NASA Contract for Ares I Rocket Development
Track this bill to get notified when it advances a stage. One tap to stop, anytime.
The Frame
This contract directs $10.51 billion in federal funds to The Boeing Company for the development of critical flight hardware for the rocket program.
Potentially affected actors named in the source documents. Mention is not a position.
The Boeing Company
The company is contractually obligated to perform manufacturing, assembly, and engineering services for the Ares I upper stage.
National Aeronautics and Space Administration
The agency is responsible for the oversight, integration, and funding of the Ares I development program.
No recent stage movement in the current record.
Next step not available in the current record.
Summary
Key Facts
- The contract value is $10.51 billion.
- The Boeing Company is responsible for manufacturing and assembling the Ares I upper stage, including the instrument unit and booster separation motors.
- The upper stage provides the second stage of flight, roll control during the first stage burn, and guidance/navigation/avionics functions.
- NASA retains responsibility for overall vehicle integration, design requirements, and government-furnished property like the upper stage engine.
- The contract baseline design is defined in the USO-CLV-SE-25704 US Design Definition Document.
- NASA will transition manufacturing, logistics, configuration management, and sustaining engineering to Boeing no later than 90 days after specific project milestones.
- Manufacturing and assembly transition occurs after the Preliminary Design Review (PDR).
- Logistics support infrastructure transition occurs after the US PDR.
- Configuration management transition occurs after the Critical Design Review (CDR).
- Sustaining engineering transition occurs after the Design Certification Review (DCR).
- Following the DCR, NASA shifts to an 'insight' role, while Boeing assumes responsibility for production and operations support.
Why It Matters
This contract directs $10.51 billion in federal funds to The Boeing Company for the development of critical flight hardware for the rocket program.
Frequently Asked Questions
What is the role of The Boeing Company in this project?
What is NASA's role once the contract is underway?
News Coverage
Discoveries
Patterns POLISCOPE noticed across the record. These are observations to investigate, not conclusions.
Transition of Responsibility
The contract explicitly defines a phased transition of operational control from NASA to the contractor based on specific design review milestones.
Connected Entities
Sources
www.usaspending.gov
Analysis Score
0–100- Significance90How much this matters to a regular citizen
- Controversy20Intensity of disagreement among stakeholders
- Entertainment10Compellingness for a non-policy-wonk reader
- Buzz30Current news / social attention level
Publisher tools