POLISCOPE
conceptMARION COUNTY · LOCAL
Local Relevance

Pardee Maricamp Storage

Records
1
Related bills
0
Finance entries
0
Connections
0

Save this entity to revisit their record, finance activity, and connections.

What This Entity Does

The available records identify this entity, but do not yet include a plain-English role description.

Recent Record

Not In The Record Yet

POLISCOPE has no related bills, finance activity or mapped connections for this entity in the records it has processed. That is a gap in coverage, not a finding about the entity.

Source Trail

Documents where this entity appears. Each item opens the Bill Dossier, which includes the official source URL when available.

  1. Jun 8, 2026local legislationPardee Maricamp Storage - Major Site Plan 000555 - Waiver to Major Site Plan in Review Parcel #: 31385-000-00 # WaiverPIR-000861-2026 Kimley-Horn and Associates LDC 2.12.8 Current boundary and topographic survey CODE Current boundary and topographic survey (one foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17 FAC. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor. APPLICANT We request waiver for survey age. Field work was completed following FDOT improvements to Maricamp and the site has remained undeveloped since. LDC 2.12.8 Topographical contours CODE Current boundary and topographic survey (one foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17 FAC. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor. APPLICANT Waiver request for 100’ contour adjacent to site. Lidar was previously utilized to determine offsite flows and historical drainage patterns which affected the project area.