Community and Economic Development Subcommittee

Monday, August 14, 2023 · Government meeting record

The 30-second read

Record incomplete

Community and Economic Development Subcommittee

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Transcript and record text

Closed captionsWhat was said at the meeting, transcribed Aug 3, 2026. Speech is not a decision.
  • No speaker turns were supplied with this transcript.
  • This transcript has no source timestamps.
  • No speaker identities were supplied with this transcript.

This source published text without speaker turns, so speakers and timestamps are not shown.

The opening of 86,358 stored characters

Okay. Welcome, everybody, to the August 13th and inaugural meeting of the Community and Economic Development Subcommittee. First item on the agenda, public comment for non agenda items. Do we have any public comment on the agenda items? No, it's been done. This will be item number two will be very brief. Since this is the first meeting of the community and economic development Subcommittee and it has been formed by combining the Lands Subcommittee involved Development, Waterfront Development Subcommittee and the Pittsburg Power Companies Subcommittee. I just wanted to quickly touch on what our plan is because we've got certain subcommittees that included planning commissioners and some that don't. So we want to make sure that we're breaking out the agenda and highlighting those different areas and what we're going to be talking about. So today provides a good example. We'll have certain items that are being discussed by or regarding the Pittsburg Power Company for which the council members who are on the subcommittee will have jurisdiction over. And so they will be the active participants in those items. And that of course, will allow for public comment when we do bring forward land use items that are within the Planning Commission's purview as well as the City Council, then we will, of course Essex County Commissioners to be active participants in those items. Today we do have one item that we're presenting the land use delegate ceiling largely with policy direction and finances. And so for this instance, intelligence we've been the city councilmembers, purview B and C, and it's Allegheny West who is understood to be part of the conversation. And then it would be the same for regional development and waterfront development. So that's how we're breaking it down at this point. Probably learned from some different things how we're going to continue to do this. But we do want to keep these subcommittee meetings within 2 hours. All of these different subcommittees could easily have taken 3 hours themselves. So we don't want to keep everybody here until Tuesday morning. So we're going to be doing that. And then also, we do intend to continually have the chamber give us updates as they normally do. However, it is likely to be more on a quarterly basis. Again, just so we can manage time and hope you can join us for, you know, to weigh in on some things. So is there any question or comment about that scene? Then we will move on to item three, which is part of Pittsburgh, our power company portion of the agenda, and we'll provide you with some service application updates. And I'm going to turn it over to Doug Buchanan. Thank you, Jordan. Normally, we do this in business or she or the administrative officer. She runs the books mostly the supervising for the power companies out there. And she has multiple obligations with her mom. So she's not able to make it so that somebody will be prepared to present their financials over the short story And the financials, as we think it through the dark period of last year with very high electric and gas pricing, we have a little bit of relaxation, a lot for some. So the the 30,000 foot view is financials are ever prudent and we're happy about that. With energy prices stabilizing this evening, I'd like to present our presenting subcommittee our most our largest initiative right at the moment, which is an application for international trade to support contemporary and that launches a fairly rigorous and significant effort to obtain estimates for power company, an interconnection application. With this forecast, I want to turn to their transmission system to support the power development in the area of the golf course. So, as you may be aware, Engineer has a fairly significant transmission corridor from there because the former power plant and substation south of some southern circuits. And the idea is to tap into those circuits as codes for power company to support protect power will take Power is currently envisioned at about 100 megawatts 99 to be precise. And in the power world that's a big number for a load I don't know will Pittsburgh for the electrical and all of Pittsburgh is I don't know I would have to guess 25 megawatts or maybe maybe 40 residential commercial or scale island energy is how much? Oh well, our biggest load of island energy with all the boats and navy boats has been around ten, ten times the size of the source, ten times the size of what has been on that is world. So it's a big deal and you launch on there's not been change of heart because it means focus, dedication, time and dollars. But we think it's for the underlying drive for this. In addition to supporting the park is to expand to the for power companies service territory in the last 25 years it's been primarily it has been exclusively Merrill and Folio, although previous has participated in supporting energy projects in Pittsburgh, Delta Energy Center. Most of the cable of this, this is taking the utilities footprint and expanding. So it's a great you know, it's a lean forward. In summary, what we've done today, we have submitted an application to which is which is part of the process to generate more interconnection of our system. The application was accepted as being complete. The subsequent step was to sign and they would support engineering for the first step, a system impact study which we will perform and the whole notion about it was to understand what the impact to their system will be. Interconnect in a new 100 megawatt load system. An impact study, not agreement on current design. There was also a team without which the initial fee is 100,000 to perform the study, which PPC will cover at least initially to. So going forward we hope for cost recovery from the developer, but in order to keep the process moving, it's $100,000 to our PPC funds and an agreement for PGE to begin forming that study. Okay, so what's the timing and outcome of that? And the next steps, the timing is they'll perform the study. Our estimation is that we'll we will get results by first quarter 2024 study. We expect we'll come back and say, well, it'll will impact our system this way. Here are the dollars for us to mitigate that and then the negotiation begins again, expecting that to be in first quarter 2024. That follows from that is the negotiation on upgrades. We as PPC and in my former life with that goal, we negotiated that for Delta and it's it's horse trading. You know what makes the best sense for gauging system in our interconnect the outcome of that is unknown at this point. It could be anywhere from zero to tens of billions. So it's just unknown at this point. I tend to be optimistic. In our studies of the transmission system, there seems to be a lot of room on the transmission system, so I'm optimistic that occasionally it comes back. It won't be extremely burdensome at all. If I may, I can give you a sense of it. With the Delta Energy Center, project engineer came back with $44 million in upgrades and we were able to find a solution of 13 million. So that's, you know, it was going to be first line and below it it was scratching nails and all that sort of thing. Following that will be the negotiation of an interconnection agreement. And I'm estimating that or we're estimating that presently as fourth quarter 2024. And that's the agreement that there were huge new associates. You can interconnect all the way that is engineering and construction for switch cards and substations and that sort of thing. And early estimates and first quarter of 2026, about the well, what makes these dates all fuzzy is we're on June any time now. We're not in control of that schedule. We're operating at time of saying all them. So in our current estimation is we would be able to begin construction on of the ten power interconnection, 100 megawatts in a location generally west of the water treatment plant, not a golf course area. And that's going to move a little bit, we think are consequential. Lots of people are their move a little bit on the notion being to support the construction of the tech park, being able to begin to power the checkerboard in the first quarter of 2026. That's a little bit different than what the while the developer is looking for. So we're trying to balance the two and be realistic at the same time, be aggressive and keep our future name. So my representation of Jordan and the second representation on the power side is to be in construction of a switchyard and substation sometime around the first quarter of 2026. If we can improve that, that would be fantastic. In a larger context for the City of Pittsburgh and KPC to launch into a 100 megawatt megawatt load. So that's a big deal. And I'll just close by indicating where we see the benefit. It'll be through energy sales, through PPC and potential for franchise fees and others and taking it back up to 80,000 paid. Looking at these types of developments, this is the big one upfront, replacing the franchise benefits and franchise fees. But the city had seen from the other developments like Delta hospitals in prospect. So a lot of health will be superb line and we'll square our chamber. We're committed and well thank you so I'll I'll take it over on more of the land development sides dug very very well covered the power side so this is not to say that you're not going to see anything until 2026 in front of you. You will see something. Well before 2026. We'll bring it to you. In fact, you're likely to see something in front of you early next year. So concurrently with going through this PPG process, this was the long all in the tent and this is something a by a really wanted to get underway. Now we've got that underway. It starts helping to form and inform the other things that we're going to be doing on the land. Use and entitlement side. Additionally, there's kind of a third avenue that we have to go down and that's approval with the CC. And I say we by approval with the CAC or C e C excuse me. The nation unfortunately is not going to see this at the CAC, the c, e, c, So now this for and Mrs.. Thank you California Energy Commission. So we're currently working on the IIR and bio is putting together all of the technical studies that need to be produced in order to put that thing, as we call out on the street for public review. And that's the first step in starting to bring it forward to the Planning Commission and the City Council for review. Now, concurrently, while we're putting together the air for the land use entitlements, which is your rezoning with the specific plan, your design review use permits, any of that. There's also a separate air that will be put together for the c C to review. So once the city Council takes action on the air, assuming that it is approved and certified, then we're going to be making a lot of assumptions just to lay out the process here. Assuming that it's approved and the air is certified, then an air will go forward to the CDC, and the CDC will have to approve that air. Then that air comes back to the city council to approve that air in order to move forward with the type of load that they're talking about serving. Once that is done, then a bio, assuming everything gets approved, can begin with the the design, the architecture rules, the engineering to actually start moving dirt. So it's very realistic, albeit aggressive, but it's very realistic that dirt could be moving on that site in 18 to 24 months because if they receive the responses on the system impact study that we're expecting, because as Doug alluded to, we feel very confident that there's a lot of room on those lines to serve the project. Then they'll begin doing the design and probably begin construction of the buildings. The buildings will take much longer than the substation and just the design and put in all the construction documents together is going to take a very long time. But realistically, 18 to 24 months is doable to start seeing dirt moving on that site and buildings going up in preparation for beginning construction on the switchyard in the substation in 2026 to a relatively quiet compared to building a large building or multiple buildings in that area. So it's possible that by the end of 2026 these things could be online, but certainly powered from TGV. Now there's a lot of details and things here. There I do want to say, going back to the idea of the system impact and what might need to be done, the way it was explained to me in layman's terms, because I'm nowhere near the expert on this, though, Doug, is you had a massive PGE, that energy plan all the system was designed to take power, pull power from that plan to deliver it, and also to put power in to operate the plan. That plan has gone dark for decades now. So that's all freeway space that you will that no cars are going up and down, which makes us feel pretty confident that the system upgrades that might be required are going to be hopefully not too large, not on the scale that they were at deck or anything like that in the $44 million range, which today is probably $200 million because that was easily 20 years ago or so permitting from the councilmembers. I think there's one piece of message and I think it's important that this is the long game. Okay? This is not a short period. This is not something we can call the sale. It's property or is this the long game with the brass ring? Are the benefits that this could bring in terms of franchise fees, electric sales and warehousing? So we're playing this not the short term, but the long term. And that takes perseverance, it takes commitment, takes focus. Well, I think the city of Pittsburgh, the benefits are real and they could be significant, as we saw from previous power projects. And so we've talked a lot about this one. Councilmembers questions, thoughts about the timeline. Anything you'd like us to go in more detail on? And we definitely thank you for the presentation. First was let's just start with the power of our go to the language. So with the we're talking about in terms of the system impact cost, is that paid upfront? Is that something that is paid out over the course of time as we're anticipating the franchise fees or whatever we're going to be collecting as a result? How does that work in terms of that total 30 million up? It was for the other project and what we may be assuming or maybe for this project counterparts to say is committed to launch in this with the system impact studies and then the large scale up against the 4000 will have sort of it started on about 100,000 when it comes back. And so this is what it's going to cost. This is the system. And how is that? No, that's a great, great question. The the position that we've taken. So the and the city needs is something I call for, but not for this development. We would not be exposed to this cost. So we put those costs on a developer and use the analogy of island energy. We do a cost per project. They might how it's green, but we have to put a new electric service in transformers. They pay for that. One of our customer projects very typical. It's also very typical with the big utilities junior investments increasing is doing to us, but not for your project. We would not do these upgrades. So again, yes, it's the the waterfall, if you will. As you know, PPG goes to us and says, okay, it's her power company. It's after negotiations and finally settle $27 million worth of improvements in the system impact, we would then turn to a buyer and go, okay, well here's your golden ticket or your project, $27 million, and here's the payment demand that he wants and works. So yeah, and frame of reference, same thing we went through with Transbay. Transbay took seven years, so this is a long one, seven years in terms of this specific piece, it took about six years after we got our initial approvals from the California system operator. The first year was sort of, you know, to New New York, put together an RFP. We can supply power to San Francisco. The best we have, the best us. So you know, everyone else, the best. And then it was, yes, going through the environmental, going through system impact, negotiating contracts, designing, building and then bringing online. That took six years of that seven years. There's an example of one of my one of the crew members had spent a lot of time with Southern Cal Edison and there actually were offer them and a blocker comes down or a tower comes out and says, We're going to do this. So then Carlos says, okay, it's going to cost $7 million. And they wouldn't lift a pencil. They wouldn't sharpen a pencil until they had the check for seven point. So the developer will bear the brunt of those costs. We've elected to proceed to kick start and support schedule because these tall all numbers are relatively minor compared to what's coming. Another way to say it is we want to serve power in the city of Pittsburgh. If a buyer was not here today, we would still be pursuing a certain amount of effort in order to get a foothold within the city of Pittsburgh. But then there comes a time where there we would do work without having somebody who's going to actually be the developer. And then we that's where we get to the but for the project and even then though, and we can talk about this ad nauseam, but even then we will bring it and we will sit at the table with the buyer. We'll talk about the different ways. How does this get financed? Because then there's also own in operation and maintenance. And so that those are things that are going to have to be baked into terra and or a sea of be dedicated just to the maintenance. And I think there's a lot of different ways that we could potentially do this. And so I think maybe the short answer to your question is it'll be funded by the developer, but there's also a lot of different ways that we will look at trying to utilize the property and the occupants are going to be there to also support this cost and things that the developer might propose that need to be approved by us to help generate that cost. But there's a lot of way to get there. It's to you on that. It's a 5 million, 10 million, 50 million. And at what point do we need to look at different ways to do this? The scale of cost is, you know, around $250 million. So so, you know, our cost is not that large in their scheme of things, of wanting to be infrastructure. Their real cost is afterwards when they put the switch. That's one point in all of our sports and maybe one thing that we haven't touched on. To give you also a little sense of why this is worth it conservatively, and we have not actually finalized prices in some of the statements in generals, but this is several million dollars a year in revenue to PPC from the full operation of the 99 megawatts and theoretically in perpetuity, as long as these things need to be powered and these things are on line. So that's that's why the significant investments in the long term way that Doug spoke to is worth it. It could be big dollars staying complacent. You know what we always have or a previous franchise. So it's important, it's necessary and for the better for this game. I think you guys all get to tell us all development of complex projects like those, they all take twists and turns and they will have what you said this was going to happen. Well, yeah, well, it didn't stop, but the ideas I had the ball on the spaceship there and in my experience as a developer, that's always been the