POLISCOPE

The public record

PUNTAGORDA (CHARLOTTE COUNTY) · LOCALHeld · official record pendingPartial coverage

Punta Gorda Isles Canal Advisory Committee

Monday, November 16, 2026 · Government meeting record

The 30-second read

Record incomplete

The Punta Gorda Isles Canal Advisory Committee scheduled a public meeting for November 16, 2026, at 1:30 PM to review canal reports, committee minutes, and financial updates. The agenda includes approval of the October 19, 2026 meeting minutes, several routine status reports, and an announcement that the next meeting will occur on December 21, 2026.

Why it matters

Residents can address the committee on any subject during public comments and request ADA accommodations through city staff at least two days prior to the meeting.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Captured actions

3

Recorded outcomes

0

Source artifacts

3

Record text

No transcript is held for this meeting. Recording: Watch video

Harry G Walberg, Chair Jeffrey T D'amico, Vice Chair Jake Dye, Committee Member Ronald P Ludvig, Committee Member James A. Merritt, Committee Member CALL TO ORDER Roll Call Pledge of Allegiance Announcements Next Meeting - December 21, 2026 PUBLIC COMMENTS Anyone wishing to address the Punta Gorda Isles Canal Advisory Committee on any subject may do so at the appropriate time during the meeting. Those who choose to speak must state their name for the record. Each person will be allowed to speak up to a maximum of three minutes. 1. APPROVAL OF MINUTES 1.a Approval of the minutes: Punta Gorda Isles Canal Advisory Committee Meeting of October 19, 2026 2. REPORTS 2.a Finance Report October 2026 2.b Budget Utilization Report October 2026 2.c Seawall Replacement Status Report for October 2026 2.d Permits Authorized by City Staff October 2026 2.e Punta Gorda Isles Capital Improvement Status Report October 2026 2.f Master Permit Agreement Status Report October 2026 3. QUASI-JUDICIAL PUBLIC HEARINGS PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE AGENDA 326 W. MARION AVE, PUNTA GORDA, FLORIDA 33950 NOVEMBER 16, 2026, 1:30 PM

3.a There are no special permits for the November 16, 2026 meeting 4. GENERAL BUSINESS STAFF COMMENTS MEMBER COMMENTS ADJOURNMENT If any person decides to appeal any matter considered at this meeting, he or she may need a record of the proceedings, and for such purpose he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. In accordance with the Americans with Disabilities Act and Florida Statute 286.26, the location of this public hearing is accessible to persons with disabilities. If you are a person with disability who needs any accommodation in order to participate in this proceeding, you are entitled, at no cost to you, to the provision of certain assistance. Interpreters for the hearing impaired (TTY 941-575-5013) or non-English speaking citizens, and any other special accommodations can be requested by contacting the Human Resources Manager/Non-Discrimination Coordinator whose address is 326 W. Marion Avenue, Punta Gorda, FL 33950, whose telephone number is (941) 575-3371, and whose email address is humres@cityofpuntagordafl.com, at least two (2) calendars days prior to the meeting.

Showing the first 24,000 of 33,679 characters. The full document is at the source.

Harry G Walberg, Chair Jeffrey T D'amico, Vice Chair Jake Dye, Committee Member Ronald P Ludvig, Committee Member James A. Merritt, Committee Member CALL TO ORDER Roll Call Pledge of Allegiance Announcements Next Meeting - December 21, 2026 PUBLIC COMMENTS Anyone wishing to address the Punta Gorda Isles Canal Advisory Committee on any subject may do so at the appropriate time during the meeting. Those who choose to speak must state their name for the record. Each person will be allowed to speak up to a maximum of three minutes. 1. APPROVAL OF MINUTES 1.a Approval of the minutes: Punta Gorda Isles Canal Advisory Committee Meeting of October 19, 2026 2. REPORTS 2.a Finance Report October 2026 2.b Budget Utilization Report October 2026 2.c Seawall Replacement Status Report for October 2026 2.d Permits Authorized by City Staff October 2026 2.e Punta Gorda Isles Capital Improvement Status Report October 2026 2.f Master Permit Agreement Status Report October 2026 3. QUASI-JUDICIAL PUBLIC HEARINGS PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE AGENDA 326 W. MARION AVE, PUNTA GORDA, FLORIDA 33950 NOVEMBER 16, 2026, 1:30 PM 1

3.a There are no special permits for the November 16, 2026 meeting 4. GENERAL BUSINESS STAFF COMMENTS MEMBER COMMENTS ADJOURNMENT If any person decides to appeal any matter considered at this meeting, he or she may need a record of the proceedings, and for such purpose he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. In accordance with the Americans with Disabilities Act and Florida Statute 286.26, the location of this public hearing is accessible to persons with disabilities. If you are a person with disability who needs any accommodation in order to participate in this proceeding, you are entitled, at no cost to you, to the provision of certain assistance. Interpreters for the hearing impaired (TTY 941-575-5013) or non-English speaking citizens, and any other special accommodations can be requested by contacting the Human Resources Manager/Non-Discrimination Coordinator whose address is 326 W. Marion Avenue, Punta Gorda, FL 33950, whose telephone number is (941) 575-3371, and whose email address is humres@cityofpuntagordafl.com, at least two (2) calendars days prior to the meeting. 2

Title: Approval of the minutes: Punta Gorda Isles Canal Advisory Committee Meeting of October 19, 2026 Funds: Recommended Action: Punta Gorda Isles Canal Advisory Committee Approval Summary: Regular Meeting Minutes of October 19, 2026 Department/Division: Public Works PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE CITY OF PUNTA GORDA 11/16/2026 APPROVAL OF MINUTES EXHIBITS: 1. October 19, 2026, Minutes 3

CITY OF PUNTA GORDA, FLORIDA PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE MEETING MINUTES OCTOBER 19, 2026, 9:00 A.M. 326 WEST MARION AVENUE PUNTA GORDA, FL 33950 MEMBERS PRESENT: Harry Walberg, Chair Jeffrey D’Amico, Jake Dye, Ronald Ludvig, James Merritt CITY STAFF PRESENT: Marc Storm, Canal Maintenance Supervisor; Samuel Updike, Mapping, Permitting, and Compliance Manager; Deputy City Clerk Falkner CALL TO ORDER Chair Walberg called the meeting to order at 1:30 p.m., followed by the Pledge of Allegiance. PUBLIC COMMENTS Public Comment Handout Joanna Chrzanowski, Hibiscus Drive, requested a study to address alleged inequities in the seawall assessment, opining taxes should be prorated based on linear footage. She noted a petition had been circulated among neighbors in support of the request and provided a copy of same to the Committee. 1) APPROVAL OF MINUTES 1.a Approval of the minutes: Punta Gorda Isles Canal Advisory Committee Meeting of August 17, 2026 Exhibits: Cover Page August 17, 2026, Minutes Member Dye MOVED to approve the August 17, 2026, minutes, SECONDED by Member Ludvig. MOTION CARRIED UNANIMOUSLY. 2) REPORTS 2.a Finance Report for September 2026 Exhibits: Cover Page Punta Gorda Isles Expenditures Report 09302026 PGI Revenue Report 093026 Marc Storm, Canal Maintenance Supervisor, briefly reviewed the report. He noted a decrease in total operating expenditures, stating the balance would be rolled over to Fiscal Year (FY) 2027. He stated projects related to Hurricane Ian riprap were ongoing. 4

