POLISCOPE

The public record

WINTERSPRINGS (SEMINOLE COUNTY) · LOCALHeld · official record pendingPartial coverage

Planning and Zoning Board/Local Planning Agency

Thursday, November 6, 2025 · Government meeting record

The 30-second read

Record incomplete

The Winter Springs Planning and Zoning Board will meet to review a development proposal for a new 7 Brew drive-thru coffee shop located at 1248 East State Road 434. The meeting includes a public hearing where residents can provide input on the project's site plan, engineering, and requested zoning waivers.

Why it matters

The board's decision on the 7 Brew development application will determine if the project proceeds as proposed or requires design changes to meet city code requirements for the area.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Record text

No recording or transcript is held for this meeting.

Showing the first 60,000 of 825,504 characters. The full document is at the source.

PLANNING AND ZONING BOARD/LOCAL PLANNING AGENCY REGULAR MEETING AGENDA THURSDAY, NOVEMBER 6, 2025 - 5:30 PM CITY HALL - COMMISSION CHAMBERS 1126 EAST STATE ROAD 434, WINTER SPRINGS, FLORIDA 1

CALL TO ORDER Roll Call Invocation Pledge of Allegiance Agenda Changes AWARDS AND PRESENTATIONS 100. Not Used INFORMATIONAL AGENDA 200. Not Used PUBLIC INPUT Anyone who wishes to speak during Public Input on any Agenda Item or subject matter will need to fill out a “Public Input” form. Individuals will limit their comments to three (3) minutes, and representatives of groups or homeowners' associations shall limit their comments to five (5) minutes, unless otherwise determined by the City Commission. CONSENT AGENDA 300. Approval of the Thursday, September 11, 2025 Planning and Zoning Board/Local Planning Agency Regular Meeting Minutes. 2025 09 11 Planning and ZoningLPA Regular Meeting Minutes.pdf PUBLIC HEARINGS AGENDA Pursuant to F.S. § 286.0115, if the mayor or any city commissioner receives and/or sends ex parte communications regarding any application filed with the city, the mayor or any city commissioner must publicly disclose such communications before or during the hearing at which a vote is taken on the quasi-judicial matter, so that persons who have opinions contrary to those expressed in the ex parte communications are given a reasonable opportunity to refute or respond to the communications. 400. 7 Brew Drive-Thru Coffee, 1248 E. SR 434 – Site/Final Engineering, Aesthetic Review, Waiver, Condition, and Development Agreement. 7 Brew Staff Report PZB 11.06.2025 FINAL.pdf 400 - Presentation 7 Brew - PZB 11.6.25.pdf Second Modification to Development Agreement - Seven Brew at The Blake Commons.pdf Fig 1 Community Workshop Flyer.pdf Fig 2 Community Workshop Sign-In Sheet.pdf Fig 3 Lot 2 Survey.PDF Fig 4 7 Brew Civil Site Plan.pdf Fig 5 Landscape Plan.pdf Fig 6 Irrigation Plan 10.24.25.pdf Fig 7 Site Photometric Plan.PDF Fig 8 Environmental Report.PDF 2

Fig 9 Geotechnical Report.PDF Fig 10 TIA_Queue Analysis.PDF Fig 11 Parking Letter.pdf Fig 12 Letter of Intent.PDF Fig 13 Architectural Elevations.PDF Fig 14 Architectural Elevation Renderings.PDF Fig 15 Setback Waiver Description.PDF Fig 16 Service Window Waiver Description.pdf Fig 17 Streetscape Waiver Description.pdf Fig 18 Site Plan App.PDF Fig 19 Aesthetic App.PDF Fig 20 Dev Agreement App.pdf Fig 21 Setback Waiver App.PDF Fig 22 Service Window App.pdf Fig 23 Streetscape Waiver App.pdf REGULAR AGENDA 500. Not Used REPORTS PUBLIC INPUT Anyone who wishes to speak during Public Input on any Agenda Item or subject matter will need to fill out a “Public Input” form. Individuals will limit their comments to three (3) minutes, and representatives of groups or homeowners' associations shall limit their comments to five (5) minutes, unless otherwise determined by the City Commission. ADJOURNMENT PUBLIC NOTICE This is a Public Meeting, and the public is invited to attend and this Agenda is subject to change. Please be advised that one (1) or more Members of any of the City's Advisory Boards and Committees may be in attendance at this Meeting, and may participate in discussions. Persons with disabilities needing assistance to participate in any of these proceedings should contact the City of Winter Springs at (407) 327-1800 "at least 48 hours prior to meeting, a written request by a physically handicapped person to attend the meeting, directed to the chairperson or director of such board, commission, agency, or authority" - per Section 286.26 Florida Statutes. "If a person decides to appeal any decision made by the board, agency, or commission with respect to any matter considered at such meeting or hearing, he or she will need a record of the proceedings, and that, for such purpose, he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based" - per Section 286.0105 Florida Statutes. 3

CONSENT AGENDA ITEM 300 PLANNING AND ZONING BOARD/LOCAL PLANNING AGENCY AGENDA | NOVEMBER 6, 2025 REGULAR MEETING TITLE Approval of the Thursday, September 11, 2025 Planning and Zoning Board/Local Planning Agency Regular Meeting Minutes. SUMMARY FUNDING SOURCE RECOMMENDATION Staff recommends approval of the Thursday, September 11, 2025 Planning and Zoning Board/Local Planning Agency Regular Meeting Minutes as presented. 4

PLANNING AND ZONING BOARD/ LOCAL PLANNING AGENCY REGULAR MEETING MINUTES SEPTEMBER 11, 2025 CITY HALL – COMMISSION CHAMBERS CITY OF WINTER SPRINGS, FLORIDA CALL TO ORDER Chairperson Kok Wan Mah called the Thursday, September 11, 2025, Planning and Zoning Board/Local Planning Agency Regular Meeting to Order at 5:30 p.m., in the Commission Chambers of the Municipal Building (City Hall, 1126 East State Road 434, Winter Springs, Florida 32708.) Roll Call: Chairperson Kok Wan Mah, present Vice-Chairperson Michael Ferrante, present Board Member Louie Hilal, present Board Member Rachel Hood, present Board Member David Mahnken, present Assistant City Attorney Kristin Eick, present Assistant City Clerk Tristin Tarrant, present Also present: Ms. Terrilyn Rolle, Director, Community Development Department Mr. John Rabon, Senior Planner, Community Development Department Ms. Jenale Garnett, Senior Planner, Community Development Department A moment of silence was held, followed by the Pledge of Allegiance. AWARDS AND PRESENTATIONS 100. Not Used INFORMATIONAL AGENDA 200. Not Used PUBLIC INPUT Chairperson Mah opened Public Input. No one addressed the Board. Chairperson Mah closed Public Input. CONSENT AGENDA 300) Approval of the Thursday, August 7th, 2025 Planning and Zoning Board/Local Planning Agency Regular Meeting Minutes. "I MOTION WE APPROVE THE MINUTES FROM THE REGULAR, AUGUST 7TH MEETING.” MOTION BY BOARD MEMBER HOOD. SECONDED BY BOARD MEMBER HILAL. DISCUSSION. 5

