POLISCOPE
Back to feed

The civic record

Read. Follow. Verify.
Local Impact

Approval of Engineering Services for Pond GC-4 Water Quality Project

Original title: Request for approval of Resolution No. 2026-41 and Task Authorization between the City of Deltona & Tetra Tech for engineering services to prepare construction drawings and obtain a permit modification for Pond GC-4 as part of the water quality mitigation improvements for the Theresa Basin Emergency High Level Overflow System in the amount of $75,938.

Record date · May 4, 2026

Track this bill to get notified when it advances a stage. One tap to stop, anytime.

Public stanceCommunity reactions are separate from the official record and reporting.

What This Bill Does

The City of Deltona is considering a $75,938 contract with Tetra Tech to provide engineering services for the Theresa Basin Emergency High Level Overflow System. This work includes creating construction drawings and securing a for Pond GC-4.

Why it matters

The city is allocating $75,938 in public funds to hire an engineering firm to advance water quality improvements for the Theresa Basin drainage system.

Who It Affects

Groups the bill's text affects, as described in the record. Being affected is not a position for or against it.

Directly affected

City of Deltona taxpayers

City funds are being allocated to pay for the engineering services contract.

Directly affected

Tetra Tech

The firm is the designated contractor for the engineering services described in the resolution.

Key Facts

  • The City of Deltona is seeking approval for Resolution No. 2026-41.
  • The resolution authorizes a task agreement with Tetra Tech for engineering services.
  • The total cost of the contract is $75,938.
  • The scope of work includes preparing construction drawings for Pond GC-4.
Show all 8 facts
  • The scope of work includes obtaining a permit modification for Pond GC-4.
  • The project is part of the water quality mitigation improvements for the Theresa Basin Emergency High Level Overflow System.
  • The file number for this request is 2015-6115.
  • The item was introduced on April 21, 2026.

Frequently Asked Questions

What is the purpose of this contract?
The contract pays for engineering services to create construction drawings and update permits for Pond GC-4, which is part of the Theresa Basin drainage system.
How much will this project cost the city?
The engineering services contract is valued at $75,938.

What else do you want to know?

News Coverage

No news coverage found yet. Articles are indexed twice daily.

Full breakdown

Who this bill affects and the strongest case for and against it, written only from the bill’s own text.

Sources

Open source document

deltona.legistar.com

Analysis Score

0–100
  • Significance30
    How much this matters to a regular citizen
  • Controversy10
    Intensity of disagreement among stakeholders
  • Entertainment5
    Compellingness for a non-policy-wonk reader
  • Buzz10
    Current news / social attention level

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record