Infrastructure and Transportation Subcommittee

Thursday, October 24, 2024 · Government meeting record

The 30-second read

Record incomplete

Infrastructure and Transportation Subcommittee

Why it matters

The official meeting record is available below. Item-level plain-language summaries are not available yet.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Transcript and record text

Closed captionsWhat was said at the meeting, transcribed Aug 3, 2026. Speech is not a decision.
  • No speaker turns were supplied with this transcript.
  • This transcript has no source timestamps.
  • No speaker identities were supplied with this transcript.

This source published text without speaker turns, so speakers and timestamps are not shown.

Then I knew right then. Welcome and good evening. Thank you for coming to this month's Infrastructure and Transportation subcommittee. Let's start with item number one. Public comment. Do we have any public comments on items not on the agenda? Yes. The, the newly slurry Marina Boulevard near the visibility bike lane is nervous, wondering if the, the little trash marks for the cars park will be, added. No, we do not plan on putting back the the little markers for the parking spaces on Marina. So sometimes the, the, parents over to Saint Peter, Mark to the park there. So I don't know if it's going to indicate whether or not they can park on next along Marina Boulevard. Okay. We can look at that. There's no rent curve or no parking signage to prohibit parking. So it is it is allowed. We just when we looked at the amount of parking on Marina Boulevard, we didn't think there was enough parking to warrant having to designate the spacing requirements for, for people that there was enough room for people just pull over and park where a spot was available. Yeah, because you keep walking the bike land in front of school to say no. So they prefer to block the bike lane, but not on the proper, you know, parking spots. So that's why I kind of raised it. Okay. They're blocking the bike lane on Marina, not on, Bayside Drive. Okay. In front of the school. Because that's, bike lane. And there's a little sign at the corner because that's where they wait for the kids. So you see that during Drop-Off and pickup times. I only capture, pickup times because, you know, I'm not. I sleep in, I don't, but, yeah, they're constantly doing it and blocking, fourth Street. Okay. Yeah. Just because the school has any, I don't know if there are a lot if they are supposed to have a permit to do a drive through because they have designated that whole order as a drive through. So no idle in the middle of Bayside Drive and then block. Yeah. One whole section. We know the the north side of fourth Street waiting. You have to get inside instead of parking inside the, the school will have to track and people go out and take. All right. Bruce. Yeah. Yeah, I. Think. Hello? Bruce Olsen, Pittsburgh's Mr. Price, and. Well. You can roam. It looks like the, improvements are complete. The westbound segment, where it goes from one lane in each direction to two lanes in each direction. This is not the first time I've seen this, but the bike lane stops. The two lanes start immediately with no space for the bike lane, and then the bike lane restarts 100ft for so further. If we just started the two lanes 100ft further, we could have a bike lane complete from one bike lane through the start of the two lanes to the other bike lane. And I am not complaining about the way the city of Pittsburgh behaved, because I've seen this in many other places. So it must be in the highway design manual. I am up against a big project to get that changed, but if if we could just make that one little change, that would be a big safety improvement for bicycles westbound on Buchanan Road. Thank you very much. The bike lanes, you know, are very thankful there's a lot of bike lanes because the added benefit is a lot of the people. There's people with disabilities and scooters or senior citizens. They do use the bike lanes. Okay, maybe I've seen one now on the, on the railroad overpass, but, our neighbors, because they come from Seattle courts, so they'll use a bike lane to get to our neighborhood and, you know, visit friends just because the sidewalks are an even. So, they will use the bike lanes. Interesting. Okay. Thank you. We'll look into Buchanan Road. Thank you very much. So compliments. Great. All right. Seeing no other public comments, we'll move into item number two, citywide road improvement program. Sarah. Excellent. Thank you. We move with that. The road improvement communications program number nine 513 of it's, a presentation to the effect of this first slide has already been brought to, this group. But I just wanted to recap. As you know, the roads in Pittsburgh need some love. We have a PCI average PCI ranking of 58 right now, which puts us at a at risk rating. According to the Metropolitan Transportation Commission. To give you an idea, 60 to 69, CPI, in statement, index, would call us fare 70 to 79 would be good and 80 plus would be very good. So the idea would be to we want to increase this number. Right now we spend about 4.1 million annually, on our roads program. And what this will get us is a one point CPI decrease every year, whereas 7 million, would be the estimated amount annually to invest to maintain our PCI rating. And 11 million would be about to improve it. There's a lot of reasons why we're in this position and we're not alone in this position versus just, underinvestment that leads to degradation over time. As John is presented with his bell curve. The graded roads, as compared to roads that just need smaller fixes are much more expensive, costly, to bring into good condition. Grant opportunities have evolved. There used to be, more grants for local roads. And while there are still roads grants, fewer of them are aimed at local roads and were aimed at, larger, more at the root and then of course, inflation. Next slide. So the goals of the city's pavement management program are to develop long term strategy to consistently rate the PCI and improve road conditions for safer, safer and more enjoyable driving experience. So we're here to start building off the momentum that John and his team, John Ryan, and their team have created. If you saw zone, zone three, a little common. I'll get into the zones later. But we've started we've started, a local roads repaving, management program. And the goals, this program, or as you see on the board when I go to the next slide. So the engineering division divide a facility into ten failing zones using natural boundaries and square miles of non arterial local roads. And, the goal is to address one zone per year. Currently, it seems like a pace of, getting to all ten zones over 14 years might be doable. But eventually leading to one zone a year. In each decade, we get to all of our local roads. Zone three is done. So, as you can see on the map, and I'm sorry I didn't show to the slide down three is done. Next is zone. Zone seven is the yellow that didn't show up. And we're looking forward to getting out to all of our zones, making these major road investments and improvements and, bringing our PCA. Next slide. So with the advent of this new program and the pace and the funding environment, staff is putting a citywide road improvement communications program into motion with the objective of engaging the public to raise awareness of open road conditions, street maintenance programs, philosophy and funding. That's the bell curve. That's the lack of grants. That's, kind of an entire ecosystem and a funding gap for maintaining PCI. We want to make the community aware that this is happening, and it's important. And all the way from the perspective of you're going to be receiving, basically inconveniences when we are in your realm. But here's how we're going to notify you. Here's how we can all adjust. Here's how you can provide, input on your project, etc.. Also, here's what's happening in your project. But beyond that, why it's important that we're doing this information, this, infrastructure upgrade, has it been funded and all of that? So our infrastructure, subcommittee newbie, actually a community outreach coordinator, put together a 12 month, communication outreach calendar, basically next slide that, has a lot of moving