POLISCOPE

The public record

SARASOTA (SARASOTA COUNTY) · LOCALHeld · official record pendingPartial coverage

Code Compliance Hearings

Thursday, June 25, 2026 · Government meeting record

The 30-second read

Record incomplete

The Code Compliance Hearings body will review 31 property cases on June 25, 2026, starting at 7:45 AM and continuing through the day until 1:30 PM. Scheduled property owners and respondents will have their cases heard at specific designated time slots.

Why it matters

Property owners scheduled on this docket face potential municipal code compliance reviews and associated administrative actions for properties across various local addresses.

What happens next

The scheduled meeting date has passed. Minutes or an action agenda are not published in the records we hold.

This meeting date has passed and no official outcome record has been published yet. Nothing on this page is a decision.

Captured actions

31

Recorded outcomes

0

Source artifacts

2

Transcript and record text

Closed captionsWhat was said at the meeting, transcribed Sep 20, 2026. Speech is not a decision.
  • No speaker turns were supplied with this transcript.
  • This transcript has no source timestamps.
  • No speaker identities were supplied with this transcript.

This source published text without speaker turns, so speakers and timestamps are not shown.

The opening of 76,037 stored characters

? ? ? ? >> been here. >> We are on record for our code compliance. A special magistrate hearing set date is June 25th 2026 first case. We're going to take up on the docket today. A city of Sarasota vs Jose Margarita Flores Benitez, the details and Louise Angel Flores when T O. And his case number 2025, 0, 1, 5, 2, 2, the search for the wreckage. Your name, please. Lewis forth. All right. And sir, your name again for artists. So thank you. All right, gentlemen, your here before she kind of, you know, the procedure myself start with the city, a certain Mr. Spence today and come right back to OKC. Mister Spence, whenever you're ready, things. >> I think shows this is new case we have violations. First being city code section 16 Dash 47 as Ford violation, junk trash and rubbish. Police report that I want correct it with inspection of 6.23. next to our Florida building code 2023 Edition, one of 5.1 permits require where there isn't here. Damone some renovation work that was done without a permit. We do see some good progress. We do have a permit applied for as of 6.24. So it's that have them as a permit be reviewed and hopefully a shunt says enough and finally is going to be center housing code through a 5.15, which pertains to a fence that is in disrepair as Red speck shun this week. It is still disrepair. So I it for Flores. Is that when you think that the offense and repair and timeframe of for the work which permits issued. >> Okay. So apply for the permit and then we have this fence that you sell it. You address that. >> Yes, so the fence on. We didn't want to take it down because we applied for permit to because it's going to be a full fence and we didn't want to get in trouble with, you know, taking it now and then. Putting, you know, a new one without getting the permit issued for us. That's really why. Yeah. And then another reason why is because the neighbor next door has like a mesh wire one and it's like stuck and I couldn't get ahold of because they have to step on his property. >> Yeah, so that's All right. Let's you just continue to work on. Okay. So we it once the permit is issued this is there work to be done here? >> A lot. Yes, sir. any idea how long it's going to it would take once the permits issued. We should have it all done within. I would say work wise because it's literally everything like mechanical plumbing. It's going to take like 60 to 90 days. I would say we're quiet because it with inspections and everything. It it will be a little tricky. >> The 5 4 on this when 45 days, perhaps edge into the night get the permit issued over these moving along and as getting a status update. You know, if you're done by then even better, but more so to see where everything stands. We're looking right around August, 6th forward every perfect, same time first thing in the morning when perfect I 30. All right, well. Talking to the case out to 8/6/2026 at 08:30AM. >> Find a violation. 105, 0.1 of Florida building code continuing at this point 16 47 in compliance is June 23rd and through 5.15, the standard housing code is continuing and looks like we have the plants that like you're moving along and appreciate. We'll see you Thanks. Thanks for coming. Thank Have a good day to Thank you. >> We're gonna go back to City of Sarasota versus James. Ian Murray case number 2025, 0, 0, 8, 7, 2, it's my understanding is that stipulated continuance on this case? >> Yes, sir. The the response at last a conference and out of town conference attend to so the request of conference's Saudi did mention that they are working with the draftsman to take care of everything in relation to the work that have been done without a permit to correct both violations. So we're going push aside about 30 to 45 days. So push us to. July 30th at 8.30. >> All right. It's on walk into the case up to July 30, 30 and from the last order on the case invited violations are continuing in. That will take us off the record. All right. We're going to go on record for city of Sarasota Rivers. Versus patents, Chichi it make what was they were typing. >> unique that making. Okay it unique and really and truly park are my wife aka Julia. You can make as to a life estate, but you Jose Ick our as remainder to by Sebastien, Jake has remained a man. Barbara Kenan does remain here right now, Carolyn. And she Kaye has remained very good. We've got the whole. They are on the docket on the record there. This case number 2026 0, 0, 4, 0, 9, I believe you're here before, too. So you always we start off with the city of talk with them are Spence today and I'll come right back to OK? Thank Alright, dispense whenever you're ready. >> tell us this is a for a number of violations. which are standard housing code violations through 2.3 and through 3.3, which pertains not having acted water counting bathrooms you know, and despair. Those winds do remain in compliance as of our inspection of 5, 6, Then we have through 5.15, which is another standout center housing code violation for offenses in disrepair. And please where that was corrected with our inspection as of 6.23. And then next, we have city code section 16 Dash 47 for the Commission, junk rubbish and trash. That corrected with their inspection of 6.24. And the final one that was corrected is the city Zoning Code Section 2, 1, 4, B, which is potential vehicles. That one is correct as of 6.24. As well leaving only the 2, 1, 0, 5, 0, One permits required pertaining to the deck. in tears last next year, renovations that were down without a permit and the city zoning code's Section 6 dash to be for having too dwelling units on a property. And finally, the center housing code violations 305, 0.5, 4 stairs porches and pardon says which obviously will be corrected once the deck has been corrected. We do see some progress, but they do have some comments that were sent out for the interior exterior Some comments were sent out back in early April and then for the deck, we have some questions that were sent out in at the end May. need to be have responding to at least as of my notes of yesterday afternoon. >> But the further respondents in relation to when they think they get those or other contractor turned those into that we continues progress. >> my I know who the spokesperson is here, but >> his >> the. >> The one for the He turned in the stuff for the apartment. The one for the fans. That was based on out. >> That on it in a way. It seems in construction because we did just different. Different. The one size. >> The what the unit that was divided, the kitchen was taking out of that unit. had not known that that couldn't be tail so that there's only one 10 and now. >> The >> waiting for survey for some of that. >> this is done today. It said the son a foot for last. I have to going to is that and the door of site. I remote. Did they that? Because was Chapek. >> door >> inside the with the drible drywall and removed at the U.S. open. I removed the I remove everything right now. Is that unit? >> They they they they and the door is one under one parent. >> That their is I'm it's meant. Tom, why are you doing the work yourself or you Yeah, I don't. know it sounded me to just listen Mr. Spence, it sounds like they've. >> The building department sent over some requests for some more information from you. Only second made. So if you had a chance want the last one that figure does for I finally we got it because everybody was so busy 5, 0, 6, 0, 7, weeks, August. Okay. I know that thinks and we not with unite. Remove my sable. Put foot save. Don't miss no big. I remove my doctor to try to lure might dump of trying tease there. My name is since not. Is 7,000 found it might and the city talking about 7.6 thousand pounds. That's mean I can keep his know they are right now. But I that you hire afraid? Bulls. What? 8? Keep my candidate item on that one, too. I Apple does I this is perfect right now. I had the picture right here. have do they pose to be? We have depended for bank door. And that knowledge you need wear just regulation. I didn't nothing inside Donald. They do need 10 was about the room will say, well, what they're going to be tonight, obey that one because was 74. I think 20 years. It's my as I want to finish that alright, Mr. Spence, you have any questions. >> I guess just for the DEC portion, just a timeframe when they get that and ration turned in and it sounds like, you and please correct me if I'm wrong, that you may have already started the work to correct it, but that would still require parents return it back to the residential single family. You know, even if you had to do, that's a permit will be required. So we will for additional information on that. John. >> something he needs permit to? Because all they kept or removed which they to make one-third of their major construction them. He needs a permit. But if they're leaving it as is. Without it being 2 units without having 2 kitchens, then it's okay like he doesn't need another perm at. We have return it the back to a residential single family of kitchens on the property is basically having to drilling units, even though you have a doorway and >> tween. So you'll have to return it to a wet bar with a base not basing but a single bar sink of that nature. So you can have like a full kitchen. See, there's no cooking facilities. So if you want to have like lack of a better word lounge area, that's totally fine. It just has to be permitted for >> Okay. So like if they're removing stove, so no longer counts, it's to catch an do you need a permit? It to leave? That asked answered you need a permit to remove all the cabin at eye. haven't it have to be removed. asked. >> front comes on remove per se unless you want them remove its just they have to be permitted to should reflect what's currently there. So once the the stoves route, that's awesome. Amazing. That will help no further along not being considered a kitchen facility. It's now has to be permitted to show like the cabinets, their the plumbing that's there as well as an electrical that may have an added or changed. they need to another permit to show that it's one unit that the kitchen was. It's no longer being used as a second. >> is this is not the department. Okay. This isn't the department is that is the same parent Duck remote and grace. Does door. >> for and this is that I got make sure that's under the kitchen facility as well. Second, right now is the one to 10 when 9 year-old 2 19 right now. >> I keep the dates sync. I need the calving it because I don't want to remove the coveted want to spend more money and that I removed the for each. I removed the electric-powered from there to I. >> All right. Well, whatever this gets sorted out over the building department here. So let's let's push this out, too. 45 60 days you know what a for the king 45 days live and work through the process. Get inspections called in so that they can, you know, take some time and if by does pop up, they can work through the process. >> That will push us Tuesday to August 6th. sure are. Yeah. that's always a Thursday. Deeper for mornings or afternoons. >> And the house is pretty close to He had big warning more and you have summer time 8.30. >> That is coming here are doing the inspection there. It will be here at them. >> into the case out to 8/6/2026 08:30AM. Just to recap recap, here are the 302 0.3, a standard housing code was correct on May 6. Real five-fifty understand how Cinco was quick to 6.23, 60. 