POLISCOPE
conceptMARION COUNTY · LOCAL
Local Relevance

Heatherwood

Records
1
Related bills
0
Finance entries
0
Connections
0

Save this entity to revisit their record, finance activity, and connections.

What This Entity Does

The available records identify this entity, but do not yet include a plain-English role description.

Recent Record

Not In The Record Yet

POLISCOPE has no related bills, finance activity or mapped connections for this entity in the records it has processed. That is a gap in coverage, not a finding about the entity.

Source Trail

Documents where this entity appears. Each item opens the Bill Dossier, which includes the official source URL when available.

  1. Jun 8, 2026local legislationHeatherwood - Preliminary Plat 000680 - Waiver to Preliminary Plat in Review Parcel #: 36640-004-00 # WaiverPIR-000845-2026 Tillman & Associates Engineering, LLC LDC 2.12.8 - Current boundary and topographic survey CODE states Current boundary and topographic survey (one foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17 FAC. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor. APPLICANT Request a waiver to allow for the use of the current boundary and topographic survey which is more than 12 months old will be submitted to DRC for consideration. LDC 6.12.9 (H) - Subdivision roads and related infrastructure CODE states (H) Dead end roads shall not exceed 1,500 feet and shall have a cul-de-sac at the terminal end. Refer to details in Section 7.3.1. Dead end roads intended to provide future access to adjacent unplatted areas may be permitted without a cul-de-sac provided that no lots front thereon, the length does not exceed 1,500 feet, and appropriate temporary end-of-road markers are provided. APPLICANT Request a waiver to allow for the use of a hammerhead style intersection on dead end road. The proposed dead-end segments will be less than 150' in length.