parts and what we're looking for today. So it took me nine slides to get you to where what I'm looking for from this subcommittee today is input on our Pittsburgh in Motion content. This would be a public engagement concept that can be used citywide, not necessarily just for roads. You know, I know the city is working with the consultant on a citywide branding, and this would certainly be cohesive with that. But to that end, we'd like the subcommittee to consider Pittsburgh and Motion as an educational campaign slogan with episodes roads would be one episode of this, that reflect pertinent information to share with the community. So we wrapped up a night last month, and I feel like night after night tonight. One thing that is definitely consistent there are a lot of consistency between entity meetings, but it's that Pittsburgh does good work and we don't share enough. There's a lot of times when people come to knit and they say, what are you going to do this? Or why haven't you done this? Or we really look forward to this. And we say, hey, guess what? We've got a plan for that. We are going to address that. Thank you for bringing that up. We agree. And Pittsburgh in motion would be one opportunity to ensure that we're doing that across a couple of media. One being a website landing page. And, Lydia, I'm sorry, you could go to Chrome. I've, opened up, landing page. It should be here. So, magnets on the edge side of that. It should be your first link on the left. Your first page on the left. Yep. There. So this is a mockup of what the Pittsburgh in Motion landing page would look like. Essentially, it would have, our city logo, a quick, little information blurb that we can get into the details of that and then links to these Pittsburgh in Motion episodes, measure, road repairs. We'd have our our transparent obviously this would be cleaned up or, you know, legibility and all that kind of stuff. But, our transparency portal on there, the interactive GIS that can show where the active projects are, where the zones are. Newsletter sign up, upcoming engagement events, things like that. So, we have a website landing page to kind of collect all of these projects and initiatives that are moving the needles right. And we envision the, episodes would communicate good things, like it's essentially give off the it's happening. The needle's moving. Evolution is occurring here. Keeping up with Pittsburgh. And if you want to go back to this slide show. We would also do outreach in the form of town halls. Ten town halls in ten zones. This would be where we would, proceed as our next slide, where we would proceed a, zone construction period with information on. Here's what's coming. There's why it's happening. This is how it's funded. These are the important things. And to know, here's your contacts during the, the construction and question and answer. We have had one town hall. It was for zone three. This is the zone with open paint. We had three attendees. All very positive, things to say about the the way zone three was done. And also feedback on how to better contact, and, complete the project. So it was great. It was a different flavor than the town hall we would hope to have in in the future. But, educational nonetheless. We would also incorporate this information into all. And it's the annual report. And, we would elevate. It's already in the, city's monthly for the company as well. Next slide. We'd also have social media and all of that. We reached out for the town hall. For zone number three. This postcard, actually. And only are sending it to a proposed to only send it to the zone receiving that information. We really want people to attend the town hall in their zone. So you won't see, like, a zone board meeting. That rose on, Instagram or Facebook? Only on next door, where we could target only via, email, where we can target and only via direct mail where we can target our invitees. And in fact, we asked all three invitees or all three attendees of the zone three, town hall how they heard about it, and they all received a postcard and they all got the email. And Jordan actually talked to other people that lived in that area, and they said they received it, but they were happy with the project. So like, at the meeting, because we had free sausage that on the fliers so again, we really want to get the word out. We wanted to do it in an interesting and, engaging way. And sorry. Next slide. And we want to know kind of your thoughts about launching this educational kind of, campaign with episode, whether that's kind of a direction you would like to go in, whether we're making it more complicated than it needs to be by having the Pittsburgh in Motion concept. Just your feedback in general on this process so that we can educate people on the good work we're going to be doing on the roads. That would be is what we're looking for today. Yeah, I think so, yeah. Going to so for the outreach standpoint, I think is brave when you say Pittsburgh in motion. I don't think of roads, though. I mostly dance from the, we can go to town hall. I don't know if I want to dance for something like that. But, I think it's great to have, like, a landing page for people to go through and know what's going on. Communication is really important for people to understand that their own, and their road repairs. So I think that's great. And videos worked well over social media. So, getting videos out there would be helpful, as well. I guess sometimes, since your outreach was so low, when you get a town hall, do you think there's other methods to get people changed? Yeah. We have. So, there's a lot of different ways of outreach, so I'm that we've used the city before that have been successful in some cases and unsuccessful in others. And we we've kind of realized that if you rotate them out, people become less, blind to them. So I don't know if you remember, we used to do posters and like, not billboards, but banners everywhere, you know, banner program we have, you know, those kinds of things. We could consider banners in the neighborhood. Recreation has had success with door hangers as well. We ran into a little, issue with door hangers. So there's not as many staff as there used to be. Seasonal staff at rec to, hang the door hangers. But it's something that with more time for notifying about the meetings, we could figure out a door neighbor situation. It's it's difficult because any blast or something along those lines, social media would bring people not from the zone potentially to the meeting. But I do think we'll have more interest from a zone that has not had the construction yet, so that the apprehension of how is this going to ruin my day. And the excitement that, how is this going to make my street better? That I think would motivate people to come rather than people that were satisfied with the work. The work was done. They're kind of over seeing the city every day. So, I'm. Yeah, I guess from my perspective, and this might seem odd, right. But the what we want to get from this campaign at the end of it is, residents to understand that we have a problem right? Not necessarily. Look, all the great things we're doing. I know that sounds bad, but, like, we don't. Because while there are other efforts that we need to push that and say, hey, we're moving the needle because, these different areas, this specific campaign should be focused on roads and that we have a problem. Like, even if we did our best over 14 years, we're still going to decline from a PCI, right? So that's really what, at the end of the day, people should understand. And it's hard because we're doing improvements and a lot of people are seeing improvements. And so they are feeling like we're going to make traction. Right. But at the end of the day, what people need to realize is, yeah, even if we do everything right, we're still going to lose ground on this. So, unless something changes. So. So I think that's really what this campaign should focus on, is trying to educate on that concept. I think something that I've seen, I haven't actually gotten pitch, but I saw it through my social media. If you don't know the City of Concord or City of Martinez, maybe they had a landing page on a website where you could type in your address and you can see when your, street was going to be up next for paving. Right. So I