2.b Budget Utilization Report September 2026 Exhibits: Cover Page PGI Utilization 202609 Marc Storm briefly reviewed the report. Member D'Amico inquired about outstanding dredging projects. Marc Storm replied the outstanding sites were Bass Inlet and Snook Inlet. Member Walberg inquired about dredging on the Punta Gorda Isles side of Alligator Creek. Marc Storm replied sonar was needed to assess same. 2.c Seawall Replacement Status Reports for September 2026 Exhibits: Cover Page NW2_IAN Seawall Phase II_Replacement Status_091426 PGI REPLACEMENT SHCEDULE232409 Marc Storm briefly reviewed the report, noting the Bal Harbor Boulevard site was the last remaining replacement following Hurricane Ian. He noted the maintenance schedules were posted on the City's website. Chair Walberg confirmed 5 barges were being used throughout City canals for regular maintenance. 2.d Permits Authorized by City Staff September 2026 Exhibits: Cover Page PGI Canal Maintenance Report by City Staff 09302026 Marc Storm indicated there were no updates to the report. 2.e Punta Gorda Isles Capital Improvement Status Report September 2026 Exhibits: Cover Page PGI Captial Improvement Status 202609 Marc Storm reviewed the report, noting the City had recently responded to additional engineering questions for the spoil site and was waiting on input from the Army Corps of Engineers. 2.f Master Permit Agreement Status Report September 2026 Exhibits: Cover Page MasterPermitStatusPGI202609 Marc Storm indicated there were no updates to the report. 2.g Seawall Replacement Status Report September 2026 Exhibits: Cover Page NW2_IAN Seawall Phase II_Replacement Status_091426 5

No additional updates were provided on the report. 3) QUASI-JUDICIAL PUBLIC HEARINGS 3.a There are no Public Hearings for this meeting Exhibits: Cover Page There were none. 4) GENERAL BUSINESS Chair Walberg inquired about Federal Emergency Management Agency updates. Sam Updike, Mapping, Permitting, and Compliance Manager, noted the City would be going through the arbitration process for 2 of the 11 Hurricane-Ian related projects, noting the funds at issue were about $11 million. STAFF COMMENTS There were none. MEMBER COMMENTS There were none. ADJOURNMENT The meeting adjourned at 1:57 p.m. Chair Board Recorder 6

Title: Finance Report October 2026 Funds: Recommended Action: For informational purposes only, no action required Summary: The attached monthly report provides updates on Expenditure and Revenue Reports for Punta Gorda Isles Department/Division: Public Works PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE CITY OF PUNTA GORDA 11/16/2026 REPORTS EXHIBITS: 1. PGI Expenditures Report 09302026 2. PGI Revenue Report 093026 7

PUNTA GORDA ISLES CANAL MAINTENANCE EXPENDITURE REPORT FY 2027 ACCOUNT NUMBER ACCOUNT DESCRIPTION 103-0000-581.99-03 PROJECTED CARRYOVER - END * ENDING RESERVES ** PUNTA GORDA ISL CANAL MNT 103-0960-572.12-01 REGULAR SALARIES & WAGES 103-0960-572.14-00 OVERTIME PAY 103-0960-572.21-00 FICA TAXES 103-0960-572.22-00 RETIREMENT CONTRIBUTION 103-0960-572.22-10 RETIREMT -DEFINED CONTRIB 103-0960-572.23-00 EMPLOYEE HLTH & LIFE INS 103-0960-572.23-02 DEP HLTH+ EMPL PD LIFE 103-0960-572.24-00 WORKMEN'S COMP PREMIUMS * PERSONNEL SERVICES 103-0960-572.31-14 ENGINEERING CONSULTANT 103-0960-572.32-00 ACCOUNTING & AUDITING 103-0960-572.34-00 CONTRACTUAL SERVICES 103-0960-572.34-08 CHANNEL MARKERS 103-0960-572.34-10 INLET DREDGE i03-0960-572.34-12 SEAWALL REPLACEMENT 103-0960-572.34-42 MANGROVE TRIMMING 103-0960-572.40-00 TRAVEL & PER DIEM 103-0960-572.41-00 COMMUNICATIONS SERVICES 103-0960-572.43-01 ELECTRICITY 103-0960-572.43-07 LOT MOWING 103-0960-572.44-05 CLOTHING & UNIFORMS 103-0960-572.45-01 FIRE/GENERAL LIAB INSUR 103-0960-572.46-00 REPAIR & MAINTENANCE SVCS 103-0960-572.46-08 R&M AUTOS/TRUCKS FLEET 103-0960-572.46-09 REPAIR/MNT EQUIP FLEET 103-0960-572.49-06 ADMINISTRATIVE CHARGES 103-0960-572.49-07 COMPUTER OVERHEAD 103-0960-572.49-08 COLLECTION COMMISSION 103-0960-572.49-13 LANDFILL FEES 103-0960-572.51-00 OFFICE SUPPLIES 103-0960-572.52-01 GASOLINE, OIL, LUBRICANTS 103-0960-572.52-21 DEPT MATERIALS & SUPPLIES 103-0960-572.52-22 SAFETY SUPPLIES 103-0960-572.52-44 SEAWALL PANEL BLDG MTLS 103-0960-572.54-00 BOOKS/MEMBS/TRAINING/EDUC * OPERATING EXPENSES 103-0960-572.63-00 IMPROVE OTHER THAN BLDGS 103-0960-572.64-01 AUTOS & ON-ROAD VEHICLES 103-0960-572.64-03 EQUIPMENT CAPITAL OUTLAY 103-0960-572.90-01 RESERVE FOR CONTINGENCIES CONTINGENCIES ** PG I CANAL MAINTENANCE ORIGINAL BUDGET 3,900,836 3,900,836 3,900,836 732,605 20,000 56,530 49,820 21,495 204,225 36,150 32,385 1,153,210 10,000 1,630 21,000 15,000 60,000 6,075,000 67,120 600 3,830 1,090 1,800 1,095 19,585 800 18,000 12,000 362,250 98,150 50,625 300 825 10,000 22,200 100 808,965 9,405 7,671,370 225,000 95,000 165,000 485,000 50,000 50,000 9,359,580 13,260,416 AMENO&O BUDGET 3,900,836 3,900,836 3,900,836 732,605 20,000 56,530 49,820 21,495 204,225 36,150 32,385 1,153,210 10,000 1,630 21,000 15,000 60,000 6,075,000 67,120 600 3,830 1,090 1,800 1,095 19,585 800 18,000 12,000 362,250 98,150 50,625 300 825 10,000 22,200 100 808,965 9,405 7,671,370 225,000 95,000 165,000 485,000 50,000 50,000 9,359,580 13,260,416 Y T-0 EXP E:N SES 0 0 0 22,922 521 1,707 0 799 15,724 2,287 7,273 51,233 0 0 0 0 0 0 0 0 0 0 0 0 10,117 0 0 0 0 0 0 0 0 0 440 0 6,181 0 16,738 0 0 0 0 0 0 67,971 67,971 EN CU MBRANCES (P.O. ' 5) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4, 000,000 0 0 0 0 0 900 0 0 0 0 0 0 0 0 0 0 0 0 350,000 0 4,350,900 0 0 0 0 0 0 4,350,900 4,350,900 DATE PREPARED: 10/15/26 WORKSHEET NAME: YTD103EX TOT AL YTO + PO ' S 0 0 0 22,922 521 1,707 0 799 15,724 2,287 7,273 51,233 0 0 0 0 0 , ,0-00,000 0 0 0 0 0 900 10, ll 7 0 0 0 0 0 0 0 0 0 440 0 356,181 0 4,367,638 0 0 0 0 0 0 4,418,871 4,418,871 \ S PENT 3 3 3 4 8 6 22 4 66 82 52 2 44 57 47 33 BALANCE 3,9 00,836 3,9 00,836 3.9 00,836 7 09,683 19,479 54,823 49,820 20,696 1 88,501 33,863 25,112 1, 1 01,977 10,000 1,630 21,000 15,000 60,000 2 , 0 75,000 67,120 600 3,830 1,090 1,800 195 9,468 800 18,000 12,000 -362,250 98,150 50,625 300 825 10,000 21,760 100 452,784 9,405 3,303,732 225,000 95,000 165,000 485,000 50,000 50,000 4,940,709 8,841,545 8

