Proposed Zoning Waivers for Target of Ocala Site Plan

Original title: Target of Ocala- Major Site Plan #33553 - Waiver to Major Site Plan in Review Parcel #35300-001-17, 35300-000-16 #WaiverPIR-000794-2026 Upham, Inc. LDC 6.8.6.K (2) - Buffers CODE states B-Type buffer shall consist of a 20-foot wide landscape strip with a buffer wall. The buffer shall contain at least two shade trees and three accent/ornamental trees for every 100 lineal feet or fractional part thereof. Shrubs and groundcovers, excluding turfgrass, shall comprise at least 50 percent of the required buffer. APPLICANT states in lieu of masonry wall, provide 6' opaque PVC fence within type "A" buffer per 6.8.6.l. (1). The fence will match the existing Walmart fence. The fence will run along the boundary for approx. 1,000 LF per Exhibit 1. Lots 2 and 3 adjacent to Target will provide separate buffers per table 6.8-2. LDC 6.13.7 Geotechnical Criteria CODE states Minimum requirements. (1) Depth. Soil test borings shall be performed to a minimum depth of 10 feet below the proposed finished grade of the bottom of all retention/detention areas or the permanent pool elevation and once the data has been obtained the hole shall be backfilled and compacted. (2) Number of tests. At least two tests shall be performed within the boundary of each proposed retention/detention area. For each half acre of pond bottom area and for each lineal retention/detention area of 250 feet, an additional test shall be conducted. The County Engineer or his designee, may require additional tests if the initial tests indicate the need for them. (3) Infiltration/permeability tests. For retention/detention areas utilizing percolation or infiltration in the design model, there shall be a minimum of two infiltration rate tests for each retention/detention area. Data used for soil permeability testing or infiltration analyses for the retention/detention areas shall be signed and sealed by a professional engineer or professional geologist for both data and procedural accuracy. (4) Aquifer parameters. The estimated seasonal high ground water elevation and confining layer shall be clearly identified. APPLICANT states Borings indicated on sheet C200 per the Geo-Tech report were drilled depths indicated except where encountering resistance due to limestone layer. Borings not meeting the minimum 10' below pond bottoms are indicated on sheet C200. Request waiver depth, use borings performed as sufficient information.

Record date · June 1, 2026

Track this bill to get notified when it advances a stage. One tap to stop, anytime.

Public stanceCommunity reactions are separate from the official record and reporting.

What This Bill Does

The developer for the Target of Ocala project is requesting two waivers from local land development codes regarding landscaping buffers and geotechnical soil testing requirements. The request is currently under review by the Development Review Committee.

Why it matters

This decision determines whether the Target development can proceed with a PVC fence instead of a masonry wall and whether existing soil test data is sufficient despite not meeting the standard 10-foot depth requirement.

Who It Affects

Groups the bill's text affects, as described in the record. Being affected is not a position for or against it.

Directly affected

Upham, Inc.

The applicant must receive approval for these waivers to proceed with their current site plan design.

Directly affected

Nearby property owners

These residents are adjacent to the site and will be affected by the type of buffer wall and landscaping installed.

Key Facts

You don't have to trust us. Each fact below is taken straight from the official document - click any one to see the exact passage, highlighted in the original.

Frequently Asked Questions

What is the developer asking to change regarding the property fence?
They are asking to use a 6-foot opaque PVC fence instead of the masonry wall required by the current land development code.
Why is the developer asking for a waiver on soil testing?
They encountered a limestone layer that prevented them from drilling the required 10-foot deep soil test borings.

What else do you want to know?

News Coverage

No news coverage found yet. Articles are indexed twice daily.

Full breakdown

Who this bill affects and the strongest case for and against it, written only from the bill’s own text.

Discoveries

1 pattern noticed across the record

Patterns POLISCOPE noticed across the record. These are observations to investigate, not conclusions.

policy shift70% confidence

Standardization of Commercial Buffers

The applicant explicitly references matching the existing Walmart fence, suggesting a pattern of using PVC fencing for commercial buffers in this area despite code requirements for masonry.

Connected Entities

Major Site Plan #33553, Upham, Inc., Development Review Committee and 2 more

Sources

Open source document

webapi.legistar.com

Analysis Score

0–100
  • Significance30
    How much this matters to a regular citizen
  • Controversy20
    Intensity of disagreement among stakeholders
  • Entertainment5
    Compellingness for a non-policy-wonk reader
  • Buzz10
    Current news / social attention level

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record