CITY OF WINTER SPRINGS, FLORIDA MINUTES PLANNING AND ZONING BOARD/LOCAL PLANNING AGENCY REGULAR MEETING – SEPTEMBER 11, 2025 PAGE 2 OF 4 P L A N N I N G A N D Z O N I N G B O A R D / L O C A L P L A N N I N G A G E N C Y R E G U L A R M E E T I N G | W E D N E S D A Y , | P A G E 2 O F 4 VOTE: MAH (AYE); FERRANTE (AYE); HOOD (AYE); MAHNKEN (AYE); HILAL (AYE) MOTION CARRIED 5-0. PUBLIC HEARINGS AGENDA 400) Wawa at Winter Springs Marketplace, SR 434 and Tuskawilla Road – Conditional Use Application, Site Plan/Final Engineering, Aesthetic Review, Waivers, and Development Agreement. Mrs. Garnett presented the staff presentation that gave an overview of the project with background information on the project and the preliminary requirements from the previous decision to postpone the item. The applicant responses were also relayed to the Board. Staff’s recommendation was once again denial of the Conditional Use Application, Site Plan, and Development Agreement as it does not meet fundamental design concepts of the Town Center Code. In the event of approval from the Board staff recommended proposed conditions that should accompany the approval. Mr. Cory Stitler, Kimely Horn, Orlando addresses the Board for the applicant and gave a presentation highlighting the change in aesthetics made to better match the marketplace as well as show give a more optimized view of the proposed Wawa to the board. Mr. Stitler further touched on issues previously raised regarding traffic flow, access and the function relaying the Wawa addition would make the marketplace a one-stop-shop amenity for Winter Springs. Chairperson Mah began with questions regarding the direction of the gas canopy, curb cut radius, and the route of delivery trucks. Mr. Stitler responded and gave clarifications. Vice-Chair Ferrante asked about peak traffic hours and traffic flow. Mr. Stitler explained the site circulation is well dispersed and room for needed stacking. Clarifying questions were asked to the City Attorney about the waivers and what would be the best way to move the items to Commission. City Attorney Eick gave the suggestion to split up the motions into a few to be clear in what the recommendations are from the Board. Concern was still expressed on the Staffs continued recommendation of denial or approval with conditions and clarification on the definition of “what a building is?” were asked. City Attorney Eick gave the definition from Section 20-1 of the City Code, and the setbacks are for principal buildings on the parcel. The Board expressed that they want to maintain the integrity of the Town Center’s intent and honor the setbacks within the code. Chairperson Mah opened the Public Hearing for Item 400. Mr. Lou Atti, President of Jesups Reserve Townhome Association, Winter Springs addressed the committee relaying their only concern was the change in ingress and egress on Roberts Family Lane for the turn in. The developers and tenant has communicated well, and they are in support of the Wawa coming in. Chairperson Mah closed the Public Hearing for Item 400. “I LIKE TO MAKE A MOTION TO RECOMMEND DENIAL OF THE CONDITIONAL USE APPLICATION (CONU-2025-0004), SITE PLAN /FINAL ENGINEERING (FEDP-2025-0016), AND DEVELOPMENT AGREEMENT (DVAG-2025-0010) AND WAIVER-2025-0015 (SETBACKS). APPROVE THE FOLLOW WAIVERS STREETSCAPE (WAIV-2025-0014) AND SIGN (WAIV- 6

CITY OF WINTER SPRINGS, FLORIDA MINUTES PLANNING AND ZONING BOARD/LOCAL PLANNING AGENCY REGULAR MEETING – SEPTEMBER 11, 2025 PAGE 3 OF 4 P L A N N I N G A N D Z O N I N G B O A R D / L O C A L P L A N N I N G A G E N C Y R E G U L A R M E E T I N G | W E D N E S D A Y , | P A G E 3 O F 4 2025-0011) WITH CONDITIONS.” MOTION BY BOARD MEMBER HOOD. SECONDED BY BOARD MEMBER MAHNKEN. DISCUSSION. VOTE: MAH (AYE); FERRANTE (AYE); HOOD (AYE); MAHNKEN (AYE); HILAL (AYE) MOTION CARRIED 5-0. Clarification was asked regarding approval of the aesthetics of the property due to the recommendation of denial of the site plans. City Attorney Eick gave clarification, and the applicant present was agreeable. Brief discussion further ensued. “I LIKE TO MAKE A MOTION TO APPROVE THE COLOR PALLET AND AESTHETIC CHANGES THAT WERE MADE PRESENTED IN THEIR FINAL PRESENTATION (AERV-2025-0008).” MOTION BY VICE-CHAIRPERSON FERRANTE. SECONDED BY BOARD MEMBER HOOD. DISCUSSION. VOTE: MAH (AYE); FERRANTE (AYE); HOOD (AYE); MAHNKEN (AYE); HILAL (AYE) MOTION CARRIED 5-0. 401) Winter Springs Marketplace Additional Parking – Site/Final Engineering and Development Agreement. Mr. Rabon opened the item and gave the staff presentation with background information, a site plan overview, and staff recommendation of approval with the three (3) listed proposed conditions. Questions and clarification were given about the additional parking spaces next to the stormwater pond and how it affects the pond. Staff relayed the minimal changes happening to the pond due to the parking. Mr. Ryan Stahl, Equinox Development, Maitland relayed some additional history and interaction with the surrounding neighborhoods when the project was first being talked about. Mr. Stahl relayed some frustration but feels the changes with the turn-in and additional parking are a long-term solution and improvement for concerns that were brought up. Brief clarification and discussion ensued on the two pieces of the application and why they were included in one item together. Chairperson Mah opened the Public Hearing for Item 401. No one addressed the Board. Chairperson Mah closed the Public Hearing for Item 401. “I WOULD MAKE A MOTION WE APPROVE THE AGENDA ITEM WITH THE STAFF CONDITIONS; WITH EXECUTION OF THE DEVELOPMENT AGREEMENT AND CONSTRUCTION OF THE SITE SHOULD NOT BEGIN UNTIL THE STORMWATER PERMIT FROM ST. JOHN’S RIVER WATER MANAGEMENT DISTRIST IS APPROVED AND ALL GRASS ON THE PROPERTY BE BAHIA; NO ST. AUGUSTINE GRASS OR GRASS TYPES WITH LOW DROUGHT TOLERANCE SHALL BE PERMITTED.” MOTION BY BOARD MEMBER HOOD. SECONDED BY VICE-CHAIRPERSON FERRANTE. DISCUSSION. VOTE: MAH (AYE); FERRANTE (AYE); HOOD (AYE); MAHNKEN (AYE); HILAL (NAY) MOTION CARRIED 4-1. 7