PUNTA GORDA ISLES CANAL MAINTENANCE REVENUE REPORT FY 2027 ORIGINAL ACCOUNT NUMBER ACCOUNT DESCRIPTION BUDGET 103-0000-325.30-00 SPEC ASSMTS - CANAL ASSMT 7,800,030 103-0000-361.10-00 INTEREST ON INVESTMENTS 155,750 103-0000-369.90-00 MISCELLANEOUS REVENUE 500 103-0000-389.90-01 PROJ CARRYOVER-BEGINNING 5,304,136 • 13,260,416 .. PUNTA GORDA ISL CANAL MNT 13,260,416 13,260,416 AMENDED BUDGET 7,800,030 155,750 500 5,304,136 13,260,416 13,260,416 13,260,416 Y-T-D % REVENUES REC'D 0 0 0 0 0 0 0 DATE PREPARED: 10/15/26 WORKSHEET NAME: YTD103RV BALANCE 7,800,030 155,750 500 5,304,136 13,260,416 13,260,416 13,260,416 9

Title: Budget Utilization Report October 2026 Funds: Recommended Action: For informational purposes only, no action required Summary: The attached monthly report provides updates on the monthly report of work completed and expenditures for seawall repairs and maintenance Department/Division: Public Works PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE CITY OF PUNTA GORDA 11/16/2026 REPORTS EXHIBITS: 1. PGI Utilization 202611 10

City of PUNTA GORDA Florida REPORTING PERIOD AS OF: November 2, 2026 PUBLIC WORKS PGI CANAL MAINTENANCE 1075 MONTHLY REPORT OF WORK COMPLETED AND EXPENDITURES FOR SEAWALL R&M DESCRIPTION: ANNUAL SCHEDULED WORK AMENDED SCHEDULED WORK CURRENT MONTH WORK YTD COMP WORK % COMP REMAINING QUANTITY QUANTITY QUANTITY UNIT Nov-26 $6,075,000 $8,763,674 BUD $0 $2,811,326 32% $5,952,348 Seawall Panels/Supplies $808,965 $901,052 BUD $6,564 $400,313 44% $500,739 Hurricane IRMA rip rap project $8,235,320 $8,235,320 BUD $0 $0 0% $8,235,320 $625,797 $625,797 BUD $0 $0 0% $625,797 $67,120 $67,120 BUD $0 $0 0% $67,120 $60,000 $70,580 BUD $0 $29,420 42% $41,160 $21,000 $21,000 BUD $0 $2,024 10% $18,976 Inlet Dredging NOTE: City seawall program has 19 worksites completed. Hurricane Ian Seawall Replacement has one worksite remaining. This worksite is estimated to start on November 16th. FEMA IRMA rip rap project processed requisition at procurement $8.2 million, and going out to bid soon. Inlet dredging pending work is at Bass and Snook Inlets and pending schedule timeframe from our marine contractor existing purchase order added $10K. Spoil site Engineering Consulting work ongoing. Spoil Site Channel Permitting/Seawall Assessment/Seawall FY - 10/01/2025 - 09/30/2026 Seawall Replacement CITY Mangrove Trimming Hurricane Ian Seawall Replacement J:\960 Canal Maintenance\PGI Monthly Reports\Budget Utilization Reports\FY 2026-2027\PGI Utilization 202611 11

Title: Seawall Replacement Status Report for October 2026 Funds: Recommended Action: For informational purposes only, no action required Summary: The attached monthly report provides updates on the Punta Gorda Isles Seawall Replacement Work program Department/Division: Public Works PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE CITY OF PUNTA GORDA 11/16/2026 REPORTS EXHIBITS: 1. NW2_IAN Seawall Phase II_Replacement Status_11226 12