think that helps from an educational standpoint. If my road is in terrible condition, it's going to be paved in your name. You know, that might motivate me to do something, you know, speak out or reach out to my local, my council member. And, so, so I think that might be a tool that can be used to educate as to, hey, this is this is when your road is going to be paved. And maybe this is how much is going to cost, right? That that's another thing people need to understand the, the dollar, the dollars for home improvements that we're making. Absolutely. So I guess those are those are my two, feedback audiences is maybe focus more on roads. And if we can, the educational piece is important. Okay. So what I'm hearing is this idea of a, flexible education concept in general is a no, really. Just roads that we have a problem unless we fundamentally have some kind of change and, dollar amount, more specific information per street, essentially. Right. And increase engagement, especially if it's not about that, but it if they're not engaging, it would still what is it about. Yeah. Excellent. We will go back to the drawing board and we will likely come back to the subcommittee. Well, the subcommittee is not meeting that meeting in November or December. So January's be our next set of meetings. So what we'll do. But we do plan to, you know, with your input, roll this out. Continue to roll this out, so that we can stay ahead of the zone construction and all that. We can come back to you in January with an update. And look for your feedback on how we're doing it, as well as, content of what what kind of information has been received. And you said them for assignments. Yeah. So be. And so will we be held. The town hall is, for. Yes. On point. In November. Yes. Yes. The next one. Working on the logistics of where? On that one. Right now. There's another. All right. Wonderful. Thank you very much. Next item three. Update on our fiscal year 20 2425 city Council boys. Comments form. Oh, I'm sorry. A public comment on item two. Yeah. I mean, I'm, I kind of thoughts coming up that, you know, you need this to campaign now for the motion. So I think for your motion means moving. So occasionally you may want to, use time lapse footage, especially on the forest road or like the before and after, and people go, whoa. Yeah. And for people pictures because, you know, this is about benefiting our population. And I would just really, you know, one of the other benefits really, you know, that the unexpected benefits, like when we pay for your boulevard are the senior citizens are caught using the, the nice, smooth, bike lanes. So probably in other neighborhoods that have a lot of commuters, maybe a feature or a commuter or feature any of, I would say the union workers we are union working on the world. You you'll say, you know, I'm just say, who knows? Hey, you know, this is from IBEW. You know. Yeah. What have you some thoughts on retirement? Any other public comments? I've had a number two. All right. So now moving on to item three. All right. Let's go ahead and go to the next slide. So for public infrastructure the overarching goal is really to improve the public facilities with the emphasis on our roads as well as beautification of city maintained areas. And so we have several goals related to that overarching topic. Next slide. We just wanted to give some high level updates on those different objectives as they're called. So the first objective was to improve key entrance ways into the city. And so we're building off of the work that's already been done where there was in a previous subcommittee meeting, there was a list of locations that were to identify, you know, gateway entrance monuments into the city and discussions on their appearance. What we plan to do as far as next steps is we're working to develop an RFQ, and we're going to put it out to the Arts committee or not, the committee, the arts community in our city, and ask for proposals or submittals of suggested ideas of what these different entrance features might look like. And so the plan is to identify or key locations, because I think that's what we can afford to do with the funding we currently have, and ask for them to preliminary proposal of what they would do in those four different locations. This is very similar to something the city of Brentwood did recently. In fact, we got a copy of their RFQ as an example. And then once we received those, those we would bring the, the submittals into this subcommittee for review and decide if there's any that we like. Is there a particular artist or do we want to select something from this artist, something from a decent artist, and hopefully we can find some like him? Not a situation where we don't get many proposals. So that status of that one, next one is to evaluate existing and new funding sources to support infrastructure improvements. We just discussed that item number two. So we developing this program to really advertise the work that we're doing and the challenges that we're facing funding wise. So we're holding town hall meetings. We've also developed standards for project signage on each of our projects. So we're identifying the funding sources that are being used on all of our projects, with a particular emphasis on measure M. And so some some projects get just a standalone measure and sign other ones. We have a larger project of to sign with that measure and logo on it. So we're really promoting not only the work that we're doing, but the funding sources behind them. And then last but not least, we're doing a lot more social media outreach to the community to, again, emphasize the work that we're doing and the funding that's being utilized to construct these improvements. Next objective is to address traffic circulation issues at the intersection of San Marco Boulevard and West Leland. And this objective would really focus on the concept of let's extend West Leland Road to will pass to get cars out of that intersection, trying to get onto the highway before at San Marco and give them another option. So what we've accomplished so far, the board did vote their approval for our substitute projects as part of the Fifth Amendment to the JPA agreement. As of yesterday, every jurisdiction has now formally approved the Fifth Amendment to the Jep agreement. And so it's now in the process of just having all the jurisdictions sign the agreement and submit it to the aquifer so that they can then ratify it and finalize that amendment. Once that's done, I believe we have to wait 30 days and then the funds become it becomes official, and the funds are now available for our project in the meantime, we're not waiting. We've already, requested qualification proposals from our On-Call design consultants, and we're currently evaluating those proposals so that we will have a design firm on board once the funds become available. And we're going to hit the ground running on this project. So that's the status of that objective. Next one addressed traffic circulation issues along the Railroad Avenue corridor. So there's two two things we're really focusing on on this one. And they're both project related. First, CCTV was able to obtain a grant to do smart signal projects in the entire county. Pittsburgh is a partner in that. And they're looking to do improvements not only along railroad, but along Leland and our other major corridors. And so we are actively working with them on this project as they start developing the scope and the program. We've entered into a funding agreement with them to pay our part of the project, and we're still working out the details of a maintenance agreement before we can present that to City Council for consideration. So that one is progressing. The other project is the earmark funds you receive for the Pittsburgh Center Smart Signal Project. This is bicycle and pedestrian improvements within a quarter radius of the Pittsburgh Center Bart station. We submitted for the earmark to receive the funds to start working on this only. We told that we didn't qualify to receive the funds because we're not a transit agency. So we reached out to Ccta. They are eligible and they are willing to accept the grant funds on our behalf and administer it there. We're working with them. They're going to be drafting an MOU to perform that service for us, and hopefully