POLISCOPE
Back to feed

The civic record

Read. Follow. Verify.
Passed

University Avenue and W 13th Street Safety Study and Design Selection

Original title: University Avenue and W 13th Street Safety Study (B) This item relates to the overview of the corridor safety study recommendations and selection of preferred Complete Street design concepts for design and implementation. The study was prepared by HDR Engineering Inc. under contract number 2018-049-AP.

Record date · October 21, 2021

Track this bill to get notified when it advances a stage. One tap to stop, anytime.

Public stanceCommunity reactions are separate from the official record and reporting.

What This Bill Does

The city has approved the safety study recommendations and selected preferred design concepts for the University Avenue and W 13th Street . The project aims to implement '' designs to improve safety in the area.

Why it matters

The city will move forward with specific infrastructure changes to the University Avenue and W 13th Street based on a study conducted by HDR Engineering Inc. under contract 2018-049-AP.

Who It Affects

Groups the bill's text affects, as described in the record. Being affected is not a position for or against it.

Directly affected

Residents and commuters using University Avenue and W 13th Street

These individuals will experience changes to the street design and infrastructure following the implementation of the selected concepts.

Directly affected

HDR Engineering Inc.

The firm is the contractor responsible for the safety study under contract 2018-049-AP.

Key Facts

  • The city approved the safety study recommendations for the University Avenue and W 13th Street corridor.
  • The city selected preferred 'Complete Street' design concepts for future implementation.
  • The safety study was prepared by HDR Engineering Inc.
  • The study was conducted under contract number 2018-049-AP.
Show all 6 facts
  • The legislative item was introduced on September 9, 2021.
  • The status of the item is marked as 'Passed'.

Frequently Asked Questions

What are 'Complete Street' design concepts?
The document refers to them as the preferred design concepts selected for implementation to improve safety.
Who conducted the safety study?
The study was prepared by HDR Engineering Inc. under contract number 2018-049-AP.

What else do you want to know?

News Coverage

No news coverage found yet. Articles are indexed twice daily.

Full breakdown

Who this bill affects and the strongest case for and against it, written only from the bill’s own text.

Discoveries

1 pattern noticed across the record

Patterns POLISCOPE noticed across the record. These are observations to investigate, not conclusions.

policy shift90% confidence

Adoption of Complete Street Standards

The city is formally moving toward 'Complete Street' design standards for major corridor improvements.

Sources

Open source document

gainesville.legistar.com

Analysis Score

0–100
  • Significance40
    How much this matters to a regular citizen
  • Controversy10
    Intensity of disagreement among stakeholders
  • Entertainment5
    Compellingness for a non-policy-wonk reader
  • Buzz15
    Current news / social attention level

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record