START WEEK OF WALL PRIORITY LOCATION # ADDRESS ESTIMATED LENGTH ACTUAL LENGTH STATUS LOW 4023 VIA SEVILLE 2141/2181 112 243 C LOW 4024 VIA SEVILLE 2080/2100/2140 100 107 C LOW 4026 EL CERITO CT 2237/2255/2275 156 155 C LOW 4027 EL CERITO CT 2111 80 C LOW 4029 BELVEDERE CT 511/517 97 C LOW 4032 BELVEDERE CT 280/290 53 C LOW 4034 DE LIDO CT 341/361 107 U LOW 4035 DE LIDO CT 381 69 U LOW 4036 DE LIDO CT 399 45 U LOW 4037 DE LIDO CT 380/399 54 U LOW 4040 BELAIRE CT 255 80 U LOW 4041 BELAIRE CT 355/365/375 88 U LOW 4010 BOCA RATON CT 1751/1743 142 C LOW 4011 BELLE CT 1800/1799 220 C LOW 4012 BELLE CT 1793 138 C 11/16/26 LOW 4013 BAL HARBOR BLVD 515/533/551 104 LTR TOTAL 5019 4997 LTR Letter sent U Under Construction C Complete HN Home owner notified Revised 11/2/26 MARINE CONTRACTING GROUP PHASE II NW2 - SEAWALL REPLACEMENT WORK PROGRAM FY 2024/2025/2026 80 102 57 136 261 84106695845 13

Title: Permits Authorized by City Staff October 2026 Funds: Recommended Action: For informational purposes only, no action required Summary: Attached is the report for Permits Issued by Staff Department/Division: Public Works PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE CITY OF PUNTA GORDA 11/16/2026 REPORTS EXHIBITS: 1. PGI Canal Maintenance Report 10312026 14

Date: 11/9/2026 PGI Canal Maintenance Report Page 1 App Yr App Number Appl Type Appl Date Application Description Street No. Str Dir Street Name Str Suff Lot Block Sub Div Sec 26 200283 BCNL 10/1/2026 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 **NOC ENCLOSED** 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 A 32K LIFT 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 BUILDING A 400 SF OF CONCRETE DOCK WITH 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 CALL FOR FINAL ONCE COMPLETED 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 RESUBMITTAL: SUBMITTING SIGNED AND 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 SEALED ENGINEERING DOCUMENTATION 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 10/1/2026, 2:43:33 PM APASTOR 3701 CARMICHAEL DR 0133 0005 PGI 012 BCNL 10/1/2026 10/8/2026, 2:43:42 PM AROSS 3701 CARMICHAEL DR 0133 0005 PGI 012 200287 BCNL 10/2/2026 **NOC ENCLOSED** 4014 LA COSTA ISLAND CT 0142 0026 PGI 012 BCNL 10/2/2026 CALL FOR FINAL ONCE COMPLETED 4014 LA COSTA ISLAND CT 0142 0026 PGI 012 BCNL 10/2/2026 DEMO DOCK AND INSTALL NEW CONCRETE DOCK 4014 LA COSTA ISLAND CT 0142 0026 PGI 012 BCNL 10/2/2026 10/2/2026, 12:21:12 PM APASTOR 4014 LA COSTA ISLAND CT 0142 0026 PGI 012 200335 BCNL 10/7/2026 **NEED NOC RECORDED** 2495 ROSA LN 0008 0002 PGI 004 BCNL 10/7/2026 CALL FOR FINAL ONCE COMPLETED 2495 ROSA LN 0008 0002 PGI 004 BCNL 10/7/2026 DOCK; RELOCATING TWO BUMPER PILES AND 2495 ROSA LN 0008 0002 PGI 004 BCNL 10/7/2026 INSTALL NEW LIFT 2495 ROSA LN 0008 0002 PGI 004 BCNL 10/7/2026 REMOVE/DISPOSE OF 4' X 15' PORTION OF 2495 ROSA LN 0008 0002 PGI 004 BCNL 10/7/2026 10/7/2026, 10:14:59 AM APASTOR 2495 ROSA LN 0008 0002 PGI 004 200370 BCNL 10/12/2026 **NO NOC NEEDED** 2285 AQUI ESTA DR 0060 0001 PGI 006 BCNL 10/12/2026 CALL FOR FINAL ONCE COMPLETED 2285 AQUI ESTA DR 0060 0001 PGI 006 BCNL 10/12/2026 INSTALL NEW CONCRETE DOCK 2285 AQUI ESTA DR 0060 0001 PGI 006 BCNL 10/12/2026 10/12/2026, 9:04:05 AM APASTOR 2285 AQUI ESTA DR 0060 0001 PGI 006 200416 BCNL 10/14/2026 **NOC ENCLOSED** 151 HIBISCUS DR 0018 0031 PGI 002 BCNL 10/14/2026 CALL FOR FINAL ONCE COMPLETED 151 HIBISCUS DR 0018 0031 PGI 002 BCNL 10/14/2026 INSTALL SOLAR POWERED BOAT LIFT 151 HIBISCUS DR 0018 0031 PGI 002 BCNL 10/14/2026 10/14/2026, 2:18:52 PM APASTOR 151 HIBISCUS DR 0018 0031 PGI 002 200423 BCNL 10/15/2026 **NOC ATTACHED** 1116 HAWKS NEST CT 0095 0015 PGI 011 BCNL 10/15/2026 CALL FOR FINAL ONCE COMPLETED 1116 HAWKS NEST CT 0095 0015 PGI 011 15