we'll have something soon that we can present to council for approval so we can get started on this project. So those are the progress has been made on that objective. Next, engage in advocate with Caltrans and improve communication, collaboration. So we've been reaching out to Caltrans to find out who are their key points of contacts for the different areas in Caltrans, in district or specifically within city Pittsburgh. We just this month, we had our first meeting with the different representatives of Caltrans. And this briefing was kind of get to know each other, different roles, responsibilities. And we expressed some of the things that we're really interested in partnering and collaborating with them. Wasn't as well attended by Caltrans as I would have liked, but we they agreed to a meeting every month. And so we're going to do some additional outreach. And maybe if we have, but we had an agenda the last time, but we'll continue to work with them to try and get them to be engaged with us and improve that collaboration. So while we're saying is on track, it's still a work in progress. And last but not least is the construct project 5067 water treatment plant filtration improvements and hypochlorite conversion. So this is going to show 50% complete and it's going to show that for a very long time. And here's what. So we really had for some the objectives of this. First was to award the construction contract, which we've already done completed. Second was to complete mobilization to the project site of the contractor. That is done and completed. The next two will take a while. It's to complete to complete the construction of the new filters and to have them online. That schedule for the end of 2026, beginning of 2027, and then the last goal is to complete the construction of the project, which is currently projected for early 2028. So we'll continue to monitor this. We'll continue to provide you with updates on the progress on the project, but it's going to be sitting at that 50% complete for. Any questions on the goals? And any public comments on the goals. All right. Hearing none we'll move on to item number four capital Improvement Program project status Ariana. Thank you John. Hi everyone. So I'll just focus on some of our projects that are our focus right now that they're heavily in construction. And I'll start off by saying that one of the projects we've completed is the annual striping at the 14 different schools. So that's why that project is is done. We did, 14 schools. I've listed under the status updates for all those 14 schools that got new crosswalks. Okay. And then, I'll move on to the projects that we have, construction. I'll just touch on some of them. One of the big ones is our Bart project. Right now we finally got a confirmation from Caltrans today that the encampments that homeless encampments on the list will be, cleared out by next Wednesday. So that same day, we're going to have our contractor moving quickly and start serving work. So right now they've been focusing on our railroad segment. We did pavement rehab from that, highway for up to east, for a 17th street. And then, that was a great collaboration. And we did our striping and all that good stuff. So now we're working on the pathway, we're laying the rug, we're doing the street lights still on railroad. We're going to start moving next week into list. And lastly we will finish on California. Parallel to all this work, we're also working with PGA and involving them with the new, the street lights that we're going to be installing in California. So there's things that are going parallel to the construction as well. Our other project that we kicked off in construction this week was the Crestview. That's project 2028. For this project, we are only going to have shoulder closures. So that's a good thing. We started, on Williams Way, and we're going to stay at that intersection for a week and a half. Then another project that simultaneously kicked off a couple weeks ago was, citywide, for this project that's pretty much all over, our city, but we're going to do, pavement rehab on East 14th and Park Parkside. That is scheduled to happen, next week. And, zone three, we just completed our punch list, so we're very happy to take that to the council for completion on the 18th as well. That project was, Marina project was linked to that one. So we'll be taking that to completion as well. We're still wrapping up a few things for all that to, to take to council as well. Then we have a ribbon cutting for frontage. We're very excited. That's tomorrow at two. Thank you. And then are we Lopez storm drain repair project. That project was awarded to plans. And as you all know, on the 21st, but, we're working on getting funds from we qualified to get funds for the federal through Caltrans for the federal highway Means program. So that's kind of we're going to pause a little bit on this project until we get the funds. So we're looking to restart that project, April of next year. The other reason that project is being paused, the contractor expressed concern because it's within a creek, that by the time they're able to mobilize and get to the job site will be entering the rainy season. And you really don't want to be working on these culverts when there's water flowing in the creek. So they they have also asked if we were willing to delay this project until the springtime, when the flows in the creek will be more easy to predict. And so we were willing to accommodate that delay. Yes. And then our Central Harbor project, we kicked off construction this week. So we're happy to see that in action. And today for, a project that it's not in construction yet, but it's in the bid and advertise phase is our Premier Fields project. We had a great turnout. We had 12 contractors today under Pre-Bid. There's a lot of interest. So we're very excited and we're hoping to have good bid results are bid opening for this project is on Friday, next Friday. And we're hoping to get this going fairly quick after we award the construction contract. And that's pretty much it. We're busy with other projects and design, and so. That's all. Are there any questions about any particular projects that we've touched on or maybe even didn't touch on? A lot of information. So I would just add one more of that, that I mean, there's a ton of projects in the city Park restroom, which was also awarded on Monday. We are working with the contractor. It's looking like that. They once we get the contract executed, they're going to do their submittals and we'll review it. Then they have to fabricate the restrooms. So it's looking like they're going to start working at the park. March in. Looking at the march to June really isn't the optimal time, but we're working with recreation to make sure that we reduce the impact. The construction will primarily be right around the two restrooms. And as we discussed the council meeting, we're going to look to bring in some temporary facilities so that we can continue to allow use of those fields while the projects that are in construction may be about three months to demo for the new foundation and then bringing the new restrooms. Very probably a small point, but I'm sure meaningful for the users of that part. When you say temporary restroom facilities, are we talking about porta potties like the the plastic ones? Are we talking about, like, a trailer with food? We're for right now, we're investigating the trailer option and seeing what the pricing and availability is. Those. Right? Yeah, that's that's the idea of porta potties will be if that. If we can't find a better option. Yeah. Thank you. That's a great question. Any public comments on this item? Yes. Yes, please. Mr. Olson, Mr. bicycle, traffic signals particularly that are going to be upgraded, particularly at, arterial streets when you're planning, please, if there are transformers or control boxes to be placed, put them ten feet back from the face of the curb so that if at some time in the future, we wanted to make a ten foot wide sidewalk there, we could. We could comment. I will make the note. Thank you Bruce. Thank you. Okay, moving on to item number five. Subcommittee and staff reports. Remarks. Anyone have any comments or remarks to make? The none. We will adjourn this meeting. And thank you all very much for being on.