kid. What's the what's the goal line? Or like all the plays in between, it's possible one could argue, advancing towards that goal, and I think we're focused on that. Other questions there about power or the landing side? No, just in terms of the procedure or the process, the idea is that we submitted the application. It's been accepted as can be completed or no. So does that mean that essentially there's no engineers deny? There are no we want to do this process? You know, they've accepted the application process as early as tomorrow, the system, and check will go to Trinity. They will begin their review process and we arrive at the results. And Councilmember, an analogy to this process would be somebody coming in and they want to build 50 units on an acre and we can't say no to them, but we can definitely put out a list of things that they have to do. And I think that that's, you know, maybe there's some details. Gary, correct me if I'm wrong, but that's General. The idea is any more or less has to let us use their transmission distribution infrastructure. We have to put in the substation. But what they can do is they can say, but based on this study, you've got to do all of these different things. Got a negotiator, I'll tell you. So for under four, the Federal Energy Regulatory Commission, they can't say no. They can't say no. But can there be costs, some barriers? Yes, if there can. And the only other question I had was in terms of the year and seven has when it comes to sitting there, there's a whole lot that goes to the CDC audience. Is there a difference between there's a lot of overlap, but there are certain things that the CDC, E.R. is going to have to look at that are required under the IRA that we do now. Having the same consultants preparing both for available means that they're doing all the work in one fell swoop. At that point, it just becomes procedural where they they want to. And I've just been told quite bluntly that the CDC is just very particular. And so they're going to want what they would consider their own document that they certify, and then we're required to recertify it, or maybe not required is not the right word, but it is pertinent to for us to be adopt that which allows us to all be entitled to project into title the type of use that they're proposing as part of this actually, this is relatively new for the energy commissioner, who's been granted or assumed oversight of data centers. This is new. So to some extent there's little uncharted territory. And we also have the California Independent System Operator expect that to be a big deal. But there are these regulatory bodies, the parties that are you know, a lot of them all have their fingers in the pie and our job is to advocate. So it's a fun class in bureaucracy, I'll tell you that much. But it's been done. And so so we'll take that. The role of all those other guys can do it. We can do it. So I'm saying that John just reminded me San Jose has a good template for the other questions Before we open up to public comment. Now, John, my question is more a of theater. Any public comment on this? I had one question. I know we're talking energy and different things like that. Are we use in any kind of natural solar or wind or anything at this tech arm that we are? So the short answer is likely. We do not actually generates any power. The city of Pittsburgh, Pittsburgh Power Company does not have work called generation assets We buy from WAPA, which Doug will have to tell you will walk a stands for Western area. I was going to say I know a lot that is going to work for the greater good. And these the tech part which is going on the stone and trees property is going to and it's going to be more marketable to companies that have requirements for green energy and so when we go to the market to purchase the power, we will likely be required to purchase renewables to power this production. Go one step further. We are we are required to buy. Yeah, we have we have what's called a renewable portfolio standard. So we have to even even though we're with our federal agency, large hydro, we still have to go to the market to purchase solar, wind or whatever. So it's called our renewable portfolio standard and we have thresholds. So we are we're coming right up again of having to file what we call our power content label, a certain percentage of that has to be 35% or more renewable and it's like the demand on us. Okay, the other public comments or questions before we move on. Thank you. We have the right team for the job. Also. Thank you, Doug. All right. We are going to move on to item number four, and I'm going to hand it over to Maria and go and resume that. And I'm going to bring up a presentation. Thank you. So good evening, everyone. And tonight will be talking about the development of this avenue. So I'm just going to give a little bit of the history, what I thought it was fantastic was not there It is. Okay. So just a little bit of a history. Back in September 2020, we did an RFP for the development of the Orange Properties. These are city owned properties. So the former Rose Miller site directly next to that is the U-Haul site on the opposite corner. It used to be owned by the county which we acquired, and then a small piece of right of way that they could use as part of that project if they were to develop for their C three. The we had to comply with the Surplus Lands Act, which was the revisions to that to that was I think it became effective October 2019, which required us to send this art out to over 230 developers and agencies to see if they were interested in developing the property. In October 2020, we received one non-compliant response. And I say noncompliance because within the RFP we set out a set of parameters in which that we wanted to see on the site how many units, how many were affordable, how much commercial came back to us, was not comply. So we didn't move forward with that. I'm going to go with the lack of interest was because of COVID again at that time. You're talking about six months into the closure. People are still trying to figure out what they were doing. So I'm going to say that that's probably a main reason. As a matter of fact, some of the people who we reached out to, we were getting responses back and having to send them out because they were no longer working for that company because they closed down shop. So we figured we'll just shut this process and we'll we'll wait until a more advantageous time. So we wait until COVID ran out, or at least we know it was going to take three years. But staff started talking with other property owners on that and then to our block. So instead of just developing the large properties, we're looking to see what would it look like if we developed or not. Just the whole area was developed, which would include the blue properties. What would that look like? So let me so this certainly what do we have to hand out? So the this table lists the four city owned properties. Collectively, they're just shy of a little bit short of five acres. Again, the biggest properties are the two quarters, which is the world's winter side of the county side. Next slide I'm hoping to find a spot letting me play the video, experimenting, maybe. There it is. Have to ask this. So some fly over. We did something to stop it right there. Get it back. Oh, sorry. Sorry. Jordan. Sir, I you to. I'm going. So anyway, that was the flyover that we did. And we posted that video on the website because at the time we couldn't conduct on site, you know, site visits. Typically, we like to work with the potential developers through that project. So so instead we had that video and still we had no takers. We had a lot of people in, but in the end we only received one response. Oh, okay, that's so wrong. Slide show. This one recorded that right there. Your first option? Yeah, just that's I think so. This is what it would look like if we were to develop all the properties. When I say we, I mean just the area. I think it would be dependent upon submitting you're talking about 30 properties in total, the orange being city owned, the blue, which is reflective of the shaded blue. You're talking about just shy of 20 acres. So 20 acres could turn into a pretty cool transit village. Just in case anyone doesn't know a transit village is a pedestrian friendly residential commercial development for a neighborhood focused around high transportation such as rail. In our case, it these are noncontiguous properties. All right. All I'm saying same sort of the whole block. So they would be contiguous because our four parcels are not are not contiguous. But the entire list avenue here, if you were told, would there be an ocean or because there's a parking lot and the restaurant, would those be wait a few slides over and along all that together you're jumping the gun? Yeah. I have a program you are asking. So I wanted to show some examples of what's transit villages look like in our area. So the top of the slide is the West Dublin and Position Park Station, and then that's the Avalon Dublin station. If you look at the aerial and I recommend measure did on Google Earth it's about 17 acres. The one below it is the BART station that's about ten acres and those who are familiar with that, we drive on tree, the residential is on top behind and then the front yard Starbucks. I think there's an eyebrow place, two restaurant, one being a pub, one a Peruvian restaurant. So I always see good walking through there, getting off BART going there and then going from the with this in this slide. The one above is the Walnut Creek BART station and the development that there is a very new it was built within the last 12 months. It's called way more. It doesn't have any commercial tenants yet, but it's prepared to have commercial tenants. It has 560 units and I think when we were there, there were at 85%. That's up. All right. But they they the interesting about this project is it's a market rate but they do accept section eight. So it's a mixed the project below on the slide is Warm Springs and this is the Fremont BART Station. If you look at Google Earth in 2022, it looks like 13.25 acres have been developed into what you see here, which are these apartments on top and commercial at the bottom. And there's still probably 22 acres that's yet to be developed, could be developed. Now Google, Google Earth or the picture might not be updated, but we're seeing these types of development all around the Bay Area. Then this next slide looks kind of busy, but I chose for a specific reason because it's an aerial of downtown Walnut Creek and I wanted to show the density around the BART station. The numbers represent multifamily housing and the numbers that are in red have an affordable component to it, and then the yellow are market rate. So if you start, I'm going to start for number one, which is as your follow my cursor right here, number one. And number four are affordable units that house. Thanks Jordan, number one and four and they house families who are 60% of am I in lower down to extremely low but if you look at three two and three two which is two isn't that right next door? Your top two is a luxury apartments for rent. Their rents go from 2300 a month to almost 8000. And next to that is owner occupied condo and they are anywhere from 600000 to 1.1 by 2 million. And then if by oh and by the way you see that pink identifier next to number 14, that's the Marriott Hotel. So I'm going to move across here and this is the Boulder Creek Station. This is way mark, which is the project that I just talked about in the previous slide. And if you go over here, this is Trinity, which is all affordable under percent affordable, and they are housing anywhere from 60%. Am I lower the homeless shelters directly across from it a number 11 are owner occupied condos that are selling for 1.1 million to 1.8. And then with that, if you go if you look at here, this is target and then along there are restaurants on local street. My point being is that you have all these different uses within walking distance of the BART station and it's affordable market at a store restaurant and you can live happily together and there are walkable. So when I talk about affordable, some of you may be wondering what is affordable. I just want to briefly touch on ABCD. This is the Housing and Community Development income level. So annually city produce publishes their income limits and income limits are what each city says. If you make a certain amount of money, you fall in this category. Anything above that, you're here, anything below that you're here. So they categorize as each income level. But my point is, if you are looking at these jobs that I've listed here, the starting salary for a U.S. elementary school teacher is 60,954. So if you look at a household of one, 60,000 falls somewhere between very low and low. So when you're talking about affordable, when you're talking about a professional, it's not necessarily what some people perceive to be not so desirable. But, you know, you're talking about a professional here, a bank teller, 44,894, that's the California average and all that salaries in between. So you're looking at different people who could live in a development along transit village where they can just hop on a barge and then go to their work. Or maybe there's work in their transit village. So I do want to touch on this slide. So this slide comes directly from our railroad, our specific plan. So the rest was adopted in 2009 and it identified, you know, the rest is a guide that helps us develop our transit village. And then the column on the right lists what the transit village includes. So you're looking at a high density, 30 to 65 dwelling units, acre Thank you, John. And then we're a commercial with residences and then you're talking about different uses and then there's hybrid apartments. So this is what that was asking earlier conceptual. So if we were just to develop the four properties or in this space, we're not even showing the little right away, these are just the three properties. That's what it could look like. Now it's kind of broken up. Could you have other properties in between? If we were to add the other side of the street, including Clark, that's what it could look like. And this is this comes directly from the Railroad Avenue specific plan. This incorporates Bliss Clark and some of the properties on the other side of railroad. So that's what it could look like. So times have changed, continuing to change. City council members have changed since the last was adopted. We have a lockdown in a pandemic. So what we're we're even seeing retail flows like we're seeing the mall in San Francisco and all those stores and they're closing. So, you know, we may look at a development differently nowadays. So what is the purpose of this conversation's to find out, you know, what the subcommittee would like to see, what kind of uses of it like they like to see under this transit village, number of residences, how many bedrooms, how many bathrooms, types of commercial spaces, types of amenities, any other types of development you'd like to see? The transit village staff would like to take that information and use it. When we start talking with a consultant to maybe design it, take that information and convey it to them so that they can come up with some conceptual plans and then use that information as we start developing a new RFP. The experiment presentation Is there a foreseen number of units that could potentially go into a project like this? Yeah, and kind of hands on on what we're looking at. It could be, well, realistically. So if you look at slide ten in the Tierney high area, we've got they're going to get to the high tier, the medium density residential. But in the Tony Bay area, 30 to 65 dwelling units per acre is permitted. However, per the specific plan, you can get a 25% increase if you're within a quarter mile of BART session. So it's kind of tough to see. But those three parcels that we have are here and here, and then there's also some others, but they're within the quarter mile, which is that orange circle there. They can go up to 82, but then you start stacking state density bonuses and all that, like the Roger oysters. As far as how many units you want to do, Greater now we're doing in our appealing can control that a little bit but you can do a lot of units I wouldn't say easily. And what you're going to see folks proposing is probably going to be between 70 to 80. And the reason it's probably going to be capped is, to be perfectly frank, right now in Pittsburgh, it probably does that. You're probably not going to have too much demand for folks to go, So they have to do a special engineering and stuff. So they're probably going to stop at about four would be my guess, maybe five. That's kind of what you see with the adjacent project, but that that density is probably more than likely what's going to be built in some of these areas to medium will be a little bit lower, probably about two thirds of three quarters of that. And then some of the others might be a little bit less. As you know, our Jordan and I did a survey which was I guess the one of the early slides showing the properties the city currently has over control versus the old version was like 14 or 15, whatever it was. Let's go to Slide 14 or 15. I forget which one it was and that's okay. But back one, come back one again. Yeah. So this is what we want. The city currently legal controls, Correct? All right. Okay, so let's let's move move on to what's really spectacular. Do we have sort of a long term vision of how we get there? Well, that's true. So why is one the pre or you know, there is to be a point where the development cost and return are greater by acquiring the various parcels around. And it doesn't have to be done all by the government. And so that's really the synergy you're hoping to push through. And maybe it's, you know, working with Bart on their parking lot and our parks and you go back to 12 and Jordan, you know, we can look at that. What was created to create a retail, I would say, but you create a live work environment in which you have that part when you create that transit oriented development. So all that TLC and what the Transit Village talks about here, it creates a synergy what what you're talking about. So you build off of development so developers comes in and builds market rate or affordable homes like the Atchison, people start to move in, but then they understand that they can live and work. And also, can you. Then it creates more of a vibrant community where you create more uses around it. So it kind of bleeds over to a different type of I get that, but it's his job to drive it. And Walnut Creek has clearly been successful. It took over 20 years. Yeah, well, yeah, yeah. Anyway, I want to make sure that we're getting the subcommittee's feedback on this, but I do want to kind of reiterate the question that Maria posed this is what we control. We want to open our A tomorrow. This is what the RFP would be with the inclusion of this, which is probably just going to be a storm water retention area. Now where the next slide and this is where I'm chomping at the bit, some are now less so, but I'm excited that we look at a bigger area where we don't control everything, but we hold off and we wait to put more pieces together. Then what we're talking about is something that is spectacular and special. Now, that's not to say if we did the RFP tomorrow, these other things going to fill in, but what we've done here with Dr. the little doctor to a little bit, but now you're seeing the development here. BART wants to develop this. And so maybe we work with this is those old barns, dilapidated area on the south side of west. Those have some structural issues. Those are probably going to need. You're not going to get rid of the smog and shrubs. They're not going to last too much longer. Do we wait and see what's coming in here? Do we try to create a larger package? You'll notice here we actually did this