Date: 11/9/2026 PGI Canal Maintenance Report Page 2 App Yr App Number Appl Type Appl Date Application Description Street No. Str Dir Street Name Str Suff Lot Block Sub Div Sec 26 200423 BCNL 10/15/2026 INSTALL 10K BOATLIFT 1116 HAWKS NEST CT 0095 0015 PGI 011 BCNL 10/15/2026 10/15/2026, 11:42:11 AM APASTOR 1116 HAWKS NEST CT 0095 0015 PGI 011 200443 BCNL 10/16/2026 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 **NEED SUB FORM FOR LIVINGSTON ELECTRIC 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 **NOC ENCLOSED** 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 CALL FOR FINAL ONCE COMPLETED 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 ELECTRIC BY LIVINGSTON ELECTRIC 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 MODEL 207 13,500# BOAT LIFT 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 REMOVE SWING LIFT AND INSTALL A DOLPHIN 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 SUBLIST ATTACHED 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 10/16/2026, 3:21:53 PM APASTOR 1741 SUZI ST 0146 0024 PGI 012 BCNL 10/16/2026 10/23/2026, 2:57:46 PM AROSS 1741 SUZI ST 0146 0024 PGI 012 200444 BCNL 10/16/2026 **NO NOC NEEDED** 1238 WHIP-POOR-WILL CT 0220 0007 PGI 014 BCNL 10/16/2026 CALL FOR FINAL ONCE COMPLETED 1238 WHIP-POOR-WILL CT 0220 0007 PGI 014 BCNL 10/16/2026 INSTALL 2 WOOD OUT-PILINGS 1238 WHIP-POOR-WILL CT 0220 0007 PGI 014 BCNL 10/16/2026 10/16/2026, 3:25:03 PM APASTOR 1238 WHIP-POOR-WILL CT 0220 0007 PGI 014 200445 BCNL 10/16/2026 **NOC ENCLOSED** 3705 WHIP-POOR-WILL BLVD0209 0010 PGI 014 BCNL 10/16/2026 CALL FOR FINAL ONCE COMPLETED 3705 WHIP-POOR-WILL BLVD0209 0010 PGI 014 BCNL 10/16/2026 CONCRETE DOCK 3705 WHIP-POOR-WILL BLVD0209 0010 PGI 014 BCNL 10/16/2026 REPLACE EXISTING DOCK WITH A 7' X 15' 3705 WHIP-POOR-WILL BLVD0209 0010 PGI 014 BCNL 10/16/2026 10/16/2026, 3:27:21 PM APASTOR 3705 WHIP-POOR-WILL BLVD0209 0010 PGI 014 200471 BCNL 10/20/2026 CALL FOR FINAL INSPECTIONS WHEN JOB 1335 CASEY KEY DR 0150 0007 PGI 012 BCNL 10/20/2026 COMPLETED 1335 CASEY KEY DR 0150 0007 PGI 012 BCNL 10/20/2026 INSTALL PILINGS AND PEDESTALS 1335 CASEY KEY DR 0150 0007 PGI 012 BCNL 10/20/2026 NOC WITH APP 1335 CASEY KEY DR 0150 0007 PGI 012 BCNL 10/20/2026 10/20/2026, 2:13:30 PM LGRANGER 1335 CASEY KEY DR 0150 0007 PGI 012 200472 BCNL 10/20/2026 CALL FOR FINAL INSPECTIONS WHEN JOB 2126 VIA VENETO 0056 0012 PGI 006 BCNL 10/20/2026 COMPLETED 2126 VIA VENETO 0056 0012 PGI 006 BCNL 10/20/2026 INSTALL BOATLIFT AND DOCK 2126 VIA VENETO 0056 0012 PGI 006 BCNL 10/20/2026 NOC WITH APP 2126 VIA VENETO 0056 0012 PGI 006 BCNL 10/20/2026 10/20/2026, 2:20:03 PM LGRANGER 2126 VIA VENETO 0056 0012 PGI 006 16

Date: 11/9/2026 PGI Canal Maintenance Report Page 3 App Yr App Number Appl Type Appl Date Application Description Street No. Str Dir Street Name Str Suff Lot Block Sub Div Sec 26 200494 BCNL 10/21/2026 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 **NO HARD FILE** 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 CALL FOR FINAL INSPECTION ONCE JOB 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 COMPLETE 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 EMAILED BMANNING FOR REVIEW 10/21/26 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 INSTALL 7'X20' CONCRETE DOCK EXTENSION 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 NOC REC'D VIA EMAIL 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 NOC REQUIRED PRIOR TO FIRST INSPECTION 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 PER SITE PLAN 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 10/21/2026, 3:38:10 PM AROSS 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 10/21/2026, 3:43:42 PM AROSS 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 10/30/2026, 3:18:31 PM AROSS 1018 FRANCESCA CT 0083 0018 PGI 007 BCNL 10/21/2026 3.43 PM 1018 FRANCESCA CT 0083 0018 PGI 007 200504 BCNL 10/22/2026 CALL FOR FINAL ONCE JOB IS COMPLETED 3706 WHIP-POOR-WILL BLVD0207 0015 PGI 014 BCNL 10/22/2026 ELECTRIC IS LIVINGSTON ELEC 3706 WHIP-POOR-WILL BLVD0207 0015 PGI 014 BCNL 10/22/2026 INSTALL BOAT LIFT 3706 WHIP-POOR-WILL BLVD0207 0015 PGI 014 BCNL 10/22/2026 NOC ATTACHED TO PERMIT 3706 WHIP-POOR-WILL BLVD0207 0015 PGI 014 BCNL 10/22/2026 10/22/2026, 10:57:23 AM SCARLAW 3706 WHIP-POOR-WILL BLVD0207 0015 PGI 014 200506 BCNL 10/22/2026 BOAT LIFT AND DOCK 3366 TRINIDAD CT 0116 0018 PGI 012 BCNL 10/22/2026 CALL FOR FINAL INSPECTION WHEN JOB 3366 TRINIDAD CT 0116 0018 PGI 012 BCNL 10/22/2026 COMPLETED 3366 TRINIDAD CT 0116 0018 PGI 012 BCNL 10/22/2026 NOC WITH APPLICATION 3366 TRINIDAD CT 0116 0018 PGI 012 BCNL 10/22/2026 10/22/2026, 12:03:03 PM LGRANGER 3366 TRINIDAD CT 0116 0018 PGI 012 200526 BCNL 10/23/2026 401 NORMA CT 0065 0016 PGI 007 BCNL 10/23/2026 401 NORMA CT 0065 0016 PGI 007 BCNL 10/23/2026 BUMPER PILINGS 401 NORMA CT 0065 0016 PGI 007 BCNL 10/23/2026 CALL FOR FINAL INSPECTIONS WHEN JOB 401 NORMA CT 0065 0016 PGI 007 BCNL 10/23/2026 COMPLETE 401 NORMA CT 0065 0016 PGI 007 BCNL 10/23/2026 INSTALL USED 7.5K BOATLIFT AND INSTALL 2 401 NORMA CT 0065 0016 PGI 007 BCNL 10/23/2026 NEED NOC PRIOR TO FIRST INSPECTION 401 NORMA CT 0065 0016 PGI 007 17

Date: 11/9/2026 PGI Canal Maintenance Report Page 4 App Yr App Number Appl Type Appl Date Application Description Street No. Str Dir Street Name Str Suff Lot Block Sub Div Sec 26 200526 BCNL 10/23/2026 RESUBMITTAL: UPDATED SITE PLAN 401 NORMA CT 0065 0016 PGI 007 BCNL 10/23/2026 10/23/2026, 10:40:28 AM LGRANGER 401 NORMA CT 0065 0016 PGI 007 BCNL 10/23/2026 11/2/2026, 11:56:36 AM AROSS 401 NORMA CT 0065 0016 PGI 007 200584 BCNL 10/28/2026 **NOC ENCLOSED** 1617 SEA HAVEN DR 0000 00TE PGI 09B BCNL 10/28/2026 CALL FOR FINAL ONCE COMPLETED 1617 SEA HAVEN DR 0000 00TE PGI 09B BCNL 10/28/2026 INSTALL BOAT LIFT 1617 SEA HAVEN DR 0000 00TE PGI 09B BCNL 10/28/2026 10/28/2026, 2:25:37 PM APASTOR 1617 SEA HAVEN DR 0000 00TE PGI 09B 18

Title: Punta Gorda Isles Capital Improvement Status Report October 2026 Funds: Recommended Action: For informational purposes only, no action required Summary: The attached monthly report provides updates on the Punta Gorda Isles Maintenance Capital Improvement Program Department/Division: Public Works PUNTA GORDA ISLES CANAL ADVISORY COMMITTEE CITY OF PUNTA GORDA 11/16/2026 REPORTS EXHIBITS: 1. PGI Captial Improvement Status 202711 19

PUNTA GORDA ISLES – CANAL MAINTENANCE Capital Improvement Program November 2026 SPOIL SITE CHANNEL– CONSULTING SERVICES To obtain necessary permitting for dredging a channel from Ponce De Leon Inlet through the shallow basin directly to the Spoil Site. Budget Amount: $843,465 Feasibility Study $12,800 Permitting $34,105 Status: 10/30/2026 The Army Corps sent additional questions from NMFS on October 12th, and our Engineering Con

Showing the first 24,000 of 38,338 characters. The full document is at the source.