Page

/

25

Loading…

![](https://docs.google.com/viewerng/thumb?ds=AON1mFwM16F8H8sJawgoBJxTQXJQjkvJtuvASPey5iRSpNODjxjRvBqG-PyjG__AhYNJhMC437o7zWLPVsJ6_ZG9q1hfB-t1W91_oD_jhRHmJ2zA1zWqiS-Of30axo5y2yMLHl12Jsb5zi8mzDMA9neu9FqQXcwVfeYhf0-jmymVlzx2MbAdq2kgGmhA4Z4nWBMAmdOBP4gAG9vI3CRuWYNLwkjkrqUEfdKfQgqKF0TOLf8kzt1aF_CF83Inf0dANgT-u6qk2OpIkfLeh39eKEEWbFJbZ1knWJn4nUy6UgPLhxWqTsYkzkC8d9KtpMymzlYJ9Q74rpg-0Z8zxknBKwieLwINQxOsvQ%3D%3D&ck=lantern&dsmi=unknown&authuser&w=800&webp=true&p=proj)

{"id": "", "title": "DocumentViewer.php", "mimeType": "application\\/pdf"}

## Page 1 of 25

65 Civic Avenue

Pittsburg, CA 94565

P: (925) 252-6900

F: (925) 252-4814

pittsburgca.gov

AGENDA

INFRASTRUCTURE AND TRANSPORTATION SUBCOMMITTEE

Thursday, October 24, 2024

5:30 PM

Pittsburg City Hall

First Floor Conference Room, 4B

65 Civic Avenue

Pittsburg, CA 94565

Subcommittee Members

Dionne Adams, Council Member

Shanelle Scales-Preston, Council Member

1\. Public Comment

2\. Citywide Road Improvement Program: Staff will provide an initial assessment and

strategy on informational campaign for Citywide road improvements.

3\. FY 2024/25 City Council Goal Update: Staff will provide an update on progress

towards public infrastructure goals.

4\. Capital Improvement Program Project Status: Staff will provide a status update on

active projects.

5\. Subcommittee and Staff Reports or Remarks

6\. Adjournment

![Page 1 of 25](blob:https://docs.google.com/b9bacf44-ee3d-49cb-a652-61cbf7ae9fd5)

## Page 2 of 25

Item No. 2

Road Improvement Communications Program

Infrastructure & Transportation Subcommittee

October 24, 2024

1

## Page 3 of 25

Showing the first 24,000 of 32,857 characters. The full document is at the source.