pathway. This becomes more pedestrian oriented. You do have opportunities for cars to come in and out. The stretch becomes more pedestrian or could potentially connect to railroad. Garcia To connect to railroad. And they could also connect here like there's a lot of opportunity here. Garcia If it goes through, it creates a natural connections here, a potential development over here, which is make your property. But if you do this, you're taking that longer term vision. You're you're saying, okay, let's wait and stack the pieces up to do something like this. And it might not be this whole area, but it might be the north side and then the south side, it might be different parts, but you can start to formulate something and not necessarily have the standalone development. Well, I'll admit that this will be out of place here and not a subcommittee, but it's a talking speaker. To John's point, if there's a way to accelerate it, you look at you look at the old army warehouse and along bless now I think about the car park and the sheriff parking spot. Is is there a mechanism to do that accelerated vision potentially? Well well, let's pull it back and let the subcommittee even let us know if they like this kind of accelerate something that they may or may not want to do. Right. Or it also is the only and maybe voicing some of the concerns a lot of my fellow veterans, because there is traffic congestion already in railroad, that's part of like my biggest deterrent in a project like this because, you know and is concerned like a lot of concerned parents trying to just get through railroad in the mornings at the drop off it is a school bus. And so having a pilot like this on paper in theory looks really nice. But the reality is that when I travel through North Maine and want to create, it's a nightmare, especially in the mornings and so just thinking about the quality of life for residents with this even be a project that would improve our lives, create more chaos in the mornings and in the afternoons. So I'll I'll take that one since I see everybody. I'm sure when we're not trying to try to do something so there and some of these things are debatable, admittedly, but the Rhode Island specific plan talks about limiting parking with the idea being if you're limiting parking, you're focusing on trying to encourage people to take public transit or take alternative modes of transportation. If you don't build it, then they won't come. They bring cars. And so that's an opportunity. You also are you qualify for different grants that can improve bike trails. Part of the reason we did the Rhode Island specific plan was to get rid of art and we had to have the plan in place, but also as part of the plan. That's how we got to a four and a half million dollars to do the Class four pathway along the west side of Railroad Avenue. You know, now and we're happy to hear these these comments as well. This is in place right now. We're talking about like do we want to just move forward with our parcels and sort of let everybody else figure those out? Or do we want to try to be the facilitator for this larger development because this zoning and what's theirs already in place? If somebody came in tomorrow and wanted to do 100 units per acre and they were in the right location and they got the density bonus like that, like that, zoning has been in place. We're not talking about changing that or say we're talking about maybe the timing. But with that said, also one of the developments look, I mean, they're playing the trap then here, the traffic impact, these both the regional and local, there's also certain mitigations that are incorporated into the specific plan that they would have to do to the intersections and that type of thing. But again, that's where we go back to. Can we if we take a larger vision, can we talk about how some of the streets that maybe get in or are no longer there provide better circulation to try and maybe that's an added benefit about taking a more holistic approach to this is saying, okay, we're not going to let these uncoordinated pieces potentially not allow for the best of knowing that we're going to take the situation that we have. We're going to try to coordinate them to try to mitigate some of the issues that folks are experiencing. That's not a perfect answer because you're absolutely right. Traffic is pretty bad. It's probably not going to get any better any time soon. But the idea here is to get cars off the road as much and also provide a different kind of housing. And people may not want to have homeownership responsibility levels online or, you know, just taking care of business cards or they just want a Walmart on their merry way. Treat is also clogged up and you have schools that are of trade but yet, you know, with this development you will see a lot of people using it in the mornings when driven by people are hopping on. They're all coming from the center for I'm I share the concern about the traffic. I think everybody's always worried about traffic in Pittsburgh. There's one thing I set out to do with this development is I am looking at Pleasantville and Walnut Creek and parking garages. There's no parking garage for this. So that to me telling me that we're not even thinking about it, or when that headache comes by, there's no there's no planning for it, because I would love for everyone to live in the development, to not utilize cars and everything of a life or, you know, minimize in terms of the number of cars proposed in this development. But that doesn't mitigate what's already happening all around. It. And especially we have commercial uses within this area. The folks living there may not be the parking, but everybody coming to it in Pittsburgh will. So I don't know how that is mitigated in terms of the parking aspect or including something in terms of parking space. I mean, some in the building, like when Richard Anton not too long ago and they have two levels of parking within their building. Yeah, a I would say that if that's something that's desirable, then that at least points, I think to the larger vision, the more holistic, because the only way you're going to get that is if you have a certain economy of scale. Because if somebody is just doing 80 to 100 units, they're not going to build just a parking garage there. And it's not unheard of, but it's going to be difficult to get a third guy that comes in, the third person that comes in to do the parking garage that everybody benefits from the way you're going to get the parking garage or even just the pedestal parking buildings as personal parking or that addition is if you get somebody who's coming in and doing a thousand units to where it's going to be cost effective to do that. And they're mobilized so I again, love to hear these comments. They're great. But that just points out to me, I'm hearing, okay, we need to take a longer vision of what this can be and that with us. I guess what I'm leaving anyways in terms of the larger vision, say three parcels develops would be nice, but then having to look with the rest of the list looks like to me that just doesn't follow. We heard that from a developer that said if we don't build it on one side, but they're just staring at the other. Yeah, I'm not a big fan of that. And then too, as far as the vision, as far as these additional passageways that are moving east west. Garcia Then what was the other one or I would much rather have that type of access in terms of types of development. I know there are a number of questions that you had on there. Thank you, Mary. 4.9 In terms of the affordability and the mix, I think we've always strived for that like mix of incomes. So I'm I'm fine with that. I do I would like to see the owner occupied condos as a part of it as well. And it's not just all rentals that we want. Commercial one, the recreational space that's there. I don't know if it would be designated office space in terms of more of that shared meeting space or that co-working space type of environment where folks who have that hybrid model may come here to work and has a day. I got to go into the city, I can easily just hop on board and go, I'm one of those type of people that could do that. So I'm thinking of myself here. And, you know, but yeah, you know, that type of of, of feel to this development, obviously the commercial aspects and those times and not the long bar. I wish there was something to grab real quick before our Walmart breakfast or whatever it is and especially folks coming off the clock and stop somewhere real easy. So definitely you want that component in there. I think overall, in terms of what you're looking at, in terms of the the approach, I would actually look for a holistic approach to being truly connected and not more of the piecemeal because I do have the concern about, you know, how a bar plays with this in terms of this development. What my question was going to be as we're talking about, you know, the the acres per unit, how the state legislation around, you know, bar development, how that impacts that or what they're expectation, I know they created some standards for themself around development. So really trying to understand that it is is looking at the larger picture helps us to achieve what they're going to demand from us. And definitely for myself, you know, rather than just the three city owned parcels, really looking at how we can get a hold of it accomplished. And it's just to your point culturally, but what you're talking about kind of do remember something in a specific part of our setting of see of ease and setting up surface parking and trying to charge a fee that would help create more additional parking structure. So that's something that be talked about and thought about during the the review process going through this is just having some of those circulation and transportation policies. They were kind of fleshed out during the EIA process, team transportation demand strategies that we can use. So that's good comments. And just thinking about how we can work with that, just to kind of think about parking and and definitely want to add and I shared with the city manager tried and interest in terms of what's happening here. So in the totality of that, getting built out in the barge space is developed. What happens to the tri delta access with their park and ride. So definitely want to keep that on the radar, especially in the transit village. I know it was a focus around Bard, but the access there in terms of what is a park and ride out that goes away, how does that impact that access for folks taking the bus routes that come through there? Remember, we say that you were in the auto sales right now, but you make a good spot for some sort of retail just like with commission filling. So that'd be great. Just grab something to eat. So I'm thinking of where Union Station is. There's always like a little like a public market that people can just grab something to eat and hop happen the bar or even people coming from the city on their way back to Antioch and hopefully rent where they can swing by, you know, get up the garden, get something to eat, then go. And then, I don't know in terms of as well how we specify high quality design standards and when I say that, not to say that we don't have good standards in our baseball code, but this is once again one of those you're passing by our city major thoroughfare. When I'm passing by now, it's like, what is that over there? I really look at the back of those buildings you look at of the ceiling that you get. But, you know, statement designs that you're passing through here. So definitely inclusion of the public art. We have this plaza, but it looks like that be there but also once again, if I'm passing by on the freeway, something that's going to make me say, hey, I want to stop by there, that looks interesting enough. I just kind of our deal is that we see now, you know know obviously glad to have development that we have, but it doesn't tell me, hey, I want to pull over and stop and see what's going on over there. So if there's anything that we can include in the design aspects that really highlights that have the objective design standards come before you. And then and then the specific point itself, I mean, it really clarifies how landscape hardscape areas should be really focused on making sure that it addresses and creates a pathway to travel interconnectivity. And then we do have to provide for design review. So we do make sure that there is going to be a high quality architecture for these projects that do come through. So, so much of the adjustment was looked at was kind of look through the lens of the specific plan here to make sure that we were building, you know, units in and creating a sense of place. And we talked about kind of talked about that for our walking to try and create that sense of place for people who want to come to live in Pittsburgh. So they enjoy I live here. I enjoy living here. I live and work in Pittsburgh and I want to be continue to do that. So it's something that's important here. We continue to do that. And I add with the number of views that we potentially could see developed in there, I don't see, you know, our space in terms of, you know, real amenities for those that are actually living there outside of shopping. I know we're going to have a lot of pleasure, but my mind is going to serve. I still would benefit from what we're going to talk about later. But, you know, we were in Detroit, that area that they had set up for the basketball court, set up for other different kind of recreational activities that could be switched out, I think would be ideal in a space like this as well. So even bigger from that perspective, a space that could be used for recreation. They're going to be living in that area, if I can add. Yes, a park would. Good. So people would not be motivated to drive out and just going to walk to a park and enjoy it. And it's going to be a high quality development. There should be a water. That's what I see in better developments. There is a lot of feature, a recycled water feature. Recycle water feature. Yes, purple pipes wherever you go. Yeah. And there's going to be kids going to be a little splash park, articulate the entries they're bringing to the that this place. And then you have all the public art, you have the benches and the furniture, and then you have your amenities around it. So those are like, you don't have to leave that area. That's basically why this plan was written, was to try to create that transient village where it's a center of focus for the attention of people. I wanted staying in Pittsburgh and I want to work because we're going to live here also shop and eat and work. I don't want to drive anywhere else. This is important I try to use well, when we were proposing some things on the island and it was called a oh, I hadn't heard the term before, but it was created a space maker Wrestling Inc boats placement. We just had a space. We said that this we were well the tour we had, we kind of used it through Jordan. I had questions, Why are you taking it down? I'm pregnant. So it's almost like you're making a little town square in that area. Exactly. Yeah, but those are key points that we want to try to discuss here with the subcommittee and with everyone to try to make sure that when we are looking at developers and we're looking at the pool selected, if we're possibly with this RFP that we're asking these questions that you're asking us, we can go back to them to ensure that they're building high quality development. Yeah, I think overall those certainly want my thoughts. I think the other aspect is just the planning. I don't know how by design in terms of addressing potential loitering and homelessness, but I just thought it by design. I don't know how, just my thought not create. I know the Plaza is right here next to the bar station in terms of maintenance of that and ensuring that it's not just proposed, purposely built and actually made it. That's a good point. To clarify, this was done purely for illustrative purposes in the air. So that actual final design could be very different and we can definitely work a little bit more to do those crime prevention through environmental design and I think so sorry, I have to go ahead with these questions. So thinking of Bart, I would love for Bart to stab a police officer, our board station, to limit the things that happen there. I'll just put it that way. So I don't know who we call to harass to get that done, but I think it should be done sooner than later. One of the questions that I had, instead of going towards railroad, why don't we go towards harbor with some of the things? Because, alas, one of the last meetings that I was here, you were talking about improving the workspaces over on Garcia, and has that not been part this improvement plan instead of going towards railroad, go towards the other way and therefore you can build a better community, not housing, but workers, buildings, businesses over in the Garcia area that workers opposed. Businesses, buildings live in this area that you're building in this transit center because it brings everything together work environments, new businesses, new employees, housing, blah, blah, blah, transit type of thing. So have we not thought about going in that direction? And then that would eliminate some of the heavy traffic that would be on railroad. So I don't know if that was part of anyone's thought process to go that way instead of towards railroad. And in thinking of that, what about, you know, kids walk to school, these weights, high schools right there, and then you have MLK, different things like that. I know you guys are talking about bike paths and riding paths. I didn't see that in any of the plans that they were talked previously, but I didn't see it on on here because this is just just for that markup. On the RFP, we actually identified a class one trail, so it would connect to the existing bike trails and different things like that. Okay. Yeah. Okay. So that was just an idea That would be definitely part of our. Okay, that was it. In other questions, comments. So I guess in terms of the thoughts and the feedback, where does that in terms of the RFP, what we were looking to move forward with was, yeah, so we would look to and this is a conversation that we would have as far as what we would look at cost and how we can move forward because we would like to get some conceptual designs and then take it obviously to the City Council as a because this is such a big project and you're talking about years of development that it would take before you get feedback and work with the consulting as it comes out and try to flesh out what's the best way to get that out for development. I know we may have talked about it during goals is that we're simply doing a design for all of what we're trying to residency. So is that still what we're looking at with this or that, a different track? We it's the same one. It's all it's all together. What kind of action? See, a part of this industrial would be great to see another just colony like a live work area. What's great about art is, you know, they they tend to bike around because they live and work at home like in jingle Town. Those areas, if it wasn't for some of the grid, it would be kind of scenic. And these are unanswered questions that we want to see them out. Yeah. Thank you. All right. Moving on to item number five, which is the RICO Keys Program Grants. So this was something that was brought to our attention a few weeks ago, and it's the actual building, it's the Distressed Area Region pilot program, which was just for urgent reasons, but the investment is $200 million in persistently distressed communities with the objective of creating and connecting people to good jobs, creating jobs and connecting people to those good jobs. So in June, the idea was the phase one. There was a funding opportunity for the strategy going, in essence is going to be a program that's going to have a little bit. But phase one is the notice