>> My name is Harry Woolberg. I'd like to start by calling the meeting to order for November 6th 2026, Punta Gorda Isles Canal Advisory Committee. Can we have roll call, please? [Roll call] >> Thank you. >> Would you like to join me in saying the Pledge of Allegiance? >> I pledge allegiance to the flag of the United States of America and to the Republic for which it stands, one nation under God, indivisible, with liberty and justice for all. >> Anybody on the board have any announcements comments or suggestions? Everybody's okay? Next meeting is planned for December 21st, 2026. And I've got a member to ask the board. Is that week gonna be a problem for anybody because it is Christmas week? Does anybody see themselves traveling? 21st. I, for one, will not be here. >> I will probably not be here either. >> And then I offer to the board a suggestion, an opinion. Maybe we delay that meeting for a week later or a different week. I know burns Store aisles has done that already. Does that make any sense to the board to do something like that? >> I am here before Christmas, so that meeting would work for me. But after Christmas, I am gone. >> I could do both. >> Do we delay it or cancel it to the next month? >> The problem we're going to have is there won't be a quorum. So if there's going to be a quasi judicial, nothing could be decided at that meeting because it's only three individuals here. >> If there's no quorum, the meeting cannot be called to order, even if no quasi judicial matters are before you. >> So if we know right now that we're only going to have three out of five people, should we delay this meeting? >> Public works if you were interested in rescheduling, it would be primarily public works. That would be in charge of changing that meeting date to that they make sure they have staff availability to present to you during the meeting. I would say that at this time, if you guys have consensus to request canceling that, we can forward that request to public works. You can see if they can delay it, but the reason that Mark had requested BSI canceled their December meeting is because Mark is also out of town during that time. >> Is that the same week? >> I'm not sure. I think it's a different week. I'm not sure which dates him out of the office. >> Can we table the decision to let it discuss it with public works? >> Absolutely. >> Thank you. Next topic is public comments. Anyone in the audience, anyone that would like to speak to the public committee? Come to the public podium, state your name and you have three minutes to speak. >> Working? >> Yes. >> My name is Joanna. Good afternoon and thank you for having me here. I was here last time during the October meeting asking about the possibility of changing the charge for the assessment taxes on the seawall from per lot to per linear foot. And I gave you the proposal, including the signature of maybe many of my neighbors. And I'm only here to ask if you have any updates on this proposal. And when do you anticipate discussing and acting on this matter? >> Is there anybody else in the public that wants to speak on the same topic? I'm only doing that this way, so I can make an announcement before. >> I appreciate that. Thank you for serving on the board. I only became aware of this recently. Our lot-- >> Please state your name for the record. >> Sorry about that. Albert de Kira, and it's 1625 Appian Drive. I have a 42 foot seawall. My bill this year is 2250. My bill for the city of Punta Gorda for police fire fighting urban design, vehicle, sanitation and code compliance is $100 cheaper. So to me that just seems out of whack. So that's it. That feeds into two things. Number one, what Joanna mentioned about an equitable cost per house. Per seawall in a linear footage basis versus per lot and the other is just the overall baseline costs, to me whether it's $1,500 or 2000 or 2500 relative to the city cost for me. $2,000. It seems really high. And I have no experience. I have only started to research this. I'll be happy to give you all my contact information. I would appreciate any resources you have that are already published that give information about cost of maintaining the seawall. Thank you very much. >> Anybody else would like to speak on the same topic? A comment that I would like to make is that just to clarify for everybody that we are an advisory committee, and advisory committee to City Council. We do not make decisions as far as taxes, fees levied and that kind of stuff. All we can do is bring forward to City Council that we as a board have discussed and what we've discussed with staff. Steph is the one that really do all the research and the determine the actual expenditures and the actual revenues and time frames involved. What has caused problems that we have not foreseen. What additional funds need to be arrived at and how we do that whether it be through loans or other funds. So if you're expecting a decision to come and the advisory committee, we just can't do that. >> May I respond? >> Let me finish what I'm saying. You have the right to bring your concerns. I would suggest you do that to the City Council to your legislature. The first person representing your district or representing any of the people on the City Council. After the meeting, we do have a discussion with staff and the city at the board. We have gone through this numerous times over the past 4 or 5 years. This is not the first time. Rightfully so. I understand where everybody's coming from. Staff always looks at it from their perspective being, what is it costing us to do all the things involved with maintaining the city Canal system? And it's beyond city wall and the walls caps and all that kind of stuff. And staff comes back to City Council and to us and says, here's what staff has determined here and that information goes to City Council. And City Council, is their prerogative or their choice to call for a vote on their own council. And they make the final decision. It's not with us. That's all I want to say. This is not really a question or answer period. I'm going to give a little bit of leeway here. >> Thank you very much. I would have appreciated that piece of information last month, but nonetheless, I wanted to let you know that I've been in contact with Doctor Reichardt, who told me to come to you. And I was in touch with Doctor, who said she supports it and to come to you. That's why I came here to this board rather than to the City Council. I followed the rules that I'm given. I had a meeting with Doctor Reichardt in person and I've had several email exchanges and this is what I was told. I'm only going through the venues that were indicated to me and I'm not familiar with how your governance works. I'm familiar with other governance, and I've been a professor at the university for 45 years. I'm familiar with all of the rules, but I've always been in contact and had a meeting on November 6th with Doctor Reichardt. So if you're telling me that we're having to scrap all this and go to the council, we will go to the council. I'll go wherever you tell me. I'm not sure what the process is. >> Jake Dye. I think you're doing the right thing. You're coming to the right place. That's Mr. Wahlberg said, we don't have the authority to make those decisions, and staff looks at it and gives us a recommendation, and then we give the recommendation to the city Council, who eventually votes. >> So I came to the right place? >> We are the best place to bring it to you as far as the leadership of the city is concerned. The effort to make the decision on how this works going forward rests with the staff to come up with a recommendation on what to do with it. As Harry commented, we've looked at this a of times, and it's more complex, quite a more complex than just the cost of the seawall. Because we've got navigation, maintenance and navigation channels dredging and navigation aids and other things that go into it that everybody pays equitably into. So it's not based on the linear footage of your seawall. So there's a couple of different parts to this. I think the city staff has been looking at it and we haven't had a discussion . Maybe we're going to have a discussion today. >> I had a meeting with Mr. Mark, too. So he knows. >> I'm not passing the buck or anything like that. >> Mark