CITY OF WINTER SPRINGS, FLORIDA MINUTES PLANNING AND ZONING BOARD/LOCAL PLANNING AGENCY REGULAR MEETING – SEPTEMBER 11, 2025 PAGE 4 OF 4 P L A N N I N G A N D Z O N I N G B O A R D / L O C A L P L A N N I N G A G E N C Y R E G U L A R M E E T I N G | W E D N E S D A Y , | P A G E 4 O F 4 REGULAR AGENDA 500. Not Used REPORTS PUBLIC INPUT Chairperson Mah opened Public Input. No one addressed the Board. Chairperson Mah closed Public Input ADJOURNMENT Chairperson Mah adjourned the Regular Meeting at 6:37 p.m. RESPECTFULLY SUBMITTED: _____________________________________ TRISTIN TARRANT ASSISTANT CITY CLERK NOTE: These Minutes were approved at the _______, 2025 Planning and Zoning Board/Local Planning Agency Regular Meeting. 8

PUBLIC HEARINGS AGENDA ITEM 400 PLANNING AND ZONING BOARD/LOCAL PLANNING AGENCY AGENDA | NOVEMBER 6, 2025 REGULAR MEETING TITLE 7 Brew Drive-Thru Coffee, 1248 E. SR 434 – Site/Final Engineering, Aesthetic Review, Waiver, Condition, and Development Agreement. SUMMARY The Community Development Department requests that the Planning & Zoning Board hold a Public Hearing to consider a Site/Final Engineering, Aesthetic Review, Waivers, and Development Agreement regarding the applicant’s request to construct a ±510 sq. ft. coffee shop with a drive-through and ±262 sq. ft. cooler/storage in the Town Center District, T5 Transect. FUNDING SOURCE RECOMMENDATION Site/Final Engineering, Aesthetic Review, Waivers, and Development Agreement, subject to the following conditions of approval: Execution of the Development Agreement. All grass on the Property shall be Bahia grass. No St. Augustine grass or grass types with low drought tolerance shall be permitted. Economic Impact analysis required before City Commission Public Hearing. 9

TITLE 7 Brew Drive-Thru Coffee, 1248 E. SR 434 – Site/Final Engineering, Aesthetic Review, Waiver, Condition, and Development Agreement. SUMMARY The Community Development Department requests that the Planning & Zoning Board hold a Public Hearing to consider a Site/Final Engineering, Aesthetic Review, Waivers, and Development Agreement regarding the applicant’s request to construct a ±510 sq. ft. coffee shop with a drive-through and ±262 sq. ft. cooler/storage in the Town Center District, T5 Transect. General Information Applicant Erin Dudley, CEI Engineering Property Owner(s) Tuskawilla Retail Partners II, LLC Location 1248 E State Road 434, Winter Springs, FL 32708 Tract Size ±0.5 Acres (subdivided from 8.11 Acres parent lot) Parcel ID Number 26-20-30-5AR-0A00-007L Zoning Designation Town Center District, T-5 Transect FLUM Designation Town Center District Adjacent Land Use North: Seminole Crossing Townhomes East: Cross Seminole Trail South: State Road 434 West: Vacant Height 19’, 1 story Setbacks Front: 25 ft, minimum, 50 ft. maximum Rear: 15 ft. minimum Side: 5 ft. minimum, 100 ft. maximum Development Standards Lot Coverage 100% Development Permits Not applicable Development Agreement Pending; prior Development Agreements were with predecessor in interest, Winter Springs Holdings, Inc., recorded at ORB 8446, Page 1131, and First Modification at ORB 8852, Page 1719 and the Tuskawilla Retail Partners II, PUBLIC HEARINGS AGENDA ITEM PLANNING & ZONING BOARD THURSDAY, NOVEMBER 6, 2025 REGULAR MEETING 10

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 2 O F 1 6 LLC Development Agreement for Blake Commons, recorded at ORB 10887, Pages 649-660 Code Enforcement Not applicable City Liens Not applicable Background Data: The development site consists of one lot, totaling 0.5 acres. The City Commission recently approved The Blake Commons plat, subject to conditions, which proposes to subdivide the 8.11-acre parent parcel. The 7 Brew Drive-Thru Coffee shop is proposed to be located on Lot 2 of The Blake Commons plat. The development site is located at the northeast corner of S.R. 434 and Michael Blake Boulevard. The applicant is proposing to construct a ±510 sq. ft. coffee shop with two (2) drive- through lanes and ±262 sq. ft. cooler/storage in the Town Center District, T5 Transect. Due to the cooler/storage accessory building proposed to be attached by a five (5) foot in length breezeway, it is considered an expansion of the principal structure per Sec.6-84(2) of the City of Winter Springs municipal code. The proposed coffee shop does not include indoor and outdoor seating areas or drive-through service windows, but utilizes the doors located on the west side of the building to serve the customers. Coffee shops with a drive-through is a permitted use in the Town Center District, Transect 5 (T5). Tuskawilla Retail Partners II is responsible for constructing and installing all supporting infrastructure for this development, including grading, utility extensions, stormwater collection facilities, and the Sea Hawk Cove extension to serve the 0.50 acre development site for the 7 Brew Drive-Thru Coffee shop, in accordance with the Final Engineering Plans approved by the City Commission for the Sea Hawk Cove Extension/The Blake Commons. Upon receipt of the Planning and Zoning Board's recommendation, the City Commission shall make a final decision on the application, to approve, approve with conditions, or deny the project within the Town Center district. Public Notices: Notices were mailed to all owners of real property adjacent to and within approximately five-hundred (500) feet of the subject property and all Homeowner’s Associations on file with the City of Winter on October 13, 2025. A Community Workshop was held on June 10, 2025 at 5:00 PM at The Foundry Church. There were no objections raised at the Community Workshop regarding the proposed development. Please see (Figure “1”) Community Workshop Flyer and (Figure “2”) Community Workshop Attendance. Analysis of Final Engineering Plans (Sec. 20-33.1) Criteria: The criteria for Final Engineering Plans are provided and analyzed below: 11