65 Civic Avenue Pittsburg, CA 94565 P: (925) 252-6900 F: (925) 252-4814 pittsburgca.gov AGENDA COMMUNITY AND ECONOMIC DEVELOPMENT SUBCOMMITTEE August 14, 2023 5:00 PM City Hall First Floor Conference Room, 4B 65 Civic Avenue Pittsburg, CA 94565 Subcommittee Members Jelani Killings, Councilmember Angelica Lopez, Councilmember 1. Public Comment for Non-Agenda Items 2. Overview of Subcommittee Agenda Formatting Pittsburg Power Company (Councilmember Killings, Councilmember Lopez) 3. Power Company Service Application Update. Staff will provide the Subcommittee with an update related to the City of Pittsburg’s submittal of a System Impact Study (SIS) application to PG&E, as well as an updated timeline on the development of the Pittsburg Technology Park. Subcommittee feedback requested. Land Use (Councilmember Killings, Councilmember Lopez) 4. Pittsburg Center Transit-Oriented Development (TOD). Staff will provide an overview of the Railroad Avenue Specific Plan TOD development area and r- issuance of an RFP for development of City-controlled parcels. Subcommittee feedback requested. Economic Development (Councilmember Killings, Councilmember Lopez) 5. Recompete Grant. The Distressed Area Recompete Pilot Program (Recompete Grant) will invest $200 million in persistently distressed communities to create and connect people to good jobs. On June 29, 2023, EDA published the Phase 1 Notice of Funding Opportunity (NOFO) to apply for Strategy Development Grants. Subcommittee feedback requested. Waterfront Development (Councilmember Killings, Councilmember Lopez)