47 corrected with the inspection 6.24. 3 of 5.5 to continue with the standard housing code. The 6 to be still continuing violation of the zoning code 105, 0.1 of the Florida building code is continuing. One of 5.1 is that applies to the exterior renovations is still continuing 7 to 14 be was correct 6.24. And looks like the 3.3 of the state housing code was correct on May 6, 2000. 26, all I'm doing today is continually case out. To give you a chance work yourself through the building permit process. I would just stay in touch with them in terms of what they need in terms of coconuts, probably the key to this. Okay. You will sort you work your way through it. thank you very much. Have a good You know Thank very much. Have database. >> 2. I will go next to City of Sarasota versus JC Bar in him up. Lou Bar case number 2026, 0, 0, 0, 3, 7, And for the record, no one's here on behalf of the respondents. So. Let me get the city's position on this case. >> Things are. >> Mr. Price that's close as our last hearing that it did not show last one. The 16% 16 49 be still remain in compliance with our inspection this week. >> Then >> to our knowledge are still working to the probate Give them one more chance to hopefully come in you know, speak up on where that stands because that I know they're trying to wait take ownership before you start putting in funds to repair the property. So part push is on 30 days to just see where everything stands. Okay. >> All right. Well, was proposed time and date on this one. Yes. We are looking at. July 30th at 10. 45? Welcome to the out to 7/30/2026 find 16, 40 subsidy. 49 be that could work. Corrected with inspections back in March. 17th the 26 there remaining violations cited are continuing and that'll take us off the record. All right. We'll go next to City of Sarasota versus Great Lakes development Kim's case number 2025, 0, 0, 2, 7, 2, Catherine Andrews is here representing Great Lakes. And Sanders. As you know, our start with the city of start with suspense today and come right back to you, Mr. Spence, whenever you're ready, Thimerosal us, this is a continued case. You have for a violation of our one of 5.1 permits required. >> Where there's a man or a hurricane renovations permit and sorry, hurricane renovations done without a permanent. in years and years, it seems that things are going more difficult because did have permits applied for and it's where process, but they're having to split up since about 3 or 4 units that are within that whole thing. They're having to develop every single one through a permit process to ensure that its OK, you know, balance and just speak up on that of a time from when she thinks get everything turned or applying everything turned in, OK, sounds like there's some complexity to the permitting processes that with. >> Yeah. So there's 3 different units they had applied one permit application for all 3 units and they recently received comments from the building department requesting for those applications to now be divided up there. See those comments this week. So obviously we're going to request an additional time to go through that process. After speaking with the contractor, I believe 60 days is what will need just to allow, you know, the typical 30 day period that the building department usually takes to provide comments back for permitting and then also give a little bit of a buffer in case there's any additional revisions that may arise with those new permits. >> was reasonable to me. So we want to just push shoppers 60 days. Yeah, cover with that. We're looking at August 27th that were says Anders, mornings afternoons. Mornings, please it 30. Yes, please. Cannot. August 27th at 8.35. The violation. One of 5.1 continuous Sanders. in and out today. So thank you. Appreciate it. >> Thank Thank Thank you so much. Good to see you. All right. we're going to go next to City of Sarasota versus the not show up tomorrow and it's case number 2025, 0, 1, 303. for the record, I'll let you identify yourself to Go ahead. >> Jeanie >> The >> You've been here before, you know the process. start with Mr. Spencer, the city and come right back to you. >> Mr. Spence, whatever your race. >> If you think Michelle U.S., this is a continued case. We have 4, 3 violations for Sunday. 105, 0.1 per it's required where there were some uncommitted enclosure of a carport conversion to a dwelling unit without a permit. Next is city zoning Code section 2, 0, to be very multiple dwelling units on the property. And finally, it's city zoning code. Section 7 Dash 602 cz. 2.1 C which pertains to near having and the principal dwelling unit Northey excess are doing it being. >> Lived in by the main property owner. As of right now, everything still ongoing. We do see a permit applied for that sneeze and corrections. >> It appears and I'll the of ours correct me if I'm wrong, but appears that they're trying to downgrade the 2 into one dwelling unit. But that would still not be sufficient enough to correct all violations due to the fact that neither the principal or the accessory dwelling unit would be owner occupied. So they would it would have to be either someone moved in as well as his permit be closed down. Or the whole property be converted back to a residential single family dwelling. But I'll let the of our speak up on that where things stand. >> OK, I'm hopeful that you've had this discussion with the building department already. You know what you need to do or what has? >> they just send in the mine. They need some modification. >> Or. >> And something more in our engineers working on it. >> Okay. >> was gonna have to assume the with has to be done. So I guess we just pushing this without as well as that we're doing here in U.S. are probably looking like 30 35 30 to 45 days to allow for process work and get everything moving forward get a 8 that will push us to July 30th York. 72. Mornings or afternoons. >> Morning morning and wanted to 9.15. >> Spilled into the KSAT July 32,026, 09:15AM, by the violations continue 105, 0.1 was of the Florida building code 6 to be in zoning code as well as 6, 7, 6, 0, 2, CC 2.1 C of the zoning code in. >> Good luck with this, OK? thank you. just one question. If we have to go out of the country and we can come and estate what we should do. >> You can't come do notify and the coach staff of the be year inspector won the ladies the back to say we can do it with are you able telephone conference? Warm or was like a stipulated continuance just to say always an out of the country recall of the country. You know, we back on this state so we can rearrange a new Thank you so much. Thank you. Have a good day. Take care. Thank you. And I think. >> Are waiting on record for city of Sarasota Reiner's as trustee. riders family living Trust dated 7/25/2024 for the record, Charlotte, you identify yourself and your connection to the responded. Jon Traxler and just a friend of the owner trying to help out. All right here with their authority. Obviously. All right. So I'll start procedure. Let's start with the City of Sarasota with Mr. Spencer on the city's position on this. Come right back. Mr. Spence, whenever you're ready, sir, I think cells. This is case we had for a violation of our >> city code section 16 dash. 49 be for evidence. Franco rose on undeveloped property and please report with our inspection as of June 5th, the properties now in compliance remains in compliance. Alright, district some of the yes. And so you agree with that. I will find 16. 49 be the city code was corrected with the city's inspection on 6/5/2026 takes us to the issue, fines and cost the city have a recommendation on that issue. We do your We had access to a pretty large fine. Last hearing is is there's no attending. >> So the potential fines accrued upwards to $15,400 with 4 inspections of 465 cities. Not to be asking for all that fine. It seems that once again where is understood, knew and understood what to do. So be asking for a one-day 5, $100 as well as the costs of 4.65 and make it a priority. All Mr. Truck study understand that recommendation to I do understand, you know your response to it. >> We have one. Yes, thank you. >> Will the code violation was sent to the and the fine was sent to previous owner who had passed away. The current owner purchased the home in January, but it was never inspected during that time. You know, all the issues have been corrected. And requesting to move all charges. >> gonna go with the city's recognition because it's a generous one. Sodium from 15 $100. I'm gonna go one day fund $100 cost of 4.65. So the taxpayer doesn't the burden for this process, but that and then all of a Kate, the priority, which is established that. Large fines and so that'll wrap it up. And thank you for coming today. Appreciated taking good day. >> would like to but he's in a hearing for the next 30 minutes. And he said are. So from 9 59 45, he asked if we could have an extension for that reason being. He's my attorney that have my brother evicted from that house which caused all the problems. >> I have no problem. You want to wait and all right. We're going to go on record for Sur for the first march to a brand is trusting them a friend. >> Trusted August 1919, 94 a mid August 16, 19 Isaacson. You stated June 14, 2018 is case number 2026, 0, 0, 0, 6, 8, Ross is here on behalf of MS brand of So won't. Brand has passed away locate that suspect. That was her mother. And this yet the name your name. >> Cristina Brand could Inc. That's right. get the last thing now. >> Ku D I C K. >> I see a very good. All right. Very good. Will procedurally. You know, I we start with the city saw start with Mr. Spence can go to Mr. Ross and so Mr. Spence, whenever you're ready, sir. >> Themselves, this is a continue because we had for a violation of our student housing code violation. One on 1.6 for a pool that was in disrepair are not being maintained. I am pleased report that the violation was corrected as of April 21st and has remained in compliance ever sense. >> OK, and Mr. Ross, you're in agreement with that. >> in just as a little background. So the city all understand the occupant of the resident was her brother who obviously did not take care of the property. We unfortunately had to go through an eviction process to get brother out, which we've successfully accomplish, allowed Kristina the opportunity to fix up the house. And so that's what we've done. And so we asked for obviously the leniency of the city understanding that the situation involved. >> Well, I think I remember this story with foods litigation to get him out, eccentric cetera. That was a different case. And so with the cities the city's recommendation on this is what exactly Mr. >> Yes, sir, I just spectrum for The conversation, As mention of the difficulties that the response of had to give the property compliance. So as you know, this was a repeat violation, which is why the fight occurred so much. We had a potential fine of $114,500 on the city's not asking for any of that fine due to the circumstances that Mr. And has a dealt with. We would only like to recoup the costs of 4 6500 sci-fi 40 so that actors brother full burden for this process and vacated by order. >> Struggling to get your response to that, that that would be fine with us. All right. I would be a little better going to 50 on that costs. And thank you. Thank you so much. bake me a vacate the You know how they could deprive yourself, take care of it. And good luck. Thank you very much. Thank you so much the day. Take care. I appreciate your time. Thank you, too. One record for city of Sarasota verse factor the and Austin would them in this. It's number 2025, 0, 1, 4, 1, 6, For the record. No one's present on behalf of respondents. So its city's position on this case. >> To this is case we have for 3 violations. First one being city code sections. 