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 3 O F 1 6 (a) Site and final engineering plans and the subdivision of land shall also be subject to the technical requirements set forth in Chapter 9 of the City Code. It is the intent of this section to apply to applications for site and final engineering plans and to any subdivision of land requiring a plat, if applicable, and does not include review and approval of a lot split application. Please see the discussion below regarding technical requirements of Chapter 9. The Final Engineering Plans have been reviewed by the City’s contract engineer, who concluded that the Plans satisfy the technical requirements. provided the conditions of approval set forth below are met. (b) Except in situations involving one (1) single-family home, the Planning and Zoning Board shall be required to review all site and final engineering plan and subdivision of land applications and make a written recommendation to the city commission. Such recommendation shall include the reasons for the board's recommendation and show the board has considered the applicable criteria set forth in this section. (c) Upon receipt of the planning and zoning board's recommendation, the city commission shall make a final decision on the application. If the city commission determines that the planning and zoning board has not made a recommendation on an application within a reasonable period of time, the city commission may, at its discretion, consider an application without the planning and zoning board's recommendation. Except in situations involving one (1) single-family home, all site and final engineering plan and subdivision recommendations and final decisions shall be based on whether the site and final engineering plan and subdivision of land comply with all the technical requirements set forth in chapter 9 of the City Code and the following criteria to the extent applicable: (1) Whether the applicant has demonstrated the site and final engineering plan and subdivision of land, including its proposed density, height, scale and intensity, hours of operation, building and lighting design, setbacks, buffers, noise, refuse, odor, particulates, smoke, fumes and other emissions, parking and traffic- generating characteristics, number of persons anticipated using, residing or working under the plan, and other off-site impacts, is compatible and harmonious with adjacent land uses, and will not adversely impact land use activities in the immediate vicinity. Analysis: Staff finds that the proposed Development is compatible and harmonious with adjacent land uses and will not adversely impact land use activities in the immediate vicinity. The height is within the limits of the Town Center District, T5 Transect as it does not exceed two stories and has sufficient landscape buffers to be aesthetically pleasing. The proposed two (2) lane drive- through coffee shop will operate Monday through Thursday between the hours of 5:30 a.m. and 10:00 p.m., and Friday through Sunday between the hours of 5:30 a.m. and 11:00 p.m. Staff has reviewed the Traffic Impact Analysis-Queue Analysis 12

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 4 O F 1 6 prepared by Traffic Mobility Consultants (TMC), (Figure 10) and finds the model predicts this development will generate eight (8) vehicles during the AM peak hours and four (4) vehicles during the PM peak hours. Based on 132 daily trips generated, the 7 Brew Drive-Thru Coffee project will not be required to provide any mobility credits. The Queue Analysis indicates that the development will accommodate up to nineteen (19) vehicles within the drive-through area, which exceeds the required capacity. Further, the site and final engineering plan depicts safe and efficient means of ingress and egress into and out of the neighborhood and adequately addresses the impact of projected traffic on the immediate neighborhood, traffic circulation patterns for the neighborhood, and traffic flow through immediate intersections and arterials (2) Whether the applicant has demonstrated the size and shape of the site, the proposed access and internal circulation, and the design enhancements to be adequate to accommodate the proposed density, scale and intensity of the site and final engineering plan requested. The site shall be of sufficient size to accommodate design amenities such as screening, buffers, landscaping, open space, off-street parking, safe and convenient automobile, bicycle, and pedestrian mobility at the site, and other similar site plan improvements needed to mitigate against potential adverse impacts of the proposed use. Analysis: Staff finds that the Applicant has demonstrated that the size and shape of the site, the proposed access and internal circulation, and the design enhancements to be adequate to accommodate the proposed density, scale, and intensity of the site and final engineering plan requested. The lot size will accommodate the ±510 sq. ft. coffee shop with a drive-through and ±262 sq. ft. cooler/storage building and design amenities. (3) Whether the proposed site and final engineering plan and subdivision of land will have an adverse impact on the local economy, including governmental fiscal impact, employment, and property values. Analysis: Staff finds that the proposed site and final engineering plan and subdivision of land will not have an adverse impact on the local economy, including governmental fiscal impact, employment, and property values. Rather, the construction of a coffee shop with a drive-through will have a beneficial impact on the local economy, providing additional coffee shop options to local residents and workers, while also providing employment at the facility. Staff find that these impacts will improve property values by continuing to make Town Center a desirable place to live and work). (4) Whether the proposed site and final engineering plan and subdivision of land will have an adverse impact on the natural environment, including air, water, and noise pollution, vegetation and wildlife, open space, noxious and desirable vegetation, and flood hazards. 13

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 5 O F 1 6 Analysis: Staff finds that the proposed site and final engineering plan will not have an adverse impact on the natural environment, including air, water, and noise pollution, vegetation and wildlife, open space, noxious and desirable vegetation, and flood hazards. The project is located outside of the special flood hazard area. (5) Whether the proposed site and final engineering plan and subdivision of land will have an adverse impact on historic, scenic, and cultural resources, including views and vistas, and loss or degradation of cultural and historic resources. Analysis: The proposed site and final engineering plan will have no impact on historical resources. No additional scenic or cultural resources. Including scenic views or vistas, will be impacted by this site and final engineering plan. (6) Whether the proposed site and final engineering plan and subdivision of land will have an adverse impact on public services, including water, sewer, stormwater and surface water management, police, fire, parks and recreation, streets, public transportation, marina and waterways, and bicycle and pedestrian facilities. Analysis: City Staff have reviewed this project from a planning and engineering perspective. Staff did not find any adverse impact on any of the public services listed above. The City Public Works Department has confirmed available water and sewer capacity. (7) Whether the site and final engineering plan and subdivision of land, and related traffic report and plan provided by the applicant, details safe and efficient means of ingress and egress into and out of the neighborhood and adequately addresses the impact of projected traffic on the immediate neighborhood, traffic circulation pattern for the neighborhood, and traffic flow through immediate intersections and arterials. Analysis: Staff has reviewed the Traffic Impact Analysis-Queue Analysis prepared by Traffic Mobility Consultants (TMC), (Figure 10) and finds the model predicts this development will generate 8 vehicles during the AM peak and 4 vehicles during the PM peak. The Queue Analysis indicates that the development will accommodate up to 19 vehicles within the drive-through area, which exceeds the required capacity. Further, the site and final engineering plan depicts safe and efficient means of ingress and egress into and out of the neighborhood and adequately addresses the impact of projected traffic on the immediate neighborhood, traffic circulation patterns for the neighborhood, and traffic flow through immediate intersections and arterials. (8) Whether the proposed site and final engineering plan and subdivision of land will have an adverse impact on housing and social conditions, including variety of housing unit types and prices, and neighborhood quality. Analysis: As a commercial project, the proposed site and final engineering plan will not have an adverse impact on the variety of housing unit types and prices. As for neighborhood quality, subject to the Conditions of Approval, the proposed site and 14