Community and Economic Development Subcommittee Meeting Agenda August 14, 2023 6. Environmental Services Grants Update. Staff will provide updates on select active and prospective grants. 7. Non-Agenda Items 8. Adjournment

Subcommittee Item PG&E Interconnection Application 14 August 2023 On June 16, 2023, Pittsburg Power Company (PPC) submitted to PG&E an application for interconnection to PG&E’s 230kV transmission system. The interconnection application begins the process for PPC to obtain an “Interconnection Agreement” (IA) with PG&E to serve new electric load in Pittsburg. In this specific case, the application is in support of the AVAIO Data Hub (aka Tech Park) Project to be located at the site of the former City of Pittsburg municipal golf course. The interconnection application is for 99MW to be interconnected to PG&E’s 230kV transmission system in an area generally west of the City of Pittsburg Water Treatment Plant. Interconnection at this voltage avoids certain California Independent System Operator (CAISO) transmission charges. Although PG&E owns the electric transmission infrastructure, the CAISO manages how the transmission system is operated. The process entails the following summary steps: 1. PPC Submission of an Interconnection Application Complete 2. PG&E System Impact Study (SIS) In Process a. SIS Agreement b. SIS Fee c. Presentation of SIS Results Est 1Q2024 3. Negotiation of PG&E System Impact Costs 4. Negotiation of Interconnection Agreement 5. Interconnection Agreement Executed Est 4Q2024 6. PG&E Switchyard / AVAIO Substation Engineering 7. PG&E Switchyard Construction, AVAIO Substation Construction Est 1Q2026

Bliss Avenue Development – Phase 1 Design Community and Economic Development Subcommittee August 14, 2023

2

Address/Location APN Acres Description 1 2101 Railroad Ave. 088-171-035 1.59 currently leased to a used car sales operator 2 75 Bliss Avenue 088-171-027 0.98 currently leased to a business as overflow parking 3 Northwest corner of Bliss Avenue and Harbor Street 088-171-037 1.86 vacant 4 Northeast corner of Bliss Avenue and Harbor Street R-O-W 0.23 portion of public right-of-way TOTAL 4.66 3

Address/Location APN Acres Description 1 2101 Railroad Avenue 088-171-035 1.59 currently leased to a used car sales operator 2 75 Bliss Avenue 088-171-027 0.98 currently leased to a business as overflow parking 3 northwest corner of Bliss Avenue and Harbor Street 088-171-037 1.86 vacant 4 Northeast corner of Bliss Avenue and Harbor Street R-O-W 0.23 portion of public right-of-way 5 95 Bliss Avenue 088-171-033 1.53 privately owned 6 105 Bliss Avenue 088-171-034 0.53 7 107 Bliss Avenue 088-171-036 0.56 8 Bliss Avenue 088-171-038 1.48 BART owned 9 Bliss Avenue 088-171-039 1.20 BART owned 10 2148 Harbor Street 088-171-005 7.38 privately owned 11 50 Bliss Avenue 088-171-013 0.53 privately owned 12 2135 Railroad Avenue 088-171-012 1.01 privately owned 13 2145 Railroad Avenue 088-171-014 0.82 privately owned TOTAL 19.70 5