Then I knew right then. Welcome and good evening. Thank you for coming to this month's Infrastructure and Transportation subcommittee. Let's start with item number one. Public comment. Do we have any public comments on items not on the agenda? Yes. The, the newly slurry Marina Boulevard near the visibility bike lane is nervous, wondering if the, the little trash marks for the cars park will be, added. No, we do not plan on putting back the the little markers for the parking spaces on Marina. So sometimes the, the, parents over to Saint Peter, Mark to the park there. So I don't know if it's going to indicate whether or not they can park on next along Marina Boulevard. Okay. We can look at that. There's no rent curve or no parking signage to prohibit parking. So it is it is allowed. We just when we looked at the amount of parking on Marina Boulevard, we didn't think there was enough parking to warrant having to designate the spacing requirements for, for people that there was enough room for people just pull over and park where a spot was available. Yeah, because you keep walking the bike land in front of school to say no. So they prefer to block the bike lane, but not on the proper, you know, parking spots. So that's why I kind of raised it. Okay. They're blocking the bike lane on Marina, not on, Bayside Drive. Okay. In front of the school. Because that's, bike lane. And there's a little sign at the corner because that's where they wait for the kids. So you see that during Drop-Off and pickup times. I only capture, pickup times because, you know, I'm not. I sleep in, I don't, but, yeah, they're constantly doing it and blocking, fourth Street. Okay. Yeah. Just because the school has any, I don't know if there are a lot if they are supposed to have a permit to do a drive through because they have designated that whole order as a drive through. So no idle in the middle of Bayside Drive and then block. Yeah. One whole section. We know the the north side of fourth Street waiting. You have to get inside instead of parking inside the, the school will have to track and people go out and take. All right. Bruce. Yeah. Yeah, I. Think. Hello? Bruce Olsen, Pittsburgh's Mr. Price, and. Well. You can roam. It looks like the, improvements are complete. The westbound segment, where it goes from one lane in each direction to two lanes in each direction. This is not the first time I've seen this, but the bike lane stops. The two lanes start immediately with no space for the bike lane, and then the bike lane restarts 100ft for so further. If we just started the two lanes 100ft further, we could have a bike lane complete from one bike lane through the start of the two lanes to the other bike lane. And I am not complaining about the way the city of Pittsburgh behaved, because I've seen this in many other places. So it must be in the highway design manual. I am up against a big project to get that changed, but if if we could just make that one little change, that would be a big safety improvement for bicycles westbound on Buchanan Road. Thank you very much. The bike lanes, you know, are very thankful there's a lot of bike lanes because the added benefit is a lot of the people. There's people with disabilities and scooters or senior citizens. They do use the bike lanes. Okay, maybe I've seen one now on the, on the railroad overpass, but, our neighbors, because they come from Seattle courts, so they'll use a bike lane to get to our neighborhood and, you know, visit friends just because the sidewalks are an even. So, they will use the bike lanes. Interesting. Okay. Thank you. We'll look into Buchanan Road. Thank you very much. So compliments. Great. All right. Seeing no other public comments, we'll move into item number two, citywide road improvement program. Sarah. Excellent. Thank you. We move with that. The road improvement communications program number nine 513 of it's, a presentation to the effect of this first slide has already been brought to, this group. But I just wanted to recap. As you know, the roads in Pittsburgh need some love. We have a PCI average PCI ranking of 58 right now, which puts us at a at risk rating. According to the Metropolitan Transportation Commission. To give you an idea, 60 to 69, CPI, in statement, index, would call us fare 70 to 79 would be good and 80 plus would be very good. So the idea would be to we want to increase this number. Right now we spend about 4.1 million annually, on our roads program. And what this will get us is a one point CPI decrease every year, whereas 7 million, would be the estimated amount annually to invest to maintain our PCI rating. And 11 million would be about to improve it. There's a lot of reasons why we're in this position and we're not alone in this position versus just, underinvestment that leads to degradation over time. As John is presented with his bell curve. The graded roads, as compared to roads that just need smaller fixes are much more expensive, costly, to bring into good condition. Grant opportunities have evolved. There used to be, more grants for local roads. And while there are still roads grants, fewer of them are aimed at local roads and were aimed at, larger, more at the root and then of course, inflation. Next slide. So the goals of the city's pavement management program are to develop long term strategy to consistently rate the PCI and improve road conditions for safer, safer and more enjoyable driving experience. So we're here to start building off the momentum that John and his team, John Ryan, and their team have created. If you saw zone, zone three, a little common. I'll get into the zones later. But we've started we've started, a local roads repaving, management program. And the goals, this program, or as you see on the board when I go to the next slide. So the engineering division divide a facility into ten failing zones using natural boundaries and square miles of non arterial local roads. And, the goal is to address one zone per year. Currently, it seems like a pace of, getting to all ten zones over 14 years might be doable. But eventually leading to one zone a year. In each decade, we get to all of our local roads. Zone three is done. So, as you can see on the map, and I'm sorry I didn't show to the slide down three is done. Next is zone. Zone seven is the yellow that didn't show up. And we're looking forward to getting out to all of our zones, making these major road investments and improvements and, bringing our PCA. Next slide. So with the advent of this new program and the pace and the funding environment, staff is putting a citywide road improvement communications program into motion with the objective of engaging the public to raise awareness of open road conditions, street maintenance programs, philosophy and funding. That's the bell curve. That's the lack of grants. That's, kind of an entire ecosystem and a funding gap for maintaining PCI. We want to make the community aware that this is happening, and it's important. And all the way from the perspective of you're going to be receiving, basically inconveniences when we are in your realm. But here's how we're going to notify you. Here's how we can all adjust. Here's how you can provide, input on your project, etc.. Also, here's what's happening in your project. But beyond that, why it's important that we're doing this information, this, infrastructure upgrade, has it been funded and all of that? So our infrastructure, subcommittee newbie, actually a community outreach coordinator, put together a 12 month, communication outreach calendar, basically next slide that, has a lot of moving parts and what we're looking for today. So it took me nine slides to get you to where what I'm looking for from this subcommittee today is input on our Pittsburgh in Motion content. This would be a public engagement concept that can be used citywide, not necessarily just for roads. You know, I know the city is working with the consultant on a citywide branding, and this would certainly be cohesive with that. But to that end, we'd like the subcommittee to consider Pittsburgh and Motion as an educational campaign slogan with episodes roads would be one episode of this, that reflect