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 6 O F 1 6 final engineering plan development will not have an adverse impact on neighborhood quality. (9) Whether the proposed site and final engineering plan and subdivision of land avoids significant adverse odor, emission, noise, glare, and vibration impacts on adjacent and surrounding lands regarding refuse collection, service delivery, parking and loading, signs, lighting, and other site elements. Analysis: Staff finds that proposed site and final engineering plan avoids significant adverse odor, emissions, noise, glare and vibration impacts on adjacent and surrounding lands regarding refuse collection, service delivery, parking and loading, signs, lighting, and other site elements. (10) Whether the applicant has provided an acceptable security plan for the proposed establishment to be located on the site and final engineering plan and subdivision of land that addresses the safety and security needs of the establishment and its users and employees and minimizes impacts on the neighborhood, if applicable. Analysis: Staff finds the safety and security of the site Civil Plans (Figure 4) and Site Photometric Plan (Figure 9) illustrates that the parking lot and building area will be lit with lighting on site. Additionally, the fire safety plan calls out the proposed route for a fire engine to navigate the site, and the existing fire hydrant that is located south of the proposed site. Additionally, customers will not be entering the building, reducing the potential for user safety issues. (11) Whether the applicant has provided on the site and final engineering plan and subdivision of land an acceptable plan for the mass delivery of merchandise for new large footprint buildings (greater than twenty thousand (20,000) square feet) including the hours of operation for delivery trucks to come into and exit the property and surrounding neighborhood, if applicable. Analysis: Not applicable as the structure being constructed is only 510 sq. ft. and would not receive mass deliveries of merchandise. (12) Whether the applicant has demonstrated that the site and final engineering plan and subdivision of land have been designed to incorporate mitigative techniques and plans needed to prevent adverse impacts addressed in the criteria stated herein or to adjacent and surrounding uses and properties. Analysis: Staff finds that subject to the Conditions of Approval, the site and final engineering plans have been designed to incorporate mitigative techniques and plans needed to prevent the adverse impacts mentioned in the criteria on adjacent and surrounding uses and properties. (13) If the proposed conditional use is a residential use, whether the elementary, middle and high schools (K—12) that will be initially assigned to the residential project by the school district at the time the city commission considers final 15

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 7 O F 1 6 approval of the conditional use have both sufficient capacity, are in close proximity to the project so as to make each of the assigned schools accessible and convenient (e.g., walking distance, travel time, private and public transportation, and quality of route environment) to the majority of the school population that will be drawn from the project, and promote and support the integration of future residents of the project into the existing city of Winter Springs community in a sustainable manner. Analysis: Not applicable as this is not a residential development. (14) Whether the applicant has agreed to execute a binding development agreement required by city to incorporate the terms and conditions of approval deemed necessary by the city commission including, but not limited to, any mitigative techniques and plans required by City Code. Analysis: The applicant has agreed to and is working on a binding development agreement with the City addressing terms and conditions deemed necessary by the City Commission. Water and Sewer: Public Works & Utilities Department Staff have confirmed that sufficient water and sewer capacity exists for this project. Stormwater: Not applicable for this project as no drainage was proposed for this project. The infrastructure included for the development will tie into the existing stormwater pond. That stormwater system will be private and subject to the Declaration of Conditions, Covenants, Easements, and Restrictions as recorded in the Official Records of Seminole County (ORSC), Book 8871, Page 98, as amended by the First Amendment to the same, as recorded in ORSC, Book 8964, Page 1579. These documents govern the maintenance and cost allocations among properties in the Town Center. Transportation: The applicant has provided a Traffic Impact Analysis-Queue Analysis (Figure 10), which has been reviewed by City staff. It was Staff’s finding that the model predicts this development will generate 8 vehicles during the AM peak and 4 vehicles during the PM peak. The Queueing Analysis indicates that the development will accommodate up to 19 vehicles within the drive-through area, which exceeds the required capacity. The site and final engineering plan depicts safe and efficient means of ingress and egress into and out of the neighborhood and adequately addresses the impact of projected traffic on the immediate neighborhood, traffic circulation patterns for the neighborhood, and traffic flow through immediate intersections and arterials. Additionally, sufficient roadway capacity exists for this project. The project will not cause the impacted roadway segments to exceed their adopted level of service (LOS) under the Comprehensive Plan. Parking Analysis: The Town Center does not have minimum required parking standards; however, 16

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 8 O F 1 6 the applicant provided documentation (Figure 11) that the 7 Brew Drive-Thru Coffee shop with two (2) drive-through lanes and no interior patron area will offer a total of seven (7) spaces for full and part-time staff. Aesthetic Review: Pursuant to Section 9-603, which sets forth guidelines and minimum standards for Aesthetic Review packages, staff have utilized the criteria below in Section 9-603 to determine the following. The attached Aesthetic Review package (Figures 13, 14, and 19 includes all of the submittal requirements for aesthetic review as set forth in Section 9-600 through 9-607 and include the following: (a) a site plan; (b) elevations illustration all sides of structures facing public streets or spaces; (c) illustrations of all walls, fences, and other accessory structures and the indication of height and their associated materials; (d) elevation of proposed exterior permanent signs or other constructed elements other than habitable space, if any; (e) illustrations of materials, texture, and colors to be used on all buildings, accessory structures, exterior signs; and (f) other architectural and engineering data as may be required. The procedures for review and approval are set forth in Section 9-603. Aesthetic Review 1. The plans and specifications of the proposed project indicate that the setting, landscaping, proportions, materials, colors, texture, scale, unity, balance, rhythm, contrast, and simplicity are coordinated in a harmonious manner relevant to the project, surrounding area and cultural character of the community. Analysis: Staff finds that all architectural and landscaping elements are coordinated in a harmonious manner relevant to the particular proposal, the surrounding area, and cultural character of the community. 2. The plans for the proposed project are in harmony with any future development which has been formally approved by the city within the surrounding area. Analysis: Staff finds that subject to the Conditions of Approval, the plans for the proposed project are in harmony with the Town Center District Code. 3. The plans for the proposed project are not excessively similar or dissimilar to any other building, structure or sign which is either fully constructed, permitted but not fully constructed, or included on the same permit application, and facing upon the same or intersecting street within five hundred (500) feet of the proposed site, with respect to one or more of the following features of exterior design and appearance: a. Front or side elevations; b. Size and arrangement of elevation facing the street, including reverse arrangement; or c. Other significant features of design such as, but not limited to materials, roof line, hardscape improvements, and height or design elements. 17

