Life and Safety 0% Infrastructure Sustainability Financial Information 411-8422-533-65-02 Project Costs Utilities/ Administration Thomas Spencer Steve Adams WTP - Reverse Osmosis RO Expansion WTP-ROX Apply best management practices and systems in infrastructure maintenance. Description/ Justification: In FY 2026, the City will begin the design and construction of a well field expansion, as identified in the 2024 Water Supply Study. This expansion will increase the water supply capacity, supporting future demand needs. In FY 2026-2027, the project will also include the design and construction of a reverse osmosis (RO) treatment expansion. The Shell Creek Water Treatment Plant’s original reverse osmosis facility, constructed in 2020, was designed to accommodate a 4 million gallons per day (MGD) operation. The facility's current groundwater well field and RO treatment capacity were built to support this initial 4 MGD capacity with room for a future expansion. This project will add an additional 4 MGD of groundwater supply and 4 MGD of RO process equipment, doubling the capacity of the existing facility to meet growing demand and ensure reliable water supply for the community. Page 1 CIP Sheet 34

City of Punta Gorda, Florida Capital Improvement Program FY 2025 – FY 2029 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Local Unfunded $0 $0 $0 $0 $0 $0 $0 Fiance (est.) - RF $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Other $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Design/ Engineering Land Construction Equipment Contingency Total Estimated $4,000,000 $0 $52,000,000 $0 $0 $56,000,000 Actual $4,000,000 $0 $0 $0 $0 $4,000,000 Variance 0% #DIV/0! -100% #DIV/0! #DIV/0! -93% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes Maintenance FEMA Funds Grant Funds Insurance Funds Page 2 CIP Sheet 35

City of Punta Gorda, Florida Capital Improvement Program FY 2025 – FY 2029 Dept/Div: Dept Contact: Project Priority: HIGH Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2025 End Date: 09/30/2026 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/Engineering $1,000,000 $1,000,000 $0 $0 $0 $0 $0 Land $0 Construction $0 Equipment $0 Contigency $0 Total $1,000,000 $1,000,000 $0 $0 $0 $0 $0 Financial Information 411-8423-533-63-21 Project Costs Utilities/ Administration Thomas Spencer Steve Adams Soccoro Water Main Replacement SOCCWM Apply best management practices and systems in infrastructure maintenance. Description/ Justification: The City’s August 2023 hydraulic model study recommended upsizing the 1,350-foot water main along Soccoro, from Aqui Esta to Via Veneto, from 6 inches to 8 inches. This upgrade is necessary to meet current and future water demand, enhance system reliability, and improve fire flow capacity in the area. The existing 6-inch water main is insufficient to support peak demand and emergency services, potentially leading to low pressure and service disruptions. Upsizing the main will ensure adequate flow for residential and commercial growth, improve water delivery during high-demand periods, and provide sufficient pressure for firefighting efforts. This project aligns with the City’s long-term infrastructure goals and supports public safety and service quality. Quality of Life and Safety 0% Infrastructure Sustainability Page 1 CIP Sheet 36

City of Punta Gorda, Florida Capital Improvement Program FY 2025 – FY 2029 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Local Unfunded $0 $0 $0 $0 $0 $0 $0 Fiance (est.) - RF $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Other $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Design/ Engineering Land Construction Equipment Contingency Total Estimated $1,000,000 $0 $0 $0 $0 $1,000,000 Actual $1,000,000 $0 $0 $0 $0 $1,000,000 Variance 0% #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Maintenance FEMA Funds Grant Funds Insurance Funds Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes Page 2 CIP Sheet 37