16 Dash. 47, which remains in compliance is or inspection back on 3, 3, and the final 2 is seen as a city code section 16 Dash 50. For a number one license vehicle down still remains out of compliance. And finally, the Florida building code one of 5.1 permits require a dozen fence installed without a permit. We're still not seeing any movement on the permit as of special this week. We're hoping that so the attendance as it was last hearing. So again, that of the doubt as to push us out one more time. But we're not seeing any progress or a no movement. me asking for entering of the affidavit. So that said, we will requesting to pushes out too. July 23rd at 9.15. Not to July 23rd at 9.15. >> of only 16, 50 the city code and 1, 0, 5, 1, Florida building code continuing. 47 remain magic appliances, March 3rd. And hope for Take us off the record. There's. >> All right. We're going to go to our next case City of Sarasota versus George T straight cash junior. It's case number 2026 year, 0, 1, 6, 0, And sir, you are George Jessica Stern I and procedure. I think you've been here for so, you know, I'm gonna start with Mr. Spence from the city. Come right back. Mr. Spence, whenever you're ready. >> I think shows this isn't mentioned. They continue case we have for a violation of our Florida building code. One of 5.1 permits required. This was a and your kitchen renovation that was done without a permit do too. Some hurricane damage happened a few years ago. We do see a has been issued and we're just waiting on some inspections to be called in. So did her a stray caution relation to anything, see circa those inspections called and had this permit closed out. >> All right. So let me go to you and get that information. Things were a little slow last month. My. And I'm April my contractor the replaced, he seems very child now he said that just about them and electrical and probably another day or so to be able to call in to have that done on plumbing side. The one thing we're waiting for is the countertops and I'm not sure exactly when that we're waiting for them to come out to measure and then too. >> Get them done so we can finish the plumbing work with the sinks and everything until done. >> The projection on time, 60 days or I would think if everything went. Rapidly should be definitely within that time period. Electrical should be within the next couple of weeks. question I have for you on what works best for you in terms of the plumbing because they don't know how long will take to get the countertop in? And I have to go away. Very end of July. beginning of September. So ideally, I would like be there when they put the countertop. It. But if that's a problem for you in terms of the inspections and such, I can have a contract or a friend be there to make sure all the work is being putting correctly summit. You know, I can I get I get I I'm a city Lawyer that comes here to hear cases. So and made sure Mr. Spence can answer that question. But especially with a good shot at it. >> In relation to installation, that would be up to you whether you know, every contractor friend be there for that. >> You know, know when it comes to the inspections like to make sure that all the plumbing is done for code, someone also have to be there so that someone can make sure that there's access to the property on this year's a lockbox code of some sort. But you can work a contractor in the city inspectors. I we push us out me 45 days, I guess or something? Yeah, we're looking at about 45 days, which would be August 13th. >> We could attic. >> We will tell them comes from if you want to fill out with key in the back again, just do that. And we'll be able tell you that date and time. But August 13 is morning. Okay. Are you another time? If 30 okay are a little later. >> little later how Tuesday? 10. 45? And that's what I don't get to the KSAT. August 13th at 10:45AM. find a violation. Any one of 5.1. >> And will speak on the phone take caution that time so take care, sir. Thank you. Re much. >> Hi. If you record your name and reason for calling. I think this person is available. >> Richard Ellis, code enforcement hearing. >> Please stay on the This as well. >> Mr. Blay Mr. Glad this is Richard is serving as magistrate. The suit is very well. All right. Let's let's see what you can. Can you hear me now serve? This is Richard Ellis serving as magistrate the city of Sarasota. Can you hear me? >> Not very well. I mean, I can kind of make out, obviously that you're with the city of Sarasota. I'm assuming obviously this is the code enforcement. I'm gonna move. I'm gonna move over little closer to the machine years ago. It's not like you're talking about. People come up. >> All right. Just like Can you hear me better now? It's a little better. All right, Mr. Officer DeLay proceed with your case, which is styled the city of Sarasota versus Frank. W Walk. And Gina, him walk. And this case number 2025, 0, 1, 1, 6, 3, And for the record, William Glade is appearing on behalf of the respondents today, Mr. Late Procedurally I we start with the City of Sarasota all start with Mr. Spence, he'll outline the city's position on this and I'll come right back to you. OK? All right, the suspense, whatever your race or thimerosal us, this is a new case for for violations. >> First, 2 of which are pertain to advertising operating without a property with a vacation rental. department, those 2 are corrected as of our inspection on December 23rd of 2025. final 2 pertain to not meeting the minimum night. 7 night minimum as set aside by the city code and those still those to remain still out of compliance with our inspection this week. So that heard Mr. Glade when he thinks you can get all advertisements either taking down or reflecting the 7, 9 minimum as the city code states. you glad you able to hear Mr. Spence. >> Yeah, I'm I'm a little confused about number of violations. We had infection and we passed. So I didn't know there are still outstanding violations on that. >> Well, other violations, I think it's I understand at this point, the only violation that it continues is the the in the Internet at the the the units being advertised for less, then 7 days and Mr. Spence, when Mr. Spence said in his outlined there was that he was wanted to ask how long was going to take to get these advertisements advertising the the units for rent for less than 7 days. >> Okay. I like down suspend where because I have it on Airbnb. And I don't know. I've never taken a reservation some time. for one thing and I don't know what date. because I I checked again. And I don't have any data that are out of compliance. So if you know the date, I have to go back in there and change it because I'm unaware of them. >> As of right now we have a screen that was on the 23rd of this month and it shows that you're able to rent the unit for a 1, 9, minimum. On air on Airbnb. >> You mind if I go into my website and check that out for myself because that's really that's really nice to me. I I I'm positive. I don't have that. >> All right. So just said, just say, you know, Mr. Glad I'm looking at the picture the 23rd of it. >> yeah, I mean lot which which stations that cover? >> What would they were reflecting that? You can read reserve those. It's not we did not make a reservation that date. >> Now I understand that. But I'm just saying let me get into my calendar real quick because I know I intend have a 7 night minimum. I understand the rule, I understand The code. You know, I'm familiar with I have other rentals. and Sarasota and we comply. So let me just log in real quick. just want to see where we're staying. We're seeing that. I don't I don't know. I'm not aware of that at all. >> There with him watching him right I'm in my calendar on Airbnb using the time you're being here. Where else do you see it? >> This screenshot from Airbnb. >> What I have their wake me and over to you. >> I was a sense inspector. He's the one the days that we have here that was, you know, a potential reservation was done February 28th of 2027 to March. First of 27. >> Mr. Players. here's what I'm going I'm going to continue the case out. I'm gonna give you a chance to do your homework on this and you probably want to do it before the hearing next time and will reset. I didn't know. >> I'm sorry to interrupt you, but I didn't know. I wasn't given any specific dates violation. I just had I have a general rule. I I to screen shot of it of 7 night. So what know specific. Time frame where it violate. I would have no idea that I was violating the code. Here's how you do. It's are you going go on the website and you check what's being listed there? Okay. >> Please do that before the next hearing. Okay. Because it when you're not gonna be able to do it during the hearing, Mr. Spence, Give me another date here. On this case. we're look other day. He said the last part of February is the one night minimum. What other day? don't know, sir. You're going to have to do that. Research yourself, OK? We're going to reset the hearing. You need to do it before the hearing. Okay. What do you have available, Mr. Spence. We are looking at July 23rd at 9.30. >> All right. I'm gonna reset this hearing for July 23rd at 9.30, I will fight to the violations have been corrected to the city's acknowledged that 34.5, 19, a one. A 2 are now corrected as of December 23rd 2, 3, of 4 be ones and 6 to a to B of the zoning code are continuing. We'll preview. Take this hearing up on July 23rd at 9.30. Thank you, sir. Have a good day. And plan for question. >> How what I have known. >> no, we're not going to do that. You get you're the way you're going to know it is. You're going to check your Web site and see if there's a listing for less than 7 days. OK? That's all I can tell you at this point. Very simple for you to do that. All right. If you think can you me that green shot? We've got we're not going to do that. You're gonna have to check it out yourself. But I actually I think with that the city could new that can screen shots all direct the city. >> appreciate that. honestly, I I always wanted to comply. Could have been doing this for a long time. And I'm very aware of the ruling and the vial and the code enforcement have having the city seniors got a screen shot. All right. Okay. We all the dates. I mean, all the day for the out of compliance double. Check them. >> going to send use a senior screenshot. All right. Have a or take care. Thank you. That conclude the hearing. All right. We're going to go on record for city of Sarasota versus Tracy Murray. Give free argue, Jeffrey or something Q spell. Gee, I you Fre case number 2026 years here for a 6. No one is here on behalf of the respondents. So Mr. Spence, the city's position on this case. >> Themselves, this is a new case for a violation of city code. Section 16 Dash 47 accumulation of junk rubbish and trash. And please report that the properties now compliance as of May 28th and remains in compliance. >> All right. So I guess we all find 16. 47 was brought into May 28 2026 a go to the issue. Fines and cost city have a recommendation on that issue. >> We do your honor. We haven't. After David Perron inspector with initial inspection of February 19th 2026. notice melt on February. 