Waiver Request for Residential Construction Site Plan (Parcel 1241-002-000)

Original title: New Residential Residence - Waiver to Major Site Plan Parcel#: 1241-002-000 #STA000212 JCH Consulting Group, Inc. LDC 2.21.1(A)(1) Applicability CODE states A.A Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds:(1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet. APPLICANT requests a waiver to a major site plan for new construction of a residential residence that will exceed 9000 square feet of impervious. Onsite stormwater controls will be constructed to prevent runoff on adjacent parcels.

Record date · January 26, 2026

Track this bill to get notified when it advances a stage. One tap to stop, anytime.

Public stanceCommunity reactions are separate from the official record and reporting.

What This Bill Does

The applicant, JCH Consulting Group, Inc., is requesting a waiver from the requirement to submit a for a new residential construction project. The project exceeds the 9,000-square-foot impervious surface threshold that typically triggers a formal site plan review.

Why it matters

The Development Review Committee will decide whether to bypass standard site plan review requirements for a residential project that exceeds local impervious surface limits, which impacts how stormwater runoff is managed on the property.

Who It Affects

Groups the bill's text affects, as described in the record. Being affected is not a position for or against it.

Directly affected

JCH Consulting Group, Inc.

The applicant is seeking a waiver from standard site plan review procedures for their construction project.

Directly affected

Adjacent property owners

These residents are affected by the proposed installation of onsite stormwater controls intended to manage runoff from the construction site.

Key Facts

  • The applicant is requesting a waiver from the Major Site Plan requirement for a new residential residence.
  • The proposed construction exceeds the 9,000-square-foot impervious surface threshold defined in LDC 2.21.1(A)(1).
  • The project includes the construction of onsite stormwater controls intended to prevent runoff onto adjacent properties.
  • The application is filed under number 2026-21895.
Show all 6 facts
  • The request is currently listed as 'Agenda Ready' for the Development Review Committee.
  • The application was introduced on January 23, 2026.

Frequently Asked Questions

Why is a Major Site Plan usually required for this project?
Under 2.21.1(A)(1), a is required if proposed improvements result in of 35% or more of the site area, or exceed 9,000 square feet.
How will the project manage water runoff?
The applicant plans to construct onsite stormwater controls to prevent runoff from affecting neighboring parcels.

What else do you want to know?

News Coverage

No news coverage found yet. Articles are indexed twice daily.

Full breakdown

Who this bill affects and the strongest case for and against it, written only from the bill’s own text.

Sources

Open source document

webapi.legistar.com

Analysis Score

0–100
  • Significance30
    How much this matters to a regular citizen
  • Controversy10
    Intensity of disagreement among stakeholders
  • Entertainment5
    Compellingness for a non-policy-wonk reader
  • Buzz5
    Current news / social attention level

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record