POLISCOPE
Back to feed

The Frame

What this does

The project will physically alter the 22-mile transit corridor through five municipalities, impacting local transit access, neighborhood connectivity, and public infrastructure for residents in Commission Districts 7, 8, and 9.

Who is mentioned in the record

Potentially affected actors named in the source documents. Mention is not a position.

Residents of Homestead, Florida City, Cutler Bay, Palmetto Bay, and Pinecrest

These residents will have the trail constructed through their municipalities, affecting local transit access and neighborhood infrastructure.

Commuters using the Metro Express Bus Rapid Transit

Commuters will have new first-and-last mile connections to transit stations via the trail.

What changed

No recent stage movement in the current record.

What's next

Next step not available in the current record.

Summary

Miami-Dade County is developing a 22-mile trail along the South Dade Transitway, connecting Homestead to the Dadeland South Metrorail Station. The project aims to improve pedestrian and cyclist safety, increase tree canopy coverage, and provide better access to the new Bus Rapid Transit (BRT) service.

Key Facts

  • The South Dade Trail is a 22-mile shared-use path running from SW 344 Street in Homestead to the Dadeland South Metrorail Station.
  • The project is currently in the design phase, with 30% of the design work completed.
  • The trail will feature a 48% increase in tree canopy coverage.
  • The trail runs through Miami-Dade County Commission Districts 7, 8, and 9.
  • The project is designed to integrate with the new Metro Express Bus Rapid Transit (BRT) service.
  • The trail will connect to 'The Underline' path at Dadeland South Station.
  • Construction will be implemented in segments based on available funding.
  • Public engagement meetings were held on May 6 and May 7, 2025.
  • Technical elements include lighting, drainage, seating, water bottle filling stations, and dog waste stations.
  • The project is part of the Rails-to-Trails Conservancy Miami-Dade County Parks and Open Spaces System Master Plan.

Why It Matters

The project will physically alter the 22-mile transit corridor through five municipalities, impacting local transit access, neighborhood connectivity, and public infrastructure for residents in Commission Districts 7, 8, and 9.

Frequently Asked Questions

How long is the South Dade Trail?
The trail is approximately 22 miles long.
Who can I contact for more information?
You can call 1-888-44-TRAIL (448-7245) or email questions@southdadetrail.com.
What is the current status of the project?
The planning phase is complete, and the design phase is currently underway (30% complete).

News Coverage

No news coverage found yet. Articles are indexed twice daily.

Sponsors

Discoveries

Patterns POLISCOPE noticed across the record. These are observations to investigate, not conclusions.

policy shift90% confidence

Integration of Transit and Active Transport

The project explicitly links the development of a pedestrian/bicycle trail to the success of the new Bus Rapid Transit (BRT) service, signaling a shift toward integrated multi-modal transit planning.

Connected Entities

locationPinecrestMunicipality along the trailMap →
locationSW 344 StreetSouthern start point of the trailMap →
locationDadeland South Metrorail StationNorthern terminus of the trailMap →
locationHomesteadSouthern terminus of the trailMap →
other701 NW 1st Court, Suite 1700, Miami, FL 33136Department office addressMap →
locationOvertown Transit Village NorthDepartment office addressMap →
locationVillage of Palmetto BayMunicipality along the trailMap →
locationFlorida CityMunicipality along the trailMap →
personStacy L. MillerDirector/CEO of Transportation and Public WorksMap →
locationCutler BayMunicipality along the trailMap →

Sources

Open source document

www.miamidade.gov

Analysis Score

0–100
  • Significance65
    How much this matters to a regular citizen
  • Controversy10
    Intensity of disagreement among stakeholders
  • Entertainment5
    Compellingness for a non-policy-wonk reader
  • Buzz20
    Current news / social attention level

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record