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 9 O F 1 6 Analysis: The plans for this project are not excessively similar or dissimilar to other projects within 500 feet of the proposed project with the proposed color scheme and materials being harmonious with the buildings in the surrounding area. 4. The plans for the proposed project are in harmony with, or significantly enhance, the established character of other buildings, structures or signs in the surrounding area with respect to architectural specifications and design features deemed significant based upon commonly accepted architectural principles of the local community. Analysis: As previously mentioned, the project has been reviewed under the Town Center District Code standards, ensuring conformance with the high standard of development for Town Center. The proposed color scheme and materials, Staff does find the exterior design and color to enhance the aesthetic impact of the project as compatible with other developments along SR 434. 5. The proposed project has incorporated significant architectural enhancements such as concrete masonry units with stucco, wrought iron, columns and piers, porches, arches, planting areas, display windows, and other distinctive design features detailing and promoting the character of the community. Analysis: The project significantly meets the standards, with the building’s primary exterior consisting of brick and aluminum with the signature red and black for the 7 Brew Drive-Thru Coffee sign on the front façade of the building. The proposed building represents a positive addition to the City of Winter Springs, and is a high quality, unique design that is harmonious with its surroundings and will add value to the proposed location. The proposed project is designed to contribute significantly to the quality architectural styles that are typical of the Town Center and the surrounding area. Reports: The Final Engineering submittal is required to include the following reports or updates of previously prepared reports for the same property. Reports December 13, 2024 Environmental Report (Figure 8) December 19, 2024 Geotechnical Report (Figure 9) October 7, 2025 Traffic Impact Analysis-Queue Analysis Report (Figure 10) 18

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 1 0 O F 1 6 Procedural History: January 27, 2025 Pre-Application Meeting June 10, 2025 Community Workshop November 6, 2025 Planning & Zoning Board | Recommendation on Site/Final Engineering, Aesthetic Review, Waiver, and Development Agreement. December 8, 2025 City Commission | Hearing on Final Engineering Site/Final Engineering, Aesthetic Review, Waiver, and Development Agreement. Waiver Review: Pursuant to Section 20-34, Any real property owner may file a waiver application requesting a waiver(s) for their real property from any term and condition of this chapter (except from the list of permitted, conditional and prohibited uses set forth in any zoning district category). The Planning and Zoning Board shall be required to review all waiver applications and make a written recommendation to the City Commission. Such recommendation shall include the reasons for the board's recommendation and show the board has considered the applicable waiver criteria set forth and analyzed below. Upon receipt of the Planning and Zoning board's recommendation, the city commission shall make a final decision on the application. If the city commission determines that the planning and zoning board has not made a recommendation on an application within a reasonable period, the city commission may, at its discretion, consider an application without the planning and zoning board's recommendation. Waiver I: A waiver to allow 7 Brew Drive-Thru Coffee to be located at a setback of 68.37’ from the right-of-way of SR 434 in lieu of the 50’ maximum front setback. Waiver Review 1. The applicant clearly demonstrates that the applicable term or condition clearly creates an illogical, impossible, impractical, or patently unreasonable result related to the proposed property and development. Analysis: Staff find that the applicant demonstrated that the 50’ setback requirement creates an impractical result in that it would not permit the lot to meet other requirements for fire access when coupled with the need to include a 510 sf building, necessary parking for staff, and two (2) drive- through lanes for customers. The difference in 18.37 feet allows the applicant to provide enough width for the two (2) drive-through aisles as well as the building, and the parking on a smaller lot within the Blake Commons. 2. The proposed development plan is in substantial compliance with this chapter and in compliance with the comprehensive plan. 19

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 1 1 O F 1 6 Analysis: Staff find that the proposed setback adjustment is substantially compliant with the Town Center setback standards as it will accommodate the necessary access for a coffee shop that is solely a drive-through with no indoor/outdoor seating and is in compliance with the comprehensive plan. 3. The proposed development plan will significantly enhance real property. Analysis: Staff find that the proposed site plan will significantly enhance the real property by providing an additional coffee shop option which will enhance the value of surrounding property and provide families who live and work near Town Center. 4. The proposed development plan serves the public health, safety, and welfare. Analysis: Staff find that the construction of 7 Brew Drive-Thru Coffee will serve the public health, safety, and welfare of area residents. 5. The waiver will not diminish property values in or alter the essential character of the surrounding neighborhood. Analysis: Staff find that the waiver will not diminish property values or the essential character of the surrounding neighborhood. The Town Center is meant to be a mixed-use of commercial and residential to serve residents and visitors. The construction of 7 Brew Drive-Thru Coffee will enhance property values and the essential character by increasing coffee shop options in Town Center. 6. The waiver granted is the minimum waiver that will eliminate or reduce the illogical, impossible, impractical, or patently unreasonable result caused by the applicable term or condition under this chapter. Analysis: Staff find that the waiver is the minimum waiver that will eliminate or reduce the illogical, impossible, impractical, or patently unreasonable result caused by the applicable term or condition under this chapter. The design helps to meet the associated requirements of the use while still meeting the intent of the ordinance. 7. The proposed development plan is compatible and harmonious with the surrounding neighborhood. Analysis: Staff find that the site plan is compatible and harmonious with the Town Center since it is similar to several building setbacks along SR 434. 8. Whether the applicant has agreed to execute a binding development agreement required by the city to incorporate the terms and conditions of approval deemed necessary by the city commission including, but not limited to, any mitigative techniques and plans required by City Code. 20

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 1 2 O F 1 6 Analysis: The Applicant is working on and has agreed to a binding Development Agreement to incorporate terms and conditions deemed necessary by the City Commission. Waiver II: A waiver to Section 20-324(6), Town Center District Code, to allow a drive- through service window (door) in the side yard of the property (eastern side of building) where this section requires drive-through windows (door) to be only permitted in the rear in and alley accessed locations provided they do not substantially disrupt pedestrian activity or surrounding uses. Waiver Review 1. The applicant clearly demonstrates that the applicable term or condition clearly creates an illogical, impossible, impractical, or patently unreasonable result related to the proposed property and development. Analysis: Due to the site being adjacent to SR 434 to the south, the extension of Sea Hawk Cove to north, and the front façade of the building is required to face SR 434 the side yards are the only options to locate the drive-through service door. Further, 7 Brew Drive-Thru Coffee provides only drive-through services with the ingress/egress located at the extension of Sea Hawk Cove, and having the drive-thru on the east side yard of the building/site makes for the best traffic flow. 2. The proposed development plan is in substantial compliance with this chapter and in compliance with the comprehensive plan. Analysis: Staff finds that the proposed development plan is substantially compliant with the Code requirements and the desired goals for the Town Center as described in the Comprehensive Planas the proposed location for the drive-through service door would be screened by the supplemental landscaping for the site. 3. The proposed development plan will significantly enhance the real property. Analysis: Staff finds that the proposed development plan will significantly enhance the real property by providing an additional coffee shop option which will enhance the value of surrounding property and provide families who live and work near Town Center. 4. The proposed development plan serves the public health, safety, and welfare. Analysis: Staff finds that the design and aesthetics of this project will serve the public health, safety, and welfare of area residents. 5. The waiver will not diminish property values in or alter the essential character of the surrounding neighborhood. Analysis: Staff finds that the waiver will not diminish property values or the essential character of the surrounding neighborhood. Landscaping along 21

