POLISCOPE
Back to feed
Part ofZoning →

The civic record

Read. Follow. Verify.
Local Impact

Request for Site Plan Waiver: Wells Fargo ATM

Original title: Wells Fargo Free Standing ATM - Waiver to Major Site Plan Parcel #: 9009-0000-08 # WaiverSTA-000660-2026 Austin L. Hattaway Contracting, LLC LDC 2.20.1.A and 2.21.1.A - Applicability CODE states A. When any of the Minor Site Plan thresholds are exceeded, a Major Site Plan is required. A. Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds the lesser of 35 percent of the gross site area or 9,000 square feet; (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips; or (3) A 24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area. APPLICANT requests a waiver to the Major Site Plan and Minor Site Plan to go directly to building permitting stage.

Record date · May 4, 2026

Track this measure to keep it in your saved records and follow what happens to it. One tap to stop, anytime.

Public stanceCommunity reactions are separate from the official record and reporting.

What This Measure Does

Austin L. Hattaway Contracting, LLC is requesting a waiver from the standard Major and Minor review requirements for a proposed Wells Fargo free-standing ATM. If approved, this waiver would allow the project to bypass the standard site plan review process and proceed directly to the building permit application stage.

Why it matters

This request determines whether a specific commercial development project on parcel 9009-0000-08 must undergo standard environmental and traffic impact reviews before receiving a building permit.

Who It Affects

Groups the measure's text affects, as described in the record. Being affected is not a position for or against it.

Directly affected

Austin L. Hattaway Contracting, LLC

The applicant is seeking to bypass standard regulatory review processes for their project.

Directly affected

Development Review Committee

The committee is tasked with evaluating whether the project meets the criteria for a waiver.

Key Facts

  • The applicant is seeking a waiver from both Major and Minor Site Plan requirements.
  • The waiver would allow the project to move directly to the building permit stage.
  • Major Site Plan review is typically required if impervious ground coverage exceeds 35% of the site or 9,000 square feet.
  • Major Site Plan review is typically required if driveway trip generation meets or exceeds 50 peak hour vehicle trips.
Show all 7 facts
  • Major Site Plan review is typically required if a 24-inch diameter pipe or larger is used for stormwater runoff.
  • The project is identified by file number 2026-22878.
  • The request is currently classified as 'Agenda Ready' under New Business.

Frequently Asked Questions

What is a Major Site Plan review?
It is a regulatory process required for developments that meet specific thresholds regarding impervious surface area, traffic generation, or stormwater infrastructure.
What happens if this waiver is granted?
The applicant would be permitted to skip the standard review process and apply for a building permit immediately.

What else do you want to know?

News Coverage

No news coverage found yet. Articles are indexed twice daily.

Full breakdown

Who this measure affects and the strongest case for and against it, written only from the measure’s own text.

Discoveries

1 pattern noticed across the record

Patterns POLISCOPE noticed across the record. These are observations to investigate, not conclusions.

policy shift90% confidence

Waiver Request Pattern

The applicant is attempting to bypass standard environmental and traffic impact thresholds defined in the Land Development Code.

Sources

Open source document

marionfl.legistar.com

Analysis Score

0–100
  • Significance20
    How much this matters to a regular citizen
  • Controversy10
    Intensity of disagreement among stakeholders
  • Entertainment5
    Compellingness for a non-policy-wonk reader
  • Buzz5
    Current news / social attention level

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record