20th notice served on February 27 via certified. Now the compliance date set for March 4th. With the and compliance and corrected as of May 20th. The SoFi currently are so fine that ran from March 5th 2026. To May 27 2026 for 84 days at $100 a ransom of 5 to $8,400 with 3 inspections of 390 answer that and his exhibit number one as well as notice that today's hearing is exhibit number 2 on on one 2. And terms of find the cause, you asked me to impose the fines on the affidavit correct. Okay. So $8400, I believe was the. >> The simple find 3.90, where the costs are recall. go ahead and impose those violations are corrected. So is not running anymore. Nothing to baking. And this one. Ibra good. I will go next. The city of Sarasota versus Patricia Basher. Case number 2025, 0, 0, 3, 5, 3, The record. No one's here. public apparently stipulated continuance on this one. Yes, There was a recent death in the family and we just agreed with, but their council as well as it pushes out about 45 days to allow. I agree process take place. So we're looking to push out excuse me. August 20th. >> At 09:00AM. >> continued out to 8/20/2026 09:00AM. And the violations continuing of 6 to one of this is oneco to one of 5.1 of Florida building code. I said Joe Caruso. Yes, Caruso. This is a Richard Ellis serving as a magistrate, the city of Sarasota. How are you, sir? >> are you don't do well, thank you. If you're ready, we'll go on record for the case. I think you're appearing for here today. City of Sarasota vs Richard Lambert E as trustee, the 23rd Street Children's Trust dated for 14, 2000. 25, it's case number 2026, 0, 0, 4, 5, 9, Mr. Cruz. So I we start with the City of Sarasota, Mr. Spence's here for the City of Sarasota today and repeat for Senator continued. You're closer to the microphone. I'm having trouble hearing you. >> Understanding you. Mr. Cruz to let's see if that's any better. Can you hear me better now? So much better. Thank you. Okay. >> All right. So as I was explaining, I'm going to go now to Mister Spence, who's here for the City of Sarasota and the city's position on this. And then I'll come right back to you. OK? spent whatever your eyes. >> Solis, this is a new case for numerous violations. Breaking down one by one for being violation of Florida. Building code 105, 0.1. >> Permits require a fence was installed without a permit. This one was corrected with our inspection on May 5th. Next being a Florida building code 105 1004.2 which pertains to an expired permit. >> That had left outstanding. This one was corrected with the reinstatement completion. As of our inspection of June 17. Next one is a another violation of our Florida building code. One of 5.1 per it's required where there's some interior renovations that were done without a permit, creating 3 dwelling units to a property after that, we have zoning code section 6 dash, 2, 2, be which is the use of the property with your change, having 3 dwelling units on presence to him for property. And finally, center housing code 307, 0.5, retains to pass an extermination. All 3 of these remain out of compliance. I know it's been told to the inspector that the past have been. Corrected, but we need either an on site to verify that there are no further signs of past or an invoice from an extermination company to correct that violation. And then the last 2 are kind of more of intricate, you know, detail as this was a vested duplex. But there is sun renovations on the that were done without a permit which created a loss of that rights for duplex. So as the city stands as of right now, the probably will have to be returned to a residential single family and no longer a duplex. I know the inspector said that the response are having difficulties wanting to keep it a duplex as they're trying to follow permits. You have everything done with that. We've been in stride and structures because owning as well as code staff to see if there's any change that can made to allow them to keep it a duplex. But I'll defer to Mr. Caruso in relation. To where that stands. All right. correct. Crucial. Let me go to USC where you are on this point in this process here, sir. >> That what We know that we've got to get test under control of company. I all I needed to do was tell the inspector, you know, residents happy with the situation. I want to know I need to do something else. mean, it's I think, unfortunately, your your assumption that is really way off. So you're going to have to. >> Have you spoken with building department at this point? >> spoke with inspector is unity will step up here. route to surrender control of minutes. We need to do something else. happy to do Yeah, there's a the big problem seems to be the zoning issue. >> You have too many units that location that are not permitted in that. So classification. So you that, you know why? That's the major issue here. you probably need to. know, try to get that information from the building department as to what what's permitted, what isn't permitted. Okay. think that's public funding >> We were we were asked to apply for up to after the fact or Bill. It and we're in the process of taking measurements inside. And create the drawings that could lead to the submitted an application for the permit. When when the property was purchased, property appraiser told us, you we needed to remove us what we've done and open up a doorway. Between the should have been aware of. The department was needed to open door way there. That will Rules into Permit applications for the if prove months that were done by the previous owner. When trying to get a I think we're at least halfway done with the measurements. I would like Completed several weeks ago. It was just too. hard to orchestrate from us. The city at airport were making progress the inspector Somewhat compliment of our progress yesterday when I spoke with But we are working on that to get actually with the city. >> All right. So a lot a lot all, you know, I think what will end up doing here today is continuing this case out to give you a chance to work work through the process. You know, I do want to, you know, please call your attention. Seems What I've heard today, the big issue may have it sound like this, Mr. Spence was saying that maybe this is a single-family zoning. Is that right? >> Yeah, that was me. My only Mr. is he planning on trying to return this back to a dwelling or start to do well and do blacks or is he just going to bring us back to RSF one Ares residential single family? I should say because as of right now the city stands that due to the renovations that have taken place. It will need to be returned back to a single family unless there's some sort of you know, deemed, you know, for returning back to that duplex. >> You grandfathering issues or something along those lines that so I just want to call your attention to that issue. So you can focus on that. But what I'll do, today's will just find a new day to bring this case that went with U.S. just. >> To the extent of work that needs to be done will pushes out just a little past 30 days. Does August 6th work out for you, Mr. Caruso. >> our best. It will be a. The current use building single-family the time. But it's not what I wanted to convert it back to single family. the president that was Removes the lock-in, started occupying both Mohegan Without my knowledge, without my permission, just the property manager for the trustee. >> Well, let me just because not the sort this out a little bit. So it is pushing South August 6. like mornings or afternoons, Mr. Caruso. >> Good morning. It's good. priest 45? Okay. >> It. 45 am work for you, sir. >> That's why sure I was too that out to 8/6/2026. The 45 am fun. The violation of one of 5.1 is the place the interior renovations. As well as 307, 0.5 supplies, the extermination and 6 to be in his own code. continuing violations. I believe Bible was applied to the fence was directed back on 5/5/2026. And one of 5.4. 1 1.2 as applied to the permit was is also correct that June 17 SEP. >> So we will see you then. Hopefully we can have some answers when we when come back. OK, good luck. Thank Thank Thank you. >> I will go next to City of Sarasota versus James Reston as to a life estate, Thomas Ruskin is of remained a man and a theater. A son has remained a man Kunce case. Number 2025, 0, 1, 1, 4, 1, For the record. believe you're Athena, Russ and yes, sir. Okay, you've been here before. You know, the process start with Mr. Spence now come right back to some suspense. Whenever you're ready. >> I think shows this a continue case. >> For a violation of our Florida building Code one, a 5.1 permits required where there are some storm damage done without a permit. We are pleased to report. We do have a permit issued as of June 23rd. >> And as of my hands notes yesterday, just pending commencement. So as a pardon mistress in relation when she gets that turned in and start getting the inspections called in. >> All right. So looks like a new nose. The commencement followed the clerk's office. You you know what that is? >> No, I don't. I so I have. The S which is I'm not sure the government building permit. >> Yeah, there's there's form over the billion part of that can help you with. I noticed the commencement that gets recorded over the county recorders office of the we may want check on that. That's it because order Collier inspections and you need to have that filed. Okay. So we're OK, go well, I think of the Billy part of a second floor. Second floor. They can building one right across the street. second for supporting office to build a walking through rubble process. Okay. Okay. Give the form. >> Yeah. I guess the holdup was so I called the neck Baltimore and I said the couple weeks ago and I was like. Gary Bell is the one that we My contractor been sending e-mails to and he said my son, Nick Baltimore Sun, I signed off on this months ago he sent what the holdup is to get someone to go, find him and talk to him and like 2 days later, it went through. So I don't know if you just got lost in the process. So that's it. So and then my contractor, when an employee for everything and everything, how much work needs to be done in their view? >> There's very little that needs to be done still. just some a little bit of finish work in. >> The bathrooms and you know, just like a little details. And then so not too much, 30 days for bringing back in 30 days. I-45? Yeah. The 45 >> We do have that available available on that will be August. 13th of that works out, OK? And you prefer mornings or afternoons. Mornings place. >> We have an 8.30, in a 45 which works best for you? And I do like around this time because I come from at least. >> 13. Every 10. 45 perfect. All right. That's all they can to the case out to August. 13th at 10:45AM, find a violation. 1, 0, 5, 1, >> Continuing at this point. Thank you for coming appreciate and thank a. >> So as far as the >> I will next to city of Sarasota versus Aloha Pipes, Management, LLC. We have 3 cases case number 2026 0, 0, 3, 3, 4, 2026, 0, 0, 3, 3, 5, 2026, 0, 0, 3, 3, 6, For the record. No one's here today on behalf of the respondents. So city's position on these 3 cases. >> The results like to start with case number 0, 0, 3, 3, 4, which pertains to a violation of our Florida building code. One of 5.1 firms require where they did a port slash roof extension over an awning area without a permit. We really do have a permit issued as of 4.27. I was hoping that someone will be in attendance to speak up on where everything stands and time frame. But with that said, I do have an affidavit created by the inspector. It is with a initial inspection of January. 5th 2026. no to smell it on January. 12th notice served on January 17th. Compliance set for January 27th with problem and out of compliance with the currents of a fine running from. January 28th of 2026. 2 June 24th of 26 for 148 days at $100 a day so finding the $14,800 with 3 inspections of 390. if I may answer that and things have been number one as well as exhibits 2, 3 for notice that today's hearing and that 1, 2, and 3 and based on the affidavit impose civil fine to date of 14,000, $800 in cost to date be imposed. start of $100 per day. running find violations corrected on Decatur. Representative is required to attend the next hearing. >> What they would want to bring this one back before we do that. We to continue idea that UK some kind of keep them all together. >> Next, who like to together as they're very similar violations. First, one is a violation of Florida building code 5, 0.1 per month Wired were there was a garage enclosure and conversion to an accessory dwelling unit. Without a permit as well as a violation of our city Zoning Code. Section 6 dash 3, 0, to be which is having 4 dwelling unit that poses a duplex in a converted, both garages and to do all units so that at the time there have been 4 dwelling units there and those same violations pertain to case number 0, 0, 3, 3, 6 as well. >> Both have a permit issued as of May 2nd. So we're looking to that continued and we'll continue these 2 out as well with the first hearing, our first case, number 0, 0, 3, that I asked for the Pfizer causing the second 2 cases. Bell find violations are. >> Continue in both. Those cases is cited. And when you want to bring the 3 case is back. we are looking at. August 6. 