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 1 3 O F 1 6 S.R. 434 will help buffer the drive-through and vehicular activity. The unique building design and layout will further enhance the area, adding to the diversity of architecture. 6. The waiver granted is the minimum waiver that will eliminate or reduce the illogical, impossible, impractical, or patently unreasonable result caused by the applicable term or condition under this chapter. Analysis: Staff finds that this is the minimum waiver that will eliminate or reduce the illogical, impossible, impractical, or patently unreasonable result caused by the applicable term or condition under this chapter. This design best suits drive-through traffic flow on this lot. 7. The proposed development plan is compatible and harmonious with the surrounding neighborhood. Analysis: Staff finds that the site plan is compatible with the Town Center and the buildings along SR 434. 8. Whether the applicant has agreed to execute a binding development agreement required by the city to incorporate the terms and conditions of approval deemed necessary by the city commission including, but not limited to, any mitigative techniques and plans required by City Code. Analysis: The Applicant is working on and has agreed to a binding Development Agreement to incorporate terms and conditions deemed necessary by the City Commission. Waiver III: A waiver to allow variations in the streetscape width and sequencing requirements for 7 Brew Drive-Thru Coffee, consisting of a 19.5’ landscape and treescape area adjacent to the SR 434 right-of-way, a 5.8’ sidewalk, and a 3’ landscape area adjacent to SR 434. Waiver Review 1. The applicant clearly demonstrates that the applicable term or condition clearly creates an illogical, impossible, impractical, or patently unreasonable result related to the proposed property and development. Analysis: Staff find that the applicant clearly demonstrates that the applicable conditions create an illogical, impossible, impractical, or patently unreasonable result related to the Town Center streetscape requirements. Additionally, maintaining the existing dimensions would be in keeping with adjacent parcels, which also sought waivers for the landscaping designs 2. The proposed development plan is in substantial compliance with this chapter and in compliance with the comprehensive plan. Analysis: Staff find that the variations in the streetscape section widths are substantially compliant with the Code requirements and the desired goals for the Town Center as described in the Comprehensive Plan. The 22

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 1 4 O F 1 6 streetscape maintains the 27’ overall width as required by the ordinance while adjusting the sections to be harmonious with the streetscapes on adjacent parcels. 3. The proposed development plan will significantly enhance the real property. Analysis: Staff find that the proposed variations on the streetscape will significantly enhance the real property by enhancing the overall appearance of the streetscape. The applicant is proposing a number of canopy trees and shrubs beyond what is required that will improve the aesthetic value of the property. 4. The proposed development plan serves the public health, safety, and welfare. Analysis: Staff find that the plan services the public health, safety, and welfare. The proposed streetscape will increase the quality of life for residents and visitors by maintaining the current path and providing a more aesthetically pleasing walkway. 5. The waiver will not diminish property values in or alter the essential character of the surrounding neighborhood. Analysis: Staff find that the waiver will not diminish property values or the essential character of the surrounding neighborhood. The proposed waiver does not affect the location of the sidewalk along SR 434 and if anything, enhances the aesthetics of the lot, thereby increasing property values and being more in-keeping with the character of the neighborhood. 6. The waiver granted is the minimum waiver that will eliminate or reduce the illogical, impossible, impractical, or patently unreasonable result caused by the applicable term or condition under this chapter. Analysis: Staff find that this waiver eliminate or reduce the illogical, impossible, impractical, or patently unreasonable result caused by the applicable conditions in the Code. The proposed waiver keeps the current landscape and sidewalk widths so as to be harmonious with the existing streetscape on adjacent parcels. The total required width of the streetscape as required by the Code will be unaffected. 7. The proposed development plan is compatible and harmonious with the surrounding neighborhood. Analysis: Staff find that the proposed development plan is compatible and harmonious with the surrounding neighborhood. While the widths of each section as proposed are not within the Code, they are compatible with the streetscape for the adjacent parcels and the amount of both canopy trees, shrubs, and plantings will result in a harmonious landscape for the surrounding neighborhood. 8. Whether the applicant has agreed to execute a binding development agreement required by the city to incorporate the terms and conditions of 23

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 1 5 O F 1 6 approval deemed necessary by the city commission including, but not limited to, any mitigative techniques and plans required by City Code. Analysis: The Applicant is working on and has agreed to a binding Development Agreement to incorporate terms and conditions deemed necessary by the City Commission. Applicable Law, Public Policy, and Events: Florida Statutes 163.2511-163.3246: Growth Policy; County and Municipal Planning; Land Development Regulation (Provides that land development regulations for municipal planning be consistent with the Comprehensive Plan). Home Rule Powers Code of Ordinances City of Winter Springs. Section 20-1. Definitions. Fiscal Impact: The Fiscal Impact Report shall be reviewed and approved prior to the project being heard before the City Commission. Development Agreement: The Applicant is currently working with the City Attorney on the Development Agreement for the project. The Development Agreement shall be executed prior to any work on the project covered within this document. STAFF RECOMMENDATION Staff recommends that the Planning & Zoning Board recommend approval of the Site/Final Engineering, Aesthetic Review, Waivers, and Development Agreement, subject to the following conditions of approval: 1. Execution of the Development Agreement. 2. All grass on the Property shall be Bahia grass. No St. Augustine grass or grass types with low drought tolerance shall be permitted. 3. Economic Impact analysis required before City Commission Public Hearing. Attachments: Figure “1” – Community Workshop Flyer Figure “2” – Community Workshop Attendance Sheet Figure “3” – Lot 2 Survey Figure “4” – 7 Brew Civil Site Plan Figure “5“– Landscape Plan Figure “6” – Irrigation Plan 10.24.25 Figure “7” – Site Photometric Plan Figure “8 “– Environmental Report Figure “9“– Geotechnical Report 24

P U B L I C H E A R I N G S A G E N D A I T E M | T H U R S D A Y , N o v e m b e r 6 , 2 0 2 5 , | P A G E 1 6 O F 1 6 Figure “10” – Traffic Impact Analysis-Queue Analysis Figure “11” – Parking Letter Figure “12” – Letter of Intent Figure “13” – Architectural Elevations Figure “14” – Architectural Elevation Renderings Figure “15” – Setback Waiver Description Figure “16” – Service Window Waiver Description Figure “17” – Streetscape Waiver Description Figure “18” – Site Plan Application Figure “19” – Aesthetic Application Figure “20” – Development Agreement Figure “21” – Setback Waiver Application Figure “22” – Service Window Waiver Application Figure “23” – Streetscape Waiver Application 25