pertinent information to share with the community. So we wrapped up a night last month, and I feel like night after night tonight. One thing that is definitely consistent there are a lot of consistency between entity meetings, but it's that Pittsburgh does good work and we don't share enough. There's a lot of times when people come to knit and they say, what are you going to do this? Or why haven't you done this? Or we really look forward to this. And we say, hey, guess what? We've got a plan for that. We are going to address that. Thank you for bringing that up. We agree. And Pittsburgh in motion would be one opportunity to ensure that we're doing that across a couple of media. One being a website landing page. And, Lydia, I'm sorry, you could go to Chrome. I've, opened up, landing page. It should be here. So, magnets on the edge side of that. It should be your first link on the left. Your first page on the left. Yep. There. So this is a mockup of what the Pittsburgh in Motion landing page would look like. Essentially, it would have, our city logo, a quick, little information blurb that we can get into the details of that and then links to these Pittsburgh in Motion episodes, measure, road repairs. We'd have our our transparent obviously this would be cleaned up or, you know, legibility and all that kind of stuff. But, our transparency portal on there, the interactive GIS that can show where the active projects are, where the zones are. Newsletter sign up, upcoming engagement events, things like that. So, we have a website landing page to kind of collect all of these projects and initiatives that are moving the needles right. And we envision the, episodes would communicate good things, like it's essentially give off the it's happening. The needle's moving. Evolution is occurring here. Keeping up with Pittsburgh. And if you want to go back to this slide show. We would also do outreach in the form of town halls. Ten town halls in ten zones. This would be where we would, proceed as our next slide, where we would proceed a, zone construction period with information on. Here's what's coming. There's why it's happening. This is how it's funded. These are the important things. And to know, here's your contacts during the, the construction and question and answer. We have had one town hall. It was for zone three. This is the zone with open paint. We had three attendees. All very positive, things to say about the the way zone three was done. And also feedback on how to better contact, and, complete the project. So it was great. It was a different flavor than the town hall we would hope to have in in the future. But, educational nonetheless. We would also incorporate this information into all. And it's the annual report. And, we would elevate. It's already in the, city's monthly for the company as well. Next slide. We'd also have social media and all of that. We reached out for the town hall. For zone number three. This postcard, actually. And only are sending it to a proposed to only send it to the zone receiving that information. We really want people to attend the town hall in their zone. So you won't see, like, a zone board meeting. That rose on, Instagram or Facebook? Only on next door, where we could target only via, email, where we can target and only via direct mail where we can target our invitees. And in fact, we asked all three invitees or all three attendees of the zone three, town hall how they heard about it, and they all received a postcard and they all got the email. And Jordan actually talked to other people that lived in that area, and they said they received it, but they were happy with the project. So like, at the meeting, because we had free sausage that on the fliers so again, we really want to get the word out. We wanted to do it in an interesting and, engaging way. And sorry. Next slide. And we want to know kind of your thoughts about launching this educational kind of, campaign with episode, whether that's kind of a direction you would like to go in, whether we're making it more complicated than it needs to be by having the Pittsburgh in Motion concept. Just your feedback in general on this process so that we can educate people on the good work we're going to be doing on the roads. That would be is what we're looking for today. Yeah, I think so, yeah. Going to so for the outreach standpoint, I think is brave when you say Pittsburgh in motion. I don't think of roads, though. I mostly dance from the, we can go to town hall. I don't know if I want to dance for something like that. But, I think it's great to have, like, a landing page for people to go through and know what's going on. Communication is really important for people to understand that their own, and their road repairs. So I think that's great. And videos worked well over social media. So, getting videos out there would be helpful, as well. I guess sometimes, since your outreach was so low, when you get a town hall, do you think there's other methods to get people changed? Yeah. We have. So, there's a lot of different ways of outreach, so I'm that we've used the city before that have been successful in some cases and unsuccessful in others. And we we've kind of realized that if you rotate them out, people become less, blind to them. So I don't know if you remember, we used to do posters and like, not billboards, but banners everywhere, you know, banner program we have, you know, those kinds of things. We could consider banners in the neighborhood. Recreation has had success with door hangers as well. We ran into a little, issue with door hangers. So there's not as many staff as there used to be. Seasonal staff at rec to, hang the door hangers. But it's something that with more time for notifying about the meetings, we could figure out a door neighbor situation. It's it's difficult because any blast or something along those lines, social media would bring people not from the zone potentially to the meeting. But I do think we'll have more interest from a zone that has not had the construction yet, so that the apprehension of how is this going to ruin my day. And the excitement that, how is this going to make my street better? That I think would motivate people to come rather than people that were satisfied with the work. The work was done. They're kind of over seeing the city every day. So, I'm. Yeah, I guess from my perspective, and this might seem odd, right. But the what we want to get from this campaign at the end of it is, residents to understand that we have a problem right? Not necessarily. Look, all the great things we're doing. I know that sounds bad, but, like, we don't. Because while there are other efforts that we need to push that and say, hey, we're moving the needle because, these different areas, this specific campaign should be focused on roads and that we have a problem. Like, even if we did our best over 14 years, we're still going to decline from a PCI, right? So that's really what, at the end of the day, people should understand. And it's hard because we're doing improvements and a lot of people are seeing improvements. And so they are feeling like we're going to make traction. Right. But at the end of the day, what people need to realize is, yeah, even if we do everything right, we're still going to lose ground on this. So, unless something changes. So. So I think that's really what this campaign should focus on, is trying to educate on that concept. I think something that I've seen, I haven't actually gotten pitch, but I saw it through my social media. If you don't know the City of Concord or City of Martinez, maybe they had a landing page on a website where you could type in your address and you can see when your, street was going to be up next for paving. Right. So I think that helps from an educational standpoint. If my road is in terrible condition, it's going to be paved in your name. You know, that might motivate me to do something, you know, speak out or reach out to my local, my council member. And, so, so I think that might be a tool that can be used to educate as to, hey, this is this is when your road is going to be paved. And maybe this is how much is going to cost, right? That