11:00AM. All right. So bring continue. All 3 cases to 8/6/2026 it 11:00AM violations are. Our continuing. All 3 cases is sited at this point. And on the second cases of I'll just not impose fines and cost of this point. Alright, takes off the record. All right. We'll go next. The city of Sarasota versus Em Capital Investment LLC, case number 2026 0, 0, 2, 9, 9, and for the record, sir, your name, please. My name. He said about the That's key. I don't expect last thing for me. Please S R a C k I. >> The and the first time against a bill that would R t O S ze. All right, sir, thank you. I don't recall you being here before procedures. I we start with the City of Sarasota, Mr. Spence's here for the city today. No outlined the city's position on the case. >> Now, come right back to you. OK, OK, alright, some Mr. Spence, whatever your race or >> yes, thank you, Mr. Ellis, this is a continue case we had for a violation of our city Code section 16 dash 49 seat for heavy dense rank, overgrowth on a vacant lot. And I am pleased to report with our inspection back on May 27th the proper thing appliance and remains in compliance. >> All right. I'm Sarah Kia, the city's indicating there that you think you are in compliance with their inspection on May 27th. I'm guessing you agree with that. Yes, I'll stick unit care of the property before dot there are mistakes because we are the owners of the property since March and is the classic developers. >> Owners of the property. And I've been taking care of the proposed use is a pill looking over and caught in the cross and recently 2 weeks ago and when I coming to cut the grass again, iPhone noticed 2 different company. 2 knows and 2 I was in not to fight soon as we both the property was notified about any and violation. But even by the mail, even by phone call or there was nothing posted on the property says we bought it. I mean, sort through this a little bit. So. >> Looks like this. I take the notice of violation was mailed in December 22nd of 22,025. >> Who owned the property that time? Is that an incompetent So the city by statute is required to to mail the notice to the location that's in the property. Appraiser's records at that time. So I don't on the closing we already signed the deed sand of the closing that properties are the be linked to When was the closing in March? Marceau? But again, they were the site. It was the citation was back in December, OK? And so the notice would have been sent to the owner. December, OK? then when we both the property, we check all the Deets, old Indian soil ever on the property. And there was nothing to cool those nothign. wouldn't necessarily be implied that we buy the property. We've already what violation they would this. It would necessarily be anything in the public records at that point because it another the orders had been entered at that point. >> There is that there is a state statute that requires any seller property to notify the buyer of a pending code enforcement case. I do if they did that and they didn't. But that requires him to do it. OK? you you may have move. May have some remedy high, some remedy with them, perhaps we will talk to. But then all fine is look to our company name so that some that's correct. Zm Capitol, if that's not your company, that's that don't. It doesn't affect you. But you know, we may. You may want to argue for me not imposing the lead on this property so that you know that. But that's the city's position. So what is the city's position on this case? >> Yes, sir, we do prepare by the inspector due to the national last year. Obviously Mr. Rocky did was unaware of the hearing, but and we had very large fine imposed with new one created with a potential fine of $14,800 with a new cost to date of 465. We understand response, you know, position on this. So we're not gonna be asking for any of that fine. asked to vacate the prior order, but we would like to still work at the city's cost of 4.65 to the taxpayers. the burden for this process. Alright, struck the other stances recommendation to me is for no fine. Just a >> assess costs for this process based on that. So the taxpayer doesn't bear the burden for itself. That's there. That sounds But I'll go with that. Enforces find costs. No, no fine. All of a kit. The priority that established a big fine. And so that will take care some. Thank you. I would hate Yes, sir. Have a good day. Take care. Thank you. thanks for coming in today. Thank you. >> It the it will be emailed to. >> They can help in the backfield tell it hopefully they've got your e-mail address and they can handle from there. Thank you. All right. We're going we're going to go next to City of Sarasota versus 15. 32 Main LLC case number 2025, 0, 0, 806, for the army. Take names again, sir. For the record you name Joseph McMIllan. McMillan's here Santa is Taylor Santa. Yes, you guys were here last time. river the process. I'll start with Mr. Spence for the city and then I'll come right back to the 2 of you. OK, perfect. Thank you, Mr. Spence, whenever you're ready, the results this is continue case for a violation of our Florida building code. 5.1 permits required. >> Where there's interrogations do without a permit. We do see some progress, though. We getting have some multiple recent failed inspections, but they are moving along. I would refer to Santos and Mr. McMIllan relation of a timeframe of when they think and then get everything finalized in closed out. Another hoop spokesperson is that you that be OK? >> So between the last meeting in this meeting, we didn't have finals. There were a few that There was an existing venue in the kitchen. Things like that. The need to be redone. So we've done that had to submit new plans. Got all that completed. So I actually requested for the Finals for tomorrow. >> Final final inspection. yes, right? Okay. Well, then I mean, how quickly you want. You want to bring back in a week or 2 or that we will be ready to go to a couple weeks to be great. let's do that a couple weeks. >> I just want to say some does happen. Will do. Well. The thank you. a July 9th. Be OK? Yep. >> As 9.30? yeah. Unite 30's on a bill for the OK? think. >> Are the sort content out to July 9th at 09:30AM, find a violation of 105, but one continue at this point. Hopefully we wrap it up and you come back. thank Thank you. Thank you. The day. Take care. We're going to go on record for city of Sarasota versus to one 12 Street LLC case number 2026, 0, 0, 0, for 7. For the record, no one's here on behalf of the respondent Lcso's City's position on this. >> The results this is a continuing case. We have for a violation of our zoning Code. Section 7 Dash 306 D for change too. Maine a required buffers shrubs and the landscapers of the parking lot. We're really in no further along. We have been prior hearings. So in will be here today to speak on a time frame. So give them one final chance. But we would also like to increase the daily running to 50 a day. >> Modify the prior order. >> Increase of daily life to 50 per day. UK to represent required to attend the next hearing. And what's available. >> We are looking at. August 6th at 8.45? continue that 8/6/2026 to 08:45AM. find a violation of 7, 3, 0, 6, V of the zoning code is continuing at this point in the cater representatives required to attend. ? >> Hello, I missed a lot of Richard Ellis serving as Prater City of Sarasota. How are you doing today? Okay. Good. If you're ready, we'll go on record for your case which is style. The city of Sarasota met him or case number 2025, 0, 0, 3, 1, 2, procedurally MS toll. I'll start with Mr. Spence's here for the City of Sarasota. outline the city's position on this and then I'll come right back to you. OK? Okay. All right, Mr. Spence, whenever you're ready, sir. >> Things are. So it's this is a key to case we have for for violations. Always start off with violation of their standard housing code through 5.15 of the fence and despair that remains out of compliance as of our inspection this week, the next to our city code violations for some being 16 dash. 47 accumulation of junk rubbish and trash. And next being 16 dash. 54 inoperable. Unlicensed vehicles. We were unable to verify. Those have been corrected. So as of right now on the city standpoint, as those who remain out of compliance as of this week and finally is our violation of our Florida building. Code 105, 0.1 is required for sure. Those installed without a permit. We are pleased for that. There has been a shed permit applied for and has been approved to be removed and it just needs its payment for issuance to have that all taken care of. difference Toler and relation if she's maybe have her son reach out to one of the city inspectors to do it on site to verify any and all violations that have been corrected as well as a time frame of when she thinks that she get the permit issued and the shed removed. Okay, miss taller than me. And your response to Mister Spence's comments. >> shed >> is gone. I making a comeback on Monday see that bring trash to the this week. They've got some tracking have to take out garbage people, but otherwise. >> trash and things. Donna spoke to be. >> All right. Did you have your inspectors phone number so you can call him and have him come each year for inspection. Okay. Great to give him a call. If you wouldn't. Hill the scheduled time with you. This can be for you to come out take a look. You confirm that all the violent violations have been corrected. >> okay. >> I stand corrected the violation of one of 5.1 is actually correct. As of today's date with a final inspection of 6.25. Okay. 6, 25, 5, 1, 0, 5, 1, of the Florida building code is correct on 6.25. >> And so all they need to do basically, I guess, is get out there and take a look at it. So I think we can solve this case if you'll just to make pick up the phone called inspector and schedule a time with him. Okay. We'll bring it back. One more time for We conclude the case of what's Mr. Spence. >> Needs. We are looking at July 30th that works for you. Ms Toler. >> July 30th, always a lead 30, okay. And then well, what I Monday's available, mornings or afternoons ring in a >> Afternoon. >> Would one 30 be OK? >> Well, continue out, July 32,026 at one, 30 PM on the violence. 60 Point of 60, 50 city code and real by 15 instead of housing continue at this point. 25 of 105, the part of the leak has corrected on 6 June 25th. >> We will hopefully wrap. wrap up the case then. So if you'll just may take that initiative in May, the inspector called think we can finish it up and and on July 30th. thank you. Have a good day to Care. Thank All right. By. Tosh a Charles. >> If your classic car. >> Charles, can you hear me? OK? >> I can. I'm going to take it off out of my go on become one 0nd that switch over. Up. All right. Perfect acting very good. This is >> didn't even matter. Hope is not every So thank you Collin Corps said thanks for allowing me to do this over the. >> Absolutely. Well, this is your case City of Sarasota versus Johnson. Case number 2026, 0, 0, 3, 2, 8, Mr. Charles, I'm gonna start with Mr. Spence's here for the City of Sarasota this morning. And while on the city's position on this and then I'll come right back to you, alright, dispense whenever you're ready, sir. >> Thank So this is a. >> A new case for a violation of our city Code Section 16 Dash 50 Peron license vehicles on the property. And I am please support the azure. Inspection of June 24th, the properties compliance that remains in compliance. OK? said that Mr. Spence indicating that the violation of 16, 50 was corrected with their inspection. >> On 6/24/2026, do you agree with that? >> Yet that correct. That. >> I will find them. The 16 50 w