6 6 West Dublin/Pleasanton BART Station – Avalon Dublin Station Pleasant Hill BART Station – Avalon Apartments

7 7 Walnut Creek BART Station – The Waymark Warm Springs/South Fremont – Avalon Apartments 7

8 1 4 3 2 5 6 7 8 9 10 11 12 13 14 8

9 HCD’s 2023 Income Limits Household Size 1 2 3 4 5 6 7 8 Acutely Low - up to 15% AMI 15,550 17,750 20,000 22,200 24,000 25,750 27,550 29,300 Extremely Low - up to 30% AMI 31,050 35,500 39,950 44,350 47,900 51,450 55,000 58,550 Very Low - up to 50% AMI 51,800 59,200 66,600 73,950 79,900 85,800 91,700 97,650 Low - up to 80% AMI 78,550 89,750 100,950 112,150 121,150 130,100 139,100 148,050 Median - up to 100% AMI 103,550 118,300 133,100 147,900 159,750 171,550 183,400 195,250 Moderate - up to 120% AMI 124,250 142,000 159,750 177,500 191,700 205,900 220,100 234,300 PUSD elementary school teacher - $60,954 (starting) City of Pittsburg Administrative Analyst - $82,824 (starting) Car salesman - $80,020 (CA average) Waiter - $40,563 (SF); $37,635 (Antioch) IT Technician - $75,803 (CA average) Bank Teller – $44,894 (CA average)

Transit Village • TOD-High • 30-65 du/ac permitted • Up to 1.5 parking spaces/unit • Ground floor commercial • 1 parking space/333 sf of retail • Uses • Allowable land uses in this district are the same as those of the M (Mixed Use) District as specified in Title 18 of the PMC. • Height Requirements • Building heights shall be no less than 25 feet and no more than 65 feet • New buildings shall have no fewer than three stories. 10

Conceptual Site Plan 11

12

13

14 14

Staff is requesting feedback: • Types of Development (residential, commercial, mixed-use, recreational spaces, etc.) • Residential units (number of beds/baths, amenities, etc.) • Commercial spaces (types, location, size) • Project amenities • Other types of developments and uses 15

65 Civic Avenue Pittsburg, CA 94565 P: (925) 252-6900 F: (925) 252-4814 pittsburgca.gov Page 1 MEMORANDUM To: Community & Economic Development Subcommittee From: Robert Carrera, Economic Development Manager Re: Agenda Item No. 5 Item No. 5: Recompete Pilot Program Background On June 29, 2023, the US Economic Development Administration (EDA) released the Phase 1 Notice of Funding Opportunity (NOFO) for the Recompete Pilot Program. The Recompete Pilot Program is authorized under the CHIPS and Science Act federal legislation passed in 2022. The program intends to invest $200 million dollars towards projects that are designed to activate economic activity and long-term job creation in areas considered economically distressed. The driving measurement for determining eligible areas is the prime-age employment gap (PAEG), which accounts for prime age workers (aged 25-54 years) that are not only unemployed, but have stopped looking for jobs and are out of the workforce. Specific census tracts in Pittsburg and Antioch, primarily North of Highway 4, are eligible areas to receive funding from this grant due to PAEG levels higher than the national average. The specific census tracts in the Pittsburg-Antioch region that are eligible are as follows. • Census Tract 3050 • Census Tract 3072.01 • Census Tract 3072.02 • Census Tract 3090 • Census Tract 3100 • Census Tract 3110 • Census Tract 3120 Funding from this program can be used to implement various construction and non-construction activities that are meant to enhance economic vitality to the qualified areas and help address the area’s PAEG. These activities are wide ranging across these four broad categories: workforce development; business and entrepreneur development; infrastructure; and additional planning, predevelopment, or technical assistance. The program is broken down into two phases of funding. This current Phase 1 NOFO, the EDA will fund Strategy Development Grants and will approve ‘Recompete Plans’ for certain regions. Funds of $250,000 to $500,000 will be provided to applicants to develop these Recompete Plans, which will act as a strategic plan on how the applicant will make place-based regional investments to reduce the PAEG of the eligible area. Once a Recompete Plan is approved, those plans are eligible to apply for Phase 2 where they can receive funding to implement these plans. The EDA expects to make approximately 4 to 8 investments into Recompete Plans ranging from $20 to $50 million each. In

City of Pittsburg pittsburgca.gov Page 2 each region selected for implementation investments, awardees will receive funding to implement approximately 3 to 8 interrelated projects. Figure 1: Snapshot of Recompete Pilot Program Eligible Census Tracts in Pittsburg-Antioch Area Analysis Upon review of this program, staff believes that this program provides an opportunity to make investments along the historical job centers and industrial region that make up the Northern Waterfront, spanning both Pittsburg and Antioch. Staff sees this as an opportunity to make investments in that area’s infrastructure and our local human capital so that this area remains a competitive, sought-after, and job rich center going into the 21st century. Staff also believes that there is value in potentially collaborating with the City of Antioch as a coalition applicant to create investments that benefit the Northern Waterfront regional economy which spans our city limits. Such investments in the economic region as a whole and in each of our prime age working citizens will provide mutual economic benefits. In pursuing this opportunity, staff has developed a vision for what this program can invest in based on the parameters of the program and what the immediate economic needs and investments are for the region. 1. Pittsburg-Antioch Hwy roadway improvements (CIP Projects ST-57 and ST-58): The city’s current Capital Improvement Program (CIP) includes projects that will enhance the road travel along the Pittsburg-Antioch Highway from Loveridge Road to Antioch city limits. The road crosses an area primarily made up of industrial zoned land and industries. These improvements include widening the road from two lanes to four lanes and adding left turn lanes. Both projects would dramatically improve the flow of traffic and commerce in the area. Both these projects are currently awaiting funding.

City of Pittsburg pittsburgca.gov Page 3 While developer fees could fund these improvements, completing these projects through this program would create an enticing incentive for industrial investment in the area because the infrastructure needed to support major job centers will be there. 2. Pittsburg-Antioch Hwy water line and sewer line improvements (CIP Projects W-24 and SS-20): There are currently gaps in the water and sewer systems along Pittsburg- Antioch Highway where there is lacking infrastructure to support the kind of major industrial development that the area has potential for. These needs are identified in the Loveridge Sub-Area Master Plan prepared in 2008 and in our CIP. Both these projects also await funding. As with the roadway improvements, funding these projects through this program instead of awaiting for a developer to cover the costs will put the area in an advantage to entice industries to develop there with the needed infrastructure already in place. 3. Fiber Internet installation in infrastructure adjacent to industrial properties in Pittsburg and Antioch: With download speeds as fast as 10 gigabits per second or higher, fiber-optic internet provides the best in terms of internet capacity, especially for modern-day industry that relies on high-quality internet networks to run their systems or operations. The City recognizes the importance of fiber-optic internet through its agreement with SiFi Networks. This program could provide an opportunity to fund a fiber optic network that serves the industrial region along Pittsburg and Antioch, with potential to partner with SiFi Networks or another fiber-optic cable provider. 4. Contract education and training with local college to support new workforce that will buy the Pittsburg Intermodal Park (former USS-POSCO site): The Pittsburg Intermodal Park is currently for sale as an 11-property portfolio totaling over 445 acres. The new owner of that property is set to be the future job center for the region, and may need to scale up a local workforce that can serve them. This program can provide an opportunity to partner with a local college, such as Los Medanos or Diablo Valley College, to provide little-to-no-cost contract education to provide the education and skills training needs for the future workforce. 5. Branding Strategy to promote the industrial corridor along the Pittsburg-Antioch Hwy: Conducting these improvements and projects provides a great incentive for industries to develop in the surrounding area. Conducting an organized, invested branding strategy to promote the area will help build attention to these improvements and the possibilities the area has to provide. Branding ideas are broad from online marketing to brochures to trade show attendance to potentially renaming the Pittsburg- Antioch Highway. 6. Wrap-around, supportive services for prime employment age residents in neighborhoods within the eligible areas: The program allows for projects that provide supportive services to the local labor market. In the most direct effort to address the PAEG in these census tracts, our proposal should include providing supportive services that directly targets neighborhoods in Pittsburg and Antioch and are specific in addressing the gaps that are preventing the prime-age workforce in those areas from getting jobs.

