POLISCOPE
Back to feed
Part ofZoning →

The civic record

Read. Follow. Verify.
Local Impact

Waiver Request for Berean Baptist Church Building Addition

Original title: Berean Baptist Church Addition- Waiver Request to Major Site Plan Parcel #: 2335-001-001 # WaiverSTA-000849-2026 Michael W. Radcliffe Engineering LDC 2.21.1.A(1) - Major Site Plan CODE states a Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: 1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet. APPLICANT requests a waiver to a Major Site Plan for the construction of a new 6,000 SF building addition with associated grading, stormwater controls, and erosion control measures. The proposed building will serve as an accessory recreation/gymnasium facility for existing members of Berean Baptist Church. No additional parking is required or proposed. As a condition of the waiver, we would provide signed and sealed stormwater calculations demonstrating that the proposed improvements meet applicable stormwater control requirements.

Record date · June 29, 2026

Track this bill to get notified when it advances a stage. One tap to stop, anytime.

What This Bill Does

Berean Baptist Church is requesting a waiver from the standard '' review process for a proposed 6,000-square-foot gymnasium addition. The applicant argues that the project should be exempt from the full review process, provided they submit certified stormwater control calculations.

Why it matters

The Development Review Committee must decide whether to bypass standard site plan review requirements for this 6,000-square-foot construction project, which would otherwise be triggered by the site's total impervious surface area exceeding 9,000 square feet.

Who It Affects

Groups the bill's text affects, as described in the record. Being affected is not a position for or against it.

Directly affected

Berean Baptist Church

The church is the applicant seeking a waiver to bypass standard site plan review procedures for their construction project.

Directly affected

Development Review Committee

The committee is responsible for evaluating the waiver request against local development code requirements.

Key Facts

  • The applicant is requesting a waiver from the Major Site Plan review process for a 6,000-square-foot gymnasium addition.
  • Current code requires a Major Site Plan for improvements exceeding 9,000 square feet of impervious ground coverage or 35% of the site area.
  • The project includes associated grading, stormwater controls, and erosion control measures.
  • The applicant proposes to provide signed and sealed stormwater calculations as a condition of the waiver.
Show all 7 facts
  • The project does not include or require additional parking spaces.
  • The facility is intended for use by existing church members.
  • The request is filed under case number WaiverSTA-000849-2026 and parcel number 2335-001-001.

Frequently Asked Questions

What is a Major Site Plan?
It is a formal review process required by the local development code for construction projects that exceed specific size or impervious surface thresholds.
Will this project add more traffic or parking needs?
The application states that no additional parking is required or proposed for the new gymnasium.

What else do you want to know?

News Coverage

No news coverage found yet. Articles are indexed twice daily.

Full breakdown

Who this bill affects and the strongest case for and against it, written only from the bill’s own text.

Discoveries

1 pattern noticed across the record

Patterns POLISCOPE noticed across the record. These are observations to investigate, not conclusions.

policy shift90% confidence

Waiver for Stormwater Compliance

The applicant is attempting to substitute a full site plan review with a specific commitment to provide certified stormwater calculations.

Connected Entities

Michael W. Radcliffe Engineering, Development Review Committee, Berean Baptist Church
OrganizationMichael W. Radcliffe Engineering“The engineering firm representing the applicant.”Map →
OrganizationDevelopment Review Committee“The body responsible for reviewing the waiver request.”Map →
OrganizationBerean Baptist Church“The applicant and property owner requesting the waiver.”Map →

Sources

Open source document

webapi.legistar.com

Analysis Score

0–100
  • Significance20
    How much this matters to a regular citizen
  • Controversy10
    Intensity of disagreement among stakeholders
  • Entertainment5
    Compellingness for a non-policy-wonk reader
  • Buzz5
    Current news / social attention level

Publisher tools

Share or embed this record

POLISCOPE publisher tools

Share or embed this record