7 Brew Drive-Thru Coffee Jenale Garnett, MURP, MPA Senior Planner Planning & Zoning Board 26

Background COMMUNITY DEVELOPMENT Property Address: 1248 E State Road 434, Winter Springs, FL 32708 (± 0.5 acres) Parcel ID: 26-20-30-5AR-0A00-007L January 7, 2024: Preapplication Meeting (PREM-2025-0017) March 13, 2025: Site Plan Application (FEDP-2025-0012) Aesthetic Application (AERV-2025-0006) Development Agreement Application (DVAG-2025-0006) September 18, 2025: Setback Waiver Application (WAIV-2025-0016) October 21, 2025: Service Window Waiver Application (WAIV-2025-0018) Streetscape Waiver Application (WAIV-2025-0017) October 13, 2025: Public Notice Letters October 20, 2025: Public Notice Signage Applicant: Erin Dudley, CEI EngineeringNovember 6, 2025 AGENDA ITEM 400 Planning & Zoning Board 7 Brew Drive-Thru Coffee FEDP-2025-0012 27

Background COMMUNITY DEVELOPMENTNovember 6, 2025 AGENDA ITEM 400 Planning & Zoning Board 7 Brew Drive-Thru Coffee FEDP-2025-0012 • Located at corner of State Road 434 and Michael Black Blvd. • Proposal is to develop a 7 Brew Drive-Thru Coffee at The Blake Commons to include a 510 sq. ft. coffee shop with two (2) drive-through lanes and 262 sq. ft. cooler/storage. • Property is zoned Town Center District, T-5 Transect. • Applicant has submitted a Final Engineering/Site Plan application, an Aesthetic Review Application, a Development Agreement Application, and three Waiver Applications. 28

Site Plan AGENDA ITEM 400 Planning & Zoning Board November 6, 2025 AGENDA ITEM 400 Planning & Zoning Board 7 Brew Drive-Thru Coffee FEDP-2025-0012 29

Landscape Plan AGENDA ITEM 400 Planning & Zoning Board November 6, 2025 AGENDA ITEM 400 Planning & Zoning Board 7 Brew Drive-Thru Coffee FEDP-2025-0012 30

Elevations COMMUNITY DEVELOPMENTNovember 6, 2025 AGENDA ITEM 400 Planning & Zoning Board 7 Brew Drive-Thru Coffee FEDP-2025-0012 Rear Front 31

Elevations COMMUNITY DEVELOPMENTNovember 6, 2025 AGENDA ITEM 400 Planning & Zoning Board 7 Brew Drive-Thru Coffee FEDP-2025-0012 Left Right 32

Proposed Conditions COMMUNITY DEVELOPMENT Staff recommends the Planning & Zoning Board approve FEDP-2024-0012 9 (site plan), AERV-2025-0006 (aesthetic), the 3 Waivers (WAIV-2025-0016, WAIV-2025- 0017, WAIV-2025-0018), and DVAG-2025-0006 (development agreement) subject to the following conditions: 1. Execution of the Development Agreement. 2. All grass on the Property shall be Bahia grass. No St. Augustine grass or grass types with low drought tolerance shall be permitted. 3. Economic Impact analysis required before City Commission Public Hearing. AGENDA ITEM 400 Planning & Zoning Board November 6, 2025 7 Brew Drive-Thru Coffee FEDP-2025-0012 33

COMMUNITY DEVELOPMENTNovember 6, 2025 AGENDA ITEM 400 Planning & Zoning Board ANY QUESTIONS? 7 Brew Drive-Thru Coffee FEDP-2025-0012 34

City of Winter Springs / Tuskawilla Retail Partners II, LLC Development Agreement – Second Modification Page 1 of 11 THIS INSTRUMENT WAS PREPARED BY AND SHOULD BE RETURNED TO: Anthony A. Garganese City Attorney of Winter Springs Garganese, Weiss, D'Agresta & Salzman, P.A. 111 N. Orange Avenue, Suite 2000 Orlando, FL 32802 (407) 425-9566 SECOND MODIFICATION TO DEVELOPMENT AGREEMENT TUSKAWILLA RETAIL PARTNERS II, LLC (Lot 2 Commercial Development - Seven Brew at The Blake Commons) THIS SECOND MODIFICATION TO DEVELOPMENT AGREEMENT (“Agreement”) is made and entered this _______ day of _____________________, 2025, by and between the CITY OF WINTER SPRINGS, a Florida Municipal Corporation (“City"), whose address is 1126 East S.R. 434, Winter Springs, Florida 32708, and TUSKAWILLA RETAIL PARTNERS II, LLC, a Florida Limited Liability Company with its principal address at 880 Glenwood Ave, Suite H, Atlanta, GA 30316 (“Developer”). WITNESSETH WHEREAS, Developer is the fee simple owner of certain real property located in the City of Winter Springs consisting of 8.11 acres, more or less, located Southeast of the corner of Michael Blake Boulevard and East State Road 434, as more particularly described herein (the “Property”); and WHEREAS, the Property is subject to that certain Development Agreement dated March 10, 2015, and recorded in the Official Records of Seminole County at Official Record Book 8446 Page 1131, as modified by the First Modification of Development Agreement dated January 9, 2017, and recorded in the Official Records of Seminole County at Official Record Book 8852 Page 1719 (the “Original Development Agreements”); and WHEREAS, the Property is also subject to that certain Tuskawilla Retail Partners II Development Agreement (Blake Commons), dated August 25, 2025, and recorded in the Official Records of Seminole County at Official Record Book 10887, Pages 649-660 (the “Development Agreement”); and FOR RECORDING DEPARTMENT USE ONLY 35

City of Winter Springs / Tuskawilla Retail Partners II, LLC Development Agreement – Second Modification Page 2 of 11 WHEREAS, the Property is also subject to that certain First Modification to the Tuskawilla Retail Partners II Development Agreement, which provides for the construction of a daycare project on Lot 3 of the Blake Commons plat, dated _________________ and recorded in the Official Records of Seminole County at Official Record Book _____ Pages _________ (the “First Modification Development Agreement”); and WHEREAS, Developer has applied for Final Engineering/Site Plan Approval, Aesthetic Plan Approval, and Waivers from the City Code to construct an approximately 510 square foot, two-lane drive-through Seven Brew coffee shop with no indoor or outdoor seating on Lot 2 of the Blake Commons plat, an approximately 0.50-acre parcel located on the southeastern portion of the Property; and WH

Official record

ArtifactSourceState
AgendaNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Planning and Zoning Board/Local Planning Agency — Packet

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • Official outcomes have not been published.
  • A transcript is not available.
  • No audio or video recording is linked.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: 34d12905d7dd6d520720d12edc1d3e94. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record