City of Pittsburg pittsburgca.gov Page 4 Next Steps Staff is requesting feedback on this program and the proposed vision to help address the challenges faced by the workforce within these eligible areas. Included in this feedback, staff would like to know the committee’s feedback on the following: 1. The proposed vision of various projects and investments presented in this memo; and 2. Applying for this program in coalition with the City of Antioch. Based upon the feedback received by this committee, staff will work with grant consultants, California Consulting, to put together an application for Phase 1 strategic planning to craft a Recompete Plan for the eligible region for approval and preparation for Phase 2 funding. Attachments: Recompete Pilot Program Fact Sheet FY 2023 Distressed Area Recompete Pilot Program Phase 1 Notice of Funding Opportunity

65 Civic Avenue Pittsburg, CA 94565 P: (925) 252-6900 F: (925) 252-4814 pittsburgca.gov Page 1 MEMORANDUM To: Community & Economic Development Subcommittee From: Sara Bellafronte, Assistant to the City Manager Re: Agenda Item No. 6 Item No. 6: Environmental Services Grants Update 1. Sea Level Rise Planning Grant Partnership with Contra Costa County: The City was approached by Contra Costa County to partner on a grant application up to $650,000 from the California Governor's Office of Planning and Research, Regional Resilience Planning Grant Program for the preparation of the Contra Costa County Sea Level Rise Resilience and Adaptation Plan that would create focused adaptation strategies and implementation actions for the communities along Contra Costa County's shoreline. This program also offers implementation grants of much larger scale, and ultimately staff hopes to accomplish waterfront resiliency through the means and methods identified by this study and resulting Plan. This effort is in line with our TLUP and with other grants, like Prop 68 and CAR 22, recently awarded to the City. Building climate resilience also ties into our Sustainability Plan and waterfront visioning exercise. The County will be submitting the application this month and if awarded, staff will approach Council for authorization to accept. 2. US EPA Brownfields! Conference: staff will provide highlights from the 2023 US EPA Brownfields! Conference attended 8/8 – 8/11. 3. Charge! In March the City applied for a Charge! grant through the BAAQMD. Last month the Air District announced doubling of its program funds to total funds to $10M and informed Pittsburg that our application is one of 27 projects eligible for funding. We applied for just over a half million dollars to support fleet EV installation at various City facilities and will be working with BAAQMD as they conduct follow-up calls to make final grant determinations this month.

Showing the first 24,000 of 86,358 characters. The full document is at the source.