that's another thing people need to understand the, the dollar, the dollars for home improvements that we're making. Absolutely. So I guess those are those are my two, feedback audiences is maybe focus more on roads. And if we can, the educational piece is important. Okay. So what I'm hearing is this idea of a, flexible education concept in general is a no, really. Just roads that we have a problem unless we fundamentally have some kind of change and, dollar amount, more specific information per street, essentially. Right. And increase engagement, especially if it's not about that, but it if they're not engaging, it would still what is it about. Yeah. Excellent. We will go back to the drawing board and we will likely come back to the subcommittee. Well, the subcommittee is not meeting that meeting in November or December. So January's be our next set of meetings. So what we'll do. But we do plan to, you know, with your input, roll this out. Continue to roll this out, so that we can stay ahead of the zone construction and all that. We can come back to you in January with an update. And look for your feedback on how we're doing it, as well as, content of what what kind of information has been received. And you said them for assignments. Yeah. So be. And so will we be held. The town hall is, for. Yes. On point. In November. Yes. Yes. The next one. Working on the logistics of where? On that one. Right now. There's another. All right. Wonderful. Thank you very much. Next item three. Update on our fiscal year 20 2425 city Council boys. Comments form. Oh, I'm sorry. A public comment on item two. Yeah. I mean, I'm, I kind of thoughts coming up that, you know, you need this to campaign now for the motion. So I think for your motion means moving. So occasionally you may want to, use time lapse footage, especially on the forest road or like the before and after, and people go, whoa. Yeah. And for people pictures because, you know, this is about benefiting our population. And I would just really, you know, one of the other benefits really, you know, that the unexpected benefits, like when we pay for your boulevard are the senior citizens are caught using the, the nice, smooth, bike lanes. So probably in other neighborhoods that have a lot of commuters, maybe a feature or a commuter or feature any of, I would say the union workers we are union working on the world. You you'll say, you know, I'm just say, who knows? Hey, you know, this is from IBEW. You know. Yeah. What have you some thoughts on retirement? Any other public comments? I've had a number two. All right. So now moving on to item three. All right. Let's go ahead and go to the next slide. So for public infrastructure the overarching goal is really to improve the public facilities with the emphasis on our roads as well as beautification of city maintained areas. And so we have several goals related to that overarching topic. Next slide. We just wanted to give some high level updates on those different objectives as they're called. So the first objective was to improve key entrance ways into the city. And so we're building off of the work that's already been done where there was in a previous subcommittee meeting, there was a list of locations that were to identify, you know, gateway entrance monuments into the city and discussions on their appearance. What we plan to do as far as next steps is we're working to develop an RFQ, and we're going to put it out to the Arts committee or not, the committee, the arts community in our city, and ask for proposals or submittals of suggested ideas of what these different entrance features might look like. And so the plan is to identify or key locations, because I think that's what we can afford to do with the funding we currently have, and ask for them to preliminary proposal of what they would do in those four different locations. This is very similar to something the city of Brentwood did recently. In fact, we got a copy of their RFQ as an example. And then once we received those, those we would bring the, the submittals into this subcommittee for review and decide if there's any that we like. Is there a particular artist or do we want to select something from this artist, something from a decent artist, and hopefully we can find some like him? Not a situation where we don't get many proposals. So that status of that one, next one is to evaluate existing and new funding sources to support infrastructure improvements. We just discussed that item number two. So we developing this program to really advertise the work that we're doing and the challenges that we're facing funding wise. So we're holding town hall meetings. We've also developed standards for project signage on each of our projects. So we're identifying the funding sources that are being used on all of our projects, with a particular emphasis on measure M. And so some some projects get just a standalone measure and sign other ones. We have a larger project of to sign with that measure and logo on it. So we're really promoting not only the work that we're doing, but the funding sources behind them. And then last but not least, we're doing a lot more social media outreach to the community to, again, emphasize the work that we're doing and the funding that's being utilized to construct these improvements. Next objective is to address traffic circulation issues at the intersection of San Marco Boulevard and West Leland. And this objective would really focus on the concept of let's extend West Leland Road to will pass to get cars out of that intersection, trying to get onto the highway before at San Marco and give them another option. So what we've accomplished so far, the board did vote their approval for our substitute projects as part of the Fifth Amendment to the JPA agreement. As of yesterday, every jurisdiction has now formally approved the Fifth Amendment to the Jep agreement. And so it's now in the process of just having all the jurisdictions sign the agreement and submit it to the aquifer so that they can then ratify it and finalize that amendment. Once that's done, I believe we have to wait 30 days and then the funds become it becomes official, and the funds are now available for our project in the meantime, we're not waiting. We've already, requested qualification proposals from our On-Call design consultants, and we're currently evaluating those proposals so that we will have a design firm on board once the funds become available. And we're going to hit the ground running on this project. So that's the status of that objective. Next one addressed traffic circulation issues along the Railroad Avenue corridor. So there's two two things we're really focusing on on this one. And they're both project related. First, CCTV was able to obtain a grant to do smart signal projects in the entire county. Pittsburgh is a partner in that. And they're looking to do improvements not only along railroad, but along Leland and our other major corridors. And so we are actively working with them on this project as they start developing the scope and the program. We've entered into a funding agreement with them to pay our part of the project, and we're still working out the details of a maintenance agreement before we can present that to City Council for consideration. So that one is progressing. The other project is the earmark funds you receive for the Pittsburgh Center Smart Signal Project. This is bicycle and pedestrian improvements within a qu

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsSource recordingread transcript
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Infrastructure and Transportation Subcommittee
  • Infrastructure and Transportation Subcommittee — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • Item-level plain-language summaries are not available; this page does not infer individual agenda items.
  • Item-linked, attributed deliberation
  • A source-grounded next meeting date
  • A plain-English overview is not available.
  • Official outcomes have not been published.
  • The available transcript has no reliable timestamps.
  • Transcript coverage is partial.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.