storm, Canal maintenance supervisor, public works. You hit on it, Jake. And we discussed the November 6th meeting or whichever. There is other maintenance involved with it, as in your repair. We do cracked ceiling. We will do seam patching, we'll do depression or whole feeling behind the cap in the wall, which prolongs longevity of your seawall. And there's also dredging involved, which is just the canal itself for navigational purposes. The dock and boat area on the resident themselves, because that's pertinence out there that you have, and not some we have addressed. So you pay now a charge on that. But you use our marine contractor for it. And the navigational purposes is in the mangrove trimming, your canal sonar and, and signage and stuff out there and pile fixing. That's on the special assessment that you get for your linear footage of wall. I can just add that it's an ad valorem, or it's a parcel like we discussed. And that got and voted on by city Council 4 to 27. So as we come up in our calendar year for fiscal year 28, that'll be June or July. I would say that's the best avenue to come back again and talk about changes because we'll have finance. We'll have more input with everybody. And these guys get presented our fiscal year stuff. And the rays on that is the 150 per year is what was projected from a 2019, 2020 survey. Every ten years we have a sea wall assessment engineering firm come in and evaluate the system and how we are grading, our age of the system and everything. So they've done it two years in the past since 1990. And I said I've only been here two and a half years, but I go off of the previous one. And this last 1 in 2020, which was the Taylor study which is on the website. Pretty long and short version. We get through it in about 55 pages to understand everything. That evaluates the whole idea behind the special assessment and the taxes. So that'll give you a good area to read. Going forward, it can be brought up with this is the right level like we discussed. And we can put it as a agenda item if you guys want for the next meeting, and that way we have more of an open discussion. You have seen what's behind it. I can get financing here to understand how it's assessed. And then after you guys think it needs to move forward, it can and you've got the process in the works at least. That's all I have. >> That's a good idea to put it as an agenda item. We did discuss it at the end of the last meeting about putting it in agenda item. The discussion was that we've already been through this numerous times. And we had this study done in 2017, and then in 2021, then we'll have another study coming up in a few years so we can relook at the course and the way things have changed. We can discuss it in a general discussion at the end of today's session and see if we want to put it on the agenda or not. I think that's the best way to move forward. It's not a recommendation, but our advice might be to the City Council to take a look at this. Did you have a right to bring it to the City Council anytime you want. Or if you want to talk to staff or talk to us. My only point is that we don't make the decisions here. We advise City Council when we think the appropriate path should be. >> Jake Dye. It seems because we're an advisory committee to the city Council, that it would be up to City Council to make a decision. Do they want to pursue this further? And if so, the ball goes back to the staff to look at it and figure out, how do we make an assessment to figure out what needs to be done? And then the staff makes a recommendation to us as the advisory committee, and we would advise the council on the proper course of action. I think for us to make a decision on what the staff is going to do and how they're going to do it, it's improper. I think that direction has to come from the City Council. If they have an interest in pursuing this, that direction needs to be issued so that everybody can move forward. I don't think we have the authority to make that decision to tell the staff to move forward, and take that on because it's a different procedure than we have used in the past. It has an impact on the entire community. And I just pj I. -- PGI, but BSI, too. So it's a little bit bigger than just our committee, I believe. >> I agree with it. I'm just thinking. What I'm thinking about right now is we've gone through this whole process, and we went through the whole budget process, and staff did all of the research and all of the work, presented all of their financial work to this board. This board made a decision, and advised at that point in time what we thought should happen, and presented that to City Council. City Council then made their final decisions on the budget and the cost. So now if we're going to reintroduce this, we're going to ask everybody, staff including City Council included to go back over what we just accomplished 2 or 3 months ago. I have no problems in doing that and advising people that maybe that's what we should do. The first discussion being with Seth. Staff wants to go through that whole process again. Pass stuff changed in the past 3 or 4 months? That's going to cause a change in the decision that was made 3 or 4 months ago. I guess the question I'm wrestling with right now. >> I am not at liberty to speak for others. For myself, I think the workload needs to be pursued further. >> I don't think you used your three minutes. I'm gonna give a little leeway if you'd like to discuss at the podium. We're bending the rules here a little bit, but that's okay. It's an important issue. >> Can you turn that microphone on? >> Absolutely agreed. Thank you for the flexibility. I'm sure we have a couple of motivated property owners that are happy to do some legwork and help. And I'm going to guess a lot of the finances are already broken down as to what costs could be attributed to on a per foot basis versus a per lot basis. So I just want to bring that up, since it seems like it might be a stumbling block of who is going to do the work of looking at the financial records. I just wanted to say that we are motivated to help. That's all. >> Appreciate it. Thank you. >> Mark Storm, canal maintenance. So to reply back. The breakdown with that, last year was 1350. And this last 2 or 3 months ago was 150, so at 1500 in calendar year starts at 10-1. So that's paid already for the year of 27. So when we come back in June or July, whichever it was, I know we're going to get working on it in May, but if it's July, whenever we approach the board with the meeting and the minutes, the vote and all of that and the review of our entire budget coming 28 fiscal year, then I think we're only five months to get into the discussion. May be able to make this happen in 28. You already paid the assessment, and it's in the works of what I'm getting at at 27. I can't speak for it, but I'm thinking possibility for 28 to make the change. That's something we can discuss going forward. Thanks. >> Jeff Dhammika. What did we decide here? How do we proceed? >> I think we can discuss it right now. I think staff is going to have to double down when I have to lay this on you Mark to have to do that. Staff might have to bring us back to council to see if this is something that Council wants to reintroduce going through the whole budget process once again. Looking at the expenditures and the revenues, and then looking at how the costs are allocated, and as you just mentioned, we're going to be doing this again 5 or 6 months from now anyway. So I really don't know if the city council is going to want to reintroduce or even if the financial department is going to want to reintroduce this at this point. It's not answering your question. >> We have two things. Figuring out what it's going to cost for everything, and this is how we're going to charge everybody. And that's separate. -- it hasn't been a new discussion. Saying we're going to do it by seawall length. Correct? >> Jake Dye. It seems that the central question right now is, does City Council want us and the staff to pursue this or not? Because it's a big issue. There's a financial impact. And we just look at the difference in revenue and we know we're talking about when you start making a decision of who is paying what. It has a big impact on the property owners in the