Code Compliance Hearings

AGENDA

CODE COMPLIANCE HEARINGS

June 25, 2026

07:45 a.m.

11.

George T Strakosch Jr, 777 John Ringling Blvd #4H, Case No. 2026-00160

8.

Marta A Brand as Trustee of the Marta A Brand Trust dated August 18 1994 amended August 16 1996 and restated June 14 2018, 1719 7th St, Case No. 2026-00068

TO BE HEARD AT 8:30 AM

1.

James Ian Murrhee, 2526 S East Ave, Case No. 2025-00872

2.

Jose Margarito Flores Benitez, Luis Angel Flores Montiel, 3215 N Osprey Ave, Case No. 2025-01522

TO BE HEARD AT 8:45 AM

3.

Pat Echenique as to a Life Estate, Julia Vargara aka Julia E Echenique as to a Life Estate, Patricio Jose Echenique Vergara as Remainderman, Sebastian Echenique as Remainderman, Barbara Keenan as Remainderman, Caroline Echenique as Remainderman, 1146 53rd St, Case No. 2026-00409

4.

J C Barr, Emma Lou Barr, 2051 E Mabel Long Way, Case No. 2026-00037

TO BE HEARD AT 9:00 AM

5.

Great Lakes Develop Inc, Stephen D Rees - Registered Agent, 11 N Blvd of The Presidents, #7, #11, #17, Case No. 2025-00272

6.

Ignacio Ibarra, 7 S Florence Ave, Case No. 2025-01303

TO BE HEARD AT 9:15 AM

8.

Marta A Brand as Trustee of the Marta A Brand Trust dated August 18 1994 amended August 16 1996 and restated June 14 2018, 1719 7th St, Case No. 2026-00068

7.

Sidney L Reiners as Trustee of The Reiners Family Living Trust dated July 25 2024, 2625 Browning St, Case No. 2026-00303

TO BE HEARD AT 9:30 AM

9.

Hector M G Amezola, Ma Ascencion Amezola Dominguez, 2127 Leon Ave, Case No. 2025-01416

TO BE HEARD AT 10:00 AM

11.

George T Strakosch Jr, 777 John Ringling Blvd #4H, Case No. 2026-00160

10.

Frank W Walk, Gina M Walk, 659 45th St, Case No. 2025-01163

TO BE HEARD AT 10:15 AM

12.

Tracie Maria Giuffre, 414 Melody Cir, Case No. 2026-00486

Showing the first 24,000 of 76,037 characters. The full document is at the source.