Okay. Welcome, everybody, to the August 13th and inaugural meeting of the Community and Economic Development Subcommittee. First item on the agenda, public comment for non agenda items. Do we have any public comment on the agenda items? No, it's been done. This will be item number two will be very brief. Since this is the first meeting of the community and economic development Subcommittee and it has been formed by combining the Lands Subcommittee involved Development, Waterfront Development Subcommittee and the Pittsburg Power Companies Subcommittee. I just wanted to quickly touch on what our plan is because we've got certain subcommittees that included planning commissioners and some that don't. So we want to make sure that we're breaking out the agenda and highlighting those different areas and what we're going to be talking about. So today provides a good example. We'll have certain items that are being discussed by or regarding the Pittsburg Power Company for which the council members who are on the subcommittee will have jurisdiction over. And so they will be the active participants in those items. And that of course, will allow for public comment when we do bring forward land use items that are within the Planning Commission's purview as well as the City Council, then we will, of course Essex County Commissioners to be active participants in those items. Today we do have one item that we're presenting the land use delegate ceiling largely with policy direction and finances. And so for this instance, intelligence we've been the city councilmembers, purview B and C, and it's Allegheny West who is understood to be part of the conversation. And then it would be the same for regional development and waterfront development. So that's how we're breaking it down at this point. Probably learned from some different things how we're going to continue to do this. But we do want to keep these subcommittee meetings within 2 hours. All of these different subcommittees could easily have taken 3 hours themselves. So we don't want to keep everybody here until Tuesday morning. So we're going to be doing that. And then also, we do intend to continually have the chamber give us updates as they normally do. However, it is likely to be more on a quarterly basis. Again, just so we can manage time and hope you can join us for, you know, to weigh in on some things. So is there any question or comment about that scene? Then we will move on to item three, which is part of Pittsburgh, our power company portion of the agenda, and we'll provide you with some service application updates. And I'm going to turn it over to Doug Buchanan. Thank you, Jordan. Normally, we do this in business or she or the administrative officer. She runs the books mostly the supervising for the power companies out there. And she has multiple obligations with her mom. So she's not able to make it so that somebody will be prepared to present their financials over the short story And the financials, as we think it through the dark period of last year with very high electric and gas pricing, we have a little bit of relaxation, a lot for some. So the the 30,000 foot view is financials are ever prudent and we're happy about that. With energy prices stabilizing this evening, I'd like to present our presenting subcommittee our most our largest initiative right at the moment, which is an application for international trade to support contemporary and that launches a fairly rigorous and significant effort to obtain estimates for power company, an interconnection application. With this forecast, I want to turn to their transmission system to support the power development in the area of the golf course. So, as you may be aware, Engineer has a fairly significant transmission corridor from there because the former power plant and substation south of some southern circuits. And the idea is to tap into those circuits as codes for power company to support protect power will take Power is currently envisioned at about 100 megawatts 99 to be precise. And in the power world that's a big number for a load I don't know will Pittsburgh for the electrical and all of Pittsburgh is I don't know I would have to guess 25 megawatts or maybe maybe 40 residential commercial or scale island energy is how much? Oh well, our biggest load of island energy with all the boats and navy boats has been around ten, ten times the size of the source, ten times the size of what has been on that is world. So it's a big deal and you launch on there's not been change of heart because it means focus, dedication, time and dollars. But we think it's for the underlying drive for this. In addition to supporting the park is to expand to the for power companies service territory in the last 25 years it's been primarily it has been exclusively Merrill and Folio, although previous has participated in supporting energy projects in Pittsburgh, Delta Energy Center. Most of the cable of this, this is taking the utilities footprint and expanding. So it's a great you know, it's a lean forward. In summary, what we've done today, we have submitted an application to which is which is part of the process to generate more interconnection of our system. The application was accepted as being complete. The subsequent step was to sign and they would support engineering for the first step, a system impact study which we will perform and the whole notion about it was to understand what the impact to their system will be. Interconnect in a new 100 megawatt load system. An impact study, not agreement on current design. There was also a team without which the initial fee is 100,000 to perform the study, which PPC will cover at least initially to. So going forward we hope for cost recovery from the developer, but in order to keep the process moving, it's $100,000 to our PPC funds and an agreement for PGE to begin forming that study. Okay, so what's the timing and outcome of that? And the next steps, the timing is they'll perform the study. Our estimation is that we'll we will get results by first quarter 2024 study. We expect we'll come back and say, well, it'll will impact our system this way. Here are the dollars for us to mitigate that and then the negotiation begins again, expecting that to be in first quarter 2024. That follows from that is the negotiation on upgrades. We as PPC and in my former life with that goal, we negotiated that for Delta and it's it's horse trading. You know what makes the best sense for gauging system in our interconnect the outcome of that is unknown at this point. It could be anywhere from zero to tens of billions. So it's just unknown at this point. I tend to be optimistic. In our studies of the transmission system, there seems to be a lot of room on the transmission system, so I'm optimistic that occasionally it comes back. It won't be extremely burdensome at all. If I may, I can give you a sense of it. With the Delta Energy Center, project engineer came back with $44 million in upgrades and we were able to find a solution of 13 million. So that's, you know, it was going to be first line and below it it was scratching nails and all that sort of thing. Following that will be the negotiation of an interconnection agreement. And I'm estimating that or we're estimating that presently as fourth quarter 2024. And that's the agreement that there were huge new associates. You can interconnect all the way that is engineering and construction for switch cards and substations and that sort of thing. And early estimates and first quarter of 2026, about the well, what makes these dates all fuzzy is we're on June any time now. We're not in control of that schedule. We're operating at time of saying all them. So in our current estimation is we would be able to begin construction on of the ten power interconnection, 100 megawatts in a location generally west of the water treatment plant, not a golf course area. And that's going to move a little bit, we think are consequential. Lots of people are their move a little bit on the notion being to support the construction of the tech park, being able to begin to power the checkerboard in the first quarter of 2026. That's a little bit different than what the while the developer is looking for. So we're trying to balance the two and be realistic at the same time, be aggressive and keep our future name. So my representation of Jordan and the second representation on the power side is to be in construction of a switchyard and substation sometime around the first quarter of 2026. If we can improve that, that would be fantastic. In a larger context for the City of Pittsburgh and KPC to launch into a 100 megawatt megawatt load. So that's a big deal. And I'll just close by indicating where we see the benefit. It'll be through energy sales, through PPC and potential for franchise fees and others and taking it back up to 80,000 paid. Looking at these types of developments, this is the big one upfront, replacing the franchise benefits and franchise fees. But the city had seen from the other developments like Delta hospitals in prospect. So a lot of health will be superb line and we'll square our chamber. We're committed and well thank you so I'll I'll take it over on more of the land development sides dug very very well covered the power side so this is not to say that you're not going to see anything until 2026 in front of you. You will see something. Well before 2026. We'll bring it to you. In fact, you're likely to see something in front of you early next year. So concurrently with going through this PPG process, this was the long all in the tent and this is something a by a really wanted to get underway. Now we've got that underway. It starts helping to form and inform the other things that we're going to be doing on the land. Use and entitlement side. Additionally, there's kind of a third avenue that we have to go down and that's approval with the CC. And I say we by approval with the CAC or C e C excuse me. The nation unfortunately is not going to see this at the CAC, the c, e, c, So now this for and Mrs.. Thank you California Energy Commission. So we're currently working on the IIR and bio is putting together all of the technical studies that need to be produced in order to put that thing, as we call out on the street for public review. And that's the first step in starting to bring it forward to the Planning Commission and the City Council for review. Now, concurrently, while we're putting together the air for the land use entitlements, which is your rezoning with the specific plan, your design review use permits, any of that. There's also a separate air that will be put together for the c C to review. So once the city Council takes action on the air, assuming that it is approved and certified, then we're going to be making a lot of assumptions just to lay out the process here. Assuming that it's approved and the air is certified, then an air will go forward to the CDC, and the CDC will have to approve that air. Then that air comes back to the city council to approve that air in order to move forward with the type of load that they're talking about serving. Once that is done, then a bio, assuming everything gets approved, can begin with the the design, the architecture rules, the engineering to actually start moving dirt. So it's very realistic, albeit aggressive, but it's very realistic that dirt could be moving on that site in 18 to 24 months because if they receive the responses on the system impact study that we're expecting, because as Doug alluded to, we feel very confident that there's a lot of room on those lines to serve the project. Then they'll begin doing the design and probably begin construction of the buildings. The buildings will take much longer than the substation and just the design and put in all the construction documents together is going to take a very long time. But realistically, 18 to 24 months is doable to start seeing dirt moving on that site and buildings going up in preparation for beginning construction on the switchyard in the substation in 2026 to a relatively quiet compared to building a large building or multiple buildings in that area. So it's possible that by the end of 2026 these things could be online, but certainly powered from TGV. Now there's a lot of details and things here. There I do want to say, going back to the idea of the system impact and what might need to be done, the way it was explained to me in layman's terms, because I'm nowhere near the expert on this, though, Doug, is you had a massive PGE, that energy plan all the system was designed to take power, pull power from that plan to deliver it, and also to put power in to operate the plan. That plan has gone dark for decades now. So that's all freeway space that you will that no cars are going up and down, which makes us feel pretty confident that the system upgrades that might be required are going to be hopefully not too large, not on the scale that they were at deck or anything like that in the $44 million range, which today is probably $200 million because that was easily 20 years ago or so permitting from the councilmembers. I think there's one piece of message and I think it's important that this is the long game. Okay? This is not a short period. This is not something we can call the sale. It's property or is this the long game with the brass ring? Are the benefits that this could bring in terms of franchise fees, electric sales and warehousing? So we're playing this not the short term, but the long term. And that takes perseverance, it takes commitment, takes focus. Well, I think the city of Pittsburgh, the benefits are real and they could be significant, as we saw from previous power projects. And so we've talked a lot about this one. Councilmembers questions, thoughts about the timeline. Anything you'd like us to go in more detail on? And we definitely thank you for the presentation. First was let's just start with the power of our go to the language. So with the we're talking about in terms of the system impact cost, is that paid upfront? Is that something that is paid out over the course of time as we're anticipating the franchise fees or whatever we're going to be collecting as a result? How does that work in terms of that total 30 million up? It was for the other project and what we may be assuming or maybe for this project counterparts to say is committed to launch in this with the system impact studies and then the large scale up against the 4000 will have sort of it started on about 100,000 when it comes back. And so this is what it's going to cost. This is the system. And how is that? No, that's a great, great question. The the position that we've taken. So the and the city needs is something I call for, but not for this development. We would not be exposed to this cost. So we put those costs on a developer and use the analogy of island energy. We do a cost per project. They might how it's green, but we have to put a new electric service in transformers. They pay for that. One of our customer projects very typical. It's also very typical with the big utilities junior investments increasing is doing to us, but not for your project. We would not do these upgrades. So again, yes, it's the the waterfall, if you will. As you know, PPG goes to us and says, okay, it's her power company. It's after negotiations and finally settle $27 million worth of improvements in the system impact, we would then turn to a buyer and go, okay, well here's your golden ticket or your project, $27 million, and here's the payment demand that he wants and works. So yeah, and frame of reference, same thing we went through with Transbay. Transbay took seven years, so this is a long one, seven years in terms of this specific piece, it took about six years after we got our initial approvals from the California system operator. The first year was sort of, you know, to New New York, put together an RFP. We can supply power to San Francisco. The best we have, the best us. So you know, everyone else, the best. And then it was, yes, going through the environmental, going through system impact, negotiating contracts, designing, building and then bringing online. That took six years of that seven years. There's an example of one of my one of the crew members had spent a lot of time with Southern Cal Edison and there actually were offer them and a blocker comes down or a tower comes out and says, We're going to do this. So then Carlos says, okay, it's going to cost $7 million. And they wouldn't lift a pencil. They wouldn't sharpen a pencil until they had the check for seven point. So the developer will bear the brunt of those costs. We've elected to proceed to kick start and support schedule because these tall all numbers are relatively minor compared to what's coming. Another way to say it is we want to serve power in the city of Pittsburgh. If a buyer was not here today, we would still be pursuing a certain amount of effort in order to get a foothold within the city of Pittsburgh. But then there comes a time where there we would do work without having somebody who's going to actually be the developer. And then we that's where we get to the but for the project and even then though, and we can talk about this ad nauseam, but even then we will bring it and we will sit at the table with the buyer. We'll talk about the different ways. How does this get financed? Because then there's also own in operation and maintenance. And so that those are things that are going to have to be baked into terra and or a sea of be dedicated just to the maintenance. And I think there's a lot of different ways that we could potentially do this. And so I think maybe the short answer to your question is it'll be funded by the developer, but there's also a lot of different ways that we will look at trying to utilize the property and the occupants are going to be there to also support this cost and things that the developer might propose that need to be approved by us to help generate that cost. But there's a lot of way to get there. It's to you on that. It's a 5 million, 10 million, 50 million. And at what point do we need to look at different ways to do this? The scale of cost is, you know, around $250 million. So so, you know, our cost is not that large in their scheme of things, of wanting to be infrastructure. Their real cost is afterwards when they put the switch. That's one point in all of our sports and maybe one thing that we haven't touched on. To give you also a little sense of why this is worth it conservatively, and we have not actually finalized prices in some of the statements in generals, but this is several million dollars a year in revenue to PPC from the full operation of the 99 megawatts and theoretically in perpetuity, as long as these things need to be powered and these things are on line. So that's that's why the significant investments in the long term way that Doug spoke to is worth it. It could be big dollars staying complacent. You know what we always have or a previous franchise. So it's important, it's necessary and for the better for this game. I think you guys all get to tell us all development of complex projects like those, they all take twists and turns and they will have what you said this was going to happen. Well, yeah, well, it didn't stop, but the ideas I had the ball on the spaceship there and in my experience as a developer, that's always been the kid. What's the what's the goal line? Or like all the plays in between, it's possible one could argue, advancing towards that goal, and I think we're focused on that. Other questions there about power or the landing side? No, just in terms of the procedure or the process, the idea is that we submitted the application. It's been accepted as can be completed or no. So does that mean that essentially there's no engineers deny? There are no we want to do this process? You know, they've accepted the application process as early as tomorrow, the system, and check will go to Trinity. They will begin their review process and we arrive at the results. And Councilmember, an analogy to this process would be somebody coming in and they want to build 50 units on an acre and we can't say no to them, but we can definitely put out a list of things that they have to do. And I think that that's, you know, maybe there's some details. Gary, correct me if I'm wrong, but that's General. The idea is any more or less has to let us use their transmission distribution infrastructure. We have to put in the substation. But what they can do is they can say, but based on this study, you've got to do all of these different things. Got a negotiator, I'll tell you. So for under four, the Federal Energy Regulatory Commission, they can't say no. They can't say no. But can there be costs, some barriers? Yes, if there can. And the only other question I had was in terms of the year and seven has when it comes to sitting there, there's a whole lot that goes to the CDC audience. Is there a difference between there's a lot of overlap, but there are certain things that the CDC, E.R. is going to have to look at that are required under the IRA that we do now. Having the same consultants preparing both for available means that they're doing all the work in one fell swoop. At that point, it just becomes procedural where they they want to. And I've just been told quite bluntly that the CDC is just very particular. And so they're going to want what they would consider their own document that they certify, and then we're required to recertify it, or maybe not required is not the right word, but it is pertinent to for us to be adopt that which allows us to all be entitled to project into title the type of use that they're proposing as part of this actually, this is relatively new for the energy commissioner, who's been granted or assumed oversight of data centers. This is new. So to some extent there's little uncharted territory. And we also have the California Independent System Operator expect that to be a big deal. But there are these regulatory bodies, the parties that are you know, a lot of them all have their fingers in the pie and our job is to advocate. So it's a fun class in bureaucracy, I'll tell you that much. But it's been done. And so so we'll take that. The role of all those other guys can do it. We can do it. So I'm saying that John just reminded me San Jose has a good template for the other questions Before we open up to public comment. Now, John, my question is more a of theater. Any public comment on this? I had one question. I know we're talking energy and different things like that. Are we use in any kind of natural solar or wind or anything at this tech arm that we are? So the short answer is likely. We do not actually generates any power. The city of Pittsburgh, Pittsburgh Power Company does not have work called generation assets We buy from WAPA, which Doug will have to tell you will walk a stands for Western area. I was going to say I know a lot that is going to work for the greater good. And these the tech part which is going on the stone and trees property is going to and it's going to be more marketable to companies that have requirements for green energy and so when we go to the market to purchase the power, we will likely be required to purchase renewables to power this production. Go one step further. We are we are required to buy. Yeah, we have we have what's called a renewable portfolio standard. So we have to even even though we're with our federal agency, large hydro, we still have to go to the market to purchase solar, wind or whatever. So it's called our renewable portfolio standard and we have thresholds. So we are we're coming right up again of having to file what we call our power content label, a certain percentage of that has to be 35% or more renewable and it's like the

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsSource recordingread transcript
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Community and Economic Development Subcommittee
  • Community and Economic Development Subcommittee — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • The available transcript has no reliable timestamps.
  • Transcript coverage is partial.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: 4338746402591dfad1a60185bbf53ab5. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record