City of Punta Gorda, Florida Capital Improvement Program FY 2025 – FY 2029 Dept/Div: Dept Contact: Project Priority: CRITICAL Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2025 End Date: 09/30/2026 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/Engineering $250,000 $250,000 $0 $0 $0 $0 $0 Land $0 Construction $3,720,000 $3,720,000 $0 $0 $0 $0 $0 Equipment $0 Contigency $0 Total $3,970,000 $3,970,000 $0 $0 $0 $0 $0 Financial Information 411-8422-533-65-06 Project Costs Utilities/ Administration Thomas Spencer Steve Adams Burnt Store Rd Booster Station Pipe Riser Repairs & Pumps BOOST Apply best management practices and systems in infrastructure maintenance. Description/ Justification: The City will invest in engineering services to evaluate the scope of improvements required to repair the riser pipe and high service pump(s) at the Burnt Store Road Booster Station. These improvements are necessary for ensuring the continued reliable operation of the booster station, which is essential for maintaining adequate water pressure and supply. A cost-benefit analysis will be conducted to determine whether to add a high service pump station to the Burnt Store Road elevated tank and repair the riser pipe, or to demolish the existing tank and construct a new 2 million gallon prestressed concrete ground storage tank with integrated booster pumps. This project aims to improve water storage capacity and pressure within the Burnt Store zone, ensuring better service and reliability for the water distribution system in this area. Quality of Life and Safety 0% Infrastructure Sustainability Page 1 CIP Sheet 38

City of Punta Gorda, Florida Capital Improvement Program FY 2025 – FY 2029 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Local Unfunded $0 $0 $0 $0 $0 $0 $0 Fiance (est.) - RF $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Applied For $0 $0 $0 $0 $0 $0 $0 Received $0 $0 $0 $0 $0 $0 $0 Total Funding $0 $0 $0 $0 $0 $0 $0 Personnel $0 $0 $0 $0 $0 $0 $0 Contractual $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 Other $0 $0 $0 $0 $0 $0 $0 Annual Cost $0 $0 $0 $0 $0 $0 $0 Deductible $0 $0 $0 $0 $0 $0 $0 Maint. Contract $0 $0 $0 $0 $0 $0 $0 Labor $0 $0 $0 $0 $0 $0 $0 Materials $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 Design/ Engineering Land Construction Equipment Contingency Total Estimated $250,000 $0 $3,720,000 $0 $0 $3,970,000 Actual $250,000 $0 $3,720,000 $0 $0 $3,970,000 Variance 0% #DIV/0! 0% #DIV/0! #DIV/0! 0% Projected Start Actual Start Status Completed Scoping 0% Procurement 0% Surveying 0% Enginering / Design 0% Land 0% Equipment 0% Permitting 0% Construction 0% Maintenance FEMA Funds Grant Funds Insurance Funds Cost Tracking Funding Sources Impact on Operations (negative entry indicates operating reduction) Insurance Project Timeline and Status Notes Page 2 CIP Sheet 39

City of Punta Gorda, Florida Capital Improvement Program FY 2025 – FY 2029 Dept/Div: Dept Contact: Project Priority: HIGH Project Lead: Project Title: Project Code: Account #: Priority Alignment: Goal: Community Impact: Timeline: Start Date: 10/01/2025 End Date: 09/30/2026 5 Year Plan Total Prior FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Design/Engineering $200,000 $200,000 $0 $0 $0 $0 $0 Land $0 Construction $800,000 $800,000 $0 $0 $0 $0 $0 Equipment $0 Contigency $0 Total $1,000,000 $1,000,000 $0 $0 $0 $0 $0 Quality of Life and Safety 0% Infrastructure Sustainability Financial Information 411-8423-533-63-21 Project Costs Utilities/ Administration Thomas Spencer Steve Adams Via Tripoli Water Main Replacement VIATWM Apply best management practices and systems in infrastructure maintenance. Description/ Justification: This project will upsize approximately 500 linear feet of existing water main to an 8-inch diameter along Via Tripoli, between Magdalena Drive and Spanish Cay. The improvement was recommended in the City’s Water Distribution System Analysis completed in August 2023, which identified this segment as a hydraulic bottleneck limiting flow capacity and fire protection. Upsizing the water main will enhance system reliability, improve water pressure, and support current and future demand in the area. This project aligns with the City's long-term infrastructure planning and water system performance goals. Page 1 CIP Sheet 40

Official record

ArtifactSourceState
AgendaNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Official pages

Coverage and corrections

Records considered

  • 1% Local Sales Tax Committee — Packet

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • Official outcomes have not been published.
  • A transcript is not available.
  • No audio or video recording is linked.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.