city. It's politically charged because you've got some property owners who believe that they are paying more than they should pay. And you've got other property owners that are going to say you're going to start making me pay a whole lot more than I've paid in the faster or pay more than my neighbor pays. So there's a lot of issues associated with it. Before anybody or the staff or the Canal Advisory Committee takes off and starts looking at this, we need to know whether or not City Council wants us to chase this thing or not. >> I agree. >> Because a lot of resources are going to be involved in the research of this and to figure out where we go and how we do it. So I think that's basic decision city Council has to make. >> And even legally, what's it going to cost for attorneys and everything else to do what we need to do to change the way that things are assessed now? >> When you go back and look at everything that we went through with Buckley's past. This almost is as complex as Buckley's past. >> I would say it's way more complex. >> Not just EGI, but BSI as well. And there's a big impact on all the properties. One of the things that we talked about is not everybody has access to the canal system, even though they might have a seawall. They don't have as much access to the canal system and maybe their neighbor does. BSI it's one of the things we talked about earlier offline. >> I'll make a suggestion and you guys can approve or disapprove or agree with. Let me bring it to City Council, as a general discussion. Tell them what we've discussed here in this meeting and past meeting. See what City Council stake is on how they would like to proceed with that. I also want to suggest the people in the audience, the public, you have the right to bring us the City Council. If you want this on the agenda, you should contact them and say you should really like this on the agenda. And not being on what's the revenues -- how is the cost appropriated to the citizens and to the homeowners? And then I would suggest in city Council could then direct me and do direct staff and they would like them to relook at the situation. And if someone just mentioned, league is gonna have to get involved we're gonna have to look at the whole thing. But first let me take the first step and contact new City Council and see how they want to move forward with this. Jake, you have a lot more experience than I do. >> I think the thoughts are going in the right direction? It would seem to me that somehow the city Council needs to rather than just hitting them blind with this, some kind of preparation. I don't know if that's the director of Public Works takes that on, or if you take that on. I could just see this being presented to city Council who doesn't know anything about it. Sitting there saying, what is this about? >> Mark storm, Canal maintenance. I will add to that, they do have a pre agenda meeting before the regular council. Myself, Ron and Doctor Reichardt, the city manager and Brian were in a meeting with-- and they're at 33 hibiscus? Doctor Shorofsky. Let me approach Ron it, then answers to Doctor Reich, our city manager, and then Let get to you. You're exactly correct. I know if that was discussed in the meeting, but there is an open discussion at City Council. We were approaching it this way. You can voice your opinion at the City Council on any manner, and it's an open discussion at the beginning. Or we can present this to Ron, and then City Manager, and they will be aware of it. But still to talk and go up. Is this Wednesday? Yep. >> So if you guys think you can talk to them prior to that, that would be great. Jake brought up Buckley's past. And I think about Buckley's past started, and it started with a person doing a presentation to city council. That's where it all started. He was adamant about getting on the agenda. He got on the agenda. He had his presentation, and that's where Buckley's past started. And from there, it just moved on and on. This is the same type of thing and that's the way it's got to start. Is that okay with you? >> There goes my three minutes. Thank you. >> It's an important issue, and we can't just push it to the side. We've got to really work through it. >> (Indiscernible) -- Now I lost my train of thought. Yes. This is an issue that is not new. I understand it and we can work from budget what you need down to Reverse it to what needs to be paid. I think it's just inequitable and everybody has the same access in this all involved. I really appreciate it and the only reason I'm here is because Doctor Reichert told me to do it this way. I'm going the right way. And I will go to the council. And if you go to the council come on maybe that carries a bit more weight. I will try to get doctor Loxon as well because maybe she's there. I'm not sure if she's a member. But I know if there is a conflict of interest on the board, with those of you who have hundred and 66 and 168ft, and I understand because I researched it as well. We researched it by profession. I research everything. As far as emails are concerned, sometimes emails are not replied to. Let's put it this way. Thank you. >> Mark, your turn. You're >> Don't forget my minutes. >> I'm sorry. We do it all the time. Anybody on the board have any comments, changes or additions to the minutes of the October 19th meeting? >> Jake Dye, move to approve. >> Second. >> All in favor, say aye. To anybody opposed? The minutes of the October 19th 2026 meeting have been approved and should be posted as written. Okay, Mark, all yours. >> (Indiscernible) Sorry. There we go. I know it was going to happen. Only second time doing the meetings. I'm getting there. The PGI expenditure report. Any questions with going forward for this year's budget? The majority is for the seawalls, which is just over 6 million? And just over 800,000 on just the manufacturer panels that we do in-house. So you're looking at about 6.8 their overall budget about 7.6. So operating close to one mil, just internal. Giving you round numbers.. Next page is our revenue report. And the majority of that increase is just from project carryovers. So you've got the spoiler side there on PGI colony point. And then there should be also the carryover from 26, if you want to say fiscal year with the seawall repair and those monies not spent. They get carried over onto here. With that, moving to-- If you want, I'll jump right into the utilization report if that's okay. A little more explanation here. You've got the seawall replacement. Let me scroll down so it's on the board. Is that too big? Let's go back one. There we go. So with this one on the seawall replacement, you see on the calendar year, fiscal year being 6 million, but the amendment. We still had to carry over from 26. We are up about 2.7. Still with carry over. So that's good to finish up 26 and roll into 27 seawall replacement. And then same with supply. Basically about another hundred thousand there that added on to the annual at 808,000. Almost 809,000 and with that riprap project which was from the Irma hurricane, we are not out for bid yet. We are still going through the scope and the write up for it. And we're very close. That's just some revised. And I should be able

All meeting actions

Source coverage incomplete

3 meeting items captured. The published sources do not prove this is the complete docket.

Showing 3 of 3

Browse by category3 actions

Official record

ArtifactSourceState
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsNot published in the sources we holdunavailable
AttachmentNot published in the sources we holdunavailable

Recording and media

Coverage and corrections

Records considered

  • Punta Gorda Isles Canal Advisory Committee
  • Punta Gorda Isles Canal Advisory Committee — Packet
  • Punta Gorda Isles Canal Advisory Committee — Closed Captions

Not claimed by this page

  • A source-grounded next meeting date
  • Official outcomes have not been published.
  • A transcript is not available.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.
  • Low-grade, ungraded, procedural, or superseded items remain in the complete agenda inventory rather than the meeting digest.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: ab14c71fbc9eec9e9533baf09a2a7ee6. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record