Presidential Permit for Enbridge Energy Pipeline Facilities in Michigan
April 15, 2026
Track this bill to get notified when it advances a stage. One tap to stop, anytime.
The Frame
This permit governs the ongoing operation of cross-border energy infrastructure that transports crude oil and petroleum products between the United States and Canada.
Potentially affected actors named in the source documents. Mention is not a position.
Enbridge Energy Company, Inc.
The company is granted legal authorization to operate specific pipeline facilities and is subject to federal oversight and maintenance requirements.
Pipeline and Hazardous Materials Safety Administration
The agency is tasked with enforcing pipeline safety laws and regulations regarding the operation and maintenance of these facilities.
Residents of St. Clair County, Michigan
The facilities are located within their jurisdiction, and the permit mandates compliance with local and state laws.
Last recorded activity April 15, 2026.
Next step not available in the current record.
Summary
Key Facts
- The permit authorizes the operation of a 30-inch diameter pipeline segment at the U.S.-Canada border.
- It revokes and replaces a previous Presidential permit issued on April 28, 1953.
- The permittee is required to indemnify the United States against liabilities, including environmental contamination.
- The President retains the right to take possession of the facilities if national security requires it.
- The permittee may change daily throughput capacity and directional flow without further amendment.
Frequently Asked Questions
Does this permit allow the pipeline to transport natural gas?
What happens if the permit is revoked or surrendered?
Can the pipeline operator change how much oil flows through the pipe?
Why It Matters
This permit governs the ongoing operation of cross-border energy infrastructure that transports crude oil and petroleum products between the United States and Canada.
News Coverage
Sponsors
Discoveries
Patterns POLISCOPE noticed across the record. These are observations to investigate, not conclusions.
Modernization of 1953 Permit
The document explicitly revokes a 1953 permit, indicating a transition to updated regulatory standards for the same border facilities.
Connected Entities
Sources
www.federalregister.gov
Analysis Score
0–100- Significance65How much this matters to a regular citizen