? ? ? ? >> been here. >> We are on record for our code compliance. A special magistrate hearing set date is June 25th 2026 first case. We're going to take up on the docket today. A city of Sarasota vs Jose Margarita Flores Benitez, the details and Louise Angel Flores when T O. And his case number 2025, 0, 1, 5, 2, 2, the search for the wreckage. Your name, please. Lewis forth. All right. And sir, your name again for artists. So thank you. All right, gentlemen, your here before she kind of, you know, the procedure myself start with the city, a certain Mr. Spence today and come right back to OKC. Mister Spence, whenever you're ready, things. >> I think shows this is new case we have violations. First being city code section 16 Dash 47 as Ford violation, junk trash and rubbish. Police report that I want correct it with inspection of 6.23. next to our Florida building code 2023 Edition, one of 5.1 permits require where there isn't here. Damone some renovation work that was done without a permit. We do see some good progress. We do have a permit applied for as of 6.24. So it's that have them as a permit be reviewed and hopefully a shunt says enough and finally is going to be center housing code through a 5.15, which pertains to a fence that is in disrepair as Red speck shun this week. It is still disrepair. So I it for Flores. Is that when you think that the offense and repair and timeframe of for the work which permits issued. >> Okay. So apply for the permit and then we have this fence that you sell it. You address that. >> Yes, so the fence on. We didn't want to take it down because we applied for permit to because it's going to be a full fence and we didn't want to get in trouble with, you know, taking it now and then. Putting, you know, a new one without getting the permit issued for us. That's really why. Yeah. And then another reason why is because the neighbor next door has like a mesh wire one and it's like stuck and I couldn't get ahold of because they have to step on his property. >> Yeah, so that's All right. Let's you just continue to work on. Okay. So we it once the permit is issued this is there work to be done here? >> A lot. Yes, sir. any idea how long it's going to it would take once the permits issued. We should have it all done within. I would say work wise because it's literally everything like mechanical plumbing. It's going to take like 60 to 90 days. I would say we're quiet because it with inspections and everything. It it will be a little tricky. >> The 5 4 on this when 45 days, perhaps edge into the night get the permit issued over these moving along and as getting a status update. You know, if you're done by then even better, but more so to see where everything stands. We're looking right around August, 6th forward every perfect, same time first thing in the morning when perfect I 30. All right, well. Talking to the case out to 8/6/2026 at 08:30AM. >> Find a violation. 105, 0.1 of Florida building code continuing at this point 16 47 in compliance is June 23rd and through 5.15, the standard housing code is continuing and looks like we have the plants that like you're moving along and appreciate. We'll see you Thanks. Thanks for coming. Thank Have a good day to Thank you. >> We're gonna go back to City of Sarasota versus James. Ian Murray case number 2025, 0, 0, 8, 7, 2, it's my understanding is that stipulated continuance on this case? >> Yes, sir. The the response at last a conference and out of town conference attend to so the request of conference's Saudi did mention that they are working with the draftsman to take care of everything in relation to the work that have been done without a permit to correct both violations. So we're going push aside about 30 to 45 days. So push us to. July 30th at 8.30. >> All right. It's on walk into the case up to July 30, 30 and from the last order on the case invited violations are continuing in. That will take us off the record. All right. We're going to go on record for city of Sarasota Rivers. Versus patents, Chichi it make what was they were typing. >> unique that making. Okay it unique and really and truly park are my wife aka Julia. You can make as to a life estate, but you Jose Ick our as remainder to by Sebastien, Jake has remained a man. Barbara Kenan does remain here right now, Carolyn. And she Kaye has remained very good. We've got the whole. They are on the docket on the record there. This case number 2026 0, 0, 4, 0, 9, I believe you're here before, too. So you always we start off with the city of talk with them are Spence today and I'll come right back to OK? Thank Alright, dispense whenever you're ready. >> tell us this is a for a number of violations. which are standard housing code violations through 2.3 and through 3.3, which pertains not having acted water counting bathrooms you know, and despair. Those winds do remain in compliance as of our inspection of 5, 6, Then we have through 5.15, which is another standout center housing code violation for offenses in disrepair. And please where that was corrected with our inspection as of 6.23. And then next, we have city code section 16 Dash 47 for the Commission, junk rubbish and trash. That corrected with their inspection of 6.24. And the final one that was corrected is the city Zoning Code Section 2, 1, 4, B, which is potential vehicles. That one is correct as of 6.24. As well leaving only the 2, 1, 0, 5, 0, One permits required pertaining to the deck. in tears last next year, renovations that were down without a permit and the city zoning code's Section 6 dash to be for having too dwelling units on a property. And finally, the center housing code violations 305, 0.5, 4 stairs porches and pardon says which obviously will be corrected once the deck has been corrected. We do see some progress, but they do have some comments that were sent out for the interior exterior Some comments were sent out back in early April and then for the deck, we have some questions that were sent out in at the end May. need to be have responding to at least as of my notes of yesterday afternoon. >> But the further respondents in relation to when they think they get those or other contractor turned those into that we continues progress. >> my I know who the spokesperson is here, but >> his >> the. >> The one for the He turned in the stuff for the apartment. The one for the fans. That was based on out. >> That on it in a way. It seems in construction because we did just different. Different. The one size. >> The what the unit that was divided, the kitchen was taking out of that unit. had not known that that couldn't be tail so that there's only one 10 and now. >> The >> waiting for survey for some of that. >> this is done today. It said the son a foot for last. I have to going to is that and the door of site. I remote. Did they that? Because was Chapek. >> door >> inside the with the drible drywall and removed at the U.S. open. I removed the I remove everything right now. Is that unit? >> They they they they and the door is one under one parent. >> That their is I'm it's meant. Tom, why are you doing the work yourself or you Yeah, I don't. know it sounded me to just listen Mr. Spence, it sounds like they've. >> The building department sent over some requests for some more information from you. Only second made. So if you had a chance want the last one that figure does for I finally we got it because everybody was so busy 5, 0, 6, 0, 7, weeks, August. Okay. I know that thinks and we not with unite. Remove my sable. Put foot save. Don't miss no big. I remove my doctor to try to lure might dump of trying tease there. My name is since not. Is 7,000 found it might and the city talking about 7.6 thousand pounds. That's mean I can keep his know they are right now. But I that you hire afraid? Bulls. What? 8? Keep my candidate item on that one, too. I Apple does I this is perfect right now. I had the picture right here. have do they pose to be? We have depended for bank door. And that knowledge you need wear just regulation. I didn't nothing inside Donald. They do need 10 was about the room will say, well, what they're going to be tonight, obey that one because was 74. I think 20 years. It's my as I want to finish that alright, Mr. Spence, you have any questions. >> I guess just for the DEC portion, just a timeframe when they get that and ration turned in and it sounds like, you and please correct me if I'm wrong, that you may have already started the work to correct it, but that would still require parents return it back to the residential single family. You know, even if you had to do, that's a permit will be required. So we will for additional information on that. John. >> something he needs permit to? Because all they kept or removed which they to make one-third of their major construction them. He needs a permit. But if they're leaving it as is. Without it being 2 units without having 2 kitchens, then it's okay like he doesn't need another perm at. We have return it the back to a residential single family of kitchens on the property is basically having to drilling units, even though you have a doorway and >> tween. So you'll have to return it to a wet bar with a base not basing but a single bar sink of that nature. So you can have like a full kitchen. See, there's no cooking facilities. So if you want to have like lack of a better word lounge area, that's totally fine. It just has to be permitted for >> Okay. So like if they're removing stove, so no longer counts, it's to catch an do you need a permit? It to leave? That asked answered you need a permit to remove all the cabin at eye. haven't it have to be removed. asked. >> front comes on remove per se unless you want them remove its just they have to be permitted to should reflect what's currently there. So once the the stoves route, that's awesome. Amazing. That will help no further along not being considered a kitchen facility. It's now has to be permitted to show like the cabinets, their the plumbing that's there as well as an electrical that may have an added or changed. they need to another permit to show that it's one unit that the kitchen was. It's no longer being used as a second. >> is this is not the department. Okay. This isn't the department is that is the same parent Duck remote and grace. Does door. >> for and this is that I got make sure that's under the kitchen facility as well. Second, right now is the one to 10 when 9 year-old 2 19 right now. >> I keep the dates sync. I need the calving it because I don't want to remove the coveted want to spend more money and that I removed the for each. I removed the electric-powered from there to I. >> All right. Well, whatever this gets sorted out over the building department here. So let's let's push this out, too. 45 60 days you know what a for the king 45 days live and work through the process. Get inspections called in so that they can, you know, take some time and if by does pop up, they can work through the process. >> That will push us Tuesday to August 6th. sure are. Yeah. that's always a Thursday. Deeper for mornings or afternoons. >> And the house is pretty close to He had big warning more and you have summer time 8.30. >> That is coming here are doing the inspection there. It will be here at them. >> into the case out to 8/6/2026 08:30AM. Just to recap recap, here are the 302 0.3, a standard housing code was correct on May 6. Real five-fifty understand how Cinco was quick to 6.23, 60. 47 corrected with the inspection 6.24. 3 of 5.5 to continue with the standard housing code. The 6 to be still continuing violation of the zoning code 105, 0.1 of the Florida building code is continuing. One of 5.1 is that applies to the exterior renovations is still continuing 7 to 14 be was correct 6.24. And looks like the 3.3 of the state housing code was correct on May 6, 2000. 26, all I'm doing today is continually case out. To give you a chance work yourself through the building permit process. I would just stay in touch with them in terms of what they need in terms of coconuts, probably the key to this. Okay. You will sort you work your way through it. thank you very much. Have a good You know Thank very much. Have database. >> 2. I will go next to City of Sarasota versus JC Bar in him up. Lou Bar case number 2026, 0, 0, 0, 3, 7, And for the record, no one's here on behalf of the respondents. So. Let me get the city's position on this case. >> Things are. >> Mr. Price that's close as our last hearing that it did not show last one. The 16% 16 49 be still remain in compliance with our inspection this week. >> Then >> to our knowledge are still working to the probate Give them one more chance to hopefully come in you know, speak up on where that stands because that I know they're trying to wait take ownership before you start putting in funds to repair the property. So part push is on 30 days to just see where everything stands. Okay. >> All right. Well, was proposed time and date on this one. Yes. We are looking at. July 30th at 10. 45? Welcome to the out to 7/30/2026 find 16, 40 subsidy. 49 be that could work. Corrected with inspections back in March. 17th the 26 there remaining violations cited are continuing and that'll take us off the record. All right. We'll go next to City of Sarasota versus Great Lakes development Kim's case number 2025, 0, 0, 2, 7, 2, Catherine Andrews is here representing Great Lakes. And Sanders. As you know, our start with the city of start with suspense today and come right back to you, Mr. Spence, whenever you're ready, Thimerosal us, this is a continued case. You have for a violation of our one of 5.1 permits required. >> Where there's a man or a hurricane renovations permit and sorry, hurricane renovations done without a permanent. in years and years, it seems that things are going more difficult because did have permits applied for and it's where process, but they're having to split up since about 3 or 4 units that are within that whole thing. They're having to develop every single one through a permit process to ensure that its OK, you know, balance and just speak up on that of a time from when she thinks get everything turned or applying everything turned in, OK, sounds like there's some complexity to the permitting processes that with. >> Yeah. So there's 3 different units they had applied one permit application for all 3 units and they recently received comments from the building department requesting for those applications to now be divided up there. See those comments this week. So obviously we're going to request an additional time to go through that process. After speaking with the contractor, I believe 60 days is what will need just to allow, you know, the typical 30 day period that the building department usually takes to provide comments back for permitting and then also give a little bit of a buffer in case there's any additional revisions that may arise with those new permits. >> was reasonable to me. So we want to just push shoppers 60 days. Yeah, cover with that. We're looking at August 27th that were says Anders, mornings afternoons. Mornings, please it 30. Yes, please. Cannot. August 27th at 8.35. The violation. One of 5.1 continuous Sanders. in and out today. So thank you. Appreciate it. >> Thank Thank Thank you so much. Good to see you. All right. we're going to go next to City of Sarasota versus the not show up tomorrow and it's case number 2025, 0, 1, 303. for the record, I'll let you identify yourself to Go ahead. >> Jeanie >> The >> You've been here before, you know the process. start with Mr. Spencer, the city and come right back to you. >> Mr. Spence, whatever your race. >> If you think Michelle U.S., this is a continued case. We have 4, 3 violations for Sunday. 105, 0.1 per it's required where there were some uncommitted enclosure of a carport conversion to a dwelling unit without a permit. Next is city zoning Code section 2, 0, to be very multiple dwelling units on the property. And finally, it's city zoning code. Section 7 Dash 602 cz. 2.1 C which pertains to near having and the principal dwelling unit Northey excess are doing it being. >> Lived in by the main property owner. As of right now, everything still ongoing. We do see a permit applied for that sneeze and corrections. >> It appears and I'll the of ours correct me if I'm wrong, but appears that they're trying to downgrade the 2 into one dwelling unit. But that would still not be sufficient enough to correct all violations due to the fact that neither the principal or the accessory dwelling unit would be owner occupied. So they would it would have to be either someone moved in as well as his permit be closed down. Or the whole property be converted back to a residential single family dwelling. But I'll let the of our speak up on that where things stand. >> OK, I'm hopeful that you've had this discussion with the building department already. You know what you need to do or what has? >> they just send in the mine. They need some modification. >> Or. >> And something more in our engineers working on it. >> Okay. >> was gonna have to assume the with has to be done. So I guess we just pushing this without as well as that we're doing here in U.S. are probably looking like 30 35 30 to 45 days to allow for process work and get everything moving forward get a 8 that will push us to July 30th York. 72. Mornings or afternoons. >> Morning morning and wanted to 9.15. >> Spilled into the KSAT July 32,026, 09:15AM, by the violations continue 105, 0.1 was of the Florida building code 6 to be in zoning code as well as 6, 7, 6, 0, 2, CC 2.1 C of the zoning code in. >> Good luck with this, OK? thank you. just one question. If we have to go out of the country and we can come and estate what we should do. >> You can't come do notify and the coach staff of the be year inspector won the ladies the back to say we can do it with are you able telephone conference? Warm or was like a stipulated continuance just to say always an out of the country recall of the country. You know, we back on this state so we can rearrange a new Thank you so much. Thank you. Have a good day. Take care. Thank you. And I think. >> Are waiting on record for city of Sarasota Reiner's as trustee. riders family living Trust dated 7/25/2024 for the record, Charlotte, you identify yourself and your connection to the responded. Jon Traxler and just a friend of the owner trying to help out. All right here with their authority. Obviously. All right. So I'll start procedure. Let's start with the City of Sarasota with Mr. Spencer on the city's position on this. Come right back. Mr. Spence, whenever you're ready, sir, I think cells. This is case we had for a violation of our >> city code section 16 dash. 49 be for evidence. Franco rose on undeveloped property and please report with our inspection as of June 5th, the properties now in compliance remains in compliance. Alright, district some of the yes. And so you agree with that. I will find 16. 49 be the city code was corrected with the city's inspection on 6/5/2026 takes us to the issue, fines and cost the city have a recommendation on that issue. We do your We had access to a pretty large fine. Last hearing is is there's no attending. >> So the potential fines accrued upwards to $15,400 with 4 inspections of 465 cities. Not to be asking for all that fine. It seems that once again where is understood, knew and understood what to do. So be asking for a one-day 5, $100 as well as the costs of 4.65 and make it a priority. All Mr. Truck study understand that recommendation to I do understand, you know your response to it. >> We have one. Yes, thank you. >> Will the code violation was sent to the and the fine was sent to previous owner who had passed away. The current owner purchased the home in January, but it was never inspected during that time. You know, all the issues have been corrected. And requesting to move all charges. >> gonna go with the city's recognition because it's a generous one. Sodium from 15 $100. I'm gonna go one day fund $100 cost of 4.65. So the taxpayer doesn't the burden for this process, but that and then all of a Kate, the priority, which is established that. Large fines and so that'll wrap it up. And thank you for coming today. Appreciated taking good day. >> would like to but he's in a hearing for the next 30 minutes. And he said are. So from 9 59 45, he asked if we could have an extension for that reason being. He's my attorney that have my brother evicted from that house which caused all the problems. >> I have no problem. You want to wait and all right. We're going to go on record for Sur for the first march to a brand is trusting them a friend. >> Trusted August 1919, 94 a mid August 16, 19 Isaacson. You stated June 14, 2018 is case number 2026, 0, 0, 0, 6, 8, Ross is here on behalf of MS brand of So won't. Brand has passed away locate that suspect. That was her mother. And this yet the name your name. >> Cristina Brand could Inc. That's right. get the last thing now. >> Ku D I C K. >> I see a very good. All right. Very good. Will procedurally. You know, I we start with the city saw start with Mr. Spence can go to Mr. Ross and so Mr. Spence, whenever you're ready, sir. >> Themselves, this is a continue because we had for a violation of our student housing code violation. One on 1.6 for a pool that was in disrepair are not being maintained. I am pleased report that the violation was corrected as of April 21st and has remained in compliance ever sense. >> OK, and Mr. Ross, you're in agreement with that. >> in just as a little background. So the city all understand the occupant of the resident was her brother who obviously did not take care of the property. We unfortunately had to go through an eviction process to get brother out, which we've successfully accomplish, allowed Kristina the opportunity to fix up the house. And so that's what we've done. And so we asked for obviously the leniency of the city understanding that the situation involved. >> Well, I think I remember this story with foods litigation to get him out, eccentric cetera. That was a different case. And so with the cities the city's recommendation on this is what exactly Mr. >> Yes, sir, I just spectrum for The conversation, As mention of the difficulties that the response of had to give the property compliance. So as you know, this was a repeat violation, which is why the fight occurred so much. We had a potential fine of $114,500 on the city's not asking for any of that fine due to the circumstances that Mr. And has a dealt with. We would only like to recoup the costs of 4 6500 sci-fi 40 so that actors brother full burden for this process and vacated by order. >> Struggling to get your response to that, that that would be fine with us. All right. I would be a little better going to 50 on that costs. And thank you. Thank you so much. bake me a vacate the You know how they could deprive yourself, take care of it. And good luck. Thank you very much. Thank you so much the day. Take care. I appreciate your time. Thank you, too. One record for city of Sarasota verse factor the and Austin would them in this. It's number 2025, 0, 1, 4, 1, 6, For the record. No one's present on behalf of respondents. So its city's position on this case. >> To this is case we have for 3 violations. First one being city code sections. 16 Dash. 47, which remains in compliance is or inspection back on 3, 3, and the final 2 is seen as a city code section 16 Dash 50. For a number one license vehicle down still remains out of compliance. And finally, the Florida building code one of 5.1 permits require a dozen fence installed without a permit. We're still not seeing any movement on the permit as of special this week. We're hoping that so the attendance as it was last hearing. So again, that of the doubt as to push us out one more time. But we're not seeing any progress or

All meeting actions

Source coverage incomplete

31 meeting items captured. The published sources do not prove this is the complete docket.

Showing 12 of 31

Browse by category31 actions

Official record

ArtifactSourceState
Agenda packetNot published in the sources we holdunavailable
BudgetNot published in the sources we holdunavailable
Action agendaNot published in the sources we holdunavailable
MinutesNot published in the sources we holdunavailable
Transcript or captionsSource recordingread transcript
AttachmentNot published in the sources we holdunavailable

Coverage and corrections

Records considered

  • Code Compliance Hearings
  • Code Compliance Hearings — Closed Captions

Not claimed by this page

  • Verified meeting decisions with item-specific public-source evidence
  • A medium- or high-grade, non-procedural agenda-item analysis for the meeting digest
  • A source-grounded next meeting date
  • Official outcomes have not been published.
  • The available transcript has no reliable timestamps.
  • Transcript coverage is partial.
  • Speakers have not been reliably matched to public profiles.
  • Named people and places have not been reliably resolved.
  • An individual roll-call roster is not available.
  • Low-grade, ungraded, procedural, or superseded items remain in the complete agenda inventory rather than the meeting digest.

No source correction or revision history is recorded for this meeting. A corrected artifact will appear here as a new version rather than replacing what is shown above.

Canonical record: f69086672c52e68654ef9aff475bb675. This page changes as stronger artifacts are published; it never overwrites an agenda with minutes.

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record